Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Lead-Zinc Ore Underground Mine from 1.08 to 2.0 million TPA (Total Excavation 2.48 million TPA) & Lead Zinc Ore Beneficiation from 1.2 to 2.5 million TPA at Rajpura Dariba Mine of M/s Hin
(b)Name of the Company / Organisation HINDUSTAN ZINC LTD RAJPURA DARIBA MINE
(c)Registered Address Hindustan Zinc Limited, Rajpura Dariba Mine,Tehsil - Railmagra, District - Rajsamand, Rajasthan,Rajsamand,Rajasthan-313211
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Ram Murari
(b)Designation (Owner/ Partner/ CEO) UnitHead
(c)Address Hindustan Zinc Limited, Rajpura Dariba Mine,Tehsil - Relmagra, District - Rajsamand, Rajasthan,Railmagra,Rajsamand,Rajasthan-313211
(d)Pin code 313211
(e)E-mail ram.murari@vedanta.co.in
(f)STD Code. 2952(f)Telephone No. 265164
(g)Fax No. 265143
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity2(b) Mineral beneficiation
(b)Category A
(c)Proposal Number IA/RJ/MIN/86877/2018
(d)Master Proposal Number(Single Window) SW/86871/2018
(e)EAC concerned (for category A Projects only) Non-Coal Mining
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. M.L.No.166/2008
(b)Pincode 313211
(c)Bounded Latitudes (North)
From
Degree 245540
Minutes
Second
From
Degree 245749
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 740657
Minutes
Second
From
Degree 740841
Minutes
Second
(e)Survey of India Topo Sheet No. 45 K/4 , 45 L/1
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 488
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 488
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Rajasthan
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11015/84/2018-IA-II(M)
(c)Date of Issue of TOR 27 Sep 2018
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 07 Jan 2019
(c)Date of Issue of EC 13 Apr 2020
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :28 Sep 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :29 Oct 2018
Distance of Public Hearing Venue from the Proposed Project :0.1
Rajpura Dariba mines campus
State :Rajasthan
District :Rajsamand
Tehsil :Railmagra
Village :Rajpura Dariba
602Employment an additional infrastructure development demand by community like water supply, schools etc.District Collector
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Lucknow
(iii)Letter No. IV/Env/R/Ind-115/758/2009/503
(iv)Status of Compliance Partially Complied
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Sep 22 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Lead Zinc Ore underground mining1.080.922Othersmillion tonnes per annumOthersShaft and Ramp
(2.)Lead Zinc ore Beneficiation1.21.32.5Othersmillion tonnes per annumRoadShaft and Ramp
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Lead Zinc ore beneficiation plant1.21.32.5
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception Copy of Consent to Operate
(iii)Date of Issue 23 Apr 2015
(iv)Valid Upto 28 Feb 2018
(v)File No. F(Mines)/Rajsamand(Railmagra)/1(1)/2008-2009/278-2
(vi)Application No. 2015-2016/Mines/2295
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 960
(b) Funds Allocated for Environment Management (Capital) (in Crores) 110
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 5.0
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 6.95
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 270
(b)Existing quantity of raw material/fuel 180
(c)Total quantity of raw material/fuel 450
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)HSD450OthersKL/MONTHIOCL, RelienceRoad300 MoUCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2017 To 31 May 2017
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 14
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube825281.66100
(2.)SO2Micro Gram per Meter Cube20617.5380
(3.)OthersCOMicro Gram per Meter Cube4900486.922000
(4.)NOxMicro Gram per Meter Cube32630.7980
(5.)PM2.5Micro Gram per Meter Cube45223460
    14.2.     No. of Ground Water monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l35206645002000
(2.)Chloridesmg/l910118.72501000
(3.)Fluoridemg/l1.60.111.5
(4.)Heavy MetalsZincmg/l0.20.2515
(5.)OthersLeadmg/l0.010.010.010.01
(6.)TSSmg/l0000
(7.)pHNA7.846.726.58.5
(8.)Total Hardnessmg/l91248200600
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l185.2D
(2.)CODmg/l18054D
(3.)DOmg/l54.6D
(4.)pHNA7.937.27D
    14.4.     No. of Ambient Noise monitoring locations : 10
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))53.151.755
(2.)Leq(Night)A-weighted decibels(dB(A))43.240.845
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNA7.846.98
(2.)N(Nitrogen)Percent16.23.1
(3.)Electric ConductivityOthersµS/cm.35698.5
(4.)K(Potassium)Milligram per Kilogram4858.32168.3
(5.)P(Phosphorus)Milligram per Kilogram86.614.3
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 16 To 8
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 12 To 6
(c)Whether Ground Water Intersection will be there ? Yes
(d)Upload Copy of Central Ground Water Authority Letter Copy of Central Ground Water Authority Letter
(e)Letter No. 21-4(315)/WR/CGWA/2008-1905
(f)Date of Issue 16 Nov 2017
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater31453.5Copy of Permission LetterPipelineOthersunderground mine21-4(315)/WR/CGWA/2008-190516 Nov 20173145
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic1550STPReuse within the Plant & Recycling15
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 15
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 15
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)TailingOthersmineral waste2212400Tons3.5OtherspipelineOthersmines back filling and tailing dam
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube342.235.2239.2280
(2.)SO2Microgram per Meter Cube200.240.13020.13080
(3.)PM10Microgram per Meter Cube821.55.8887.88100
(4.)PM2.5Microgram per Meter Cube00000
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)D.G.SETHSD50.12PM100.066
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 13000
(b)Source Capative power plant /Ajmer Vidhyut Vitran Nigam L
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 2 x 500 kVA
(e)Stack Height (in m) 5
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 578.2006
(c)Government Land (ha.) 201.34
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 362.67
    Total Land (ha.) 1142.2106
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 18559.59
(b)Waste/Barren Land (ha.) 435.3
(c)Grazing/ Community Land (ha.) 7183.58
(d)Surface Water Bodies (ha.) 667.8
(e)Settlements (ha.) 642.7
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : TREE COVER & Scrub Land 3927.89
    Total (ha.) 31416.86
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersNA0
Total (ha.) 0
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsNA0NA
(2.)ESZsNA0NA
(3.)CorridorsNA0NA
(4.)WLSNA00
(5.)Critically Polluted AreaNA0NA
(6.)NPANA00
(7.)Wildlife CorridorsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA0NA
(2.)OthersNANA0NA
(3.)Archaeological SitesNA0NA
(4.)Defence InstallationsNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 554.19
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Already acquired.
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species 8 nos. of schedule I species reported.
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made Rs.126 lacs
(iii)Period of Implementation 5 years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area village pond
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Banas river
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 8.2
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 250
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 365
(f)Total Manpower 250
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt1900190
(2.)Percentage of Total Project Area34.28034.28
(3.)No. of Plants1900000190000
(4.)Funds Allocated200000001000000030000000
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 2
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)ZincMajor
(2.)LeadMajor
2.
Mine Capacity in ROM (Run of Mine) 2 million tonnes
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. 584(4)(3)(1705)/2017 RCM-AJM
(b)Date of Approval 26 Sep 2017
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department IBM
(e)Approved Mining Lease Area 1142.2106
(f)Approved Capacity 2.0
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 60.05
(b)Mineable Reserves (Million Ton) 41
(c)Extractable Reserves(Million Ton) 33
(d)Percent(%) of Extraction 80
(e)Grade of Coal /Ore /Mineral Zinc 6.38 and Lead 1.91
(f)Stripping Ratio 0 : 0
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) NA
(i)Mining Method Underground
(j)Life of Mine (Years) 20
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area Yes
(b)Beneficiation / Washing Technology Froth Flotation
(c)Capacity 2.5
(d)Whether it is proposed to install crusher within the mining lease area Yes
(e)No. of crushers 3
     6.1.    Details of crusher:
S. No.Crusher ID Capacity (in PH)Remarks
(1.)1400 Secondary crusher
(2.)2400 Tertiary Crusher (I)
(3.)3400 Tertiary Crusher (II)
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 1142.2106
(b)Whether obtained Letter of Intent (LOI) from the state government ? No
(i)Reason thereof NOT APPLICABLE
(c)Whether Lease Deed Executed ? Yes
(i)Copy of Executed Lease deed valid as on Date Copy of Executed Lease deed
(ii)Provide area in Hectare as per executed lease deed (initial) document 1142.2106
(iii)Validity of the lease deed From : 30 May 2010 To : 29 May 2030
(iv)Date of Execution of Mining Lese 30 Aug 2012
(v)Reference Number 166/2008
(d)Whether Lease Deed Renewed ? Yes
     8.1.    Earlier Renewals:
S. No.Lease Details Date of Renewal Period Copy of Earlier Lease Letter No.Area Remarks
(1.)Initial 01 Jan 1900 From : 30 May 1970 To : 29 May 1990 Copy of Earlier LeaseF3 (2)/KHANIZ/68 1142.2106
(2.)Renewal 16 Sep 1993 From : 30 May 1990 To : 29 May 2010 Copy of Earlier Lease541 1142.2106 First renewal
(3.)Renewal 12 Jun 2012 From : 30 May 2010 To : 29 May 2030 Copy of Earlier Lease168/2008 1142.2106 second renewal
9.
OB (Over Burden) Management:
Details Not Applicable
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 0
(b)Depth (in meter) 0
(c)Volume (in Million Cubic meter) 0
12.
Details of Quarry:
(a)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 0
13.
Details of Transportation:
(a)In Pit/Underground to Surface Shaft and Ramp
(b)Surface to Siding/Loading Conveyor belt and Road
(c)Transportation / Conveyor Details Shaft and Ramp
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)GRAZING LAND27.333927.893955.22
(2.)AGRICULTURE LAND578.218559.5919137.79
(3.)SURFACE WATER BODIES0667.8667.8
(4.)SETTLEMENTS362.66642.71005.36
(5.)WASTE LAND131.037183.587314.61
(6.)FOREST LAND000
(7.)OTHERS(Specify)roads42.98435.3478.28
TOTAL1142.231416.8632559.06
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)EXCAVATION/QUARRY0000
(2.)TOP SOIL STORAGE0000
(3.)INTERNAL OB DUMPS5005
(4.)ROADS0000
(5.)BUILT UP AREA (COLONY/OFFICE)0000
(6.)VIRGIN AREA0000
(7.)EXTERNAL OB DUMPS0000
(8.)GREEN BELT13400134
(9.)OtherNA0000
TOTAL139000139
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare)
(b)Internal Dump(in hectare)
(c)Quarry(in hectare)
(d)Safety Zone(in hectare)
(e)Final Void of (hectare) at a Depth of meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.)
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc)
(h)Total afforestation plant (in hectare)
17.
Status of progressive Mining Closure Plan:
Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan
Any Deviation from the Approved Progressive Mine Closure Plan
Total Area Excavated (in hectare)
Total Area Backfilled after Excavation (in hectare)
Total Area Reclaimed (in hectare)
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)199309000007640006314070
(2.)199409000007940004238050
(3.)199709000004500003117500
(4.)199809000004500003517100
(5.)200309000006000003757700
(6.)200509000006000005273280
(7.)200606314076600005065270
(8.)200706314077000005075600
(9.)200906314077200004832930
(10.)20119000009000007000004962340
(11.)20129000009000009000005876000
(12.)20139000009000009000005543540
(13.)201890000090000010000008955680
(14.)199509000007940002486520
(15.)199909000004900003148900
(16.)199609000003600003675500
(17.)200109000004000002734000
(18.)200209000006000003757700
(19.)20109000009000006000005012820
(20.)20159000009000009000005732840
(21.)200409000006000005857430
(22.)200009000004750002828900
(23.)200806314077000005057490
(24.)20149000009000009000006102420
(25.)20169000009000006360006687770
(26.)20179000009000009500007455340
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. S.no
(ii)Name of the EIA Consultant GAURANG ENVIRONMENTAL SOLUTIONS PRIVATE LIMITED
(iii)Address 501 SONI'S PARIS POINT NEAR COLLECTORATE CIRCLE BANI PARK JAIPUR
(iv)Mobile No. 9782074776
(v)Landline No. 0141402911
(vi)Email Id gaurangenviro@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 22 Jan 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAaccepted 07 Jan 2019
2.NAThe correction have been made as per the instruction received 07 Jan 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterDear Sir, With reference to the subject cited above we hereby submit that Government of Rajasthan granted the Lease on 31.03.1970, Letter no F.3 (2) Khaniz/68 and the same was executed on 07.04.1970 and registered on 30.05.1970 for the Lead, Zinc minerals for a period of 20 years i.e. from 30.05.1970 to 29.05.1990. The first renewal of lease was granted vide order Pa. 12 (36) khan/group-2/90, executed on 08.06.1993 and registered on 14.06.1993. The validity period of the mining lease ML-2/89 is up to 29.05.2010 after 1st renewal and after 2nd renewal the validity period of the mining lease ML-166/2008 is up to 29.05.2030, vide Order no Ps.5 (47) Khan/group-2/2011. DMG issued letter dated 10.10.2019 mentioning First lease renewal letter number and the same is now updated along with current lease number (i.e. ML-166/2008). Revised Letter issued by DMG is attached as Annexure 1 for your kind perusal. In view of the above, we request you to kindly consider our proposal in upcoming EAC (non-coal mining) for grant of Environment Clearance for our proposed expansion of Lead Zinc underground mine for Lead, Zinc Ore production from 1.08 to 2.0 Million tonnes per annum (Total Excavation of 2.48 Million Tones per annum) and Expansion of Ore Beneficiation from 1.2 to 2.5 Million tons per annum. Thanking You, Yours faithfully, (Ram Murari) Unit Head 18 Nov 2019
2.NAThe Mining Lease No. Mentioned in the letter issued by mining officer Rajsamand dated 10th October 2019 is not matching with mining lease no. mentioned by PP in the application and other document. Please ensured to submit the correct letter. 15 Nov 2019
3.NAThe Mining Lease No. Mentioned in the letter issued by mining officer Rajsamand dated 10th October 2019 is not matching with mining lease no. mentioned by PP in the application and other document. Please ensured to submit the correct letter. 15 Nov 2019
4.NAThe Mining Lease No. Mentioned in the letter issued by mining officer Rajsamand dated 10th October 2019 is not matching with mining lease no. mentioned by PP in the application and other document. Please ensured to submit the correct letter. 15 Nov 2019
5.NAThe Mining Lease No. Mentioned in the letter issued by mining officer Rajsamand dated 10th October 2019 is not matching with mining lease no. mentioned by PP in the application and other document. Please ensured to submit the correct letter. 15 Nov 2019
6.NAThe Mining Lease No. Mentioned in the letter issued by mining officer Rajsamand dated 10th October 2019 is not matching with mining lease no. mentioned by PP in the application and other document. Please ensured to submit the correct letter. 15 Nov 2019
7.NAThe Mining Lease No. Mentioned in the letter issued by mining officer Rajsamand dated 10th October 2019 is not matching with mining lease no. mentioned by PP in the application and other document. Please ensured to submit the correct letter. 15 Nov 2019
8. ADS Reply LetterDear Sir, With reference to the subject cited above we hereby submit that all additional documents/ clarification sought by MoEF&CC vide letter no. J-11018/84/2018-IA.II(M) dated 25.02.2019 under Para ‘a’ to ‘q’ are enclosed as Appendix A. Due to size constraint, hard copy of all Annexures are submitted to MOEF&CC office on 24th Oct 2019. In view of the above, we request you to kindly consider our proposal for grant of Environment Clearance for our proposed expansion of Lead Zinc underground mine for Lead, Zinc Ore production from 1.08 to 2.0 Million tonnes per annum (Total Excavation of 2.48 Million Tones per annum) and Expansion of Ore Beneficiation from 1.2 to 2.5 Million tons per annum. Thanking You, Yours faithfully, Ram Murari Unit Head Rajpura Dariba Mine Hindustan Zinc Limited 24 Oct 2019
9.NANA 01 Feb 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRam Murari
DesignationUnitHead
Name of Company (Applicant Name should not be given here)HINDUSTAN ZINC LTD RAJPURA DARIBA MINE
AddressHindustan Zinc Limited, Rajpura Dariba Mine
Print