Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) BADAMPAHAR IRON ORE MINES
(b)Name of the Company / Organisation LAL TRADES AND AGENCIES PVT LTD
(c)Registered Address At/po-Badampahar, Dist - Mayurbhanj, Odisha, Pin:757043 ,,Mayurbhanj,Orissa-757043
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Raj Kumar Misra
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address Near railway crossing, At/po:- Rairangpur, Dist:-Mayurbhanj,,,Kolkata,West Bengal-700069
(d)Pin code 700069
(e)E-mail laltrades@gmail.com
(f)STD Code. 6794(f)Telephone No. 222698
(g)Fax No. 222834
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity1(a) Mining of minerals
(b)Category A
(c)Proposal Number IA/OR/MIN/7250/2007
(d)Master Proposal Number(Single Window) SW/85907/2018
(e)EAC concerned (for category A Projects only) Non-Coal Mining
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No. 1121, 1122, 1123, 1124, 1125, 1126, 1127,
(b)Pincode 757043
(c)Bounded Latitudes (North)
From
Degree 22.06468611
Minutes
Second
From
Degree 22.08598055
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 86.10939166
Minutes
Second
From
Degree 86.140225
Minutes
Second
(e)Survey of India Topo Sheet No. 73J/4 and 73K/1
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 830
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 6
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Orissa
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)OrissaMayurbhanjBadampaharDhangrimuta, Dudhijharan & Badampahar RF
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11015/1180/07-I.A. II(M)
(c)Date of Issue of TOR 04 Sep 2008
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 22 Oct 2009
(c)Date of Issue of EC 09 Apr 2010
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :01 Sep 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :10 Oct 2018
Distance of Public Hearing Venue from the Proposed Project :0.5
Near the premises of Badampahar Iron Ore Mines at Badampahar
State :Orissa
District :Mayurbhanj
Tehsil :Badampahar
Village :Dhangrimuta, Dudhijharan & Badampahar RF
6001. Road dust pollution no water sprinkling 2. Paddy fields in the downhill get covered with red murrom soil in the runoff water Potable water problem of the area. 3. Hospital problem of the area and nOthersADM
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhubaneswar
(iii)Letter No. 101-463/16/EPE, Dated 19.09.2018
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Aug 21 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Iron Ore/ Mining0.720.781.5OthersMTPARoad,Rail
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)NANANANANA
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception Copy of Consent to Operate
(iii)Date of Issue 18 Feb 2016
(iv)Valid Upto 31 Mar 2020
(v)File No. 3010/IND-I-CON-2334
(vi)Application No. 2376
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 35.5
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.76
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 2.085
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.172
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
a)Protected areas notified under the wildlife (Protection) Act, 1972 Yes
c)Notified Eco-sensitive areas Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)NA0OthersNANAOthersNA0 OthersNACopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 05 Mar 2018 To 25 May 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube78.947.974.7100
(2.)PM2.5Micro Gram per Meter Cube54.232.150.360
(3.)SO2Micro Gram per Meter Cube13.34.711.280
(4.)NOxMicro Gram per Meter Cube19.29.616.780
(5.)OthersCOMili Gram per Meter Cube0.330.120.34
    14.2.     No. of Ground Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Chloridesmg/l129.9522.402501000
(2.)OthersIronmg/l0.360.180.30.3
(3.)TDSmg/l432.0178.05002000
(4.)Total Hardnessmg/l268.094.0300600
(5.)Fluoridemg/l0.20.1111.5
(6.)Heavy MetalsMagnesiummg/l24.7715.0230100
(7.)TSSmg/l0000
(8.)pHNA7.126.966.58.5
    14.3.     No. of Surface Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.26.8C
(2.)BODmg/l1.61.1C
(3.)CODmg/l00C
(4.)DOmg/l7.06.1C
(5.)OthersTDSmg/l124114C
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))56.7535.6370
(2.)Leq(Day)A-weighted decibels(dB(A))6643.8875
    14.5.     No. of Soil Sample Monitored locations : 4
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOtherscm/hr6.85.8
(2.)P(Phosphorus)Kilogram per hectare23.419.2
(3.)Electric ConductivityMillisiemens per Centimetre0.220.16
(4.)N(Nitrogen)Kilogram per hectare412296
(5.)K(Potassium)Kilogram per hectare724422
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 40.01 To 49.93
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 37.62 To 47.58
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater1321Copy of Permission LettermodeOthersWater TankersOthersBore Well & Rainwater Harvesting Ponds21-4(193)/CGWA/SER2009-120008 Dec 2009300
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)No Waste Water Generated During Operation00NAOthersNA00
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 0
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)OverburdenOthersMining689500Tons1.5RoadOthersBackfilling
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube54.241.7555.9560
(2.)PM10Microgram per Meter Cube78.943.8882.78100
(3.)SO2Microgram per Meter Cube12.440.00112.40180
(4.)NOxMicrogram per Meter Cube19.246.1525.3580
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NANA00OthersNA0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 212
(b)Source NESCO UTILITY
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) No. of DG Sets=5. DG- 1x15 KVA, 2x25 KVA, 1x160 KV
(e)Stack Height (in m) 2
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 117.84
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0.78
(e)Other Land (ha.) 10.99
    Total Land (ha.) 129.61
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0.78
(f)Industrial (ha.) 3.33
(g)Forest (ha.) 66.586
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NA 0
    Total (ha.) 70.696
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Quarry Area35.742
(2.)OB Dump Area7.09
(3.)Built Up Area4.11
(4.)Main Plant0.572
(5.)OthersMineral Storage, Road, Other allied activities30.362
Total (ha.) 77.876
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESZsSimilipal Eco Sensitive Zone6.1Within 10 Km
(2.)WLSSimilipal Sanctuary6.1Distance from the lease boundary
(3.)NPASimilipal Sanctuary6.1Within 10 Km
(4.)Critically Polluted AreaNA0NA
(5.)ESAsSimilipal Sanctuary6.1Within 10 Km
(6.)CorridorsSimilipal Sanctuary6.1Within 10 Km
(7.)Wildlife CorridorsElephant Corridors6.1Within 10 Km
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA0NA
(2.)Defence InstallationsNA0NA
(3.)OthersState Highway & National HighwaySH-49 NH-66from NH-6
(4.)ForestBadampahar RF0Part of Lease in Forest
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? Yes
(a)Forests Clearance Status Final(Stage-II) Approval Obtained
(i)MoEFCC file number FP/OR/MIN/816/2004
(ii)Date of final approval 27 Jul 2009
(iii)Date of In-Principle Approval 27 Jul 2009
(iv)Area diverted 117.84
(v)Uploaded FC Letter Copy of FC Letter
(b)Legal Status of Forest Land Reserved
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Elephant
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made Rs. 68.4 Lakhs (2007 Plan) & Rs. 91.16 Lakhs (For
(iii)Period of Implementation For 10 Years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Kunkijharan Nala
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 5.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 500
(e)No. of working days 305
(f)Total Manpower 500
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt11.816.76118.571
(2.)Percentage of Total Project Area9.25.2114.41
(3.)No. of Plants280891688544974
(4.)Funds Allocated315000100000415000
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)Iron OreMajor
2.
Mine Capacity in ROM (Run of Mine) 0.72 MTPA
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. MPM/FM/16-ORJ/BHU/2018-19
(b)Date of Approval 26 Jul 2018
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department IBM
(e)Approved Mining Lease Area 129.61
(f)Approved Capacity 1.5
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 8.29
(b)Mineable Reserves (Million Ton) 8.29
(c)Extractable Reserves(Million Ton) 8.29
(d)Percent(%) of Extraction 100
(e)Grade of Coal /Ore /Mineral +50% to -62% Fe
(f)Stripping Ratio 1 : 0.15
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) NA
(i)Mining Method Opencast
(j)Life of Mine (Years) 6
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 129.61
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 05 Jul 2016
(iii)Validity of LOI 50
(iv)Reference No. of LOI 5615/SM/BHUBANESHWAR
(c)Whether Lease Deed Executed ? Yes
(i)Copy of Executed Lease deed valid as on Date Copy of Executed Lease deed
(ii)Provide area in Hectare as per executed lease deed (initial) document 129.61
(iii)Validity of the lease deed From : 27 May 1970 To : 26 May 2020
(iv)Date of Execution of Mining Lese 23 Dec 2016
(v)Reference Number 1911600001
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof NA
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
(v)No. of year back fill up 0
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 6
(ii)Total Area (in Hectare) 4.53
(iii)Height (in meter) 15
(iv)Quantity (in Million Cubic meter) 0.486
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 35.742
(b)Depth (in meter) 25
(c)Volume (in Million Cubic meter) 8.94
12.
Details of Quarry:
(a)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 35.742
13.
Details of Transportation:
(a)In Pit/Underground to Surface Through Dumpers and Hyva
(b)Surface to Siding/Loading Through AMW and Hyva
(c)Transportation / Conveyor Details Transportation through Trucks
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)AGRICULTURE LAND000
(2.)FOREST LAND117.840117.84
(3.)WASTE LAND000
(4.)SETTLEMENTS0.7800.78
(5.)GRAZING LAND000
(6.)SURFACE WATER BODIES000
(7.)OTHERS(Specify)Safety Zone - Forest10.99010.99
TOTAL129.610129.61
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)GREEN BELT10.990010.99
(2.)BUILT UP AREA (COLONY/OFFICE)4.11004.11
(3.)VIRGIN AREA40.7440040.744
(4.)EXCAVATION/QUARRY35.7420035.742
(5.)TOP SOIL STORAGE0000
(6.)EXTERNAL OB DUMPS0000
(7.)ROADS002.6442.644
(8.)OtherPlantation Mining allied activities28.2900028.29
(9.)INTERNAL OB DUMPS7.09007.09
TOTAL126.96602.6440129.61
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 7.09
(c)Quarry(in hectare) 35.742
(d)Safety Zone(in hectare) 10.99
(e)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 2500
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 32.4
(h)Total afforestation plant (in hectare) 86.22
17.
Status of progressive Mining Closure Plan:
Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan
Any Deviation from the Approved Progressive Mine Closure Plan No
Total Area Excavated (in hectare) 33.742
Total Area Backfilled after Excavation (in hectare) 0.905
Total Area Reclaimed (in hectare) 0.905
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)197400000
(2.)197000010112.75010112.750
(3.)197500000
(4.)197700085462.60085462.600
(5.)19780008862188621
(6.)19800006150261502
(7.)19820001097210972
(8.)198500019152.26819152.268
(9.)19870001318813188
(10.)19890001438614386
(11.)19900001711517115
(12.)1993000335335
(13.)1994000334334
(14.)19950001049010490
(15.)199600030933.25030933.250
(16.)19980001372313723
(17.)2004005472060144.4600
(18.)20100.727200005187005950880
(19.)20110.727200006789306786430
(20.)20130.727200007100106978400
(21.)20140.72720000725760613238.9730
(22.)20150.7272000010418823041100
(23.)20160.7272000011679657107700
(24.)20170.7272000012949697194200
(25.)2008052000609840316735.1800
(26.)2006002265000
(27.)19840001250812508
(28.)19920002077620776
(29.)197300000
(30.)19790009307693076
(31.)19810001808518085
(32.)19830001639716397
(33.)19860001765717657
(34.)19880001884018840
(35.)19970004430144301
(36.)19990002087720877
(37.)2000006553582900
(38.)2002005082559000
(39.)20030048691584910
(40.)20050042464424640
(41.)2007052000485100198867.3000
(42.)200907200007157601564410
(43.)20120.727200007056006856100
(44.)197100000
(45.)197200000
(46.)197600051829.92051829.920
(47.)2001005889224430
(48.)199100066486648
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? Yes
(b)Name of the Court High Courts
(c)Name of the Sub Court Orissa
(d)Case No. 2(c) C.C. No. 6 of 2013
(e)Orders/Directions of the court ,if any and its relevance with the proposed project Stay Granted Stay order, Dated 31.07.2014
(f)Case Details Under Section 15 of EP Act
(g)Uploaded Court Order Copy of Court Order
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/RA0090
(ii)Name of the EIA Consultant Visiontek Consultancy Services Pvt. Ltd.
(iii)Address Plot No. M-22 & 23, Chandaka Industrial Estate, Bhubaneswar-751024, Dist- Khurda, Odisha
(iv)Mobile No. 9338822732
(v)Landline No. 0674645178
(vi)Email Id visiontekin@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 13 Mar 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRaj Kumar Misra
DesignationDirector
Name of Company (Applicant Name should not be given here)LAL TRADES AND AGENCIES PVT LTD
AddressAt/po-Badampahar, Dist - Mayurbhanj, Odisha, Pin:757043
Print