1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | AJITABURU IRON & MANGANESE MINE | (b)Name of the Company / Organisation | CRYSTAL CONSULTANTS | (c)Registered Address | Plot No.: 231-236, Phase-II, GIDC Estate, Vatva, Ahmedabad.,,Ahmedabad,Gujarat-382445 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | shishir Kumar | (b)Designation (Owner/ Partner/ CEO) | CEO | (c)Address | Kshitij, Kashyap Vihar, Opp. ashok Nagar Road No. -3,,Namkum,Ranchi,Jharkhand-834002 | (d)Pin code | 834002 | (e)E-mail | info@crystalconsultants.org | (f)STD Code. | 651(f)Telephone No. | 2243120 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(a) Mining of minerals
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/JH/MIN/85167/2009 | (d)Master Proposal Number(Single Window) | SW/85163/2018 | (e)EAC concerned (for category A Projects only) | Non-Coal Mining | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | COMP. NO. - 31 | (b)Pincode | 833221 | (c)Bounded Latitudes (North) | | From | | Degree | 2451904.618 | Minutes | | Second | | From | | Degree | 2452089.835 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 329944.195 | Minutes | | Second | | From | | Degree | 329954.869 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 73F/8 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 624 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 1 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Jharkhand | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11015/377/2007-IA.II(M) | (b)Date of Apply of TOR | 14 Dec 2009 | (c)Date of Issue of TOR / Standard ToR | 18 Jan 2010 | (d)Date of Apply of EC | 11 Nov 2008 | (e)Date of Issue of EC | 16 Jan 2009 | (f)Previous TOR Letter | Copy of Previous TOR letter | (g)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 28 May 2010 | Distance of Public Hearing Venue from the Proposed Project : | 3 |
| BOKNA LOWER PRIMARY SCHOOL | State : | Jharkhand | District : | West Singhbhum | Tehsil : | Noamundi | Village : | BOKNA |
| 156 | The local resident raised the concern about proper control on air or water pollution. They also requested for provision of a check dam for irrigation purpose. They also expressed that local people sho | Deputy Commissioner | | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Ranchi | (iii)Letter No. | 103-115/07/EPE/2622 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Jul 11 2018 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | MANGANESE | 4275 | 55225 | 59500 | Tons per Annum(TPA) | | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | EXCAVATOR | 07 | 07 | 07 | 0.9 CUM/BUCKET | (2.) | JACKHAMMER | 1 | 1 | 1 | | (3.) | DUMPER | 37 | 37 | 37 | 3.5 CUM | (4.) | JEEP | 2 | 2 | 2 | | (5.) | WATER TANKER | 1 | 1 | 1 | 4000 LTRS | (6.) | WAGON DRILL | 2 | 2 | 2 | 110 MM | (7.) | JCB LOADER | 1 | 1 | 1 | 0.3 CUM/BUCKET | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | Copy of Consent to Operate | (iii)Date of Issue | 03 Jan 2018 | (iv)Valid Upto | 31 Mar 2020 | (v)File No. | JSPCB/HO/RNC/CTO-1876905/2018/19 | (vi)Application No. | 1876905 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 200 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.0720 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 0 | (b)Existing quantity of raw material/fuel | 0 | (c)Total quantity of raw material/fuel | 0 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | MANGANESE | 0 | Others | NOT APPLICABLE | MINE | Road | | 0 | Others | NO LINKAGE | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 03 Apr 2009 To 29 Jun 2009 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 86.5 | 23.3 | 83.9 | 100 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 210.4 | 103 | 206.9 | 60 | (3.) | SO2 | | Micro Gram per Meter Cube | 36.2 | 13.0 | 36.1 | 80 | (4.) | NOx | | Micro Gram per Meter Cube | 38.6 | 11.0 | 38.1 | 80 | |
14.2. No. of Ground Water monitoring locations : 5 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Total Hardness | | | mg/l | | 252 | 140 | 300 | 300 | (2.) | TDS | | | mg/l | | 405.6 | 248.6 | 500 | 500 | (3.) | pH | | | NA | | 7.40 | 7.00 | 6.5 | 8.5 | (4.) | Chlorides | | | mg/l | | 56.99 | 28.36 | 250 | 250 | (5.) | Fluoride | | | mg/l | | 0.42 | 0.28 | 1 | 1 | (6.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (7.) | Heavy Metals | | IRON | mg/l | | 1.4 | 1.2 | 0.30 | 0.30 | |
14.3. No. of Surface Water monitoring locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 0.34 | 0.20 | A | (2.) | DO | | mg/l | | 4.0 | 3.6 | B | (3.) | BOD | | mg/l | | 4.8 | 2.4 | C | (4.) | COD | | mg/l | | 8.6 | 8.2 | D | |
14.4. No. of Ambient Noise monitoring locations : 5 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 62.8 | 30.2 | 100 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 0 | 0 | 0 | |
14.5. No. of Soil Sample Monitored locations : 5 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | Others | NULL | 6.82 | 6.32 | (2.) | N(Nitrogen) | Parts per Million | | 50.2 | 42.4 | (3.) | K(Potassium) | Parts per Million | | 50.2 | 46.4 | (4.) | Electric Conductivity | Others | NULL | 0 | 0 | (5.) | P(Phosphorus) | Parts per Million | | 6.2 | 3.4 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 30 To 35 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 20 To 22 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 10 | 0 | Not Appliacble | Pipeline | | Tube Well | | NUL | 06 Dec 2018 | 10 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | MINE WATER | 450 | 450 | DESILTATION OND | Discharge into Surface Water Body | | | 450 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 450 | (b)Total Discharged Water (Kilolitre per Day) | 450 | (c)Total Reused Water (Kilolitre per Day) | 0 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | INDUSTRIAL WASTE | Industrial Waste | | 1140822.5 | Tons | 0 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 86.5 | 0 | 5.14 | 91.64 | 100 | (2.) | PM2.5 | | Microgram per Meter Cube | 51.9 | 0 | 3.08 | 54.98 | 60 | (3.) | SO2 | | Microgram per Meter Cube | 36.2 | 0 | 1.2 | 37.4 | 80 | (4.) | NOx | | Microgram per Meter Cube | 37.9 | 0 | 2.1 | 40 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | NOT APPLICABLE | 0 | 0 | 0 | Others | NULL | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 0 | (b)Source | NULL | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 0 | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 46.620 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 46.620 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 46.62 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : NUL | 0 | Total (ha.) | 46.62 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 0 | | (2.) | Township | | 0 | | (3.) | Green belt | | 2.11 | | (4.) | Ash Pond | | 0 | | (5.) | Quarry Area | | 28.46 | | (6.) | OB Dump Area | | 2.33 | | (7.) | Safety Zone | | 2.265 | | (8.) | Tailing Pond | | 0 | | (9.) | LandFill | | 0 | | (10.) | Water Reservoir | | 0 | | (11.) | Desalination Plant | | 0 | | (12.) | Area for Solid Waste Management | | 0 | | (13.) | Built Up Area | | 0 | | (14.) | Others | ROAD, INFRASTRUCTURE, ETC | 11.455 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Corridors | NULL | 0 | NOT APPLICABLE | (2.) | Critically Polluted Area | NULL | 0 | NOT APPLICABLE | (3.) | NPA | NULL | 0 | NOT APPLICABLE | (4.) | ESZs | NULL | 0 | NOT APPLICABLE | (5.) | WLS | NULL | 0 | NOT APPLICABLE | (6.) | ESAs | NULL | 0 | NOT APPLICABLE | (7.) | Wildlife Corridors | NULL | 0 | NOT APPLICABLE | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | NUL | 0 | NOT APPLICABLE | (2.) | Defence Installations | | NUL | 0 | NOT APPLICABLE | (3.) | Forest | | SARANDA FOREST DIVISION | 0 | PROJECT SITE WITHIN FOREST | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | ELEPHANT & PYTHON | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | KARO RIVER | (ii)Direction of Water Bodies in Buffer Area | East | (iii)Distance of Water Bodies in Buffer Area | 1.5 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 0 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 250 | (e)No. of working days | 280 | (f)Total Manpower | 250 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 2.11 | 0 | 2.11 | (2.) | Percentage of Total Project Area | 5.59 | 0 | 5.59 | (3.) | No. of Plants | 0 | 2532 | 2532 | (4.) | Funds Allocated | 0 | 14.77 | 14.77 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
NIL | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Non-Coal Mining |
|
1. No. of Mineral(s) to be Mined : 1 |
---|
S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
---|
(1.) | Iron | Major | (2.) | Manganese | Major | |
|
2. | Mine Capacity in ROM (Run of Mine) | 4275 | |
|
|
4. | Mining Plan: | (a)Approval Letter No. | 314(3)/2009-MCCM(CZ)S-4 | (b)Date of Approval | 22 Jul 2009 | (c)Approved Letter | Copy of Approved Letter | (d)Approved By State Mining and Geology Department | IBM | (e)Approved Mining Lease Area | 46.62 | (f)Approved Capacity | 4275 | |
|
5. | Technical Details: | (a)Total Geological Reserves (Million Ton) | 8760600,2342040 | (b)Mineable Reserves (Million Ton) | 4448755.41 | (c)Extractable Reserves(Million Ton) | 4003879.87 | (d)Percent(%) of Extraction | 90 | (e)Grade of Coal /Ore /Mineral | Hematite | (f)Stripping Ratio | 1 : 0.63 | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | NA | (h)Average Gradient(Degree) | 6.25 | (i)Mining Method | Opencast | (j)Life of Mine (Years) | 5 | |
|
6. | Details of Beneficiations: | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | No | (b)Whether it is proposed to install crusher within the mining lease area | Yes | (c)No. of crushers | 1 | |
|
6.1. Details of crusher: |
---|
S. No. | Crusher ID | Capacity (in PH) | Remarks |
---|
(1.) | 1 | 200 | One Crusher | |
|
7. | Details of Seams: | (a)Whether details of seam applicable | No | |
|
8. | Details of Mining Lease: | (a)Mining Lease Area (in Hectare) | 46.42 | (b)Whether obtained Letter of Intent (LOI) from the state government ? | No | (i)Reason thereof | NIL | (c)Whether Lease Deed Executed ? | Yes | (i)Copy of Executed Lease deed valid as on Date | Copy of Executed Lease deed | (ii)Provide area in Hectare as per executed lease deed (initial) document | 46.42 | (iii)Validity of the lease deed | From : 31 Mar 2017 To : 31 Mar 2020 | (iv)Date of Execution of Mining Lese | 31 Mar 2017 | (v)Reference Number | NIl | (d)Whether Lease Deed Renewed ? | No | (i)Reason thereof | Nil | |
|
9. | OB (Over Burden) Management: | (a) Details of External Dumps: | (i)No. of OB Dumps | 8 | (ii)Total Area (in Hectare) | 2.33 | (iii)Height (in meter) | 26.47 | (iv)Quantity (in Million Cubic meter) | 4.56 | (v)No. of year back fill up | 0 | (b) Details of Internal Dumps: | (i)No. of Internal Dumps | 0 | (ii)Total Area (in Hectare) | 0 | (iii)Height (in meter) | 0 | (iv)Quantity (in Million Cubic meter) | 0 | |
|
10. | Details of Topsoil Management: | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 0 | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 0 | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 0 | |
|
11. | Details of Final Mine Void: | (a)Area (in Hectare) | 19.976 | (b)Depth (in meter) | 45 | (c)Volume (in Million Cubic meter) | 49.03 | |
|
12. | Details of Quarry: | (a)Final Void of 19.976 (hectare) at a Depth of 45 meter which is Proposed to be Converted into a Water Body. | (b)Total Quarry Area (ha) | 19.976 | |
|
13. | Details of Transportation: | (a)In Pit/Underground to Surface | IN PIT | (b)Surface to Siding/Loading | NA | (c)Transportation / Conveyor Details | By Road Transportation | |
|
|
14. Details of Land Usage (Pre-Mining) |
---|
S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
---|
(1.) | SURFACE WATER BODIES | | 0 | 0 | 0 | (2.) | AGRICULTURE LAND | | 0 | 0 | 0 | (3.) | WASTE LAND | | 0 | 0 | 0 | (4.) | FOREST LAND | | 46.42 | 0 | 46.42 | (5.) | GRAZING LAND | | 0 | 0 | 0 | (6.) | SETTLEMENTS | | 0 | 0 | 0 | |
TOTAL | 46.42 | 0 | 46.42 | |
|
15. Details of Land Usage (Post-Mining) |
---|
S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
---|
(1.) | INTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (2.) | GREEN BELT | | 0.15 | 0 | 0 | | 0.15 | (3.) | BUILT UP AREA (COLONY/OFFICE) | | 0.322 | 0 | 0 | | 0.322 | (4.) | VIRGIN AREA | | 0 | 0 | 0 | | 0 | (5.) | EXCAVATION/QUARRY | | 0 | 38.586 | 0 | | 38.586 | (6.) | TOP SOIL STORAGE | | 0 | 0 | 0 | | 0 | (7.) | EXTERNAL OB DUMPS | | 2.16 | 0 | 0 | | 2.16 | (8.) | ROADS | | 3.337 | 0 | 0 | | 3.337 | |
TOTAL | 5.969 | 38.586 | 0 | 0 | 44.555 | |
16. | Details of Reclamation: | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | (a)External OB Dump(in hectare) | 19.976 | (b)Internal Dump(in hectare) | 0 | (c)Quarry(in hectare) | 38.586 | (d)Safety Zone(in hectare) | 0 | (e)Final Void of 38.586 (hectare) at a Depth of 45 meter which is Proposed to be Converted into a Water Body. | (f)Density of Tree Plantation per ha (in no.) | 1800 | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | 0 | (h)Total afforestation plant (in hectare) | 10744 | |
|
|
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
---|
S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
---|
(1.) | 2018 | 600000 | 600000 | 600000 | 600000 | 0 | |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | No | (i)Reason for not Hiring the Consultant | Self Presentation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | (i). Copy of executed lease deed has not uploaded.
(ii). It is noted that the PP/Consultant has not prepared the EIA/EMP report as per Appendix III (Generic Structure of Environmental Impact Assessment Document) of EIA Notification, 2006. The report should contain 12 chapters whereas PP has submitted only 10 Chapters in the EIA/EMP Report. In this context Consultant/ PP needs to revise the EIA EMP report as per Appendix III of EIA Notification, 2006 and resubmit the same for consideration before EAC.
(iii). Copy of approved mine plan has not uploaded.
(iv). Details of past production of mine since its inception, duly authenticated by Department of Mines & Geology, State Government.
(v). Copy of affidavit needs to be submitted by PP in compliance of the Ministry’s OM no. 3-50/2017-IA.III (Pt.), dated 30th May 2018.
(vi). Compliance of order dated 02.8.2017 in CWP No. 114/2014 of Hon'ble Supreme court (Common Cause Vs Union of India &Ors.)
(vii). Details of demand if any raised | 01 Feb 2019 | 2. | NA | The correction have been made as per the instruction received | 17 Mar 2019 | 3. | NA | 10) Copies of previous EC documents
11) Details of past production of mine since its inception, duly authenticated by Department of Mines & Geology, State Government.
12) Copy of affidavit needs to be submitted by PP in compliance of the Ministry’s OM no. 3-50/2017-IA.III (Pt.), dated 30th May 2018.
13) MOEFCC-R.O. Compliance Report.
14) Copy of CTO/CTE of mine since its inception
15) Compliance of order dated 02.8.2017 in CWP No. 114/2014 of Hon'ble Supreme court (Common Cause Vs Union of India &Ors.)
16) Details of demand if any raised by Department of Mining and Geology
17) Details of payment, if any made to Department of Mines & Geology
18) Letter from Forest Department stating that whether the mine leases area is coming under conservation zone or mining zone.
19) Status of mine whether working or not | 11 Apr 2019 | 4. | NA | The correction have been made as per the instruction received | 13 Jun 2019 | 5. | NA | Please Upload the appropriate reply for the earlier EDS along with the documents/Information. | 14 Feb 2020 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | shishir Kumar | Designation | CEO | Name of Company (Applicant Name should not be given here) | CRYSTAL CONSULTANTS | Address | Kshitij, Kashyap Vihar, Opp.Ashok nagar Raod No. 3, Ranchi (Jharkhand) |
|