Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Existing Grain Based Distillery (110 to 170 KLPD) within Existing Plant Premises at Village Durgapur, Block - Diamond Harbour-II, District South 24 Parganas, West Bengal
(b)Name of the Company / Organisation IFB AGRO INDUSTRIES LIMITED
(c)Registered Address Plot No Ind-5, Sector 1, East Kolkata Township, Kolkata,,Kolkata,West Bengal-700107
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant S K Bayen
(b)Designation (Owner/ Partner/ CEO) VP
(c)Address Village Durgapur, Post Noorpur, PS - Ramnagar, Block-Diamond Harbour II, District South 24 Parganas, West Bengal,,Diamond Harbour - II,South 24 Parganas,West Bengal-743368
(d)Pin code 743368
(e)E-mail skbayen@gmail.com
(f)STD Code. 33(f)Telephone No. 272226
(g)Fax No. 24421003
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(g) Distilleries
Minor Activity
(b)Category A
(c)Proposal Number IA/WB/IND2/86195/2006
(d)Master Proposal Number(Single Window) SW/86182/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 873, 894, 895, 908, 909, 916, 917, 918, 919, 920,
(b)Pincode 743368
(c)Bounded Latitudes (North)
From
Degree 22.20895833
Minutes
Second
From
Degree 22.21300278
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 88.0892389
Minutes
Second
From
Degree 88.093258333
Minutes
Second
(e)Survey of India Topo Sheet No. F45K4, F45K3, F45J15, F45J16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 7
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.2
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project West Bengal
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/333/2006-IA.II(I)
(c)Date of Issue of TOR 16 Sep 2006
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 04 Jan 2019
(c)Date of Issue of EC 25 Oct 2019
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :28 May 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :29 Jun 2018
Distance of Public Hearing Venue from the Proposed Project :9.5
Meeting Hall, Sub Divisional Office, Diamond Harbour
State :West Bengal
District :South 24 Parganas
Tehsil :Diamond Harbour - II
Village :Diamond Harbour
86Employment, ESR activities in nearby areas (provision of drinking water facilities, education, health, infrastructure), Effect on environmentOthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhubaneswar
(iii)Letter No. 102-469/EPE dated 19.02.2018
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Dec 26 2017 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)ENA/RS/Ethanol11060170Kilo Litre per Day(KLD)Road
(2.)Power4.904.9Mega Watt(MW)OthersCables
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Distillery Unit I5050100KLPD
(2.)Distillery Unit II601070KLPD
(3.)Co-generation power plant4.904.9MW
(4.)CO2 Plant253560TPD
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 21 Jan 2016
(iv)Valid Upto 31 Jan 2019
(v)File No. CO60237
(vi)Application No. 37/30/WBPCB/R(3)/99
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 40
(b) Funds Allocated for Environment Management (Capital) (in Crores) 7.35
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.0
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.50
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 44450
(b)Existing quantity of raw material/fuel 82250
(c)Total quantity of raw material/fuel 126700
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Grains – Maize, jowar, broken rice126700Tons per AnnumNearby Area & StatesRoad500 MoUCopy of Linkage
(2.)bio fuel as rice husk/bagasse91000Tons per AnnumLocal SuppliersRoad500 Open MarketCopy of Linkage
(3.)Coal12250Tons per AnnumLocal SuppliersRoad500 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2017 To 31 Dec 2017
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube49.828.649.0560
(2.)SO2Micro Gram per Meter Cube16.86.316.1180
(3.)PM10Micro Gram per Meter Cube92.862.691.78100
(4.)NOxMicro Gram per Meter Cube28.512.427.4880
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.17.746.58.5
(2.)TDSmg/l10705655002000
(3.)Chloridesmg/l402.83112.112501000
(4.)TSSNA0000
(5.)Total Hardnessmg/l290.88226.24200600
(6.)Fluoridemg/l0.880.5011.5
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l5.65.4B
(2.)BODmg/l9.605.40E
(3.)pHNA8.147.82E
(4.)CODmg/l31.7119.76E
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))56.942.245 - 70
(2.)Leq(Day)A-weighted decibels(dB(A))64.752.155 - 75
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNA7.687.05
(2.)N(Nitrogen)Kilogram per hectare430.53237.46
(3.)P(Phosphorus)Kilogram per hectare282.2134.68
(4.)K(Potassium)Kilogram per hectare1187.02349.97
(5.)Electric ConductivityMillisiemens per Centimetre0.290.17
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.5 To 6.8
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.58 To 6.48
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater13800Copy of Permission LetterPipelineTube WellSWID Letters no 002049, 002050, 002051, 00205217 Apr 20121522
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial9331300Anaerobic Digestion, Aerobic Treatment and ROReuse within the Plant & Recycling,OthersWashing and Vent9330
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 933
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 933
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Fly ashFly Ash18847Tons100RoadOthersGiven to brick or Cement manufacturers
(2.)ETP SludgeIndustrial Waste60Tons0RoadOthersUsed as manure
(3.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)2Tons100RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube83.60.70.3683.96100
(2.)NOxMicrogram per Meter Cube25.10.71.5526.6580
(3.)PM2.5Microgram per Meter Cube45.70.70.1245.8260
(4.)SO2Microgram per Meter Cube13.30.70.9014.280
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Boiler (2x22 TPH)Rice Husk alongwith Biogas and Coal402.25PM1050
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 4500
(b)Source Co-generation Power Plant (4.9 MW)
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 2 x 725 KVA, 1 x 500 KVA
(e)Stack Height (in m) 14
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 13.51
    Total Land (ha.) 13.51
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 13.51
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : No additional land required for expansion 0
    Total (ha.) 13.51
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant7.97Plant and Internal Road
(2.)Green belt4.73
(3.)OthersOpen area0.81
Total (ha.) 13.51
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Wildlife CorridorsNot Applicable0No Wildlife Corridors within 10 km radius
(2.)ESZsNot Applicable0No ESZs within 10 km radius
(3.)CorridorsNot Applicable0No Corridors within 10 km radius
(4.)Critically Polluted AreaNot Applicable0No CPA within 10 km radius
(5.)WLSNot Applicable0No WLS within 10 km radius
(6.)NPANot Applicable0No NPA within 10 km radius
(7.)ESAsNot Applicable0No ESAs within 10 km radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNot Applicable0No Defence installation within 10 km radius
(2.)ForestNot Applicable0No Forest within 10 km radius
(3.)Archaeological SitesNot Applicable0No Archaeological sites within 10 km radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 13.51
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Expansion within existing plant hence no additiona
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Hugli River
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 0.2
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 200
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 100
(e)No. of working days 350
(f)Total Manpower 300
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt4.7304.73
(2.)Percentage of Total Project Area35035
(3.)No. of Plants70955057600
(4.)Funds Allocated50000050000550000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployment Generation
(2.)FinancialImproved livelihood with increased Business opportunities
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA 0069
(ii)Name of the EIA Consultant JM EnviroNet Pvt. Ltd.
(iii)Address 202 A, ABW Tower, MG Road, Gurgaon Haryana
(iv)Mobile No. 9015209362
(v)Landline No. 9015209362
(vi)Email Id jmenviron@hotmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 18 May 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease inform/clarify the following:- - EC dated 14/3/2007 is for grain based distillery of 60 KLPD. Also, the consent to operate has been issued by SPCB to produce RS/ENA not exceeding 1800 TPM. How the present proposal is for expansion from 110 to 170 KLPD. - Whether the required clearance has been obtained from the concerned regulatory authority for ground water withdrawal of 1380 cum/day. 12 Dec 2018
2.NAThe correction have been made as per the instruction received 17 Dec 2018
3.NAEarlier EC should have been obtained for expansion from 50 to 110 KLPD. Also, there seems no logic for having two separate CTOs against single EC proposed for the distillery. 28 Dec 2018
4.NAThe correction have been made as per the instruction received 04 Jan 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterWe request your good self to kindly consider our proposal in upcoming Agenda. 13 Jun 2019
2.NAIt appears that the EIA/EMP report for EC has been submitted by Proposal No.IA/WB/IND2/86195/2006 and the ADS was sought by the Committee as mentioned in the Minutes of meeting, however, the ADS reply submitted by the PP vide letter dated 22nd May, 2019 has mentioned proposal No. IA/WB/IND2/69992/2017, F.No.J-11011/491/2017-IA-II(I, please clarify the same. 13 Jun 2019
3. ADS Reply LetterWe are herewith submitted the reply of the ADS generated on 18.04.2019. Kindly consider our proposal for further proceedings. 22 May 2019
4.NAThe EAC, after deliberations, desired for clarification/inputs in respect of the following:- (i) Details of proposed feedstock/non edible grains namely, broken rice, sorghum, bajra, maize, etc, their source and firmed up plan for procurement. (ii) Test report from a Govt recognized laboratory to ensure non edibility of the grains. (iii) Permission required from the concerned regulatory authority to meet the increased water requirement of 1380 cum/day. Even the present certificate of registration of existing well dated 17th April, 2012 issued by the State Water Investigation Department, Government of West Bengal, needs revalidation. (iv) Approval from PESO for the site and layout plan for storage facilities. (v) Plan for Corporate Environment Responsibility. (vi) Measures taken to reduce carbon footprint. The proposal was deferred for the needful. 22 Apr 2019
5.NA

Deferred

18 Apr 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantS K Bayen
DesignationVP
Name of Company (Applicant Name should not be given here)IFB AGRO INDUSTRIES LIMITED
AddressPlot No Ind-5, Sector 1, East Kolkata Township, Kolkata