|
1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Bhubaneswari OC Expansion 39.2 Mty Mahanadi Coalfields Limited | (b)Name of the Company / Organisation | BHUBANESWARI OC EXPN. (39.20 MTY) MAHANADI COALFIELDS LIMITED | (c)Registered Address | C/o . Office of General Manager, Jagannath Area, P. O. : Dera, Dist.: Angul,,Angul,Orissa-759100 | (d)Legal Status of the Company | Central PSU | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Bontal Mahamood Miya | (b)Designation (Owner/ Partner/ CEO) | ProjectOfficer | (c)Address | C/o Office of General Manager, Jagannath Area, P. O. Dear, Dist. Angul,,Talcher Sadar,Angul,Orissa-759100 | (d)Pin code | 759100 | (e)E-mail | bhubaneswari39.2mty@gmail.com | (f)STD Code. | 663(f)Telephone No. | 2542084 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(a) Mining of minerals
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/OR/CMIN/85237/2007 | (d)Master Proposal Number(Single Window) | SW/85235/2018 | (e)EAC concerned (for category A Projects only) | Coal Mining | (f)Project Type | One time capacity expansion(only for Coal Mining) |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | NARAHARIPUR: 2 TO 128/28, HENSMUL: 2 TO 322/128, J | (b)Pincode | 759103 | (c)Bounded Latitudes (North) | | From | | Degree | 205759 | Minutes | | Second | | From | | Degree | 205843 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 850910 | Minutes | | Second | | From | | Degree | 851137 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 73 H/1(1:50000) | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 110 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0.5 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Orissa | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11015/280/2013-IA.II(M)pt. | (b)Date of Apply of TOR | 31 Jan 2007 | (c)Date of Issue of TOR / Standard ToR | 28 Mar 2007 | (d)Date of Apply of EC | 23 Nov 2017 | (e)Date of Issue of EC | 16 Feb 2018 | (f)Previous TOR Letter | Copy of Previous TOR letter | (g)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | As per OM dtd. 15-09-2017 | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bhubaneswar | (iii)Letter No. | 101-980/epe | (iv)Status of Compliance | Partially Complied | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Nov 9 2018 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Capacity | 28 | 11.2 | 39.2 | Others | Million Tonnes per Year | Road,Rail,Conveyor Belt | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Surface Miner, 100 Ton Dumper, Tipper | Surface Miner, 100 Ton Dumper, Tipper | Surface Miner, 100 Ton Dumper, Tipper | Surface Miner, 100 Ton Dumper, Tipper | | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 17 Mar 2018 | (iv)Valid Upto | 31 Mar 2021 | (v)File No. | 3062/IND-I-CON-4829 | (vi)Application No. | 2003528 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 490.10 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 71.41 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 23.26 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 94.67 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 166.41 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 166.41 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Fuel Energy | 166.41 | Kilo Litre per Day | | Domestic | Road | | 0 | Fuel Supply Agreement | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 16 Mar 2018 To 07 Jun 2018 | (b)Season | Pre-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 4 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 366 | 116 | 350.60 | 300 | (2.) | NOx | | Micro Gram per Meter Cube | 26.10 | 2.12 | 25.94 | 120 | (3.) | SO2 | | Micro Gram per Meter Cube | 5.68 | 0.51 | 5.56 | 120 | (4.) | PM2.5 | | Micro Gram per Meter Cube | 94.31 | 15.6 | 94.30 | 0 | |
14.2. No. of Ground Water monitoring locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | mg/l | | 7.41 | 6.52 | 8.5 | 8.5 | (2.) | TDS | | | mg/l | | 540 | 450 | 500 | 2000 | (3.) | Heavy Metals | | Cadmium | mg/l | | 0.0005 | 0.0005 | 0.003 | 0.003 | (4.) | Total Hardness | | | mg/l | | 232 | 148 | 200 | 600 | (5.) | Fluoride | | | mg/l | | 1.27 | 1.12 | 1 | 1.5 | (6.) | TSS | | | mg/l | | 32 | 32 | 100 | 100 | (7.) | Chlorides | | | mg/l | | 26 | 18 | 250 | 1000 | |
14.3. No. of Surface Water monitoring locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.46 | 7.23 | C | (2.) | COD | | mg/l | | 230 | 220 | C | (3.) | DO | | mg/l | | 5.8 | 5.4 | C | (4.) | BOD | | mg/l | | 3.6 | 3.4 | C | |
14.4. No. of Ambient Noise monitoring locations : 4 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 64.2 | 60.2 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 63.9 | 57.2 | 70 | |
14.5. No. of Soil Sample Monitored locations : 6 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | Others | 1:2.5/w:v | 5.92 | 4.94 | (2.) | N(Nitrogen) | Kilogram per hectare | | 312 | 233.1 | (3.) | P(Phosphorus) | Kilogram per hectare | | 28.13 | 23.12 | (4.) | K(Potassium) | Kilogram per hectare | | 185 | 126 | (5.) | Electric Conductivity | Others | mmhos/cm | 0.090 | 0.052 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.80 To 13.27 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.05 To 9.85 | (c)Whether Ground Water Intersection will be there ? | Yes | (d)Upload Copy of Central Ground Water Authority Letter | Copy of Central Ground Water Authority Letter | (e)Letter No. | 4464 | (f)Date of Issue | 31 Aug 2018 | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Mine water | 2062 | 0.5 | Copy of Permission Letter | Pipeline | | Others | Pump | Not applicaton | 21 Aug 2018 | 2062 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Workshop | 260 | 9600 | Effluent treatment plant | Reuse within the Plant & Recycling | | 260 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 260 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 260 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Over burden | Others | Over Burden | 365741600 | Tons | 0.5 | Road | | Others | Backfilling | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 151.21 | 0 | 90.49 | 241.70 | 300 | (2.) | SO2 | | Microgram per Meter Cube | 0.51 | 0 | 5.21 | 5.72 | 120 | (3.) | NOx | | Microgram per Meter Cube | 4.39 | 0 | 7.83 | 12.22 | 120 | (4.) | PM2.5 | | Microgram per Meter Cube | 37 | 0 | 75.72 | 112.72 | 0 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Not Applicable | 00 | 00 | 00 | Others | Not applicable | 00 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 132 | (b)Source | Central substation at Nandira | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 500 | (e)Stack Height (in m) | 00 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 112.521 | (b)Private Land (ha.) | 675.390 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 787.911 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 445.03 | (b)Waste/Barren Land (ha.) | 149.57 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 112.521 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Otherland | 80.790 | Total (ha.) | 787.9109999999998 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Quarry Area | | 442.258 | | (2.) | OB Dump Area | | 94 | | (3.) | Safety Zone | | 83.15 | | (4.) | Township | | 149.57 | | (5.) | Others | Other | 18.933 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | Not Applicable | 0 | Not Applicable | (2.) | ESAs | Not Applicable | 0 | Not Applicable | (3.) | Corridors | Not Applicable | 0 | Not Applicable | (4.) | Wildlife Corridors | Not Applicable | 0 | Not Applicable | (5.) | Critically Polluted Area | Bhubaneswari OC Expn | 0 | Itself is marked as CPA | (6.) | NPA | Not Applicable | 0 | Not Applicable | (7.) | ESZs | Not Applicable | 0 | Not Applicable | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Rakash | 0 | Adjacent | (2.) | Archaeological Sites | | Not Applicable | 0 | Not Applicable | (3.) | Defence Installations | | Not Applicable | 0 | Not Applicable | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 787.911 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Not Applicable | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Bangaru Nala | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Brahmani River | (ii)Direction of Water Bodies in Buffer Area | East | (iii)Distance of Water Bodies in Buffer Area | 10 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 0 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 13 | (e)No. of working days | 330 | (f)Total Manpower | 13 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 83.15 | 0 | 83.15 | (2.) | Percentage of Total Project Area | 12.62 | 0 | 12.62 | (3.) | No. of Plants | 133000 | 0 | 133000 | (4.) | Funds Allocated | 170.76 | 0 | 170.76 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
NIL | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Coal Mining |
|
1. No. of Mineral(s) to be Mined : 1 |
---|
S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
---|
(1.) | Coal | Major | |
|
2. | Mine Capacity in ROM (Run of Mine) | 39.20 | |
|
|
4. | Mining Plan: | (a)Approval Letter No. | MCL/SBP/CS/BD-206/Exct/2018 | (b)Date of Approval | 08 Nov 2018 | (c)Approved Letter | Copy of Approved Letter | (d)Approved By State Mining and Geology Department | MCL Board | (e)Approved Mining Lease Area | 638.341 | (f)Approved Capacity | 39.20 | |
|
5. | Technical Details: | (a)Total Geological Reserves (Million Ton) | 741.091 | (b)Mineable Reserves (Million Ton) | 238.26 | (c)Extractable Reserves(Million Ton) | 207.14 | (d)Percent(%) of Extraction | 86.94 | (e)Grade of Coal /Ore /Mineral | G14 | (f)Stripping Ratio | 1 : 0.71 | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | NA | (h)Average Gradient(Degree) | 4.5 | (i)Mining Method | Opencast | (j)Life of Mine (Years) | 6 | |
|
6. | Details of Beneficiations: | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | No | (b)Whether it is proposed to install crusher within the mining lease area | No | |
|
7. | Details of Seams: | (a)Whether details of seam applicable | Yes | (b)No. of seams | 15 | (c)Thickness of seams to be worked on | 38.55 | (d)Maximum Thickness of Seams (metres) | 40.9 | |
|
8. | Details of Mining Lease: | (a)Mining Lease Area (in Hectare) | 638.341 | (b)Whether obtained Letter of Intent (LOI) from the state government ? | No | (i)Reason thereof | Acquired under The Coal Bearing Areas (Acquisition | (c)Whether Lease Deed Executed ? | No | (i)Reason thereof | Acquired under The Coal Bearing Areas (Acquisition | (d)Whether Lease Deed Renewed ? | No | (i)Reason thereof | Acquired under The Coal Bearing Areas (Acquisition | |
|
9. | OB (Over Burden) Management: | (a) Details of External Dumps: | (i)No. of OB Dumps | | (ii)Total Area (in Hectare) | | (iii)Height (in meter) | | (iv)Quantity (in Million Cubic meter) | | (v)No. of year back fill up | | (b) Details of Internal Dumps: | (i)No. of Internal Dumps | | (ii)Total Area (in Hectare) | | (iii)Height (in meter) | | (iv)Quantity (in Million Cubic meter) | | |
|
10. | Details of Topsoil Management: | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 132.68 | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 132.68 | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 132.68 | |
|
11. | Details of Final Mine Void: | (a)Area (in Hectare) | | (b)Depth (in meter) | | (c)Volume (in Million Cubic meter) | | |
|
12. | Details of Quarry: | (a)Final Void of 31 (hectare) at a Depth of 187.5 meter which is Proposed to be Converted into a Water Body. | (b)Total Quarry Area (ha) | 442.258 | |
|
13. | Details of Transportation: | (a)In Pit/Underground to Surface | Tippers | (b)Surface to Siding/Loading | present - Tippers ; proposed - Belt | (c)Transportation / Conveyor Details | 10 mty coal by pipe conveyor to siding 3&4 (Work i | |
|
|
14. Details of Land Usage (Pre-Mining) |
---|
S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
---|
(1.) | AGRICULTURE LAND | | 445.03 | 0 | 445.03 | (2.) | FOREST LAND | | 112.521 | 0 | 112.521 | (3.) | SETTLEMENTS | | 0 | 0 | 0 | (4.) | SURFACE WATER BODIES | | 0 | 0 | 0 | (5.) | WASTE LAND | | 0 | 149.57 | 149.57 | (6.) | OTHERS(Specify) | tenency | 80.79 | 0 | 80.79 | (7.) | GRAZING LAND | | 0 | 0 | 0 | |
TOTAL | 638.341 | 149.57 | 787.911 | |
|
15. Details of Land Usage (Post-Mining) |
---|
S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
---|
(1.) | TOP SOIL STORAGE | | 0 | 0 | 0 | | 0 | (2.) | ROADS | | 0.85 | 0 | 10.083 | | 10.933 | (3.) | VIRGIN AREA | | 0 | 0 | 0 | | 0 | (4.) | Other | Railway Siding | 1.6 | 0 | 6.4 | | 8 | (5.) | BUILT UP AREA (COLONY/OFFICE) | | 29.92 | 0 | 199.65 | | 229.57 | (6.) | EXCAVATION/QUARRY | | 355.517 | 31 | 55.741 | | 442.258 | (7.) | EXTERNAL OB DUMPS | | 94 | 0 | 0 | | 94 | (8.) | INTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (9.) | GREEN BELT | | 83.15 | 0 | 0 | | 83.15 | |
TOTAL | 565.037 | 31 | 271.874 | 0 | 867.911 | |
16. | Details of Reclamation: | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | (a)External OB Dump(in hectare) | 94 | (b)Internal Dump(in hectare) | 0 | (c)Quarry(in hectare) | 355.517 | (d)Safety Zone(in hectare) | 83.150 | (e)Final Void of 31 (hectare) at a Depth of 187.50 meter which is Proposed to be Converted into a Water Body. | (f)Density of Tree Plantation per ha (in no.) | 2500 | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | 32.37 | (h)Total afforestation plant (in hectare) | 565.037 | |
|
17. | Status of progressive Mining Closure Plan: | Details Not Applicable | |
|
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
---|
S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
---|
(1.) | 2007 | 10 | 10 | 10 | 0.2 | 00 | (2.) | 2008 | 10 | 10 | 10 | 1.84 | 00 | (3.) | 2009 | 10 | 10 | 10 | 4 | 00 | (4.) | 2011 | 10 | 10 | 10 | 7.11 | 00 | (5.) | 2013 | 25 | 25 | 25 | 24.44 | 00 | (6.) | 2014 | 25 | 25 | 25 | 25 | 00 | (7.) | 2015 | 25 | 25 | 25 | 25 | 00 | (8.) | 2012 | 20 | 20 | 20 | 17.93 | 00 | (9.) | 2017 | 28 | 28 | 28 | 26.25 | 00 | (10.) | 2010 | 10 | 10 | 10 | 3.27 | 00 | (11.) | 2016 | 25 | 25 | 25 | 25 | 00 | |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1720/ RA 0092 | (ii)Name of the EIA Consultant | Central Mine Planning and Design Institute | (iii)Address | Gondwana Place, Kanke Road, Ranchi, Jharkhand, PIN – 834 031 | (iv)Mobile No. | 8987788797 | (v)Landline No. | 0651223005 | (vi)Email Id | gmenv.cmpdi@coalindia.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Coal Mining | (ix)Validity of Accreditation | 01 Oct 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Please inform/clarify the following:-
- No details regarding ToR and the public hearing,
- No CCR for the EC to the project at production capacity of 28 MTPA,
- Rationale for increase in capacity by 11.2 MTPA. | 23 Nov 2018 | 2. | NA | The correction have been made as per the instruction received | 04 Dec 2018 | 3. | NA | Proposal to be submitted only along with the requisite documents, otherwise the status remains incomplete and thus not acceptable. | 16 Dec 2018 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Bontal Mahamood Miya | Designation | ProjectOfficer | Name of Company (Applicant Name should not be given here) | BHUBANESWARI OC EXPN. (39.20 MTY) MAHANADI COALFIELDS LIMITED | Address | C/o . Office of General Manager, Jagannath Area, P. O. : Dera, Dist.: Angul |
|