Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of “Radisson Blu Hotel”
(b)Name of the Company / Organisation DIVINE INFRACON PRIVATE LIMITED
(c)Registered Address Plot No. 4, Sector-13, Dwarka, New Delhi,,South West,Delhi-110075
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Gaurav Aggarwal
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address D-31, Pushpanjali Enclave, Pitampura, New Delhi,,Najafgarh,South West,Delhi-110034
(d)Pin code 110034
(e)E-mail gaurav.aggarwal@hotmail.com
(f)STD Code. 11(f)Telephone No. 30908045
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity8(a) Building and Construction projects
Minor Activity
(b)Category B2
   Reason for Applying at Ministry SEIAA
(c)Proposal Number IA/DL/MIS/86403/2008
(d)Master Proposal Number(Single Window) SW/86396/2018
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 4
(b)Pincode 110075
(c)Bounded Latitudes (North)
From
Degree 3164870.09
Minutes
Second
From
Degree 3165036.66
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 699081.07
Minutes
Second
From
Degree 699155.86
Minutes
Second
(e)Survey of India Topo Sheet No. 53 H/02
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 214
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1.64
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Delhi
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number 21-9/2019-IA-III
(c)Date of Issue of TOR 26 Apr 2008
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 30 Jan 2019
(c)Date of Issue of EC 18 Oct 2019
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason As it is a Building Construction project. Therefor
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Lucknow
(iii)Letter No. IV/521/2008-RO(NZ)/605
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jan 4 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Plot area15376015376Otherssquare meterOthersNot Applicable
(2.)Built-up area65303.7820487.81485791.594Otherssquare meterOthersNot Applicable
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Multiplex099
(2.)Hotel Rooms3250325
(3.)Restaurant and Bar404
(4.)Banquet101
(5.)Food Court101
(6.)Shops15020170
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 07 Feb 2017
(iv)Valid Upto 15 May 2019
(v)File No. 0
(vi)Application No. 0
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 523.36
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.87
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 2.61
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.11
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)NA0OthersNot applicableNAOthersNA0 OthersNACopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 09 Oct 2018 To 12 Oct 2018
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube7.16.16.980
(2.)NOxMicro Gram per Meter Cube26.123.125.680
(3.)PM2.5Micro Gram per Meter Cube85.672.579.360
(4.)PM10Micro Gram per Meter Cube131.4122.8130.7100
    14.2.     No. of Ground Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Fluoridemg/l0.870.8711
(2.)Chloridesmg/l1599.51599.5250250
(3.)TDSmg/l33533353500500
(4.)TSSNA0000
(5.)pHNA7.27.28.58.5
(6.)Total Hardnessmg/l18601860200200
    14.3.     No. of Surface Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l208208E
(2.)BODmg/l3232E
(3.)DOmg/l4.84.8E
(4.)pHNA7.47.4E
    14.4.     No. of Ambient Noise monitoring locations : 1
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))59.259.265
(2.)Leq(Day)A-weighted decibels(dB(A))52.352.355
    14.5.     No. of Soil Sample Monitored locations : 1
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNA8.258.25
(2.)K(Potassium)Milligram per Kilogram12.112.1
(3.)P(Phosphorus)Milligram per Kilogram41.141.1
(4.)Electric ConductivityOthersMicrosiemens per Centimeter169.2169.2
(5.)N(Nitrogen)Milligram per Kilogram81.381.3
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.40 To 53.17
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.69 To 54.02
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersDelhi Jal Board6160Copy of Permission LetterPipelineOthersDelhi Jal BoardF64A (111)/EE (P) W-I/2015/63328 Jul 2015616
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Kitchen & Laundry2730Effluent Treatment PlantOthersLosses during treatment126
(2.)Commercial Complex266360Sewage Treatment PlantReuse within the Plant & Recycling,Otherslosses during treatment25313
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 293
(b)Total Discharged Water (Kilolitre per Day) 39
(c)Total Reused Water (Kilolitre per Day) 254
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Biodegradable WasteMunicipal Solid Waste339.8Tons0OthersWithin the siteOthersOrganic Waste Convertor
(2.)Non Biodegradable WasteMunicipal Solid Waste101.9Tons15RoadAuthorized Recyclers
(3.)Hazardous WasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.288Kilolitre15RoadOthersApproved Vendor
(4.)Hazardous WasteE Waste0.024Tons15RoadAuthorized Recyclers
(5.)Plastic WastePlastic Waste101.9Tons15RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube85.60.80.48086.0860
(2.)PM10Microgram per Meter Cube130.70.80.355131.055100
(3.)SO2Microgram per Meter Cube6.40.80.2096.60980
(4.)NOxMicrogram per Meter Cube25.60.81.0926.6980
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Diesel Generating SetUltra-low Sulphur Diesel60.60NOx887.5
(2.)Diesel Generating SetUltra-low Sulphur Diesel60.60OthersCO210
(3.)Diesel Generating SetUltra-low Sulphur Diesel60.60OthersHC100
(4.)Diesel Generating SetUltra-low Sulphur Diesel60.60PM1075
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 3368.42
(b)Source BSES
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 2x1500
(e)Stack Height (in m) 6
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 1.5367
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 1.5367
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Commercial Complex 1.5367
    Total (ha.) 1.5367
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersPlot area1.5367Plot area
Total (ha.) 1.5367
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNA0NA
(2.)NPANA0NA
(3.)ESZsNA0NA
(4.)Critically Polluted AreaAnand Parbat14.59North East direction from project site
(5.)ESAsNA0NA
(6.)CorridorsNA0NA
(7.)Wildlife CorridorsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesAncient Mosque Babur’s Period4.12East direction from project site
(2.)OthersNANA0NA
(3.)ForestPusa Hill Forest13.52North east direction from project site
(4.)Defence InstallationsNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1.5367
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Najafgarh Drain
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 1.64
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 694
(c)Temporary Employment- During Construction 150
(d)Temporary Employment- During Operation 0
(e)No. of working days 360
(f)Total Manpower 844
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt307303073
(2.)Percentage of Total Project Area20020
(3.)No. of Plants1920192
(4.)Funds Allocated000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Environmental20% of the plot area has already been developed into green area.
(2.)SocialBy creating employment opportunities, the socio-economic status of the surrounding area will be enhanced.
(3.)FinancialCreation of employment opportunities in the area will strengthen the financial status of the area.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 43.1
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 1
(d)Total plot area (sqm) 15367
(e)Total built up area (sqm) 85791.594
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 3
(d)Capacity 141
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 1075
5.
Energy Saving Measures:
(a)Source/Mode Solar Water Heater of 15 KLD & LED
(b)Percentage 1
(c)Quantity 33.68
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area There will be no extraction of Ground water. STP o
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. Rev 71, 12th November at S. No 117.
(ii)Name of the EIA Consultant Perfact Envirosolutions Pvt. Ltd.
(iii)Address 5th Floor|Front Wing|NN Mall|Sector-3|Rohini|New Delhi-110085|
(iv)Mobile No. 9818362330
(v)Landline No. 49281360
(vi)Email Id info@perfactgroup.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 27 Nov 2018
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAThis is an Expansion project. Kindly provide Certified Compliance Report issued by the MoEF&CC, Regional Office or concerned regional office of Central Pollution Control Board or the Member Secretary of the respective State Pollution Control Board for the conditions stipulated in the Environmental Clearance granted for the existing project. 23 Jan 2019
2.NAThe correction have been made as per the instruction received 30 Jan 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantGaurav Aggarwal
DesignationDirector
Name of Company (Applicant Name should not be given here)DIVINE INFRACON PRIVATE LIMITED
AddressPlot No. 4, Sector-13, Dwarka, New Delhi
Print