Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) WELSPUN FLOORING LIMITED
(b)Name of the Company / Organisation WELSPUN FLOORING LIMITED
(c)Registered Address D.NO: 6-3-609/147/A, NEAR DAYANAND HIGH SCHOOL ,KHAIRATABAD,HYDERABAD,,Rangareddi,Telangana-500004
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Mukesh Ashok Sawalani Sawalani
(b)Designation (Owner/ Partner/ CEO) CEO
(c)Address D.NO 6-3-609/147/A, NEAR DAYANAND HIGH SCHOOL,KHAIRATABAD,HYDERABAD-500004,Shabad,Rangareddi,Telangana-501503
(d)Pin code 501503
(e)E-mail durganagendra_babu@welspun.com
(f)STD Code. 40(f)Telephone No. 40179770
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(d) Manmade fibres manufacturing
Minor Activity5(d) Manmade fibres manufacturing
(b)Category B2
   Reason for Applying at Ministry SEIAA
(c)Proposal Number IA/TG/IND2/86277/2018
(d)Master Proposal Number(Single Window) SW/86264/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 190
(b)Pincode 501503
(c)Bounded Latitudes (North)
From
Degree 171255.2
Minutes
Second
From
Degree 171308.7
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 781030.8
Minutes
Second
From
Degree 781059.4
Minutes
Second
(e)Survey of India Topo Sheet No. 56K/3, 56K/4, 56K/7, 56K/8
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 520
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 15
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Telangana
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)TelanganaRangareddiShabadChandanavalli
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number 1
(b)Date of Apply of TOR 20 Nov 2018
(c)Date of Issue of TOR / Standard ToR 22 Nov 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Not Applicable As per the EIA notification 2006, t
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)BulkContinuousFilamentyarnandPartiallyorientedyarn25000MTPA
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Now the company has planned to establish synthetic yarn unit Non Rayon and Non polymerization route to manufacture Bulk Continuous Filament yarn and Partially oriented yarn25000OthersMetric Tonnes per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 22 Nov 2018
(iv)Valid Upto 22 Nov 2022
(v)File No. Not Applicable
(vi)Application No. Not Applicable
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 344.75
(b) Funds Allocated for Environment Management (Capital) (in Crores) 4.65
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.517
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.5
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 26666.05
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 26666.05
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Spin finish oil175OthersMetric Tonnes per AnnumLocalRoad100 Open MarketCopy of Linkage
(2.)Chips for Colorization700OthersMetric Tonnes per AnnumLocal/importRoad500 Open MarketCopy of Linkage
(3.)Base white polymer Chips (PET/ RPET/ PA6)7615.55OthersMetric Tonnes per AnnumLocal/importRoad500 Open MarketCopy of Linkage
(4.)Chipsforcolorization350OthersMetric Tonnes per AnnumLocal/importRoad500 Open MarketCopy of Linkage
(5.)Base white polymer( PP/ PET/ RPET/ PA6 Chips17790.5OthersMetric Tonnes per AnnumLocal/importRoad500 Open MarketCopy of Linkage
(6.)spinfinishoil35OthersMetric Tonnes per AnnumLocal/importRoad500 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 22 Nov 2018 To 22 Nov 2018
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube1111
(2.)SO2Micro Gram per Meter Cube1111
(3.)PM10Micro Gram per Meter Cube1111
(4.)PM2.5Micro Gram per Meter Cube1111
    14.2.     No. of Ground Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l1111
(2.)Total Hardnessmg/l1111
(3.)Fluoridemg/l1111
(4.)Heavy Metalsledmg/l1111
(5.)pHmg/l1111
(6.)TSSmg/l1111
(7.)Chloridesmg/l1111
    14.3.     No. of Surface Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l00A
(2.)BODmg/l00A
(3.)pHmg/l00A
(4.)CODmg/l00A
    14.4.     No. of Ambient Noise monitoring locations : 0
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))000
(2.)Leq(Day)A-weighted decibels(dB(A))000
    14.5.     No. of Soil Sample Monitored locations : 0
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHMilligram per Litre00
(2.)K(Potassium)Milligram per Litre00
(3.)Electric ConductivityMilligram per Litre00
(4.)N(Nitrogen)Milligram per Litre00
(5.)P(Phosphorus)Milligram per Litre00
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 0 To 0
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0 To 0
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersTSIIC768.50.5Copy of Permission LetterPipelineOthersTSIIC PipelineT1/TDWSP/bulk waterconnections/2017-1804 Aug 20181000
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)HVAC MAKE UP3.00ETPReuse within the Plant & Recycling3.0
(2.)Boiler2.0170ROReuse within the Plant & Recycling2.0
(3.)Domestic1950STPReuse within the Plant & Recycling19
(4.)Cooling tower blow down50170ETPReuse within the Plant & Recycling50
(5.)Spin finish preparation POY00ETPReuse within the Plant & Recycling0
(6.)Burn Out BCF and POY4.025ETPReuse within the Plant & Recycling4.0
(7.)Monomer washer BCF2.525ETPReuse within the Plant & Recycling02.5
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 80.5
(b)Total Discharged Water (Kilolitre per Day) 2.5
(c)Total Reused Water (Kilolitre per Day) 78
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)left over yarn on bobbinsOthersNON-Hazardous912.5Tons30RoadAuthorized Recyclers
(2.)yarn soft wasteOthersNON-Hazardous624.15Tons30RoadAuthorized Recyclers
(3.)HardFlushwasteOthersNON-Hazardous73Tons30RoadAuthorized Recyclers
(4.)Empty drums/bags/Liners Nos/YearPlastic Waste10000Tons30RoadAuthorized Recyclers
(5.)other packaging wasteOthersNON-Hazardous2555Tons30RoadAuthorized Recyclers
(6.)Coal/Husk AshBottom Ash3650Tons30RoadOtherswill be sold to brick manufacturers
(7.)MEE SaltsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)328.5Tons98.5RoadTreatment, Storage and Disposal Facility(TSDF)
(8.)ETP wasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1Tons98.5RoadTreatment, Storage and Disposal Facility(TSDF)
(9.)used oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1.5Tons98.5RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube00000
(2.)PM2.5Microgram per Meter Cube00000
(3.)PM10Microgram per Meter Cube00000
(4.)NOxMicrogram per Meter Cube00000
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)0000SO20
(2.)0000NOx0
(3.)0000PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 8700
(b)Source TSPDCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 3X1500
(e)Stack Height (in m) 20
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 80.93
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 80.93
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : 80.93 0
    Total (ha.) 0
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt11.3547
(2.)OthersOpen Plot Area for future expansion62.3915Open Plot Area for future expansion
(3.)Built Up Area7.1738
Total (ha.) 80.92
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNONE00
(2.)ESAsNONE00
(3.)CorridorsNONE00
(4.)ESZsNONE0there are no eco sensitive zones with in 10 km
(5.)Wildlife CorridorsNONE00
(6.)NPANONE00
(7.)WLSNONE00
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestMudimial8.92Reserve Forest
(2.)Archaeological SitesNone0There are no any Historical places
(3.)Defence InstallationsNone0There are no any Defence installations
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 80.93
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Already acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Musa river
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 3.0
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 20
(b)Permanent Employment-During Operation 210
(c)Temporary Employment- During Construction 30
(d)Temporary Employment- During Operation 10
(e)No. of working days 350
(f)Total Manpower 270
32.
Green Belt in Ha:
(a)Total Area of Green Belt 11.35
(b)Percentage of Total Project Area 14.02
(c)No. of Plants to be Planted 5000
(d)Funds Allocated for Plantation 2500000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialProvide Employment to the 270 people
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. S.No 155, Rev.71, November 12th 2018
(ii)Name of the EIA Consultant Unistar Environment & Research Labs private limite
(iii)Address 215, Royal Arcade, Near GIDC Office, Vapi-396195
(iv)Mobile No. 9849023662
(v)Landline No. 0404017977
(vi)Email Id pvr@pridhvienviro.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 30 Jan 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA- EIA Consultant is not accredited for category B projects under item 5(d) of the schedule to the EIA Notification, 2006. - Status of clearance/permission to meet water requirement of 768.5 cum/day. - Detailed justification for the project to be covered under category B2. 04 Dec 2018
2.NAThe correction have been made as per the instruction received 10 Dec 2018
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantMukesh Ashok Sawalani Sawalani
DesignationCEO
Name of Company (Applicant Name should not be given here)WELSPUN FLOORING LIMITED
AddressD.NO: 6-3-609/147/A, NEAR DAYANAND HIGH SCHOOL ,KHAIRATABAD,HYDERABAD
Print