1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Expansion in Manufacturing of Sponge Iron, TMT Bars, M.S. Billet/ S.S. Billets, MS Rolled Bar and Coal Based Captive Power Plant & WHRB of Gallantt Metal Limited situated at # Survey no. 175/1, Villa | (b)Name of the Company / Organisation | GALLANTT METAL LIMITED | (c)Registered Address | SURVEY NO 175/1 VILLAGE SAMAKHIYALI, TALUKA BHACHAU, DISTT KUTCH, GUJARAT-370150,PLOT NO 123, G-1, GROUND FLOOR, WARD 10 BC GANDHIDHAM, KUTCH, GUJARAT-370201,kutch,Gujarat-370150 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Manoj Rastogi | (b)Designation (Owner/ Partner/ CEO) | Sr. Manager Commercial | (c)Address | SURVEY NO 175/1 VILLAGE SAMAKHIYALI, TALUKA BHACHAU, DISTT KUTCH, GUJARAT-370150,PLOT NO 123, G-1, GROUND FLOOR, WARD 10 BC GANDHIDHAM, KUTCH, GUJARAT-3702001,Bhachau,kutch,Gujarat-370150 | (d)Pin code | 370150 | (e)E-mail | taxes@gallantt.com | (f)STD Code. | 2837(f)Telephone No. | 283689 | (g)Fax No. | 283557 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 3(a) Metallurgical industries (ferrous & non ferrous)
| Minor Activity | 1(d) Thermal Power Plants
| (b)Category | A | (c)Proposal Number | IA/GJ/IND/5472/2013 | (d)Master Proposal Number(Single Window) | SW/85185/2018 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 1 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Survey no.:- 175/1 | (b)Pincode | 370150 | (c)Bounded Latitudes (North) | | From | | Degree | 2578517.64 | Minutes | | Second | | From | | Degree | 2579443.71 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 652500.13 | Minutes | | Second | | From | | Degree | 652767.53 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 41 I/7, I/8, I/11, I/12 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 42 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 60 | (j)Seismic Zone | 4 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Gujarat | kutch | Bhachau | | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/52/2013-IA-II(I) | (c)Date of Issue of TOR | 13 Jun 2013 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 14 Apr 2015 | (c)Date of Issue of EC | 18 May 2016 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 31 Jul 2018 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| Gallantt Metals Ltd. at Plant Premises | State : | Gujarat | District : | kutch | Tehsil : | Bhachau | Village : | Samakhiyali |
| 194 | Air & water pollution control, Employment, CSR fund, Occupational health | District Collector | | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bhopal | (iii)Letter No. | File No.- 4-24/2007 (Env)568 dated:18.10.2018 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Sep 20 2018 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | TMT Bars | 330000 | 92400 | 422400 | Tons per Annum(TPA) | | Road | | (2.) | M S Rolled Bar | 5346 | 1497 | 6843 | Tons per Annum(TPA) | | Road | | (3.) | Power Plant (AFBC/CFBC) | 25 | 10 | 35 | Mega Watt(MW) | | Others | for Captive use | (4.) | M.S. Billets | 336600 | 92400 | 429000 | Tons per Annum(TPA) | | Road | | (5.) | Runner & Raiser | 891 | 0 | 891 | Tons per Annum(TPA) | | Road | | (6.) | Sponge Iron | 225000 | 148500 | 373500 | Tons per Annum(TPA) | | Road | | (7.) | Power Plant (WHRB) | 8 | 8 | 16 | Mega Watt(MW) | | Others | for Captive use | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Power Plant Boiler (AFBC/CFBC) | 01 (25MWH) | 01 (10MWH) | 35MWH | | (2.) | Induction Furnace | 05 (20 TPH each furnace ) | 01 (30TPH) | 130TPH | | (3.) | Rolling Mill (TMT Bars) | 01(1000TPD) | 01 (280TPD) | 1280TPD | | (4.) | Power Plant Boiler(WHRB) | 01 (8MWH) | 01 (8MWH) | 16MWH | | (5.) | Sponge Iron Kiln | 04 (175TPD Each kiln) | 01 (450TPD) | 1150TPD | | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 20 Jul 2016 | (iv)Valid Upto | 27 Dec 2020 | (v)File No. | PC/CCA-Kutch-341(5)/GPCB ID17845/364967&AWH-80514 | (vi)Application No. | 109050 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 596 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 7.4 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 3.125 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.65 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 148140 | (b)Existing quantity of raw material/fuel | 225360 | (c)Total quantity of raw material/fuel | 373500 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | MS Billets | 429000 | Tons per Annum | | In-house production | Others | Internal Transport | 0 | Captive | | Copy of Linkage | (2.) | HSD | 1667 | Tons per Annum | | Nearby Diesel/ Petrol Pump | Road | | 5.0 | Open Market | | Copy of Linkage | (3.) | Sponge | 373500 | Tons per Annum | | In-house production | Road | | 0 | Captive | | Copy of Linkage | (4.) | Iron ore | 597600 | Tons per Annum | | Imported/ Indian, Kandla Port | Road,Others | Ship to port | 45.72 | MoU | | Copy of Linkage | (5.) | Coal | 663057 | Tons per Annum | | Imported/ Indian, Kandla Port | Road,Others | Ship to Port | 45.72 | MoU | | Copy of Linkage | (6.) | Coal Char | 93513 | Tons per Annum | | In-house production | Road | | 0 | Captive | | Copy of Linkage | (7.) | Scrap | 156660 | Tons per Annum | | Local Market/ Imported | Road | Kandla | 45.72 | MoU | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Dec 2017 To 28 Feb 2018 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 80.40 | 63.2 | 79.85 | 100 | (2.) | SO2 | | Micro Gram per Meter Cube | 15.7 | 7.2 | 15.65 | 80 | (3.) | Others | CO | Micro Gram per Meter Cube | 430 | 132 | 427.7 | 2000 | (4.) | NOx | | Micro Gram per Meter Cube | 23.4 | 14 | 23.26 | 80 | (5.) | PM2.5 | | Micro Gram per Meter Cube | 43.7 | 32.2 | 43.61 | 60 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (2.) | Chlorides | | | mg/l | | 1610 | 40 | 250 | 1000 | (3.) | Fluoride | | | mg/l | | 0 | 0 | 0 | 0 | (4.) | Total Hardness | | | mg/l | | 950 | 70 | 200 | 600 | (5.) | Heavy Metals | | Lead | mg/l | | 0.005 | 0.005 | 0.005 | 0.005 | (6.) | Others | Mercury as Hg | | mg/l | | 0.00025 | 0.00025 | 0.001 | 0.001 | (7.) | pH | | | mg/l | | 7.14 | 6.56 | 8.5 | 8.5 | (8.) | TDS | | | mg/l | | 3860 | 210 | 500 | 2000 | |
14.3. No. of Surface Water monitoring locations : 6 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | mg/l | | 7.17 | 6.44 | A | (2.) | BOD | | mg/l | | 21 | 8 | A | (3.) | COD | | mg/l | | 208 | 24 | A | (4.) | DO | | mg/l | | 6.4 | 5.8 | A | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 69.0 | 57.3 | 90 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 71 | 60.2 | 90 | |
14.5. No. of Soil Sample Monitored locations : 5 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | Electric Conductivity | Others | µmhos/cm | 5240 | 4510 | (2.) | P(Phosphorus) | Milligram per Kilogram | | 120 | 55 | (3.) | N(Nitrogen) | Milligram per Kilogram | | 58 | 30 | (4.) | pH | Others | log | 8.08 | 6.92 | (5.) | K(Potassium) | Milligram per Kilogram | | 1.2 | 0.1 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 15 To 20 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 20 | (c)Whether Ground Water Intersection will be there ? | NA | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 1661 | 20.34 | Copy of Permission Letter | Canal | | Others | Canal water | GWIL/Kutch/Ind.Conn/3000 | 31 Dec 2010 | 1755 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic | 154 | 200 | STP | Others | Gardening | 154 | 0 | (2.) | Industrial | 210.5 | 250 | ETP | Reuse within the Plant & Recycling | | 210.5 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 364.5 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 364.5 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Slag | Industrial Waste | | 27083 | Tons | 0 | Road | | Others | Sold to road construction activity. | (2.) | Total Ash | Others | Fly Ash & Bottom Ash | 99000 | Tons | 17.5 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (3.) | Coal Char | Industrial Waste | | 96761 | Tons | 0 | Road | | Others | Reused 100% in Power plant as a fuel. | (4.) | Biodegradable | Municipal Solid Waste | | 375 | Tons | 21 | Road | | Others | Municipal Council Bhachau Katch Gujarat | (5.) | Accretion | Industrial Waste | | 1550 | Tons | 15 | Road | | Others | Used in Land filling | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 76.8 | 0 | 0.7 | 77.5 | 100 | (2.) | PM2.5 | | Microgram per Meter Cube | 43.2 | 0 | 0.48 | 43.7 | 60 | (3.) | SO2 | | Microgram per Meter Cube | 15.6 | 0 | 3.06 | 18.7 | 80 | (4.) | NOx | | Microgram per Meter Cube | 23.4 | 0 | 4.5 | 27.9 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Rotary Kiln No. 1 & 2 | Coal | 40 | 1 | SO2 | | 4.22 g/s | (2.) | ROtary Kiln No. 1 & 2 | Coal | 40 | 1 | NOx | | 7.76 g/s | (3.) | Rotary Kiln No. 3 & 4 | Coal | 40 | 1 | PM10 | | 0.81 g/s | (4.) | Induction Furnace 2 & 3 | Coal | 48 | 1 | PM10 | | 0.55 g/s | (5.) | Induction Furnace No. 1 & 4 | Coal | 48 | 1 | PM10 | | 0.55 g/s | (6.) | Induction Furnance No. 5 | Coal | 48 | 1 | NOx | | 5.15 g/s | (7.) | Coal Crusher | Coal | 30 | 1 | PM10 | | 0.8 g/s | (8.) | Re-heating Furnace | Coal | 30 | 1 | PM10 | | 0.25 g/s | (9.) | Rotary Kiln No. 5 | Coal | 48 | 1 | PM10 | | 0.32 g/s | (10.) | Captive Power Plant (10 MW) | Coal | 95 | 2 | NOx | | 3.15 g/s | (11.) | Rotary Kiln No. 5 | Coal | 48 | 1 | NOx | | 3.925 g/s | (12.) | Captive Power Plant (25 MW) | Coal | 95 | 2 | SO2 | | 12.2 g/s | (13.) | Captive Power Plant (10 MW) | Coal | 95 | 2 | PM10 | | 0.8 g/s | (14.) | DG Sets 3 nos. | HSD | 12 | 0.5 | SO2 | | 0.75 g/s | (15.) | Captive Power Plant (25 MW) | Coal | 95 | 2 | NOx | | 31.05 g/s | (16.) | Captive Power Plant (10 MW) | Coal | 95 | 2 | SO2 | | 3.15 g/s | (17.) | Rotary Kiln No. 5 | Coal | 48 | 1 | SO2 | | 2.4 g/s | (18.) | Rotary Kiln No. 3 & 4 | Coal | 40 | 1 | SO2 | | 4.22 g/s | (19.) | DG Sets 3 nos. | HSD | 12 | 0.5 | PM10 | | 0.09 g/s | (20.) | Rotary Kiln No. 3 & 4 | Coal | 40 | 1 | NOx | | 7.76 g/s | (21.) | Induction Furnace 2 & 3 | Coal | 48 | 1 | NOx | | 5.15 g/s | (22.) | Induction Furnace No. 6 | Coal | 48 | 1 | PM10 | | 0.22 g/s | (23.) | Captive Power Plant (25 MW) | Coal | 95 | 2 | PM10 | | 1.7 g/s | (24.) | Induction Furnace No. 5 | Coal | 48 | 1 | PM10 | | 0.55 g/s | (25.) | Induction Furnace 1 & 4 | Coal | 48 | 1 | NOx | | 5.15 g/s | (26.) | Rotary liln No. 1 & 2 | Coal | 40 | 1 | PM10 | | 0.81 g/s | (27.) | DG Sets 3 nos. | HSD | 12 | 0.5 | NOx | | 1.84 g/s | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 51000 | (b)Source | PGVCL & Captive Power Plant | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 1500kVA*2, 1000kVA*1, 812kVA*2, 500kVA*1, 82kVA*1 | (e)Stack Height (in m) | 16 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 46.9435 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 46.9435 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 46.9435 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : 0 | 0 | Total (ha.) | 46.9435 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 17.28 | | (2.) | Green belt | | 11.3635 | | (3.) | Others | Open Area for future expansion | 18.3 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | NPA | None | 0 | None within 15 Km radius. | (2.) | Corridors | None | 0 | None within 15 Km radius. | (3.) | Wildlife Corridors | None | 0 | None within 15 Km radius. | (4.) | Critically Polluted Area | None | 0 | None within 15 Km radius. | (5.) | ESAs | None | 0 | None within 15 Km radius. | (6.) | ESZs | None | 0 | None within 15 Km radius. | (7.) | WLS | None | 0 | None within 15 Km radius. | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | R.F. Near Gamdau Village | 11.50 | NNE | (2.) | Archaeological Sites | | None | 0 | None within 15 Km radius. | (3.) | Defence Installations | | None | 0 | None within 15 Km radius. | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 46.9435 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Indian Peafowl & Painted Stork NT (Near to Threatened) is reported in the buffer zone. | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | Pea Fowl- Rs. 29.10Lacs Painted Stork-Rs. 11.0L | (iii)Period of Implementation | 10 Years for Both | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Adhoi Nadi | (ii)Direction of Water Bodies in Buffer Area | North | (iii)Distance of Water Bodies in Buffer Area | 2.8 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 70 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 220 | (e)No. of working days | 300 | (f)Total Manpower | 290 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 11.3636 | 4.1278 | 15.491399999999999 | (2.) | Percentage of Total Project Area | 24.2 | 8.8 | 33 | (3.) | No. of Plants | 24919 | 6200 | 31119 | (4.) | Funds Allocated | 6500000 | 1860000 | 8360000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Financial | Revenue to State and Center | (2.) | Environmental | Improved Aesthetic surrounding Environment & Conservation of Schedule -1 Peafowl and NT- Painted Stork - The proposed green belt will enhance the aesthetic beauty of the surrounding environment and conservation of Schedule -1 Peafowl and NT- Painted Stork Pea Fowl- Rs. 29.10Lacs, Painted Stork-Rs. 11.0Lacsfund is allocated which will be implement in 10 years to conserve the Species. | (3.) | Social | • Promoting Education, including Special Education and Employment Enhancing Vocation Skills Especially among Children, Women, Elderly, and the Differently-Able and Livelihood Enhancement Projects.
• Ensuring Environmental Sustainability, Ecological Balance, Protection of Flora and Fauna, Animal Welfare, Agro-forestry, Conservation of Natural Resources and Maintaining Quality of Soil, Air and Water.
• Improve the Poverty and Malnutrition, Promoting Preventive Health Care and Sanitation and making | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 1 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | 45 | (ii)Name of the EIA Consultant | Enkay Enviro Services Pvt. Ltd. | (iii)Address | # 92, Heera Nagar - A, Near Shalimar Bagh, Ajmer Road, Jaipur (Raj.). -, Pin Code:- 302021 | (iv)Mobile No. | 93 | (v)Landline No. | 0141492077 | (vi)Email Id | info@enkayenviro.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 1 | (ix)Validity of Accreditation | 06 Nov 2018 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | May kindly peruse the certificate compliance report uploaded on the portal. The report is not complete. Please upload the complete report along with the closure of non-compliance if obtained for further consideration of the proposal | 17 Dec 2018 | 2. | NA | The correction have been made as per the instruction received | 24 Dec 2018 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Based on the Minutes of Meeting posted on MoEF&CC Website on 14.01.2019
1. Revised Noise Monitoring Data
2. Revised ground water monitoring data
3. Study on drainage pattern of the study area
4. Revised action plan to the issue raised during the public hearing.
5. Revised action plan for implementation of Corporate Environmental Responsibility related activities. | 28 Jan 2019 | 2. | NA | ADS | 14 Jan 2019 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Manoj Rastogi | Designation | Sr. Manager Commercial | Name of Company (Applicant Name should not be given here) | GALLANTT METAL LIMITED | Address | SURVEY NO 175/1 VILLAGE SAMAKHIYALI, TALUKA BHACHAU, DISTT KUTCH, GUJARAT-370150 |
|