Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) 1200MW Pinnapuram Pumped Storage ProjectHEP
(b)Name of the Company / Organisation GREENKO ENERGIES PRIVATE LIMITED
(c)Registered Address Plot no-1071, Road No-44, Jubilee Hills, Hyderabad,,Hyderabad,Telangana-500033
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Gopi Krushna Nikku
(b)Designation (Owner/ Partner/ CEO) AGM
(c)Address Plot No-1071, Road no-44, Jubilee Hills, Hyderabad,,Khairatabad,Hyderabad,Telangana-500033
(d)Pin code 500033
(e)E-mail envifor.irepap@greenkoenergyprojects.com
(f)STD Code. 40(f)Telephone No. 40301333
(g)Fax No. 40301101
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(c) River Valley projects
Minor Activity
(b)Category A
(c)Proposal Number IA/AP/RIV/85150/2018
(d)Master Proposal Number(Single Window) SW/85141/2018
(e)EAC concerned (for category A Projects only) River Valley and Hydroelectric Projects
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 123
(b)Pincode 518010
(c)Bounded Latitudes (North)
From
Degree 153626
Minutes
Second
From
Degree 153726
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 781513
Minutes
Second
From
Degree 781530
Minutes
Second
(e)Survey of India Topo Sheet No. 57I2 57I6C
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 500
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Andhra Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Andhra PradeshKurnoolNandyalPinnapuram
6.
Details of Terms of Reference (ToR):
(b)MoEF&CC / SEIAA File Number NA
(c)Date of Issue of TOR / Standard ToR NA
(d)Previous TOR Letter NA
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :30 Sep 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :02 Nov 2018
Distance of Public Hearing Venue from the Proposed Project :1
Near Mandal Parishad Upper Primary School Pinnapuram Village
State :Andhra Pradesh
District :Kurnool
Tehsil :Nandyal
Village :Pinnapuram
990Issues raised in the public hearing are majorly providing the employment opportunities to the local villagers, development of nearby villages by providing infrastructure facilities such as constructioDistrict Collector
(2.)
Date of Advertisement :30 Sep 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :02 Nov 2018
Distance of Public Hearing Venue from the Proposed Project :1
Near Mandal Parishad Upper Primary School Pinnapuram Village
State :Andhra Pradesh
District :Kurnool
Tehsil :Nandyal
Village :Pinnapuram
990Issues raised in the public hearing are majorly providing the employment opportunities to the local villagers, development of nearby villages by providing infrastructure facilities such as constructioDistrict Collector
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Pumped storage Hydro project1200 MW
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Electricity generation1200Mega Watt(MW)Road
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 5468.03
(b) Funds Allocated for Environment Management (Capital) (in Crores) 118.40
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 10.54
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 118.40
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 580000
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 580000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)coarse aggregate193333OtherscumecQuarry sitesRoad1 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 15 Jan 2018 To 22 Jan 2018
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube7.96.07.980
(2.)NOxMicro Gram per Meter Cube8.67.08.680
(3.)PM10Micro Gram per Meter Cube67.955.567.9100
(4.)PM2.5Micro Gram per Meter Cube32.920.332.960
    14.2.     No. of Ground Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.657.346.58.5
(2.)Chloridesmg/l786810001000
(3.)TDSmg/l745.4542.920002000
(4.)Total Hardnessmg/l167.33150.44600600
(5.)Fluoridemg/l0011.5
(6.)OthersAlkanitymg/l8057600600
(7.)TSSmg/l0000
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.87.6A
(2.)BODmg/l2.11.5A
(3.)CODmg/l13.46.9B
(4.)DOmg/l7.77.2A
    14.4.     No. of Ambient Noise monitoring locations : 6
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))43.536.245
(2.)Leq(Day)A-weighted decibels(dB(A))54.548.955
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNA8.27.7
(2.)P(Phosphorus)Kilogram per hectare30.523.5
(3.)Electric ConductivityOthersMicro Simen per Centimeter868300
(4.)K(Potassium)Kilogram per hectare160.0135.0
(5.)N(Nitrogen)Kilogram per hectare180145
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 12.67 To 2.20
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.47 To 22.0
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersOne time from Gorakallu Reservoir09Copy of Permission LetterPipelineOthersPumpingGO. Ms. 2419 Jul 201828316846
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)River Valley and Hydroelectric Projects000Reuse within the Plant & Recycling0
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 0
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Solid WasteMunicipal Solid Waste438Tons1RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube67.90.5067.9100
(2.)NOxMicrogram per Meter Cube8.60.508.680
(3.)PM2.5Microgram per Meter Cube32.90.5032.960
(4.)SO2Microgram per Meter Cube7.90.507.980
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)0000OthersNA0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 2500
(b)Source Panyam/ Kaluvabugga
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1
(e)Stack Height (in m) 1
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 365.66
(b)Private Land (ha.) 119.65
(c)Government Land (ha.) 228.34
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 713.65
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 33098.03
(b)Waste/Barren Land (ha.) 9679.47
(c)Grazing/ Community Land (ha.) 0.00
(d)Surface Water Bodies (ha.) 2867.65
(e)Settlements (ha.) 356.77
(f)Industrial (ha.) 0.00
(g)Forest (ha.) 8425.54
(h)Mangroves (ha.) 0.00
(i)Marine Area (ha.) 0.00
(j)Others (ha.) : Scrub Land 13160.79
    Total (ha.) 67588.2500
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Water Reservoir599.19
(2.)Main Plant114.46
Total (ha.) 713.65
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)CorridorsNA0NA
(2.)WLSRollapadu Wild Life Sanctuary11.50NA
(3.)NPANA0NA
(4.)Wildlife CorridorsNA0NA
(5.)ESAsNA0NA
(6.)Critically Polluted AreaNA0NA
(7.)ESZsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA00
(2.)ForestNA00
(3.)Defence InstallationsNA00
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 713.65
(c)Status of Land acquisition if not acquired 713.65
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Antelope cervicapra (Blackbuck), Pavo cristatus (Peafowl)
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 45.50 lakh
(iii)Period of Implementation 5 years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 200
(b)Permanent Employment-During Operation 150
(c)Temporary Employment- During Construction 350
(d)Temporary Employment- During Operation 200
(e)No. of working days 22
(f)Total Manpower 900
32.
Green Belt in Ha:
(a)Total Area of Green Belt 5
(b)Percentage of Total Project Area 0.70
(c)No. of Plants to be Planted 5000
(d)Funds Allocated for Plantation 4750000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialA number of marginal activities and jobs would be available to the locals during construction phase. ii) Developer bringing large scale investment to the area will also invest in local area development and benefit will be reaped by locals. Education, medical, transportation, road network and other infrastructure will improve. iii) The availability of alternative resources provided by developer in the rural areas will reduce the dependence of the locals on natural resources such as forest.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For River Valley and Hydroelectric Projects
S. No.Item Details
1. Project Sub Sector Hydroelectric Project
2. Name of the River Gorakallu Reservoir
3.
Whether Cumulative Impact Assessment and Carrying Capacity Study of River Basin is Carried Out? No
     4.      Type of Project: (Construction of Dam/ Barrage/ Run of the River/ Lift Irrigation Scheme)
S. No.Project TypeDam Height (in meters)Dam Length (in meters)Total Submergence Area (in hectare)Gross Command Area (GCA) (in hectare)Irrigable Command Area (ICA) (in hectare)Culturable Command Area (CCA) (in hectare)Total Command Area (in hectare)
(1.)Construction of Dam45000000
5.
Powerhouse Installed Capacity No
(a) Type of Powerhouse Surface
(b) Capacity (in megawatts) 1200
(c) No. of Tunnels 0
(d) No. of Units 0
(e) Bank of River Both
6.
Generation of Electricity Annually.
(a) Quantity of Generation of Electricity Annually (in giga watt hours) 0
(b) Water Availability at Various percentage
S. No.PercentageWater availability (in cusecs)Dependable yearRemarks
(1.)50 %000
(2.)90 %000
(3.)75 %000
(c) Machine Availability (in percent) 0
(d) Cost of Electricity Generation (in INR) 0
(e) Internal Rate of Return (in percent) 0
(f) Year of achievement of Internal Rate of Return 0
7. Catchment Area Treatment Plan Copy of Catchment Plan
8.
Muck Management Plan
(a)Muck Management Plan Copy of Muck Management Plan
(b) Total Excavation Muck (in cubic meter) 9730346
(c) Utilized for Construction (in cubic meter)7610000
(d) No. of Muck Disposal sites1
(e) Total Muck Disposal Area (in hectare)21
9.
Fishery Development and Management Plan
(a)Fishery Development and Management Plan Copy of Fishery Development and Management Plan
(b) No. of Fish Species 0
(c) Name of the umbrella Fish Species (Scientific Name)0
10.
Status of Environmental Flow
S. No.SeasonAverage Inflow (in cumec)Percent of Flow
(1.)Lean00
(2.)Monsoon00
(3.)Non-Lean Non-Monsoon00
11. Free Flow Stretch (in km) 0
12.
Approval of Central Water Commission No
13.
Approval of Central Electricity Authority No
14.
Details of Coffer Dam (Upstream) None
15.
Details of Coffer Dam (Downstream) None
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/RA 0152
(ii)Name of the EIA Consultant R S ENVIROLINK TECHNOLOGIES PVT LTD
(iii)Address 403, BESTECH CHAMBERS B BLOCK SUSHANT LOK PHASE I GURUGRAM
(iv)Mobile No. 9818145875
(v)Landline No. 0124429538
(vi)Email Id ravi@rstechnologies.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation River Valley and Hydroelectric Projects
(ix)Validity of Accreditation 14 Aug 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantGopi Krushna Nikku
DesignationAGM
Name of Company (Applicant Name should not be given here)GREENKO ENERGIES PRIVATE LIMITED
AddressPlot no-1071, Road No-44, Jubilee Hills, Hyderabad
Print