Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Capacity expansion of Hot Strip Mill from 1.6 MTPA to 3.2 MTPA and installation for 0.3 MTPA Cold Rolling Mill
(b)Name of the Company / Organisation JINDAL UNITED STEEL LIMITED
(c)Registered Address Kalinga Nagar Industrial Complex, PO : Danagadi,,Jajpur,Orissa-755026
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Rahul Himatsingka
(b)Designation (Owner/ Partner/ CEO) Whole Time Director
(c)Address Kalinga Nagar Industrial Complex, PO - Danagadi,,Duburi,Jajpur,Orissa-755026
(d)Pin code 755026
(e)E-mail envcell2@jindalstainless.com
(f)STD Code. 6726(f)Telephone No. 266260
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
Minor Activity
(b)Category A
(c)Proposal Number IA/OR/IND/86732/2018
(d)Master Proposal Number(Single Window) SW/86673/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Please see Annexure-1 attached in Additional Attac
(b)Pincode 755026
(c)Bounded Latitudes (North)
From
Degree 20.94
Minutes
Second
From
Degree 20.96
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 86.03
Minutes
Second
From
Degree 86.06
Minutes
Second
(e)Survey of India Topo Sheet No. 4 - F45N16, F45O4, F45T13, F45U1
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 300
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 7.5
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Orissa
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)OrissaJajpurRadhanagar
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/110/2018-IA II(I)
(c)Date of Issue of TOR 24 Jul 2018
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 30 Nov 2018
(c)Date of Issue of EC 24 May 2019
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :12 Oct 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :14 Nov 2018
Distance of Public Hearing Venue from the Proposed Project :3
Danagadi Bhawan
State :Orissa
District :Jajpur
Tehsil :Sukinda
Village :Danagadi
108Environment Local employment Education Health facilities Drinking water PlantationOthers
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhubaneswar
(iii)Letter No. JUSL/JRD/ENV/2018-19/22
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Nov 30 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)HSM160000016000003200000Tons per Annum(TPA)Road,Rail
(2.)CRM0300000300000Tons per Annum(TPA)Road,Rail
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)CRM-0.3 MTPA0.3 MTPA
(2.)HSM with Plate Finishing shop1.6 MTPA1.6 MTPA3.2 MTPA
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 29 Mar 2018
(iv)Valid Upto 31 Mar 2021
(v)File No. 3795/IND-I-CON-6567
(vi)Application No. 1930575 dated 10-12-2017
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 700
(b) Funds Allocated for Environment Management (Capital) (in Crores) 35
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 5.0
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 2
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 1635300
(b)Existing quantity of raw material/fuel 1630000
(c)Total quantity of raw material/fuel 3265300
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Slabs3265300Tons per AnnumJSL & OthersRoad,Rail,OthersSlab cars350 MoUCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 02 Feb 2017 To 07 May 2017
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube62.637.656.460
(2.)SO2Micro Gram per Meter Cube24.5521.380
(3.)PM10Micro Gram per Meter Cube113.867.1105.5100
(4.)NOxMicro Gram per Meter Cube4022.139.180
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Fluoridemg/l.1.111.5
(2.)Chloridesmg/l157.624.92501000
(3.)Total Hardnessmg/l42092200600
(4.)TSSmg/l1010100150
(5.)pHNA7.15.568.5
(6.)TDSmg/l10502805002000
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l6.25.2B
(2.)BODmg/l73B
(3.)CODmg/l31.59.5B
(4.)pHNA7.357.01B
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))74.3842.3870
(2.)Leq(Day)A-weighted decibels(dB(A))82.3843.875
    14.5.     No. of Soil Sample Monitored locations : 3
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Milligram per Kilogram890620
(2.)pHOthersNA7.46.9
(3.)P(Phosphorus)Milligram per Kilogram302169
(4.)K(Potassium)Milligram per Kilogram1394622
(5.)Electric ConductivityMillisiemens per Centimetre.42.32
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 3.05 To 8.38
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From .92 To 4.58
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface13682Copy of Permission LetterPipelineOthersCommon reservior of JSL26166/WR09 Nov 201630000
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Mill600600ETPReuse within the Plant & Recycling600
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 600
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 600
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Grinding SludgeIndustrial Waste700Tons1RoadOthersreused in Ferro alloy plant of JSL
(2.)Waste OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)75Kilolitre150RoadAuthorized Recyclers
(3.)ETP Sludge from MillsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)24000Tons40RoadTreatment, Storage and Disposal Facility(TSDF)
(4.)Mill ScaleIndustrial Waste20000Tons1RoadOthersreused in Ferro alloy plant of JSL
(5.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)75Kilolitre150RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube91.31.60.591.8100
(2.)PM2.5Microgram per Meter Cube50.61.6.2550.8560
(3.)SO2Microgram per Meter Cube18.38.6.0718.3780
(4.)NOxMicrogram per Meter Cube371.6.4637.4680
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)HSM#RHF2NA803.2PM101.38
(2.)HSM#Shot Blast 2NA301PM10.28
(3.)HSM#ShotBlast 2NA301NOx.14
(4.)HSM#RHF2NA803.2NOx1.11
(5.)CRM#ShotBlastNA301.8PM10.33
(6.)CRM#ShotBlastNA301.8SO2.11
(7.)HSM#ShotBlast 2NA301SO2.08
(8.)HSM#RHF2NA803.2SO2.69
(9.)CRM#ShotBlastNA301.8NOx.19
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 309000000
(b)Source Grid via JSL
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 1
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 154.66
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 154.66
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 154.66
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NA 0
    Total (ha.) 154.66
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt37.12
(2.)Main Plant117.54
Total (ha.) 154.66
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANA0NA
(2.)ESAsNA0NA
(3.)Wildlife CorridorsNA0NA
(4.)Critically Polluted AreaNA0NA
(5.)WLSNA0NA
(6.)ESZsNA0NA
(7.)CorridorsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA0NA
(2.)Defence InstallationsNA0NA
(3.)ForestBarang RF7Other forests are Ragarhi PF, Sunajhari PF, Dangadi PF
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 154.66
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Brahmani River, Kharsua River
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 5.1
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 35
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 115
(e)No. of working days 365
(f)Total Manpower 150
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt37.1213.9251.04
(2.)Percentage of Total Project Area24933
(3.)No. of Plants458401350059340
(4.)Funds Allocated200000001000000030000000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalImplementation of proposed pollution control measures like Bag filter, Oil Mist Interceptor, Low NOx oxy-fuel burner, ‘Zero Liquid Discharge’ concept, ETP for waste water, Surface run off water management, Agreement for disposal of hazardous waste with authorised agencies etc
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. RA 134th AC Meeting: Jun 08, 2017 Rev 01
(ii)Name of the EIA Consultant M N Dastur & Co P Ltd
(iii)Address P 17 Mission Row Extension. Kol - 13
(iv)Mobile No. 9433341156
(v)Landline No. 22255420
(vi)Email Id sandip.m@dastur.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 30 Apr 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterNA 31 Jan 2019
2.NAADS 14 Jan 2019
3. ADS Reply LetterNA 12 Dec 2018
4.NAYou are requested to submit certificate of compliance of earlier EC conditions 03 Dec 2018
5.NAYou are requested to submit certificate of compliance of earlier EC conditions 03 Dec 2018
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRahul Himatsingka
DesignationWhole Time Director
Name of Company (Applicant Name should not be given here)JINDAL UNITED STEEL LIMITED
AddressKalinga Nagar Industrial Complex, PO : Danagadi
Print