Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Bhubaneswari OC Expansion 39.2 Mty Mahanadi Coalfields Limited
(b)Name of the Company / Organisation BHUBANESWARI OC EXPN. (39.20 MTY) MAHANADI COALFIELDS LIMITED
(c)Registered Address C/o . Office of General Manager, Jagannath Area, P. O. : Dera, Dist.: Angul,,Angul,Orissa-759100
(d)Legal Status of the Company Central PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Bontal Mahamood Miya
(b)Designation (Owner/ Partner/ CEO) ProjectOfficer
(c)Address C/o Office of General Manager, Jagannath Area, P. O. Dear, Dist. Angul,,Talcher Sadar,Angul,Orissa-759100
(d)Pin code 759100
(e)E-mail bhubaneswari39.2mty@gmail.com
(f)STD Code. 663(f)Telephone No. 2542084
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity
(b)Category A
(c)Proposal Number IA/OR/CMIN/85237/2007
(d)Master Proposal Number(Single Window) SW/85235/2018
(e)EAC concerned (for category A Projects only) Coal Mining
(f)Project Type One time capacity expansion(only for Coal Mining)
4.
Location of the Project:
(a)Plot/Survey/Khasra No. NARAHARIPUR: 2 TO 128/28, HENSMUL: 2 TO 322/128, J
(b)Pincode 759103
(c)Bounded Latitudes (North)
From
Degree 205759
Minutes
Second
From
Degree 205843
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 850910
Minutes
Second
From
Degree 851137
Minutes
Second
(e)Survey of India Topo Sheet No. 73 H/1(1:50000)
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 110
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.5
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Orissa
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11015/280/2013-IA.II(M)pt.
(b)Date of Apply of TOR 31 Jan 2007
(c)Date of Issue of TOR / Standard ToR 28 Mar 2007
(d)Date of Apply of EC 23 Nov 2017
(e)Date of Issue of EC 16 Feb 2018
(f)Previous TOR Letter Copy of Previous TOR letter
(g)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason As per OM dtd. 15-09-2017
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhubaneswar
(iii)Letter No. 101-980/epe
(iv)Status of Compliance Partially Complied
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Nov 9 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Capacity2811.239.2OthersMillion Tonnes per YearRoad,Rail,Conveyor Belt
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Surface Miner, 100 Ton Dumper, TipperSurface Miner, 100 Ton Dumper, TipperSurface Miner, 100 Ton Dumper, TipperSurface Miner, 100 Ton Dumper, Tipper
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 17 Mar 2018
(iv)Valid Upto 31 Mar 2021
(v)File No. 3062/IND-I-CON-4829
(vi)Application No. 2003528
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 490.10
(b) Funds Allocated for Environment Management (Capital) (in Crores) 71.41
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 23.26
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 94.67
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 166.41
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 166.41
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Fuel Energy166.41Kilo Litre per DayDomesticRoad0 Fuel Supply AgreementCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 16 Mar 2018 To 07 Jun 2018
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube366116350.60300
(2.)NOxMicro Gram per Meter Cube26.102.1225.94120
(3.)SO2Micro Gram per Meter Cube5.680.515.56120
(4.)PM2.5Micro Gram per Meter Cube94.3115.694.300
    14.2.     No. of Ground Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHmg/l7.416.528.58.5
(2.)TDSmg/l5404505002000
(3.)Heavy MetalsCadmiummg/l0.00050.00050.0030.003
(4.)Total Hardnessmg/l232148200600
(5.)Fluoridemg/l1.271.1211.5
(6.)TSSmg/l3232100100
(7.)Chloridesmg/l26182501000
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.467.23C
(2.)CODmg/l230220C
(3.)DOmg/l5.85.4C
(4.)BODmg/l3.63.4C
    14.4.     No. of Ambient Noise monitoring locations : 4
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))64.260.275
(2.)Leq(Night)A-weighted decibels(dB(A))63.957.270
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthers1:2.5/w:v5.924.94
(2.)N(Nitrogen)Kilogram per hectare312233.1
(3.)P(Phosphorus)Kilogram per hectare28.1323.12
(4.)K(Potassium)Kilogram per hectare185126
(5.)Electric ConductivityOthersmmhos/cm0.0900.052
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.80 To 13.27
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.05 To 9.85
(c)Whether Ground Water Intersection will be there ? Yes
(d)Upload Copy of Central Ground Water Authority Letter Copy of Central Ground Water Authority Letter
(e)Letter No. 4464
(f)Date of Issue 31 Aug 2018
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersMine water20620.5Copy of Permission LetterPipelineOthersPumpNot applicaton21 Aug 20182062
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Workshop2609600Effluent treatment plantReuse within the Plant & Recycling260
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 260
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 260
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Over burdenOthersOver Burden365741600Tons0.5RoadOthersBackfilling
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube151.21090.49241.70300
(2.)SO2Microgram per Meter Cube0.5105.215.72120
(3.)NOxMicrogram per Meter Cube4.3907.8312.22120
(4.)PM2.5Microgram per Meter Cube37075.72112.720
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Not Applicable000000OthersNot applicable00
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 132
(b)Source Central substation at Nandira
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 500
(e)Stack Height (in m) 00
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 112.521
(b)Private Land (ha.) 675.390
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 787.911
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 445.03
(b)Waste/Barren Land (ha.) 149.57
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 112.521
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Otherland 80.790
    Total (ha.) 787.9109999999998
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Quarry Area442.258
(2.)OB Dump Area94
(3.)Safety Zone83.15
(4.)Township149.57
(5.)OthersOther18.933
Total (ha.) 787.911
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNot Applicable0Not Applicable
(2.)ESAsNot Applicable0Not Applicable
(3.)CorridorsNot Applicable0Not Applicable
(4.)Wildlife CorridorsNot Applicable0Not Applicable
(5.)Critically Polluted AreaBhubaneswari OC Expn0Itself is marked as CPA
(6.)NPANot Applicable0Not Applicable
(7.)ESZsNot Applicable0Not Applicable
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestRakash0Adjacent
(2.)Archaeological SitesNot Applicable0Not Applicable
(3.)Defence InstallationsNot Applicable0Not Applicable
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 787.911
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Not Applicable
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Bangaru Nala
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Brahmani River
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 10
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 13
(e)No. of working days 330
(f)Total Manpower 13
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt83.15083.15
(2.)Percentage of Total Project Area12.62012.62
(3.)No. of Plants1330000133000
(4.)Funds Allocated170.760170.76
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)CoalMajor
2.
Mine Capacity in ROM (Run of Mine) 39.20
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. MCL/SBP/CS/BD-206/Exct/2018
(b)Date of Approval 08 Nov 2018
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department MCL Board
(e)Approved Mining Lease Area 638.341
(f)Approved Capacity 39.20
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 741.091
(b)Mineable Reserves (Million Ton) 238.26
(c)Extractable Reserves(Million Ton) 207.14
(d)Percent(%) of Extraction 86.94
(e)Grade of Coal /Ore /Mineral G14
(f)Stripping Ratio 1 : 0.71
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 4.5
(i)Mining Method Opencast
(j)Life of Mine (Years) 6
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable Yes
(b)No. of seams 15
(c)Thickness of seams to be worked on 38.55
(d)Maximum Thickness of Seams (metres) 40.9
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 638.341
(b)Whether obtained Letter of Intent (LOI) from the state government ? No
(i)Reason thereof Acquired under The Coal Bearing Areas (Acquisition
(c)Whether Lease Deed Executed ? No
(i)Reason thereof Acquired under The Coal Bearing Areas (Acquisition
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof Acquired under The Coal Bearing Areas (Acquisition
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps
(ii)Total Area (in Hectare)
(iii)Height (in meter)
(iv)Quantity (in Million Cubic meter)
(v)No. of year back fill up
(b) Details of Internal Dumps:
(i)No. of Internal Dumps
(ii)Total Area (in Hectare)
(iii)Height (in meter)
(iv)Quantity (in Million Cubic meter)
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 132.68
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 132.68
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 132.68
11.
Details of Final Mine Void:
(a)Area (in Hectare)
(b)Depth (in meter)
(c)Volume (in Million Cubic meter)
12.
Details of Quarry:
(a)Final Void of 31 (hectare) at a Depth of 187.5 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 442.258
13.
Details of Transportation:
(a)In Pit/Underground to Surface Tippers
(b)Surface to Siding/Loading present - Tippers ; proposed - Belt
(c)Transportation / Conveyor Details 10 mty coal by pipe conveyor to siding 3&4 (Work i
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)AGRICULTURE LAND445.030445.03
(2.)FOREST LAND112.5210112.521
(3.)SETTLEMENTS000
(4.)SURFACE WATER BODIES000
(5.)WASTE LAND0149.57149.57
(6.)OTHERS(Specify)tenency80.79080.79
(7.)GRAZING LAND000
TOTAL638.341149.57787.911
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)TOP SOIL STORAGE0000
(2.)ROADS0.85010.08310.933
(3.)VIRGIN AREA0000
(4.)OtherRailway Siding1.606.48
(5.)BUILT UP AREA (COLONY/OFFICE)29.920199.65229.57
(6.)EXCAVATION/QUARRY355.5173155.741442.258
(7.)EXTERNAL OB DUMPS940094
(8.)INTERNAL OB DUMPS0000
(9.)GREEN BELT83.150083.15
TOTAL565.03731271.8740867.911
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 94
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 355.517
(d)Safety Zone(in hectare) 83.150
(e)Final Void of 31 (hectare) at a Depth of 187.50 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 2500
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 32.37
(h)Total afforestation plant (in hectare) 565.037
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)20071010100.200
(2.)20081010101.8400
(3.)2009101010400
(4.)20111010107.1100
(5.)201325252524.4400
(6.)20142525252500
(7.)20152525252500
(8.)201220202017.9300
(9.)201728282826.2500
(10.)20101010103.2700
(11.)20162525252500
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/ RA 0092
(ii)Name of the EIA Consultant Central Mine Planning and Design Institute
(iii)Address Gondwana Place, Kanke Road, Ranchi, Jharkhand, PIN – 834 031
(iv)Mobile No. 8987788797
(v)Landline No. 0651223005
(vi)Email Id gmenv.cmpdi@coalindia.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Coal Mining
(ix)Validity of Accreditation 01 Oct 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease inform/clarify the following:- - No details regarding ToR and the public hearing, - No CCR for the EC to the project at production capacity of 28 MTPA, - Rationale for increase in capacity by 11.2 MTPA. 23 Nov 2018
2.NAThe correction have been made as per the instruction received 04 Dec 2018
3.NAProposal to be submitted only along with the requisite documents, otherwise the status remains incomplete and thus not acceptable. 16 Dec 2018
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantBontal Mahamood Miya
DesignationProjectOfficer
Name of Company (Applicant Name should not be given here)BHUBANESWARI OC EXPN. (39.20 MTY) MAHANADI COALFIELDS LIMITED
AddressC/o . Office of General Manager, Jagannath Area, P. O. : Dera, Dist.: Angul
Print