Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Desh Bhakt Ratnappa Kumbhar Panchganga Sahakari Sakhar Karkhana Ltd. (DBRKPSSKL) Leased to Shree Renuka Sugars Ltd.
(b)Name of the Company / Organisation DBRK PANCHGANGA SSK LTD LEASED UNIT OF SHREE RENUKA SUGARS LTD
(c)Registered Address A/p. Ganganagar, Ichalkaranji, Tal.: Hathkanangale, Dist.: Kolhapur,,Kolhapur,Maharashtra-416116
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Prakash Shripati Sawant
(b)Designation (Owner/ Partner/ CEO) GeneralManager
(c)Address A/p. Ganganagar, Ichalkaranji, Tal.Hathkanangale, Dist. Kolhapur,,Belgaum,Belgaum,Karnataka-590001
(d)Pin code 590001
(e)E-mail savant@renukasugars.com
(f)STD Code. 831(f)Telephone No. 2404000
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(j) Sugar Industry
Minor Activity
(b)Category A
(c)Proposal Number IA/MH/IND2/84951/2000
(d)Master Proposal Number(Single Window) SW/84947/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 3
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 29,
(b)Pincode 590001
(c)Bounded Latitudes (North)
From
Degree 16.7136
Minutes
Second
From
Degree 16.7175
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 74.4477
Minutes
Second
From
Degree 74.4501
Minutes
Second
(e)Survey of India Topo Sheet No. 47L5, 47L6, 47L9, 47L10
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 582
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 4
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number MPCB-CONSENT-0000051296
(b)Date of Apply of TOR 08 Nov 2000
(c)Date of Issue of TOR / Standard ToR 08 Nov 2000
(d)Date of Apply of EC 25 Jun 2018
(e)Date of Issue of EC 25 Jun 2018
(f)Previous TOR Letter Copy of Previous TOR letter
(g)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :02 Aug 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :04 Sep 2018
Distance of Public Hearing Venue from the Proposed Project :0
D.B.R.K. Panchaganga S.S.K. Ltd. Sugar Factory, Tal.:Hatkanangale, Dist.: Kolhapur, State: Maharashtra
State :Maharashtra
District :Kolhapur
Tehsil :Hatkanangle
Village :Ichalkaranji
1501.Air pollution due to bagasse particles suspened from overhead conveyor belt. 2.Improper environmental management at Distillery in project complex 3.Air pollution due to fly ashOthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Nagpur
(iii)Letter No. EC-786/RON/2018-NGP/4134
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jul 12 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Molasses450004500090000Tons per Annum(TPA)Road
(2.)Bagasse300000300000600000Tons per Annum(TPA)Conveyor Belt
(3.)Sugar130000130000260000Tons per Annum(TPA)Road
(4.)Pressmud400004000080000Tons per Annum(TPA)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Sugar Factory5000 TCD5000 TCD10000 TCD-
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 04 Dec 2015
(iv)Valid Upto 31 Jul 2016
(v)File No. Format 1.0/BO/CAC-CELL/EIC No. PN-26272-15/R/CAC-1
(vi)Application No. MPCB-CONSENT-0000051296
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 80.90
(b) Funds Allocated for Environment Management (Capital) (in Crores) 2.54
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 2
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 12.90
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
d)Inter-State boundaries and international boundaries Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 5000
(b)Existing quantity of raw material/fuel 5000
(c)Total quantity of raw material/fuel 10000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Sugar cane2000000Tons per AnnumNear by FarmsRoad25 Open MarketCopy of Linkage
(2.)Bagasse as fuel for co generation power plant305280Tons per AnnumOwn sugar factoryConveyor Belt0 CaptiveCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2017 To 31 Dec 2017
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube28.9012.9020.7860
(2.)SO2Micro Gram per Meter Cube47.9014.2230.2980
(3.)PM10Micro Gram per Meter Cube73.3033.7064.53100
(4.)NOxMicro Gram per Meter Cube63.0019.4055.6580
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Fluoridemg/l0.420.1711
(2.)Total Hardnessmg/l804.13364.17200200
(3.)TDSmg/l1328.33804.27500500
(4.)Chloridesmg/l337.18265.71250250
(5.)pHNA7.877.16.58.5
(6.)TSSmg/l5240100100
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l385.2333.30E
(2.)BODmg/l140.6612.80E
(3.)DOmg/l5.11.4E
(4.)pHNA8.067.15E
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))74.144.175
(2.)Leq(Night)A-weighted decibels(dB(A))65.335.470
    14.5.     No. of Soil Sample Monitored locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNA8.07.5
(2.)K(Potassium)Milligram per Kilogram485.36335.32
(3.)P(Phosphorus)Milligram per Kilogram30.2517.23
(4.)Electric ConductivityMillisiemens per Centimetre160105
(5.)N(Nitrogen)Milligram per Kilogram923.54632.51
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.5 To 11.7
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.3 To 9.6
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface504.8Copy of Permission LetterPipelineJack Well667331 Aug 20132315
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic Effluent4550Proposed STPGreen Belt Renewal PlantUsed for Flushing purpose45
(2.)Industrial Effluents (Sugar & Co-gen)8901000Existing ETP to be upgraded under expansion.Green Belt Renewal Plant,Otherstreated water-for crop cultivation8900
(3.)Industrial Effluent (Distillery)360360Reboiler followed by comopostingOthersUsed for composting3600
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 1295
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 1295
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Boiler AshBottom Ash4320Tons25RoadOthersFarmers/ sale to brick manufactures
(2.)ETP SludgeIndustrial Waste3.5Tons0RoadOthersUsed for plantation as Manure
(3.)Boiler Ash (Distillery Leased to Saideep Traders)Bottom Ash600Tons0RoadOthersMixed with pressmud and used for composting
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube24.851.081.226.0560
(2.)SO2Microgram per Meter Cube41.661.080.141.7680
(3.)PM10Microgram per Meter Cube64.531.088.7773.3100
(4.)NOxMicrogram per Meter Cube55.650055.6580
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)140 TPH boilerBagasse754.43PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 13000
(b)Source Own Co-gen plant
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1010 KVA (2No)
(e)Stack Height (in m) 6
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 59.46
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 59.46
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 14740
(b)Waste/Barren Land (ha.) 6881.62
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 228.86
(e)Settlements (ha.) 5772.4
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Scrub land 3791.72
    Total (ha.) 31414.6
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Built Up Area21.22
(2.)Green belt19.62
Total (ha.) 40.84
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNil0There is no presence of any CPA, NPA, ESAs, ESZs, Corridors & wildlife corridors in 10 Km radius of project
(2.)WLSNil0There is no presence of any CPA, NPA, ESAs, ESZs, Corridors & wildlife corridors in 10 Km radius of project
(3.)NPANil0There is no presence of any CPA, NPA, ESAs, ESZs, Corridors & wildlife corridors in 10 Km radius of project
(4.)CorridorsNil0There is no presence of any CPA, NPA, ESAs, ESZs, Corridors & wildlife corridors in 10 Km radius of project
(5.)Wildlife CorridorsNil0There is no presence of any CPA, NPA, ESAs, ESZs, Corridors & wildlife corridors in 10 Km radius of project
(6.)ESZsNil0There is no presence of any CPA, NPA, ESAs, ESZs, Corridors & wildlife corridors in 10 Km radius of project
(7.)ESAsNil0There is no presence of any CPA, NPA, ESAs, ESZs, Corridors & wildlife corridors in 10 Km radius of project
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA0There is no forest land within 10 km from project site
(2.)Archaeological SitesNA0There are no archealogical sites within 10 km from project site
(3.)Defence InstallationsNA0There are no any defence installations within 10 km from project site
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Nil
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Panchganga River
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 00
(c)Temporary Employment- During Construction 25
(d)Temporary Employment- During Operation 0
(e)No. of working days 200
(f)Total Manpower 25
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt89197.7107037.25196234.95
(2.)No. of Plants154625004046
(3.)Funds Allocated350000040000007500000
(4.)Percentage of Total Project Area151833
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalSugar Factory is the 2nd Largest agro-based industry in the Country. Maximum Utilization of Sugarcane in Command Area tho’ Sugar Factory Expansion.
(2.)SocialSugar Industry is instrumental in Resource Mobilization, Employment Generation, Income Generation and in creating Social Infrastructure in Command Area
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Industrial Projects - 3
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? Yes
(b)Name of the Court High Courts
(c)Name of the Sub Court Bombay
(d)Case No. No. 126/2013
(e)Orders/Directions of the court ,if any and its relevance with the proposed project Removal of bagasse conveyor belt across road
(f)Case Details Regarding removal of bagasse carrying conveyor bel
(g)Uploaded Court Order Copy of Court Order
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1518/SA 063
(ii)Name of the EIA Consultant Equinox Environmets (I) Pvt. Ltd.
(iii)Address F-11, Namdev Nest, 1160 ‘E’ ward, Opp. Kamala College, Sykes Extension, Kolhapur
(iv)Mobile No. 9657865122
(v)Landline No. 0231253123
(vi)Email Id projects@equinoxenvi.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 3
(ix)Validity of Accreditation 21 Oct 2018
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease confirm categorization of the unit vis-a-vis the schedule to the EIA Notification, 2006. 23 Nov 2018
2.NAThe correction have been made as per the instruction received 28 Nov 2018
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantPrakash Shripati Sawant
DesignationGeneralManager
Name of Company (Applicant Name should not be given here)DBRK PANCHGANGA SSK LTD LEASED UNIT OF SHREE RENUKA SUGARS LTD
AddressA/p. Ganganagar, Ichalkaranji, Tal.: Hathkanangale, Dist.: Kolhapur