Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Setting up new manufacturing unit of Pesticides by M/s Crystal Crop Protection Pvt. Ltd.
(b)Name of the Company / Organisation CRYSTAL CROP PROTECTION PRIVATE LIMITED
(c)Registered Address B-95 Wazirpur Industrial Area, Wazirpur, New Delhi,,North West,Delhi-110052
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Jagat Sharma
(b)Designation (Owner/ Partner/ CEO) Chiefmanufactuingofficer
(c)Address B-95 Wazirpur Industrial Area, Wazirpur, New Delhi,,Model Town,North West,Delhi-110052
(d)Pin code 110052
(e)E-mail crycrop@gmail.com
(f)STD Code. 11(f)Telephone No. 27006800
(g)Fax No. 27118885
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
Minor Activity
(b)Category A
(c)Proposal Number IA/MH/IND2/70618/2017
(d)Master Proposal Number(Single Window) SW/85130/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No. G-5 MIDC Butibori, Maharastra
(b)Pincode 441412
(c)Bounded Latitudes (North)
From
Degree 20.943552
Minutes
Second
From
Degree 20.943724
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 78.959215
Minutes
Second
From
Degree 78.962261
Minutes
Second
(e)Survey of India Topo Sheet No. 55 O/4, 55 K/16, 55P/1, 55L/13
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 250
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 15
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)MaharashtraNagpurNagpur (Rural)
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/526/2017-IA-II(I)
(b)Date of Apply of TOR 27 Oct 2017
(c)Date of Issue of TOR / Standard ToR 26 Dec 2017
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :04 Sep 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :06 Oct 2018
Distance of Public Hearing Venue from the Proposed Project :0.100
Plot No: G-54, MIDC Butibori, Nagpur Maharashtra’, PIN Code – 441122.
State :Maharashtra
District :Nagpur
Tehsil :Nagpur (Rural)
Village :MIDC BUTIBORI
60Employment,District Collector
(2.)
Date of Advertisement :04 Sep 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :06 Oct 2018
Distance of Public Hearing Venue from the Proposed Project :0.100
Plot No: G-54, MIDC Butibori, Nagpur Maharashtra’, PIN Code – 441122.
State :Maharashtra
District :Nagpur
Tehsil :Nagpur (Rural)
Village :MIDC BUTIBORI
60Employment,District Collector
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)hazardosu waste storage300sqm
(2.)Qc laboratory425-
(3.)explosive godown213-
(4.)canteen and security156-
(5.)Raw water storage tank273sqm
(6.)others19382sqm
(7.)WAREHOUSE1961-
(8.)UTILITIES1344-
(9.)PLANT AND MACHINERY3354-
(10.)greenbelt area13365sqm
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Cymoxanil Technical105Tons per AnnumRoad
(2.)Propiconazole Technical50Tons per AnnumRoad
(3.)Hexaconazole Technical315Tons per AnnumRoad
(4.)Tebuconazole Technical300Tons per AnnumRoad
(5.)Azoxystrobin Technical125Tons per AnnumRoad
(6.)Pyraclostrobin Technical5Tons per AnnumRoad
(7.)Picoxystrobin Technical105Tons per AnnumRoad
(8.)Epoxyconazole Technical330Tons per AnnumRoad
(9.)Fluopyram Technical50Tons per AnnumRoad
(10.)Fluoxastrobin Technical30Tons per AnnumRoad
(11.)Clothianidine50Tons per AnnumRoad
(12.)Thiamethoxam Technical480Tons per AnnumRoad
(13.)Pyridaben Technical50Tons per AnnumRoad
(14.)Spirotetramat Technical30Tons per AnnumRoad
(15.)Sulfoxaflor Technical50Tons per AnnumRoad
(16.)Flubendamide100Tons per AnnumRoad
(17.)Cypermethrin Technical250Tons per AnnumRoad
(18.)Pyrazosulfuron Technical20Tons per AnnumRoad
(19.)Penoxsulam Technical30Tons per AnnumRoad
(20.)Oxadiazon Technical25Tons per AnnumRoad
(21.)Saflufenacil Technical30Tons per AnnumRoad
(22.)Bentazone Technical360Tons per AnnumRoad
(23.)Imidacloprid Technical400Tons per AnnumRoad
(24.)Chlorantraniliprole Technical100Tons per AnnumRoad
(25.)Clomazone Technical450Tons per AnnumRoad
(26.)Metiram Technical850Tons per AnnumRoad
(27.)Tricyclazole Technical420Tons per AnnumRoad
(28.)Benzovindiflupyr Technical30Tons per AnnumRoad
(29.)Bixafen Technical30Tons per AnnumRoad
(30.)Fluxapyroxad Technical30Tons per AnnumRoad
(31.)Flonicamide Technical105Tons per AnnumRoad
(32.)Dinetofuron100Tons per AnnumRoad
(33.)Lambda Cyhalothrin Technical400Tons per AnnumRoad
(34.)Bifenthrin Technical250Tons per AnnumRoad
(35.)Tembotrione Technical50Tons per AnnumRoad
(36.)Quizalofop Ethyl Technical80Tons per AnnumRoad
(37.)Clodinofop Propargyl Technical100Tons per AnnumRoad
(38.)Metamifop Technical50Tons per AnnumRoad
(39.)Sulfentrazone Technical135Tons per AnnumRoad
(40.)Mandipropamid Technical100Tons per AnnumRoad
(41.)Acetamiprid Technical180Tons per AnnumRoad
(42.)Propaquizafop Technical100Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 35
(b) Funds Allocated for Environment Management (Capital) (in Crores) 2.46
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.35
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.50
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 9023
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 9023
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)CCMT350Tons per AnnumImportRoad875 Open MarketCopy of Linkage
(2.)long list of raw material enclosed as Annexure8673Tons per AnnumimportRoad875 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2017 To 31 Dec 2017
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube56215560
(2.)SO2Micro Gram per Meter Cube20.54.520.380
(3.)PM10Micro Gram per Meter Cube964596100
(4.)NOxMicro Gram per Meter Cube29.68.82920.6
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l2200
(2.)Total Hardnessmg/l556276200600
(3.)Fluoridemg/l0.560.2611.5
(4.)Heavy MetalsMercurymg/l0.050.0010.010.05
(5.)TDSmg/l9644465002000
(6.)pHOthersnone7.76.986.58.5
(7.)Chloridesmg/l428482501000
    14.3.     No. of Surface Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l4.83.8D
(2.)BODmg/l3.83D
(3.)CODmg/l2214D
(4.)pHOthersnone7.967.82C
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))63.850.555-75
(2.)Leq(Night)A-weighted decibels(dB(A))58.341.045-70
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare354.4256.5
(2.)K(Potassium)Kilogram per hectare238.4166.2
(3.)pHOthersnone8.167.78
(4.)P(Phosphorus)Kilogram per hectare15.29.5
(5.)Electric ConductivityOthersmicromhopercentimeter242136.2
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 2
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 18 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersMIDC1201Copy of Permission LetterPipelineOtherspipelineMIDC15 Jan 2009120
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic1525STPReuse within the Plant & Recycling15
(2.)process17100ETPReuse within the Plant & Recycling17
(3.)boiler and cooling tower9100ETPReuse within the Plant & Recycling9
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 41
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 41
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Sludge from ETPOthersSludge from ETP0.3Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)Residue- solvent DistillationOthersResidue- solvent Distillation0.5Tons10RoadAuthorized Recyclers
(3.)Process WasteOthersProcess Waste1.0Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
(4.)Solids- ATFD ETPOthersSolids- ATFD ETP0.5Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
(5.)Incinerator AshOthersIncinerator Ash0.05Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
(6.)Sludge from STPOthersSludge from STP0.05Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube71.614.476100
(2.)SO2Microgram per Meter Cube10.510.410.980
(3.)Others(Specify)COMicrogram per Meter Cube0010.40.42
(4.)NOxMicrogram per Meter Cube16.810.917.780
(5.)PM2.5Microgram per Meter Cube5610.456.460
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)3 stage scrubberHSD120.15PM100.1
(2.)3 stage scrubberHSD120.15PM100.1
(3.)3 stage scrubberHSd120.15SO20.1
(4.)3 stage scrubberhsd120.15NOx0.0075
(5.)IncineratorHSD300.8OthersCO0.1
(6.)boilerrice husk300.8PM101
(7.)3 stage scrubberHSD120.15PM100.1
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1000
(b)Source Maharastra State Electric Board
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 750KVA & 180 KVA
(e)Stack Height (in m) 6
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 00
(b)Private Land (ha.) 00
(c)Government Land (ha.) 4.05
(d)Revenue Land (ha.) 00
(e)Other Land (ha.) 00
    Total Land (ha.) 4.05
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 20085
(b)Waste/Barren Land (ha.) 00
(c)Grazing/ Community Land (ha.) 00
(d)Surface Water Bodies (ha.) 745
(e)Settlements (ha.) 2141
(f)Industrial (ha.) 00
(g)Forest (ha.) 1023
(h)Mangroves (ha.) 00
(i)Marine Area (ha.) 00
(j)Others (ha.) : open shrub 8383
    Total (ha.) 32377
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0.34
(2.)Township00
(3.)Green belt1.34
(4.)Othersopenspace1.27
Total (ha.) 2.95
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted Areanone0NONE
(2.)WLSnone00NONE
(3.)ESAsnone00NONE
(4.)ESZsnone00NONE
(5.)Corridorsnone00none
(6.)NPAnone00NONE
(7.)Wildlife Corridorsnone00none
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological Sitesnone00not applicable
(2.)Defence Installationsnone00not applicable
(3.)ForestBir sukli3.45RF
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 4.05
(b)Land yet to be acquired(Ha) 00
(c)Status of Land acquisition if not acquired 00
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 00
(b)No. of Households 00
(c)No. of PDFs (Project Displaced Families) 00
(d)No. of PAFs (Project Affected Families) 00
(e)Funds Allocated for R&R(in INR) (in Lacs) 00
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Vadgaon river
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 9
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 25
(b)Permanent Employment-During Operation 25
(c)Temporary Employment- During Construction 25
(d)Temporary Employment- During Operation 25
(e)No. of working days 330
(f)Total Manpower 100
32.
Green Belt in Ha:
(a)Total Area of Green Belt 1.33
(b)Percentage of Total Project Area 32.84
(c)No. of Plants to be Planted 1590
(d)Funds Allocated for Plantation 25.75
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/SA/070;july 17 2018
(ii)Name of the EIA Consultant EQMS INDIA PVT LTD
(iii)Address 304-305 rishab corporate tower, karkardooma
(iv)Mobile No. 8890836012
(v)Landline No. 0113000320
(vi)Email Id crycrop@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 23 May 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantJagat Sharma
DesignationChiefmanufactuingofficer
Name of Company (Applicant Name should not be given here)CRYSTAL CROP PROTECTION PRIVATE LIMITED
AddressB-95 Wazirpur Industrial Area, Wazirpur, New Delhi
Print