Details of Project:
(a)Name of the project(s) Expansion of EC capacity with increase in clinker from 3.3 MTPA to 4.42 MTPA along with cement production from 5.0 MTPA to 5.8 MTPA & 9.5 MW Waste Heat Recovery Boiler at existing facility as per prov
(b)Name of the Company / Organisation BHARATHI CEMENT CORPORATION PRIVATE LIMITED
(c)Registered Address kamalapuram mandal,yerraguntla,,Cuddapah,Andhra Pradesh-516289
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant swathi vobilishetty
(b)Designation (Owner/ Partner/ CEO) manager
(c)Address banjarahills.hyderabad,,Secunderabad,Hyderabad,Telangana-500034
(d)Pin code 500034
(e)E-mail swathi.y@vicat.com
(f)STD Code. 40(f)Telephone No. 30006999
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(b) Cement plants
Minor Activity
(b)Category A
(c)Proposal Number IA/AP/IND/84911/2018
(d)Master Proposal Number(Single Window) SW/84910/2018
(e)EAC concerned (for category A Projects only) NIL
(f)Project Type Expansion under para 7(ii)
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 212,213,215,217,355
(b)Pincode 516289
(c)Bounded Latitudes (North)
From
Degree 143456.82
Minutes
Second
From
Degree 143547.66
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 783421.95
Minutes
Second
From
Degree 783451.30
Minutes
Second
(e)Survey of India Topo Sheet No. D44G10
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 165
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1.3
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Andhra Pradesh
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC: Not Applicable
4.
Whether the Project Exempted from Public Hearing? Details Not Applicable
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Chennai
(iii)Letter No. EP/12.1/525/AP/1578
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Sep 11 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Cement50000008000005800000Tons per Annum(TPA)Road,Rail
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Cement Grinding5.0 MTPA0.8 MTPA5.8 MTPAEnhancement through modernisation
(2.)CLinker unit3.3 MTPA1.12 MTPA4.42 MTPAUpgradation and modernization of the kilns.
(3.)Power Plant (WHRS)09.5 MW9.5 MWUsage of clinker waste heat
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 25 Feb 2018
(iv)Valid Upto 30 Sep 2020
(v)File No. APPCB/KNL/ATP/105/CFO/HO/2018-595
(vi)Application No. APPCB/KNL/ATP/105/CFO/HO/2018-595
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 105
(b) Funds Allocated for Environment Management (Capital) (in Crores) 5.0
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.03
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.5
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 1624000
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 1624000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Limestone1624000Tons per AnnumCaptive MinesConveyor Belt0.4 CaptiveCopy of Linkage
16.
Baseline Data Not Applicable
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10.15 To 14.25
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 12.85 To 8.49
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface772313.78Copy of Permission LetterPipelineIntake WellG.O.Ms.No.1802 Feb 20087723
(2.)GroundWater10000Copy of Permission LetterPipelineOthersBore well6919/HgII(1)/200610 Jan 20071000
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial6465ETPReuse within the Plant & Recycling64
(2.)Domestic100300STPGreen Belt Renewal Plant100
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 164
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 164
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)0Industrial Waste0Tons0Conveyor BeltCo-Processing
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube27.42.40.0027.460
(2.)SO2Microgram per Meter Cube14.12.80.0014.180
(3.)NOxMicrogram per Meter Cube17.12.80.0017.180
(4.)PM10Microgram per Meter Cube66.62.40.05666.7100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Kiln ICo-processing1405PM100.0071
(2.)Kiln ICo-processinh1405SO20.0092
(3.)Kiln ICo-processing1405NOx0.129
(4.)Kiln IiCo processing1405OthersHcl0.0012
(5.)Cooler INA304PM100.017
(6.)Cooler IiNA404.3PM100.015
(7.)Coal Mill INA351.7PM100.0088
(8.)Kiln IICo processing1405SO20.0082
(9.)Coal Mill IINA351.6PM100.029
(10.)Cement Mill I & IINA505.3PM100.022
(11.)Kiln ICo processing1405OthersHCL0.0012
(12.)Kiln IICo processing1405PM100.026
(13.)Kiln IICo processing1405NOx0.154
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 50
(b)Source Captive Power Plant
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 2 x 3 MW
(e)Stack Height (in m) 17
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 198.29
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 198.29
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 23457
(b)Waste/Barren Land (ha.) 3453.8
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 2229.8
(e)Settlements (ha.) 622.2
(f)Industrial (ha.) 414.0
(g)Forest (ha.) 62.3
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Mining 1161.4
    Total (ha.) 31400.5
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0No change in the land utilization
Total (ha.) 0
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA0Not found
(2.)Wildlife CorridorsNA0Not found
(3.)ESZsNA0Not found
(4.)CorridorsNA0Not found
(5.)WLSNA0Not found
(6.)NPANA0Not found
(7.)ESAsNA0Not found
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA0Not available
(2.)Defence InstallationsNA0Not available
(3.)ForestNA0Not available
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 198.28
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Pageru river
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 1.3
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 30
(b)Permanent Employment-During Operation 233
(c)Temporary Employment- During Construction 140
(d)Temporary Employment- During Operation 713
(e)No. of working days 330
(f)Total Manpower 1116
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt65065
(2.)Percentage of Total Project Area33033
(3.)No. of Plants865201098097500
(4.)Funds Allocated151125009750015210000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialLocal livelihood, community education, health care and infrastructural development
(2.)EnvironmentalAfforestation and Ground water recharge
(3.)FinancialRevenue generation & employment
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. 158
(ii)Name of the EIA Consultant Visiontek Consultancy Services Pvt Ltd
(iii)Address Plot No- N 22 & 23, Chandaka Industrial Estate
(iv)Mobile No. 7752017905
(v)Landline No. 0674645178
(vi)Email Id visiontekin@yahoo.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 12 Oct 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of Applicantswathi vobilishetty
Designationmanager
Name of Company (Applicant Name should not be given here)BHARATHI CEMENT CORPORATION PRIVATE LIMITED
Addresskamalapuram mandal,yerraguntla
Print