1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | WELSPUN FLOORING LIMITED | (b)Name of the Company / Organisation | WELSPUN FLOORING LIMITED | (c)Registered Address | D.NO: 6-3-609/147/A, NEAR DAYANAND HIGH SCHOOL ,KHAIRATABAD,HYDERABAD,,Rangareddi,Telangana-500004 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Mukesh Ashok Sawalani Sawalani | (b)Designation (Owner/ Partner/ CEO) | CEO | (c)Address | D.NO 6-3-609/147/A, NEAR DAYANAND HIGH SCHOOL,KHAIRATABAD,HYDERABAD-500004,Shabad,Rangareddi,Telangana-501503 | (d)Pin code | 501503 | (e)E-mail | durganagendra_babu@welspun.com | (f)STD Code. | 40(f)Telephone No. | 40179770 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(d) Manmade fibres manufacturing
| Minor Activity | 5(d) Manmade fibres manufacturing
| (b)Category | B2 | Reason for Applying at Ministry | SEIAA | (c)Proposal Number | IA/TG/IND2/86277/2018 | (d)Master Proposal Number(Single Window) | SW/86264/2018 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 190 | (b)Pincode | 501503 | (c)Bounded Latitudes (North) | | From | | Degree | 171255.2 | Minutes | | Second | | From | | Degree | 171308.7 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 781030.8 | Minutes | | Second | | From | | Degree | 781059.4 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 56K/3, 56K/4, 56K/7, 56K/8 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 520 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 15 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Telangana | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Telangana | Rangareddi | Shabad | Chandanavalli | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | 1 | (b)Date of Apply of TOR | 20 Nov 2018 | (c)Date of Issue of TOR / Standard ToR | 22 Nov 2018 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | Not Applicable As per the EIA notification 2006, t | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | BulkContinuousFilamentyarnandPartiallyorientedyarn | 25000MTPA | | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Now the company has planned to establish synthetic yarn unit Non Rayon and Non polymerization route to manufacture Bulk Continuous Filament yarn and Partially oriented yarn | 25000 | Others | Metric Tonnes per Annum | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 22 Nov 2018 | (iv)Valid Upto | 22 Nov 2022 | (v)File No. | Not Applicable | (vi)Application No. | Not Applicable | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 344.75 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 4.65 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.517 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.5 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 26666.05 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 26666.05 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Spin finish oil | 175 | Others | Metric Tonnes per Annum | Local | Road | | 100 | Open Market | | Copy of Linkage | (2.) | Chips for Colorization | 700 | Others | Metric Tonnes per Annum | Local/import | Road | | 500 | Open Market | | Copy of Linkage | (3.) | Base white polymer Chips (PET/ RPET/ PA6) | 7615.55 | Others | Metric Tonnes per Annum | Local/import | Road | | 500 | Open Market | | Copy of Linkage | (4.) | Chipsforcolorization | 350 | Others | Metric Tonnes per Annum | Local/import | Road | | 500 | Open Market | | Copy of Linkage | (5.) | Base white polymer( PP/ PET/ RPET/ PA6 Chips | 17790.5 | Others | Metric Tonnes per Annum | Local/import | Road | | 500 | Open Market | | Copy of Linkage | (6.) | spinfinishoil | 35 | Others | Metric Tonnes per Annum | Local/import | Road | | 500 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 22 Nov 2018 To 22 Nov 2018 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 1 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | NOx | | Micro Gram per Meter Cube | 1 | 1 | 1 | 1 | (2.) | SO2 | | Micro Gram per Meter Cube | 1 | 1 | 1 | 1 | (3.) | PM10 | | Micro Gram per Meter Cube | 1 | 1 | 1 | 1 | (4.) | PM2.5 | | Micro Gram per Meter Cube | 1 | 1 | 1 | 1 | |
14.2. No. of Ground Water monitoring locations : 1 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TDS | | | mg/l | | 1 | 1 | 1 | 1 | (2.) | Total Hardness | | | mg/l | | 1 | 1 | 1 | 1 | (3.) | Fluoride | | | mg/l | | 1 | 1 | 1 | 1 | (4.) | Heavy Metals | | led | mg/l | | 1 | 1 | 1 | 1 | (5.) | pH | | | mg/l | | 1 | 1 | 1 | 1 | (6.) | TSS | | | mg/l | | 1 | 1 | 1 | 1 | (7.) | Chlorides | | | mg/l | | 1 | 1 | 1 | 1 | |
14.3. No. of Surface Water monitoring locations : 1 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | DO | | mg/l | | 0 | 0 | A | (2.) | BOD | | mg/l | | 0 | 0 | A | (3.) | pH | | mg/l | | 0 | 0 | A | (4.) | COD | | mg/l | | 0 | 0 | A | |
14.4. No. of Ambient Noise monitoring locations : 0 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 0 | 0 | 0 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 0 | 0 | 0 | |
14.5. No. of Soil Sample Monitored locations : 0 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | Milligram per Litre | | 0 | 0 | (2.) | K(Potassium) | Milligram per Litre | | 0 | 0 | (3.) | Electric Conductivity | Milligram per Litre | | 0 | 0 | (4.) | N(Nitrogen) | Milligram per Litre | | 0 | 0 | (5.) | P(Phosphorus) | Milligram per Litre | | 0 | 0 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0 To 0 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0 To 0 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | TSIIC | 768.5 | 0.5 | Copy of Permission Letter | Pipeline | | Others | TSIIC Pipeline | T1/TDWSP/bulk waterconnections/2017-18 | 04 Aug 2018 | 1000 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | HVAC MAKE UP | 3.0 | 0 | ETP | Reuse within the Plant & Recycling | | 3.0 | | (2.) | Boiler | 2.0 | 170 | RO | Reuse within the Plant & Recycling | | 2.0 | | (3.) | Domestic | 19 | 50 | STP | Reuse within the Plant & Recycling | | 19 | | (4.) | Cooling tower blow down | 50 | 170 | ETP | Reuse within the Plant & Recycling | | 50 | | (5.) | Spin finish preparation POY | 0 | 0 | ETP | Reuse within the Plant & Recycling | | 0 | | (6.) | Burn Out BCF and POY | 4.0 | 25 | ETP | Reuse within the Plant & Recycling | | 4.0 | | (7.) | Monomer washer BCF | 2.5 | 25 | ETP | Reuse within the Plant & Recycling | | 0 | 2.5 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 80.5 | (b)Total Discharged Water (Kilolitre per Day) | 2.5 | (c)Total Reused Water (Kilolitre per Day) | 78 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | left over yarn on bobbins | Others | NON-Hazardous | 912.5 | Tons | 30 | Road | | Authorized Recyclers | | (2.) | yarn soft waste | Others | NON-Hazardous | 624.15 | Tons | 30 | Road | | Authorized Recyclers | | (3.) | HardFlushwaste | Others | NON-Hazardous | 73 | Tons | 30 | Road | | Authorized Recyclers | | (4.) | Empty drums/bags/Liners Nos/Year | Plastic Waste | | 10000 | Tons | 30 | Road | | Authorized Recyclers | | (5.) | other packaging waste | Others | NON-Hazardous | 2555 | Tons | 30 | Road | | Authorized Recyclers | | (6.) | Coal/Husk Ash | Bottom Ash | | 3650 | Tons | 30 | Road | | Others | will be sold to brick manufacturers | (7.) | MEE Salts | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 328.5 | Tons | 98.5 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (8.) | ETP waste | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1 | Tons | 98.5 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (9.) | used oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1.5 | Tons | 98.5 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | SO2 | | Microgram per Meter Cube | 0 | 0 | 0 | 0 | 0 | (2.) | PM2.5 | | Microgram per Meter Cube | 0 | 0 | 0 | 0 | 0 | (3.) | PM10 | | Microgram per Meter Cube | 0 | 0 | 0 | 0 | 0 | (4.) | NOx | | Microgram per Meter Cube | 0 | 0 | 0 | 0 | 0 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | 0 | 0 | 0 | 0 | SO2 | | 0 | (2.) | 0 | 0 | 0 | 0 | NOx | | 0 | (3.) | 0 | 0 | 0 | 0 | PM10 | | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 8700 | (b)Source | TSPDCL | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 3X1500 | (e)Stack Height (in m) | 20 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 80.93 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 80.93 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : 80.93 | 0 | Total (ha.) | 0 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Green belt | | 11.3547 | | (2.) | Others | Open Plot Area for future expansion | 62.3915 | Open Plot Area for future expansion | (3.) | Built Up Area | | 7.1738 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | NONE | 0 | 0 | (2.) | ESAs | NONE | 0 | 0 | (3.) | Corridors | NONE | 0 | 0 | (4.) | ESZs | NONE | 0 | there are no eco sensitive zones with in 10 km | (5.) | Wildlife Corridors | NONE | 0 | 0 | (6.) | NPA | NONE | 0 | 0 | (7.) | WLS | NONE | 0 | 0 | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Mudimial | 8.92 | Reserve Forest | (2.) | Archaeological Sites | | None | 0 | There are no any Historical places | (3.) | Defence Installations | | None | 0 | There are no any Defence installations | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 80.93 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Already acquired | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Musa river | (ii)Direction of Water Bodies in Buffer Area | North | (iii)Distance of Water Bodies in Buffer Area | 3.0 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 20 | (b)Permanent Employment-During Operation | 210 | (c)Temporary Employment- During Construction | 30 | (d)Temporary Employment- During Operation | 10 | (e)No. of working days | 350 | (f)Total Manpower | 270 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 11.35 | (b)Percentage of Total Project Area | 14.02 | (c)No. of Plants to be Planted | 5000 | (d)Funds Allocated for Plantation | 2500000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | Provide Employment to the 270 people | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | S.No 155, Rev.71, November 12th 2018 | (ii)Name of the EIA Consultant | Unistar Environment & Research Labs private limite | (iii)Address | 215, Royal Arcade, Near GIDC Office, Vapi-396195 | (iv)Mobile No. | 9849023662 | (v)Landline No. | 0404017977 | (vi)Email Id | pvr@pridhvienviro.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 30 Jan 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | - EIA Consultant is not accredited for category B projects under item 5(d) of the schedule to the EIA Notification, 2006.
- Status of clearance/permission to meet water requirement of 768.5 cum/day.
- Detailed justification for the project to be covered under category B2. | 04 Dec 2018 | 2. | NA | The correction have been made as per the instruction received | 10 Dec 2018 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Mukesh Ashok Sawalani Sawalani | Designation | CEO | Name of Company (Applicant Name should not be given here) | WELSPUN FLOORING LIMITED | Address | D.NO: 6-3-609/147/A, NEAR DAYANAND HIGH SCHOOL ,KHAIRATABAD,HYDERABAD |
|