Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Matoshri Laxmi Sugar and Cogeneration Industries Limited
(b)Name of the Company / Organisation MATOSHRI LAXMI SUGAR COGENERATION INDUSTRIES LTD
(c)Registered Address Satling Nagar, At Ruddhewadi, Post: Dudhani, Tal.: Akkalkot, Dist.: Solapur,,Solapur,Maharashtra-413220
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Shivraj Siddharam Mhetre
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address Satling Nagar, At Ruddhewadi, Post: Dudhani, Tal.: Akkalkot, Dist.: Solapur,,Akkalkot,Solapur,Maharashtra-413220
(d)Pin code 413220
(e)E-mail mhetre.shivraj@gmail.com
(f)STD Code. 2181(f)Telephone No. 256796
(g)Fax No. 256796
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(g) Distilleries
Minor Activity
(b)Category A
(c)Proposal Number IA/MH/IND2/86873/2016
(d)Master Proposal Number(Single Window) SW/86870/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 82,83,92,93,94,95,96
(b)Pincode 413320
(c)Bounded Latitudes (North)
From
Degree 76.342350
Minutes
Second
From
Degree 76.344536
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 17.381462
Minutes
Second
From
Degree 17.381512
Minutes
Second
(e)Survey of India Topo Sheet No. 58 C/3, 56 C/7
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 450
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1.40
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J-11011/308/2016-IA-Ia II (I)
(b)Date of Apply of TOR 21 Sep 2016
(c)Date of Issue of TOR / Standard ToR 21 Nov 2016
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :24 Apr 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :25 May 2018
Distance of Public Hearing Venue from the Proposed Project :0
Matoshri Laxmi Sugar and Cogeneration Industries Limited, Satling nagar, At- Ruddhewadi Po- Dudhani Tal- Akkalkot, Dist- Solapur
State :Maharashtra
District :Solapur
Tehsil :Akkalkot
Village :At- Ruddhewadi Po- Dudhani
200No any issues were raised during public hearing. Information w.r.t. types of pollution to be generated under proposed distillery & storage details and project benefits were asked during public hearingOthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Fermentation SectionFermenters, Tanks and Pumps--
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Rectified Spirit (Proposed Distillery)45Kilo Litre per DayRoad
(2.)Impure Spirit2.5Kilo Litre per DayRoad
(3.)Extra Neutal Alcohol (Proposed Distillery)45Kilo Litre per DayRoad
(4.)Ethanol (Proposed Distillery)45Kilo Litre per DayRoad
(5.)Sugar (Existing Sugar Factory)63000Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 68.50
(b) Funds Allocated for Environment Management (Capital) (in Crores) 8.85
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 4.51
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.75
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 34885
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 34885
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Molasses raw material for distillery5000OthersMT/MOwn Sugar FactoryRoad0 OthersOwn Sugar FactoryCopy of Linkage
(2.)Sugar cane3500Tons Crushed per DayNearby FarmsRoad25 LinkageNearby FarmsCopy of Linkage
(3.)Molasses45000Tons per AnnumOwn Sugar FactoryRoad0 LinkageCopy of Linkage
(4.)Bagasse26160OthersMT/MOwn Sugar FactoryRoad25 LinkageCopy of Linkage
(5.)Urea2OthersMT/MLocal vendorRoad25 LinkageCopy of Linkage
(6.)Sulphur52OthersMT/MLocal vendorRoad25 LinkageCopy of Linkage
(7.)De-Foaming Oil1OthersMT/MLocal vendorRoad25 LinkageCopy of Linkage
(8.)Yeast2OthersMT/MLocal vendorRoad25 LinkageCopy of Linkage
(9.)Lime168OthersMT/MLocal vendorRoad25 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2016 To 31 Dec 2016
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube31.4115.2529.3180
(2.)SO2Micro Gram per Meter Cube24.3011.1514.7580
(3.)PM2.5Micro Gram per Meter Cube20.3710.4117.3260
(4.)PM10Micro Gram per Meter Cube64.9736.1860.02100
    14.2.     No. of Ground Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.767.246.58.5
(2.)OthersSulphates as SO4mg/l47.3029.88200200
(3.)Total Hardnessmg/l516.00492.00200200
(4.)Heavy MetalsLead as Pbmg/l000.010.01
(5.)TSSmg/l73.2422.15100100
(6.)TDSmg/l740.465637.4500500
(7.)Fluoridemg/l0.070.040.100.10
(8.)Chloridesmg/l125101.33250250
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA00C
(2.)DOmg/l00C
(3.)CODmg/l00C
(4.)BODmg/l00C
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))73.652.675
(2.)Leq(Night)A-weighted decibels(dB(A))71.652.670
    14.5.     No. of Soil Sample Monitored locations : 4
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare380.4112.9
(2.)P(Phosphorus)Kilogram per hectare590135.11
(3.)K(Potassium)Kilogram per hectare272.9100.55
(4.)Electric ConductivityOthersMicro simens/cm485285
(5.)pHOthersNA7.757.29
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.5 To 12.8
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.0041 To 4.0
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface1054.81.83Copy of Permission LetterPipelineJack WellJa/Kr/MuA(ViPr)/UA5/Sinchan/2121/201114 Mar 2011218000
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic2835Proposed STPReuse within the Plant & Recycling28
(2.)Industrial (Sugar, Cogen)200325Existing ETPReuse within the Plant & Recycling200
(3.)Industrial (Proposed Distillery)435500Proposed CPUReuse within the Plant & Recycling435
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 663
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 663
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)biological sludgeIndustrial Waste2700Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)Boiler ashIndustrial Waste8100Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)Yeast sludgeIndustrial Waste1800Kilolitre0RoadTreatment, Storage and Disposal Facility(TSDF)
(4.)CPU SludgeIndustrial Waste4.5Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube14.750014.7580
(2.)Others(Specify)CONA0.00001000.000014
(3.)PM10Microgram per Meter Cube60.020060.02100
(4.)PM2.5Microgram per Meter Cube17.320017.3260
(5.)NOxMicrogram per Meter Cube29.310029.3180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)BoilerBagasse653.2SO214.75
(2.)BoilerBagasse653.2NOx29.31
(3.)BoilerBagasse653.2PM1060.02
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 4100
(b)Source Cogen plant
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1
(e)Stack Height (in m) 5
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 44.49
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 44.49
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 13136.90
(b)Waste/Barren Land (ha.) 4964.94
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 12.62
(e)Settlements (ha.) 616.41
(f)Industrial (ha.) 616.41
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Fallow land 12494.4
    Total (ha.) 31841.68
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Built Up Area17.50
(2.)Green belt15.06
(3.)OthersOpen space11.93
Total (ha.) 44.49
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsNA0There is no presence of any CPA, NPA, ESAs, ESZs, Corridors & wildlife corridors in 10 Km radius of project
(2.)WLSNA0There is no presence of any CPA, NPA, ESAs, ESZs, Corridors & wildlife corridors in 10 Km radius of project
(3.)NPANA0There is no presence of any CPA, NPA, ESAs, ESZs, Corridors & wildlife corridors in 10 Km radius of project
(4.)ESZsNA0There is no presence of any CPA, NPA, ESAs, ESZs, Corridors & wildlife corridors in 10 Km radius of project
(5.)CorridorsNA0There is no presence of any CPA, NPA, ESAs, ESZs, Corridors & wildlife corridors in 10 Km radius of project
(6.)Wildlife CorridorsNA0There is no presence of any CPA, NPA, ESAs, ESZs, Corridors & wildlife corridors in 10 Km radius of project
(7.)Critically Polluted AreaNA0There is no presence of any CPA, NPA, ESAs, ESZs, Corridors & wildlife corridors in 10 Km radius of project.
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA0There is no forest land within 10 km from project site
(2.)Archaeological SitesNA0There are no archealogical sites within 10 km from project site
(3.)Defence InstallationsNA0There are no any defence installations within 10 km from project site
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Bori river
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 21
(b)Permanent Employment-During Operation 419
(c)Temporary Employment- During Construction 40
(d)Temporary Employment- During Operation 40
(e)No. of working days 270
(f)Total Manpower 520
32.
Green Belt in Ha:
(a)Total Area of Green Belt 15.61
(b)Percentage of Total Project Area 35.09
(c)No. of Plants to be Planted 6396
(d)Funds Allocated for Plantation 350000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialAlcohol is an important Source of Revenue to Govt. tho’ Excise Duty.
(2.)EnvironmentalBlending with petroleum fuels, in pharmaceutical industry for blending with medicines and drugs, in manufacturing of chemicals. Used in perfumes, cosmetics and vegetable essences. In manufacture of IMFL & Country Liquors.
(3.)SocialSugar-Distillery-Cogen Industry has been instrumental in Resource Mobilization, Employment Generation, Income Generation and in creating Social Infrastructure in Command Area.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1518/SA063
(ii)Name of the EIA Consultant Equinox Environments India Pvt. Ltd.
(iii)Address F-11, Namdev Nest, 1160 ‘E’ ward, Opp. Kamala College, Sykes Extension, Kolhapur
(iv)Mobile No. 9657865122
(v)Landline No. 0231253123
(vi)Email Id projects@equinoxenvi.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 21 Oct 2018
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantShivraj Siddharam Mhetre
DesignationDirector
Name of Company (Applicant Name should not be given here)MATOSHRI LAXMI SUGAR COGENERATION INDUSTRIES LTD
AddressSatling Nagar, At Ruddhewadi, Post: Dudhani, Tal.: Akkalkot, Dist.: Solapur