1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion in Manufacturing of Sponge Iron, TMT Bars, M.S. Billet/ S.S. Billets, MS Rolled Bar and Coal Based Captive Power Plant & WHRB of Gallantt Metal Limited situated at # Survey no. 175/1, Villa
(b)Name of the Company / Organisation GALLANTT METAL LIMITED
(c)Registered Address SURVEY NO 175/1 VILLAGE SAMAKHIYALI, TALUKA BHACHAU, DISTT KUTCH, GUJARAT-370150,PLOT NO 123, G-1, GROUND FLOOR, WARD 10 BC GANDHIDHAM, KUTCH, GUJARAT-370201,kutch,Gujarat-370150
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Manoj Rastogi
(b)Designation (Owner/ Partner/ CEO) Sr. Manager Commercial
(c)Address SURVEY NO 175/1 VILLAGE SAMAKHIYALI, TALUKA BHACHAU, DISTT KUTCH, GUJARAT-370150,PLOT NO 123, G-1, GROUND FLOOR, WARD 10 BC GANDHIDHAM, KUTCH, GUJARAT-3702001,Bhachau,kutch,Gujarat-370150
(d)Pin code 370150
(e)E-mail taxes@gallantt.com
(f)STD Code. 2837(f)Telephone No. 283689
(g)Fax No. 283557
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
Minor Activity1(d) Thermal Power Plants
(b)Category A
(c)Proposal Number IA/GJ/IND/5472/2013
(d)Master Proposal Number(Single Window) SW/85185/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Survey no.:- 175/1
(b)Pincode 370150
(c)Bounded Latitudes (North)
From
Degree 2578517.64
Minutes
Second
From
Degree 2579443.71
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 652500.13
Minutes
Second
From
Degree 652767.53
Minutes
Second
(e)Survey of India Topo Sheet No. 41 I/7, I/8, I/11, I/12
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 42
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 60
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratkutchBhachau
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/52/2013-IA-II(I)
(c)Date of Issue of TOR 13 Jun 2013
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 14 Apr 2015
(c)Date of Issue of EC 18 May 2016
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :28 Jun 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :31 Jul 2018
Distance of Public Hearing Venue from the Proposed Project :0
Gallantt Metals Ltd. at Plant Premises
State :Gujarat
District :kutch
Tehsil :Bhachau
Village :Samakhiyali
194Air & water pollution control, Employment, CSR fund, Occupational healthDistrict Collector
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhopal
(iii)Letter No. File No.- 4-24/2007 (Env)568 dated:18.10.2018
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Sep 20 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)TMT Bars33000092400422400Tons per Annum(TPA)Road
(2.)M S Rolled Bar534614976843Tons per Annum(TPA)Road
(3.)Power Plant (AFBC/CFBC)251035Mega Watt(MW)Othersfor Captive use
(4.)M.S. Billets33660092400429000Tons per Annum(TPA)Road
(5.)Runner & Raiser8910891Tons per Annum(TPA)Road
(6.)Sponge Iron225000148500373500Tons per Annum(TPA)Road
(7.)Power Plant (WHRB)8816Mega Watt(MW)Othersfor Captive use
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Power Plant Boiler (AFBC/CFBC)01 (25MWH)01 (10MWH)35MWH
(2.)Induction Furnace05 (20 TPH each furnace )01 (30TPH)130TPH
(3.)Rolling Mill (TMT Bars)01(1000TPD)01 (280TPD)1280TPD
(4.)Power Plant Boiler(WHRB)01 (8MWH)01 (8MWH)16MWH
(5.)Sponge Iron Kiln04 (175TPD Each kiln)01 (450TPD)1150TPD
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 20 Jul 2016
(iv)Valid Upto 27 Dec 2020
(v)File No. PC/CCA-Kutch-341(5)/GPCB ID17845/364967&AWH-80514
(vi)Application No. 109050
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 596
(b) Funds Allocated for Environment Management (Capital) (in Crores) 7.4
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 3.125
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.65
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 148140
(b)Existing quantity of raw material/fuel 225360
(c)Total quantity of raw material/fuel 373500
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)MS Billets429000Tons per AnnumIn-house productionOthersInternal Transport0 CaptiveCopy of Linkage
(2.)HSD1667Tons per AnnumNearby Diesel/ Petrol PumpRoad5.0 Open MarketCopy of Linkage
(3.)Sponge373500Tons per AnnumIn-house productionRoad0 CaptiveCopy of Linkage
(4.)Iron ore597600Tons per AnnumImported/ Indian, Kandla PortRoad,OthersShip to port45.72 MoUCopy of Linkage
(5.)Coal663057Tons per AnnumImported/ Indian, Kandla PortRoad,OthersShip to Port45.72 MoUCopy of Linkage
(6.)Coal Char93513Tons per AnnumIn-house productionRoad0 CaptiveCopy of Linkage
(7.)Scrap156660Tons per AnnumLocal Market/ ImportedRoadKandla45.72 MoUCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2017 To 28 Feb 2018
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube80.4063.279.85100
(2.)SO2Micro Gram per Meter Cube15.77.215.6580
(3.)OthersCOMicro Gram per Meter Cube430132427.72000
(4.)NOxMicro Gram per Meter Cube23.41423.2680
(5.)PM2.5Micro Gram per Meter Cube43.732.243.6160
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l0000
(2.)Chloridesmg/l1610402501000
(3.)Fluoridemg/l0000
(4.)Total Hardnessmg/l95070200600
(5.)Heavy MetalsLeadmg/l0.0050.0050.0050.005
(6.)OthersMercury as Hgmg/l0.000250.000250.0010.001
(7.)pHmg/l7.146.568.58.5
(8.)TDSmg/l38602105002000
    14.3.     No. of Surface Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHmg/l7.176.44A
(2.)BODmg/l218A
(3.)CODmg/l20824A
(4.)DOmg/l6.45.8A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))69.057.390
(2.)Leq(Day)A-weighted decibels(dB(A))7160.290
    14.5.     No. of Soil Sample Monitored locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)Electric ConductivityOthersµmhos/cm52404510
(2.)P(Phosphorus)Milligram per Kilogram12055
(3.)N(Nitrogen)Milligram per Kilogram5830
(4.)pHOtherslog8.086.92
(5.)K(Potassium)Milligram per Kilogram1.20.1
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 15 To 20
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 20
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface166120.34Copy of Permission LetterCanalOthersCanal waterGWIL/Kutch/Ind.Conn/300031 Dec 20101755
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic154200STPOthersGardening1540
(2.)Industrial210.5250ETPReuse within the Plant & Recycling210.5
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 364.5
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 364.5
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)SlagIndustrial Waste27083Tons0RoadOthersSold to road construction activity.
(2.)Total AshOthersFly Ash & Bottom Ash99000Tons17.5RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)Coal CharIndustrial Waste96761Tons0RoadOthersReused 100% in Power plant as a fuel.
(4.)BiodegradableMunicipal Solid Waste375Tons21RoadOthersMunicipal Council Bhachau Katch Gujarat
(5.)AccretionIndustrial Waste1550Tons15RoadOthersUsed in Land filling
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube76.800.777.5100
(2.)PM2.5Microgram per Meter Cube43.200.4843.760
(3.)SO2Microgram per Meter Cube15.603.0618.780
(4.)NOxMicrogram per Meter Cube23.404.527.980
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Rotary Kiln No. 1 & 2Coal401SO24.22 g/s
(2.)ROtary Kiln No. 1 & 2Coal401NOx7.76 g/s
(3.)Rotary Kiln No. 3 & 4Coal401PM100.81 g/s
(4.)Induction Furnace 2 & 3Coal481PM100.55 g/s
(5.)Induction Furnace No. 1 & 4Coal481PM100.55 g/s
(6.)Induction Furnance No. 5Coal481NOx5.15 g/s
(7.)Coal CrusherCoal301PM100.8 g/s
(8.)Re-heating FurnaceCoal301PM100.25 g/s
(9.)Rotary Kiln No. 5Coal481PM100.32 g/s
(10.)Captive Power Plant (10 MW)Coal952NOx3.15 g/s
(11.)Rotary Kiln No. 5Coal481NOx3.925 g/s
(12.)Captive Power Plant (25 MW)Coal952SO212.2 g/s
(13.)Captive Power Plant (10 MW)Coal952PM100.8 g/s
(14.)DG Sets 3 nos.HSD120.5SO20.75 g/s
(15.)Captive Power Plant (25 MW)Coal952NOx31.05 g/s
(16.)Captive Power Plant (10 MW)Coal952SO23.15 g/s
(17.)Rotary Kiln No. 5Coal481SO22.4 g/s
(18.)Rotary Kiln No. 3 & 4Coal401SO24.22 g/s
(19.)DG Sets 3 nos.HSD120.5PM100.09 g/s
(20.)Rotary Kiln No. 3 & 4Coal401NOx7.76 g/s
(21.)Induction Furnace 2 & 3Coal481NOx5.15 g/s
(22.)Induction Furnace No. 6Coal481PM100.22 g/s
(23.)Captive Power Plant (25 MW)Coal952PM101.7 g/s
(24.)Induction Furnace No. 5Coal481PM100.55 g/s
(25.)Induction Furnace 1 & 4Coal481NOx5.15 g/s
(26.)Rotary liln No. 1 & 2Coal401PM100.81 g/s
(27.)DG Sets 3 nos.HSD120.5NOx1.84 g/s
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 51000
(b)Source PGVCL & Captive Power Plant
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 1500kVA*2, 1000kVA*1, 812kVA*2, 500kVA*1, 82kVA*1
(e)Stack Height (in m) 16
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 46.9435
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 46.9435
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 46.9435
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : 0 0
    Total (ha.) 46.9435
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant17.28
(2.)Green belt11.3635
(3.)OthersOpen Area for future expansion18.3
Total (ha.) 46.9435
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANone0None within 15 Km radius.
(2.)CorridorsNone0None within 15 Km radius.
(3.)Wildlife CorridorsNone0None within 15 Km radius.
(4.)Critically Polluted AreaNone0None within 15 Km radius.
(5.)ESAsNone0None within 15 Km radius.
(6.)ESZsNone0None within 15 Km radius.
(7.)WLSNone0None within 15 Km radius.
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestR.F. Near Gamdau Village11.50NNE
(2.)Archaeological SitesNone0None within 15 Km radius.
(3.)Defence InstallationsNone0None within 15 Km radius.
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 46.9435
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Indian Peafowl & Painted Stork NT (Near to Threatened) is reported in the buffer zone.
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made Pea Fowl- Rs. 29.10Lacs Painted Stork-Rs. 11.0L
(iii)Period of Implementation 10 Years for Both
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Adhoi Nadi
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 2.8
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 70
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 220
(e)No. of working days 300
(f)Total Manpower 290
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt11.36364.127815.491399999999999
(2.)Percentage of Total Project Area24.28.833
(3.)No. of Plants24919620031119
(4.)Funds Allocated650000018600008360000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialRevenue to State and Center
(2.)EnvironmentalImproved Aesthetic surrounding Environment & Conservation of Schedule -1 Peafowl and NT- Painted Stork - The proposed green belt will enhance the aesthetic beauty of the surrounding environment and conservation of Schedule -1 Peafowl and NT- Painted Stork Pea Fowl- Rs. 29.10Lacs, Painted Stork-Rs. 11.0Lacsfund is allocated which will be implement in 10 years to conserve the Species.
(3.)Social• Promoting Education, including Special Education and Employment Enhancing Vocation Skills Especially among Children, Women, Elderly, and the Differently-Able and Livelihood Enhancement Projects. • Ensuring Environmental Sustainability, Ecological Balance, Protection of Flora and Fauna, Animal Welfare, Agro-forestry, Conservation of Natural Resources and Maintaining Quality of Soil, Air and Water. • Improve the Poverty and Malnutrition, Promoting Preventive Health Care and Sanitation and making
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. 45
(ii)Name of the EIA Consultant Enkay Enviro Services Pvt. Ltd.
(iii)Address # 92, Heera Nagar - A, Near Shalimar Bagh, Ajmer Road, Jaipur (Raj.). -, Pin Code:- 302021
(iv)Mobile No. 93
(v)Landline No. 0141492077
(vi)Email Id info@enkayenviro.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 06 Nov 2018
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAMay kindly peruse the certificate compliance report uploaded on the portal. The report is not complete. Please upload the complete report along with the closure of non-compliance if obtained for further consideration of the proposal 17 Dec 2018
2.NAThe correction have been made as per the instruction received 24 Dec 2018
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterBased on the Minutes of Meeting posted on MoEF&CC Website on 14.01.2019 1. Revised Noise Monitoring Data 2. Revised ground water monitoring data 3. Study on drainage pattern of the study area 4. Revised action plan to the issue raised during the public hearing. 5. Revised action plan for implementation of Corporate Environmental Responsibility related activities. 28 Jan 2019
2.NAADS 14 Jan 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantManoj Rastogi
DesignationSr. Manager Commercial
Name of Company (Applicant Name should not be given here)GALLANTT METAL LIMITED
AddressSURVEY NO 175/1 VILLAGE SAMAKHIYALI, TALUKA BHACHAU, DISTT KUTCH, GUJARAT-370150
Print