(a)Name of the project(s) ASR Multimetals Pvt Ltd
(b)Name of the Company / Organisation ASR MULTIMETALS PVT. LTD.
(c)Registered Address Survey no. 394/2, 398, 399 & 400, National highway 8-A, Village Chhadwada, Taluka Bhachau, District Kutchh, Gujarat,,kutch,Gujarat-370140
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant VIJAY KUMAR DUBEY
(b)Designation (Owner/ Partner/ CEO) DGM( Taxation & Administration
(c)Address ASR Multimetals Private Limited, Staff colony, Village Chhadwada, Taluka Bhachau, District Kutchh, Gujarat.,,Bhachau,kutch,Gujarat-370140
(d)Pin code 370140
(e)E-mail vijaykumardubey@yahoo.com
(f)STD Code. 91(f)Telephone No. 283449
(g)Fax No. 2837283
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
Minor Activity1(d) Thermal Power Plants
(b)Category A
(c)Proposal Number IA/GJ/IND/85547/2015
(d)Master Proposal Number(Single Window) SW/85529/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 394/1(P), 394/2, 395, 398, 397, 399 & 400
(b)Pincode 370140
(c)Bounded Latitudes (North)
From
Degree 23.3048
Minutes
Second
From
Degree 23.3106
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 70.4654
Minutes
Second
From
Degree 70.4673
Minutes
Second
(e)Survey of India Topo Sheet No. NF42-3
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 44
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 2
(j)Seismic Zone 5
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/251/2007-IA II (I)
(b)Date of Apply of TOR 28 Apr 2015
(c)Date of Issue of TOR / Standard ToR 07 Jul 2015
(d)Date of Apply of EC 28 Feb 2007
(e)Date of Issue of EC 31 Mar 2008
(f)Previous TOR Letter Copy of Previous TOR letter
(g)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :05 Jul 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :07 Aug 2018
Distance of Public Hearing Venue from the Proposed Project :0
Chadavada
State :Gujarat
District :kutch
Tehsil :Bhachau
Village :Chadavada
199Less amount of CSR fund were spent. Dust particles were observed in near villages. Local people be considered for employment. Rain scarce area,hence affecting crops. Local villagers ask company toDistrict Magistrate
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhopal
(iii)Letter No. 5-49/2009(ENV)519
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jun 23 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)MS - Rods, Wires, Flats, Re-rolled steel products144000288000432000Tons per Annum(TPA)Road
(2.)Sponge Iron66000180000246000Tons per Annum(TPA)Road
(3.)Pwer from WHRB (Waste Heat Gases Rotary Klin4812Mega Watt(MW)OthersBy Wire and Cables
(4.)Steel Bilets/ Ingots (Semi Finished Products)147996288000435996Tons per Annum(TPA)Road
(5.)Power from AFBC Boile (Coal Base)41721Mega Watt(MW)OthersBy Wire and Cables
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Rotary Kiln2x100 MT2x250 MT20500 MT/Month
(2.)WHRB4 MW8 MW12 MW
(3.)Induction Furnace3 Nos2x30 MT36333 MT/Month
(4.)Rolling Mill12000 MT/Month24000 MT/Month36000 MT/Month
(5.)AFBC Boiler4 MW17 MW21 MW
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 20 Jun 2018
(iv)Valid Upto 13 May 2023
(v)File No. J-11011/251/2007-IA- (II)
(vi)Application No. 136805
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 250
(b) Funds Allocated for Environment Management (Capital) (in Crores) 3.57
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.20
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.6
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 180000
(b)Existing quantity of raw material/fuel 90000
(c)Total quantity of raw material/fuel 270000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Sponge Iron180000Tons per AnnumJindal Saw LTDRoad44 LinkageCopy of Linkage
(2.)Iron ore288000Tons per AnnumJindalRoad44 LinkageCopy of Linkage
(3.)Coal216000Tons per AnnumAditya Birla Swiss SingaporeRoad44 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 15 Mar 2015 To 15 Jun 2015
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube35.028.3134.7580
(2.)PM10Micro Gram per Meter Cube996098.5100
(3.)PM2.5Micro Gram per Meter Cube55205560
(4.)OthersCOMicro Gram per Meter Cube1533.31846.751241.98---
(5.)SO2Micro Gram per Meter Cube26.143.3726.1480
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHOtherspH Unit7.937.226.58.5
(2.)OthersNitratemg/l31.031.04545
(3.)TDSmg/l18001505002000
(4.)Chloridesmg/l1417.7.852501000
(5.)Fluoridemg/l1.520.8411.5
(6.)TSSmg/l0000
(7.)Total Hardnessmg/l718144300600
    14.3.     No. of Surface Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHOtherspH Unit7.436.70B
(2.)BODmg/l1606B
(3.)DOmg/l00B
(4.)CODmg/l16020B
(5.)OthersTotal coliformsOthersMPN/100 ml42B
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))70.952.175
(2.)Leq(Night)A-weighted decibels(dB(A))5136.270
    14.5.     No. of Soil Sample Monitored locations : 7
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Milligram per Kilogram21.351.83
(2.)K(Potassium)Milligram per Kilogram57222.5
(3.)Electric ConductivityOthersumho/cm45600100
(4.)N(Nitrogen)Percent6.30.012
(5.)pHOtherspH unit7.987.35
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 25.05 To 37.64
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 13.71 To 27.43
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersGujarat Water Infrastructure Limited (GWIL)10000Copy of Permission LetterPipelineOthersSupply through pipelineGWIL/Kutch/Renewal/2016-17-55530 Jul 2016395
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Cooling TOwer40500Primary TreatmentReuse within the Plant & Recycling40
(2.)Boiler237.44500Primary TreatmentReuse within the Plant & Recycling237.44
(3.)D M Reject127.20500Primary TreatmentReuse within the Plant & Recycling127.20
(4.)domestic4040soak pitDischarge into Seawater Body,OthersSoak pit0040
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 444.64
(b)Total Discharged Water (Kilolitre per Day) 40
(c)Total Reused Water (Kilolitre per Day) 404.64
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)SlagIndustrial Waste69300Tons45RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)Used OilIndustrial Waste111.365Tons50RoadAuthorized Recyclers
(3.)Fly AshFly Ash145530Tons25RoadAuthorized Recyclers
(4.)Coal CharIndustrial Waste72600Tons20RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube19.241.1181.65820.89880
(2.)NOxMicrogram per Meter Cube23.560.79.70733.26780
(3.)PM2.5Microgram per Meter Cube850.71.63786.637100
(4.)PM10Microgram per Meter Cube850.71.63786.637100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)AFBC BoilerCoal/Coal char601.2SO28.709
(2.)AFBC BoilerCoal/ Coal char601.2NOx18.051
(3.)DG SetDiesel170.35PM100.180
(4.)DG SetDiesel170.35PM100.180
(5.)Induction Furnace I to IIIElectricity300.8PM101.069
(6.)Rotary KilnCoal451.8NOx49.295
(7.)Rotary KilnCoal451.8NOx49.295
(8.)Induction Furnace I to IIIElectricity300.8NOx8.022
(9.)Rotary Kiln III - IVCoal451.8PM103.286
(10.)DG SetDiesel170.35SO20.041
(11.)DG Setdiesel170.35NOx1.354
(12.)AFBC BoilerCoal/ Coal Char601.2PM101.203
(13.)Rotary KilnCoal451.8SO28.68
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 46500
(b)Source SEB/Own CPP
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 4250 KVa
(e)Stack Height (in m) 17
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 00
(b)Private Land (ha.) 10.8103
(c)Government Land (ha.) 00
(d)Revenue Land (ha.) 00
(e)Other Land (ha.) 00
    Total Land (ha.) 10.8103
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 25783.4
(b)Waste/Barren Land (ha.) 21.40
(c)Grazing/ Community Land (ha.) 20.0
(d)Surface Water Bodies (ha.) 272.63
(e)Settlements (ha.) 453.01
(f)Industrial (ha.) 230.56
(g)Forest (ha.) 00
(h)Mangroves (ha.) 2237.64
(i)Marine Area (ha.) 180.73
(j)Others (ha.) : Open Vegetation 2177.99
    Total (ha.) 31377.36
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant1.6453
(2.)Green belt14.4753
(3.)Township0.44
(4.)Ash Pond1.21
(5.)Built Up Area0.226
(6.)OthersStorage Area13.44
Total (ha.) 31.4366
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Wildlife Corridors--0000
(2.)Critically Polluted Area--0000
(3.)NPA--00000
(4.)ESAs--0000
(5.)WLS--0000
(6.)ESZs--0000
(7.)Corridors--0000
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological Sites--0000
(2.)Defence InstallationsSamakhayali3.200
(3.)Forest--0000
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 00
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 31.4683
(b)Land yet to be acquired(Ha) 00
(c)Status of Land acquisition if not acquired acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 00
(b)No. of Households 00
(c)No. of PDFs (Project Displaced Families) 00
(d)No. of PAFs (Project Affected Families) 00
(e)Funds Allocated for R&R(in INR) (in Lacs) 00
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 100
(b)Permanent Employment-During Operation 100
(c)Temporary Employment- During Construction 50
(d)Temporary Employment- During Operation 150
(e)No. of working days 330
(f)Total Manpower 400
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt56980.587773144753.5
(2.)Percentage of Total Project Area222547
(3.)No. of Plants116751025021925
(4.)Funds Allocated233500002050000043850000
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA 62
(ii)Name of the EIA Consultant Detox Corporation Pvt. Ltd.
(iii)Address 3rd floor, K G Chambers, Opp. Gujarat Samachar Press, Udhna Darwaja, Ring Road, Surat
(iv)Mobile No. 9824412866
(v)Landline No. 0261235124
(vi)Email Id pushpak.shah@detoxgroup.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 09 Jul 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAMay kindly refer to the Form-2 submitted. The following observations were observed. 1. The details of earlier ToR and MoEFCC file number is mentioned as Nil 2. The EIA/EMP is not able to view 3. The covering letter also does not have any details. In light of the above it is very difficult to verify the project inter alia including the valdity of the ToR, Baseline, and other mandatory details. Therefore, you are requested to make application properly by providing complete details instead of mentioneing as "Nil" 23 Dec 2018
2.NAThe correction have been made as per the instruction received 26 Dec 2018
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantVIJAY KUMAR DUBEY
DesignationDGM( Taxation & Administration
Name of Company (Applicant Name should not be given here)ASR MULTIMETALS PVT. LTD.
AddressSurvey no. 394/2, 398, 399 & 400, National highway 8-A, Village Chhadwada, Taluka Bhachau, District Kutchh, Gujarat