Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Development of Bhiwadi International Airport near Bhiwadi, Distt. Alwar, Rajasthan
(b)Name of the Company / Organisation DELHI MUMBAI INDUSTRIAL CORRIDOR DEVELOPMENT CORPORATION
(c)Registered Address Delhi Mumbai Industrial Corridor Development Corporation, Room No. 341-B, 3rd Floor, Hotel Ashok, 50B Diplomatic Enclave, Chanakyapuri, New Delhi,,Central,Karnataka-110021
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Talleen Kumar
(b)Designation (Owner/ Partner/ CEO) CEO & MD, DMICDC
(c)Address Delhi Mumbai Industrial Corridor Development Corporation, Room No. 341-B, 3rd Floor, Hotel Ashok, 50B Diplomatic Enclave, Chanakyapuri, New Delhi,,Karol Bagh,Central,Delhi-110021
(d)Pin code 110021
(e)E-mail ceo@nicdc.in
(f)STD Code. 11(f)Telephone No. 26118886
(g)Fax No. 01126118889
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(a) Air ports
Minor Activity7(a) Air ports
(b)Category A
(c)Proposal Number IA/RJ/MIS/64611/2017
(d)Master Proposal Number(Single Window) SW/85419/2018
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Total Number of Plots-3988
(b)Pincode 301702
(c)Bounded Latitudes (North)
From
Degree 27.991964
Minutes
Second
From
Degree 28.023533
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 76.742653
Minutes
Second
From
Degree 76.805942
Minutes
Second
(e)Survey of India Topo Sheet No. G43E9, G43E13, H43W12, H43W16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 275.5
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 2.94
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Rajasthan
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)RajasthanAlwarKotkasim
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number 10-29/2017-IA-III
(c)Date of Apply of TOR 10 May 2017
(d)Date of Issue of TOR / Standard ToR 13 Jun 2017
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :05 Aug 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :12 Sep 2018
Distance of Public Hearing Venue from the Proposed Project :0.250
Government Sanskrit School, Ladpur, village, Alwar
State :Rajasthan
District :Alwar
Tehsil :Kotkasim
Village :Ladpur
326Plantation in lieu of tree cutting, Rate of Compensation for Land acquisition, Job opportunity, Time frame for project completion, Flora / Fauna conservation.Others
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)NANADevelopment of Greenfield International Airport
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)NA0OthersTo be incorporated in contract documentOthersTo be incorporated in contract document
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 1757.68
(b) Funds Allocated for Environment Management (Capital) (in Crores) 112.72
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 8.78
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.24
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
b)Critically polluted areas as notified by the Central Pollution Control Board(CPCB) from time to time Yes
d)Inter-State boundaries and international boundaries Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)To be incorporated in contract documents0OthersTo be incorporated in contract documentTo be incorporated in contract documentRoad0 OthersTo be incorporated in contract documentCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Nov 2017 To 31 Jan 2018
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube161.298.8160.1CPCB guidelines and MoEF&CC Manual
(2.)NOxMicro Gram per Meter Cube31.420.630.6CPCB guidelines and MoEF&CC Manual
(3.)PM2.5Micro Gram per Meter Cube81.553.279CPCB guidelines and MoEF&CC maual
(4.)SO2Micro Gram per Meter Cube15.31014.8CPCB guidelines and MoEF&CC Manual
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.256.958.58.5
(2.)TSSmg/l13600
(3.)Fluoridemg/l111.01.5
(4.)TDSmg/l38654075002000
(5.)Chloridesmg/l10159.910001000
(6.)Total Hardnessmg/l1111111600600
(7.)Heavy MetalsManganesemg/l0.0520.00620.10.3
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.256.95A
(2.)BODmg/l103A
(3.)CODmg/l282A
(4.)DOmg/l7.56.1A
    14.4.     No. of Ambient Noise monitoring locations : 12
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))60.151.3MoEF&CC Manual
(2.)Leq(Night)A-weighted decibels(dB(A))49.640.6MoEF&CC Manual
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNA7.837.14
(2.)N(Nitrogen)Kilogram per hectare310.76196.35
(3.)K(Potassium)Milligram per Kilogram413.72110.80
(4.)Electric ConductivityOthersms/cm00
(5.)P(Phosphorus)Kilogram per hectare183.3494.93
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 20
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 20 To 40
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater14090Copy of Permission LetterPipelineTube WellTo be applied29 Oct 20181409
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Flushing , Floor Washing,226250Packaged STPOthersReuse for horticulture2260
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 226
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 226
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Solid WasteMunicipal Solid Waste182.5Tons23RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube22.40.20.6923.0980
(2.)SO2Microgram per Meter Cube12.80.20.1112.9180
(3.)PM10Microgram per Meter Cube121.30.20.02121.32100
(4.)PM2.5Microgram per Meter Cube58.80.20.0158.8160
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NANA00Others00
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 35000
(b)Source State Electricity Board
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 10
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 1793.45
(c)Government Land (ha.) 84.65
(d)Revenue Land (ha.) 81.67
(e)Other Land (ha.) 98.23
    Total Land (ha.) 2058
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 1785
(b)Waste/Barren Land (ha.) 202
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 1
(e)Settlements (ha.) 70
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : 0 0
    Total (ha.) 2058
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt237.98NA
(2.)OthersFor Runway, Apron, Terminal building, ATC etc98.7NA
Total (ha.) 336.68
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNot Applicable0NA
(2.)NPANot Applicable00NA
(3.)Wildlife CorridorsNot Applicable00NA
(4.)Critically Polluted AreaBhiwadi Industrial Cluster9.5Nil
(5.)ESAsNot Applicable00NA
(6.)ESZsNot applicable00NA
(7.)CorridorsNot Applicable00NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestBhalaki5.4Outside proposed Airport site
(2.)Archaeological SitesNA0Not situated within 10 km of proposed Airport site.
(3.)Defence InstallationsNA0Not situated within 10 km of proposed Airport site.
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 4456
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 2058
(c)Status of Land acquisition if not acquired Land acquisition process yet to be initiated
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 14
(b)No. of Households 2928
(c)No. of PDFs (Project Displaced Families) 1123
(d)No. of PAFs (Project Affected Families) 1345
(e)Funds Allocated for R&R(in INR) (in Lacs) 10197
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Peacock
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made Shall be incorporated as per conditions stipulated
(iii)Period of Implementation As per MoEF&CC directions
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Dry Ponds covering an area of 1 ha
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Sabi seasonal River
(ii)Direction of Water Bodies in Buffer Area North West
(iii)Distance of Water Bodies in Buffer Area 2.94
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 3000
(c)Temporary Employment- During Construction 1000
(d)Temporary Employment- During Operation 0
(e)No. of working days 6
(f)Total Manpower 4000
32.
Green Belt in Ha:
(a)Total Area of Green Belt 237.98
(b)Percentage of Total Project Area 11.56
(c)No. of Plants to be Planted 16500
(d)Funds Allocated for Plantation 24750000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Environmental1. Improved Air transportation. 2. Avenue Plantation. 3. Reduction in Green House Gas Emissions. 4. Water Conservation through Rain Water Harvesting. 5. Energy Conservation. 6. Solar Power Generation. 7. Landscaping. 8. Establishment of Environment Management Cell.
(2.)Financial1.Carbon Credits. 2. Overall economic improvement of the project influence area. 3. Contribute to the enhancement of regional GDP and attract industries
(3.)Social1. Potential of direct and indirect employment during construction and operation phases. 2. Socio-economic development of project influenced area. 3. Better tourism facilities. 4. Benefit due to CSR activity. 5. Industrial development.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 25
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 7
(d)Total plot area (sqm) 2058000
(e)Total built up area (sqm) 909304
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 70
(b)Capacity 1000
(c)No. of Recharge Pits 36
(d)Capacity 1000
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 8.5 ha
5.
Energy Saving Measures:
(a)Source/Mode Solar
(b)Percentage 30
(c)Quantity 10500
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area NA
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0056
(ii)Name of the EIA Consultant RITES Limited
(iii)Address Plot No-1, Sector-29, Gurgaon-122001, Haryana
(iv)Mobile No. 9873549648
(v)Landline No. 0124281872
(vi)Email Id ue.rites@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 21 Aug 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAEIA/EMP report is not uploaded on the portal. Kindly upload the same. 12 Dec 2018
2.NAThe correction have been made as per the instruction received 12 Dec 2018
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1.NAKindly see the final minutes of 37th meeting of EAC Infra-2 18 Jan 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantTalleen Kumar
DesignationCEO & MD, DMICDC
Name of Company (Applicant Name should not be given here)DELHI MUMBAI INDUSTRIAL CORRIDOR DEVELOPMENT CORPORATION
AddressDelhi Mumbai Industrial Corridor Development Corporation, Room No. 341-B, 3rd Floor, Hotel Ashok, 50B Diplomatic Enclave, Chanakyapuri, New Delhi
Print