Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) AJITABURU IRON & MANGANESE MINE
(b)Name of the Company / Organisation CRYSTAL CONSULTANTS
(c)Registered Address Plot No.: 231-236, Phase-II, GIDC Estate, Vatva, Ahmedabad.,,Ahmedabad,Gujarat-382445
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant shishir Kumar
(b)Designation (Owner/ Partner/ CEO) CEO
(c)Address Kshitij, Kashyap Vihar, Opp. ashok Nagar Road No. -3,,Namkum,Ranchi,Jharkhand-834002
(d)Pin code 834002
(e)E-mail info@crystalconsultants.org
(f)STD Code. 651(f)Telephone No. 2243120
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity
(b)Category A
(c)Proposal Number IA/JH/MIN/85167/2009
(d)Master Proposal Number(Single Window) SW/85163/2018
(e)EAC concerned (for category A Projects only) Non-Coal Mining
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. COMP. NO. - 31
(b)Pincode 833221
(c)Bounded Latitudes (North)
From
Degree 2451904.618
Minutes
Second
From
Degree 2452089.835
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 329944.195
Minutes
Second
From
Degree 329954.869
Minutes
Second
(e)Survey of India Topo Sheet No. 73F/8
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 624
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Jharkhand
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11015/377/2007-IA.II(M)
(b)Date of Apply of TOR 14 Dec 2009
(c)Date of Issue of TOR / Standard ToR 18 Jan 2010
(d)Date of Apply of EC 11 Nov 2008
(e)Date of Issue of EC 16 Jan 2009
(f)Previous TOR Letter Copy of Previous TOR letter
(g)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :28 Apr 2010
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :28 May 2010
Distance of Public Hearing Venue from the Proposed Project :3
BOKNA LOWER PRIMARY SCHOOL
State :Jharkhand
District :West Singhbhum
Tehsil :Noamundi
Village :BOKNA
156The local resident raised the concern about proper control on air or water pollution. They also requested for provision of a check dam for irrigation purpose. They also expressed that local people shoDeputy Commissioner
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Ranchi
(iii)Letter No. 103-115/07/EPE/2622
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jul 11 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)MANGANESE42755522559500Tons per Annum(TPA)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)EXCAVATOR0707070.9 CUM/BUCKET
(2.)JACKHAMMER111
(3.)DUMPER3737373.5 CUM
(4.)JEEP222
(5.)WATER TANKER1114000 LTRS
(6.)WAGON DRILL222110 MM
(7.)JCB LOADER1110.3 CUM/BUCKET
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception Copy of Consent to Operate
(iii)Date of Issue 03 Jan 2018
(iv)Valid Upto 31 Mar 2020
(v)File No. JSPCB/HO/RNC/CTO-1876905/2018/19
(vi)Application No. 1876905
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 200
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.0720
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)MANGANESE0OthersNOT APPLICABLEMINERoad0 OthersNO LINKAGECopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 03 Apr 2009 To 29 Jun 2009
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube86.523.383.9100
(2.)PM2.5Micro Gram per Meter Cube210.4103206.960
(3.)SO2Micro Gram per Meter Cube36.213.036.180
(4.)NOxMicro Gram per Meter Cube38.611.038.180
    14.2.     No. of Ground Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Total Hardnessmg/l252140300300
(2.)TDSmg/l405.6248.6500500
(3.)pHNA7.407.006.58.5
(4.)Chloridesmg/l56.9928.36250250
(5.)Fluoridemg/l0.420.2811
(6.)TSSmg/l0000
(7.)Heavy MetalsIRONmg/l1.41.20.300.30
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA0.340.20A
(2.)DOmg/l4.03.6B
(3.)BODmg/l4.82.4C
(4.)CODmg/l8.68.2D
    14.4.     No. of Ambient Noise monitoring locations : 5
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))62.830.2100
(2.)Leq(Night)A-weighted decibels(dB(A))000
    14.5.     No. of Soil Sample Monitored locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNULL6.826.32
(2.)N(Nitrogen)Parts per Million50.242.4
(3.)K(Potassium)Parts per Million50.246.4
(4.)Electric ConductivityOthersNULL00
(5.)P(Phosphorus)Parts per Million6.23.4
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 30 To 35
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 20 To 22
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater100 Not Appliacble PipelineTube WellNUL06 Dec 201810
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)MINE WATER450450DESILTATION ONDDischarge into Surface Water Body450
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 450
(b)Total Discharged Water (Kilolitre per Day) 450
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)INDUSTRIAL WASTEIndustrial Waste1140822.5Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube86.505.1491.64100
(2.)PM2.5Microgram per Meter Cube51.903.0854.9860
(3.)SO2Microgram per Meter Cube36.201.237.480
(4.)NOxMicrogram per Meter Cube37.902.14080
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NOT APPLICABLE000OthersNULL0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 0
(b)Source NULL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 0
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 46.620
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 46.620
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 46.62
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NUL 0
    Total (ha.) 46.62
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0
(2.)Township0
(3.)Green belt2.11
(4.)Ash Pond0
(5.)Quarry Area28.46
(6.)OB Dump Area2.33
(7.)Safety Zone2.265
(8.)Tailing Pond0
(9.)LandFill0
(10.)Water Reservoir0
(11.)Desalination Plant0
(12.)Area for Solid Waste Management0
(13.)Built Up Area0
(14.)OthersROAD, INFRASTRUCTURE, ETC11.455
Total (ha.) 46.62
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)CorridorsNULL0NOT APPLICABLE
(2.)Critically Polluted AreaNULL0NOT APPLICABLE
(3.)NPANULL0NOT APPLICABLE
(4.)ESZsNULL0NOT APPLICABLE
(5.)WLSNULL0NOT APPLICABLE
(6.)ESAsNULL0NOT APPLICABLE
(7.)Wildlife CorridorsNULL0NOT APPLICABLE
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNUL0NOT APPLICABLE
(2.)Defence InstallationsNUL0NOT APPLICABLE
(3.)ForestSARANDA FOREST DIVISION0PROJECT SITE WITHIN FOREST
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species ELEPHANT & PYTHON
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area KARO RIVER
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 1.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 250
(e)No. of working days 280
(f)Total Manpower 250
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt2.1102.11
(2.)Percentage of Total Project Area5.5905.59
(3.)No. of Plants025322532
(4.)Funds Allocated014.7714.77
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)IronMajor
(2.)ManganeseMajor
2.
Mine Capacity in ROM (Run of Mine) 4275
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. 314(3)/2009-MCCM(CZ)S-4
(b)Date of Approval 22 Jul 2009
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department IBM
(e)Approved Mining Lease Area 46.62
(f)Approved Capacity 4275
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 8760600,2342040
(b)Mineable Reserves (Million Ton) 4448755.41
(c)Extractable Reserves(Million Ton) 4003879.87
(d)Percent(%) of Extraction 90
(e)Grade of Coal /Ore /Mineral Hematite
(f)Stripping Ratio 1 : 0.63
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 6.25
(i)Mining Method Opencast
(j)Life of Mine (Years) 5
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area Yes
(c)No. of crushers 1
     6.1.    Details of crusher:
S. No.Crusher ID Capacity (in PH)Remarks
(1.)1200 One Crusher
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 46.42
(b)Whether obtained Letter of Intent (LOI) from the state government ? No
(i)Reason thereof NIL
(c)Whether Lease Deed Executed ? Yes
(i)Copy of Executed Lease deed valid as on Date Copy of Executed Lease deed
(ii)Provide area in Hectare as per executed lease deed (initial) document 46.42
(iii)Validity of the lease deed From : 31 Mar 2017 To : 31 Mar 2020
(iv)Date of Execution of Mining Lese 31 Mar 2017
(v)Reference Number NIl
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof Nil
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 8
(ii)Total Area (in Hectare) 2.33
(iii)Height (in meter) 26.47
(iv)Quantity (in Million Cubic meter) 4.56
(v)No. of year back fill up 0
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 19.976
(b)Depth (in meter) 45
(c)Volume (in Million Cubic meter) 49.03
12.
Details of Quarry:
(a)Final Void of 19.976 (hectare) at a Depth of 45 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 19.976
13.
Details of Transportation:
(a)In Pit/Underground to Surface IN PIT
(b)Surface to Siding/Loading NA
(c)Transportation / Conveyor Details By Road Transportation
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)SURFACE WATER BODIES000
(2.)AGRICULTURE LAND000
(3.)WASTE LAND000
(4.)FOREST LAND46.42046.42
(5.)GRAZING LAND000
(6.)SETTLEMENTS000
TOTAL46.42046.42
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)INTERNAL OB DUMPS0000
(2.)GREEN BELT0.15000.15
(3.)BUILT UP AREA (COLONY/OFFICE)0.322000.322
(4.)VIRGIN AREA0000
(5.)EXCAVATION/QUARRY038.586038.586
(6.)TOP SOIL STORAGE0000
(7.)EXTERNAL OB DUMPS2.16002.16
(8.)ROADS3.337003.337
TOTAL5.96938.5860044.555
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 19.976
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 38.586
(d)Safety Zone(in hectare) 0
(e)Final Void of 38.586 (hectare) at a Depth of 45 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 1800
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0
(h)Total afforestation plant (in hectare) 10744
17.
Status of progressive Mining Closure Plan:
Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan
Any Deviation from the Approved Progressive Mine Closure Plan No
Total Area Excavated (in hectare) 26.15
Total Area Backfilled after Excavation (in hectare) 0.53
Total Area Reclaimed (in hectare) 0
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)20186000006000006000006000000
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? No
(i)Reason for not Hiring the Consultant Self Presentation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA(i). Copy of executed lease deed has not uploaded. (ii). It is noted that the PP/Consultant has not prepared the EIA/EMP report as per Appendix III (Generic Structure of Environmental Impact Assessment Document) of EIA Notification, 2006. The report should contain 12 chapters whereas PP has submitted only 10 Chapters in the EIA/EMP Report. In this context Consultant/ PP needs to revise the EIA EMP report as per Appendix III of EIA Notification, 2006 and resubmit the same for consideration before EAC. (iii). Copy of approved mine plan has not uploaded. (iv). Details of past production of mine since its inception, duly authenticated by Department of Mines & Geology, State Government. (v). Copy of affidavit needs to be submitted by PP in compliance of the Ministry’s OM no. 3-50/2017-IA.III (Pt.), dated 30th May 2018. (vi). Compliance of order dated 02.8.2017 in CWP No. 114/2014 of Hon'ble Supreme court (Common Cause Vs Union of India &Ors.) (vii). Details of demand if any raised 01 Feb 2019
2.NAThe correction have been made as per the instruction received 17 Mar 2019
3.NA10) Copies of previous EC documents 11) Details of past production of mine since its inception, duly authenticated by Department of Mines & Geology, State Government. 12) Copy of affidavit needs to be submitted by PP in compliance of the Ministry’s OM no. 3-50/2017-IA.III (Pt.), dated 30th May 2018. 13) MOEFCC-R.O. Compliance Report. 14) Copy of CTO/CTE of mine since its inception 15) Compliance of order dated 02.8.2017 in CWP No. 114/2014 of Hon'ble Supreme court (Common Cause Vs Union of India &Ors.) 16) Details of demand if any raised by Department of Mining and Geology 17) Details of payment, if any made to Department of Mines & Geology 18) Letter from Forest Department stating that whether the mine leases area is coming under conservation zone or mining zone. 19) Status of mine whether working or not 11 Apr 2019
4.NAThe correction have been made as per the instruction received 13 Jun 2019
5.NAPlease Upload the appropriate reply for the earlier EDS along with the documents/Information. 14 Feb 2020
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of Applicantshishir Kumar
DesignationCEO
Name of Company (Applicant Name should not be given here)CRYSTAL CONSULTANTS
AddressKshitij, Kashyap Vihar, Opp.Ashok nagar Raod No. 3, Ranchi (Jharkhand)
Print