Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) THE PROPOSED GREENFIELD AIRPORT AT HOLONGI, ITANAGAR, ARUNACHAL PRADESH
(b)Name of the Company / Organisation AAI ITANAGAR
(c)Registered Address Airport Authority of India, Rajiv Gandhi Bhavan, Safdarjung Airport, New Delhi,,New Delhi,Delhi-110003
(d)Legal Status of the Company Central Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Biswas Alakesh
(b)Designation (Owner/ Partner/ CEO) JtGMEnggCivil
(c)Address Airport Authority of India, Rajiv Gandhi Bhavan, Safdarjung Airport, New Delhi,,Parliament Street,New Delhi,Delhi-110003
(d)Pin code 110003
(e)E-mail abiswas@aai.aero
(f)STD Code. 11(f)Telephone No. 25652760
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(a) Air ports
Minor Activity7(a) Air ports
(b)Category A
(c)Proposal Number IA/MIS/AR/23946/2014
(d)Master Proposal Number(Single Window) SW/85448/2018
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Holongi
(b)Pincode 791123
(c)Bounded Latitudes (North)
From
Degree 265810
Minutes
Second
From
Degree 265812
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 933950
Minutes
Second
From
Degree 933953
Minutes
Second
(e)Survey of India Topo Sheet No. 83 E/12, E/16, F/19 and F/13
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 104
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 5
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Arunachal Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Arunachal PradeshPapum PareBalijan Circle
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number 10-20/21014-IA.III
(c)Date of Apply of TOR 30 Jul 2014
(d)Date of Issue of TOR / Standard ToR 21 Oct 2015
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :29 Sep 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :30 Oct 2018
Distance of Public Hearing Venue from the Proposed Project :1
Government Middle School Ground, Patila, District Papum Pare, Arunachal Pradesh
State :Arunachal Pradesh
District :Papum Pare
Tehsil :Itanagar Circle
Village :Holongi
209Employment, R&R, Land Compensation etc.District Collector
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)airport200 PAX
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Airport424.28HectaresOthersAirport
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 1092.03
(b) Funds Allocated for Environment Management (Capital) (in Crores) 58.38
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 5.46
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 3
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
d)Inter-State boundaries and international boundaries Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Diesel100Kilo Litre per DaylocalRoad2 Open Marketlocal marketCopy of Linkage
(2.)Not Applicable0Tons per AnnumlocalRoad2 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2015 To 31 Dec 2015
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube13.46.112.960
(2.)SO2Micro Gram per Meter Cube12.88.212.680
(3.)NOxMicro Gram per Meter Cube13.89.013.580
(4.)PM10Micro Gram per Meter Cube28.815.228.6100
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.46.56.58.5
(2.)TDSmg/l323.852.55002000
(3.)TSSNA0000
(4.)Fluoridemg/l0.10.11.01.5
(5.)Heavy MetalsIronmg/l0.20.060.30
(6.)Total Hardnessmg/l14832200600
(7.)Chloridesmg/l38.42.82501000
    14.3.     No. of Surface Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.77.2D
(2.)DOmg/l6.25.6D
(3.)BODmg/l83D
(4.)CODmg/l405D
    14.4.     No. of Ambient Noise monitoring locations : 10
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))42.933.655
(2.)Leq(Day)A-weighted decibels(dB(A))51.539.265
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersnot applicable6.34.5
(2.)N(Nitrogen)Kilogram per hectare119.514.3
(3.)Electric ConductivityMillisiemens per Centimetre118.614.8
(4.)P(Phosphorus)Kilogram per hectare692.62.8
(5.)K(Potassium)Kilogram per hectare217.128.0
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 5 To 8
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface908Copy of Permission LetterCanalOthersKokila streamF/No. Sectt/PHE-20/201801 Nov 201890
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)domestic sewage3636MBBRGreen Belt Renewal Plant36
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 36
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 36
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)domesticMunicipal Solid Waste43.8Tons5RoadOthersLocal authority
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube28.80.80.0528.85100
(2.)PM2.5NA13.40.80060
(3.)SO2Microgram per Meter Cube12.80.82.9315.7380
(4.)NOxMicrogram per Meter Cube13.80.829.243.080
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)0000Othersnot applicable0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 125
(b)Source State Electricity Board
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 2
(e)Stack Height (in m) 10
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 424.281
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 424.281
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 13326
(b)Waste/Barren Land (ha.) 1336
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 1235
(e)Settlements (ha.) 5245
(f)Industrial (ha.) 50
(g)Forest (ha.) 13608
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : not applicable 0
    Total (ha.) 34800
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Built Up Area0.4Terminal Building
Total (ha.) 0.4
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted Areanil0not applicable
(2.)ESZsNil0not applicable
(3.)CorridorsNil0not applicable
(4.)Wildlife CorridorsNil0not applicable
(5.)WLSNil0not applicable
(6.)NPANil0not applicable
(7.)ESAsNil0not applicable
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNil0Not applicable
(2.)Defence InstallationsNil0Not applicable
(3.)ForestDrupong RF0.5north from project site
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 424.28
(c)Status of Land acquisition if not acquired yet to be acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 156
(c)No. of PDFs (Project Displaced Families) 156
(d)No. of PAFs (Project Affected Families) 156
(e)Funds Allocated for R&R(in INR) (in Lacs) 29700
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Kokila river & Telephone nala
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? Yes
(i)Uploaded copy of permission Copy of permission
(ii)Letter No. No. WRD/4/140/2004-05
(iii)Date of issue 30 Sep 2014
(iv)Recommendation NA
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Holongi river (Near Project site)
(ii)Direction of Water Bodies in Buffer Area South West
(iii)Distance of Water Bodies in Buffer Area 0.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 100
(c)Temporary Employment- During Construction 500
(d)Temporary Employment- During Operation 50
(e)No. of working days 365
(f)Total Manpower 650
32.
Green Belt in Ha:
(a)Total Area of Green Belt 42.8
(b)Percentage of Total Project Area 10.09
(c)No. of Plants to be Planted 15000
(d)Funds Allocated for Plantation 10000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 10
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 4
(d)Total plot area (sqm) 4242810
(e)Total built up area (sqm) 4100
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 3
(d)Capacity 6500
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 150 cars
5.
Energy Saving Measures:
(a)Source/Mode local
(b)Percentage 40
(c)Quantity 50
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area Minimal, river will be retrained
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. QCI/NABET/ENV/ACO/17/0285
(ii)Name of the EIA Consultant Vimta Labs Limited
(iii)Address 142, IDA,, PHASE-II CHERLAPALLY
(iv)Mobile No. 9000711309
(v)Landline No. 0402726414
(vi)Email Id janardhan@vimta.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 19 May 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantBiswas Alakesh
DesignationJtGMEnggCivil
Name of Company (Applicant Name should not be given here)AAI ITANAGAR
AddressAirport Authority of India, Rajiv Gandhi Bhavan, Safdarjung Airport, New Delhi