1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Proposed Bulk Drugs & Intermediates Manufacturing Unit by Archimedis Laboratories Private Limited | (b)Name of the Company / Organisation | ARCHIMEDIS LABORATORIES PRIVATE LIMITED | (c)Registered Address | Survey No. 108 & 109, (Village) Jayanthipuram, (Mandal) Jaggayyapeta, (District) Krishna,,Krishna,Andhra Pradesh-521457 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | VenkateswaraReddy Maddireddy | (b)Designation (Owner/ Partner/ CEO) | ManagingDirector | (c)Address | 5-163/1, 2 nd Floor, Malleswari Nilayam, Chintalkunta, LB Nagar Post Hyderabada,,Uppal kalan,Rangareddi,Telangana-500074 | (d)Pin code | 500074 | (e)E-mail | archimedismlpl@gmail.com | (f)STD Code. | 40(f)Telephone No. | 23070602 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/AP/IND2/84787/2018 | (d)Master Proposal Number(Single Window) | SW/84784/2018 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Sy No: 108 & 109, Jayanthipuram (V) Jaggayyapet (M | (b)Pincode | 521457 | (c)Bounded Latitudes (North) | | From | | Degree | 16.846 | Minutes | | Second | | From | | Degree | 16.849 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 80.136 | Minutes | | Second | | From | | Degree | 80.137 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 65 D/1 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 51 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 3.3 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Andhra Pradesh | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | F No.IA-J-11011/9/2018-IA-II(I) | (b)Date of Apply of TOR | 03 Jan 2018 | (c)Date of Issue of TOR / Standard ToR | 05 Feb 2018 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 27 Oct 2018 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| Proposed Project Site, Sy No: 108 & 109, Jayanthipuram (V) Jaggayyapet (M), Krishna District, Andhra Pradesh | State : | Andhra Pradesh | District : | Krishna | Tehsil : | Jaggayyapeta | Village : | Jayanthipuram |
| 79 | Main Issues raised during PH is Employment, CSR activities, Green belt, Rain Water Harvesting and Pollution prevention. | District Magistrate | | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | RO System | Capacity: 100 KLD | | (2.) | Coal fired boilers | Capacity : 8 TPH & 4 TPH | | (3.) | MEE System | Capacity: 85 KLD | | (4.) | Biological Treatment Plant | Capacity: 110 KLD | | (5.) | DG set | Capacity:500 KVA & 1000 KVA | | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Ketorolac tromethamine | 5 | Others | Tons per Month (TPM) | Road | | (2.) | Olmesartan medoxomil | 4 | Others | Tons per Month (TPM) | Road | | (3.) | Itraconazole | 4 | Others | Tons per Month (TPM) | Road | | (4.) | Duloxetine Hydrochloride | 2 | Others | Tons per Month (TPM | Road | | (5.) | Sumatriptan Succinate | 1 | Others | Tons per Month (TPM) | Road | | (6.) | Zolmitriptan | 1 | Others | Tons per Month (TPM) | Road | | (7.) | Mesalamine (or) Mesalazine | 4 | Others | Tons per Month (TPM) | Road | | (8.) | Celecoxib | 4 | Others | Tons per Month (TPM) | Road | | (9.) | Rosuvastatin | 4 | Others | Tons per Month (TPM) | Road | | (10.) | Dabigatran | 2 | Others | Tons per Month (TPM) | Road | | (11.) | Emtricitabine | 4 | Others | Tons per Month (TPM) | Road | | (12.) | 4-Dimethyl amino butytalde diethyl acetal | 5 | Others | Tons per Month (TPM) | Road | | (13.) | Pentaprazole Sodium | 9 | Others | Tons per Month (TPM) | Road | | (14.) | Imatinib Mesylate | 2 | Others | Tons per Month (TPM) | Road | | (15.) | Sitagliptin Phosphate Monohydrate | 2 | Others | Tons per Month (TPM) | Road | | (16.) | Velpatasvir | 2 | Others | Tons per Month (TPM) | Road | | (17.) | Lansprazole | 1 | Others | Tons per Month (TPM) | Road | | (18.) | Pregabalin | 4 | Others | Tons per Month (TPM) | Road | | (19.) | 2,4- Dihydro-4-(4-4 hydroxy phenyl )-1-piperazinyl ) -2-(1-methyl propyl )-3H-1,2,4-Triazole-3-one(Itraconazole intermediate) | 10 | Others | Tons per Month (TPM) | Road | | (20.) | Cis -2-[2,4-Di chloro Phenyl]-2-[1H-1,2,4-Triazole -1-yl methyl]-1,3 Dioxalane-4yl Methyl ] Methane Sulfonate (Itraconazole intermediate) | 5 | Others | Tons per Month (TPM) | Road | | (21.) | 2-[3-methyl -4-(2,2,2-trifluoroethoxy)-2-pyridinyl ] 5methylthio -1H-benzimidazole(Lansoprazole Sulfide Intermediate ) | 5 | Others | Tons per Month (TPM) | Road | | (22.) | 4-Chloro-1 hydroxy butane sulphonic acid sodium salt | 5 | Others | Tons per Month (TPM) | Road | | (23.) | 4-Chloro Butyralde Diethyl acetal | 5 | Others | Tons per Month (TPM) | Road | | (24.) | Cis -2-[2,4-Di Chloro Phenyl] -2-[1H-1,2,4-Triazole -1-yl Methyl ]-1,3 Dioxalane -4 yl Methanol(Itraconazole intermediate) | 4 | Others | Tons per Month (TPM) | Road | | (25.) | Pentaprazole chloro compound (2-Chloromethyl-3,4-Dimethoxy-Pyridine) | 10 | Others | Tons per Month (TPM) | Road | | (26.) | Almotriptan Malate | 1 | Others | Tons per Month (TPM) | Road | | (27.) | (S)-(-)-3-(Dimethyl amino )-1-(2-Thienyl)-1-praponal | 10 | Others | Tons per Month (TPM) | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 30 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 1.1 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.6 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.20 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 274 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 274 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Tetra hydrofuran | 78.33 | Others | kg/day | Domestic | Road | | 0 | Open Market | | Copy of Linkage | (2.) | Maltol | 274 | Others | kg/day | Domestic | Road | | 0 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2018 To 31 May 2018 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 70.15 | 48.23 | 68.88 | 100 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 30.59 | 14.52 | 28.92 | 60 | (3.) | SO2 | | Micro Gram per Meter Cube | 16.30 | 9.58 | 15.15 | 80 | (4.) | Others | CO | Mili Gram per Meter Cube | 0.76 | 0.19 | 0.74 | 2 | (5.) | NOx | | Micro Gram per Meter Cube | 23.19 | 13.78 | 22.33 | 80 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 8.37 | 7.32 | 8.5 | 0 | (2.) | Total Hardness | | | mg/l | | 670 | 295 | 200 | 600 | (3.) | Fluoride | | | mg/l | | 0 | 0 | 1 | 1.5 | (4.) | Heavy Metals | | Lead | mg/l | | 0 | 0 | 0.01 | 0 | (5.) | TSS | | | NA | | 0 | 0 | 0 | 0 | (6.) | Chlorides | | | mg/l | | 310 | 94.2 | 250 | 1000 | (7.) | TDS | | | mg/l | | 983.4 | 467.5 | 500 | 2000 | |
14.3. No. of Surface Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | DO | | mg/l | | 5.2 | 4.8 | E | (2.) | BOD | | mg/l | | 19.2 | 9.2 | E | (3.) | pH | | NA | | 8.37 | 7.32 | E | (4.) | COD | | mg/l | | 74 | 28 | E | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 62.3 | 46.5 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 52.1 | 38.9 | 70 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | K(Potassium) | Kilogram per hectare | | 386 | 294 | (2.) | Electric Conductivity | Others | µ mhos | 142 | 98.6 | (3.) | pH | Others | NA | 7.30 | 6.75 | (4.) | N(Nitrogen) | Kilogram per hectare | | 172 | 112 | (5.) | P(Phosphorus) | Kilogram per hectare | | 59 | 48 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.52 To 11.2 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.21 To 9.06 | (c)Whether Ground Water Intersection will be there ? | Yes | (d)Upload Copy of Central Ground Water Authority Letter | Copy of Central Ground Water Authority Letter | (e)Letter No. | 1588/Hg-II/2018 | (f)Date of Issue | 20 Aug 2018 | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 259 | 0 | Copy of Permission Letter | modeOthers | Within the Plant Site | Tube Well | | 1588/Hg-II/2018 | 20 Aug 2018 | 269 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Scrubbing system | 5 | 110 | ZLD System | Others | Treatment Losses | 3.5 | 1.5 | (2.) | Process | 66 | 110 | ZLD System | Others | Treatment Losses | 49.87 | 16.13 | (3.) | Boiler Blow down | 10 | 110 | ZLD System | Others | Treatment Losses | 8.93 | 1.07 | (4.) | Cooling towers bleed off | 12 | 110 | ZLD System | Others | Treatment Losses | 10.72 | 1.28 | (5.) | Domestic | 2.8 | 110 | ZLD System | Others | Treatment Losses | 2.5 | 0.3 | (6.) | Washings | 10 | 110 | ZLD System | Others | Treatment Losses | 8.93 | 1.07 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 105.8 | (b)Total Discharged Water (Kilolitre per Day) | 21.35 | (c)Total Reused Water (Kilolitre per Day) | 84.45 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Organic Solid Waste | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1352.52 | Tons | 10 | Road | | Others | Sent to Cement Industries | (2.) | Spent Carbon | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 38.88 | Tons | 10 | Road | | Others | Sent to Cement Industries | (3.) | Organic Evaporate Liquid from MEE Stripper | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 374.4 | Tons | 10 | Road | | Others | Sent to Cement Industries | (4.) | ETP Sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 360 | Tons | 600 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (5.) | Inorganic Solid Waste | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 131.76 | Tons | 600 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (6.) | MEE Salts | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1783.44 | Tons | 600 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (7.) | Used Oils | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1 | Kilolitre | 50 | Road | | Authorized Recyclers | | (8.) | Ash From Boiler | Others | Ash from boiler | 6048 | Tons | 50 | Road | | Others | Sent to Brick Manufacturers | (9.) | Solvent Distillation Residue | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 422.64 | Tons | 10 | Road | | Others | Sent to Cement Industries | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | NOx | | Microgram per Meter Cube | 22.33 | 0.5 | 9.47 | 31.80 | 80 | (2.) | PM10 | | Microgram per Meter Cube | 68.88 | 0.5 | 0.45 | 69.33 | 100 | (3.) | PM2.5 | | Microgram per Meter Cube | 28.92 | 0.5 | 0.31 | 29.23 | 60 | (4.) | Others(Specify) | SPM | Microgram per Meter Cube | 68.88 | 0.5 | 0.759 | 69.639 | 100 | (5.) | SO2 | | Microgram per Meter Cube | 15.15 | 0.5 | 4.694 | 19.844 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | 4.0 TPH Boiler | Coal | 30 | 0.4 | SO2 | | 1.48 gm/Sec | (2.) | 8.0 TPH Boiler | Coal | 34 | 0.5 | SO2 | | 2.95 gm/Sec | (3.) | 8.0 TPH Boiler | Coal | 34 | 0.5 | PM10 | | 0.156 gm/Sec | (4.) | 4.0 TPH Boiler | Coal | 30 | 0.4 | NOx | | 4.86 gm/Sec | (5.) | 8.0 TPH Boiler | Coal | 34 | 0.5 | NOx | | 9.70 gm/Sec | (6.) | 4.0 TPH Boiler | Coal | 30 | 0.4 | PM10 | | 0.078 gm/Sec | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 2000 | (b)Source | Andhra Pradesh Southern Power Distribution Corpora | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 500 KVA & 1000 KVA | (e)Stack Height (in m) | 10 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 4.702 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 4.702 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 17210 | (b)Waste/Barren Land (ha.) | 6000 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 2323.0 | (e)Settlements (ha.) | 1632.0 | (f)Industrial (ha.) | 596.0 | (g)Forest (ha.) | 3642 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : NA | 0 | Total (ha.) | 31403 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Built Up Area | | 1.1536 | | (2.) | Green belt | | 1.7287 | | (3.) | Others | Roads & Open Area | 1.8201 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | Not Present | 0 | NA | (2.) | NPA | Not Present | 0 | NA | (3.) | Wildlife Corridors | Not Present | 0 | NA | (4.) | ESZs | Not Present | 0 | NA | (5.) | Critically Polluted Area | Not Present | 0 | NA | (6.) | Corridors | Not Present | 0 | NA | (7.) | ESAs | Not Present | 0 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | None | 0 | None | (2.) | Defence Installations | | None | 0 | None | (3.) | Forest | | Jaggayyapeta Extension R.F | 0.39 | 0.52 km (S), 0.39 km (N) of Project Site | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 4.702 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Chillakallu Major canal - 2.10 km (WNW) | (ii)Direction of Water Bodies in Buffer Area | West | (iii)Distance of Water Bodies in Buffer Area | 2.1 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 10 | (b)Permanent Employment-During Operation | 70 | (c)Temporary Employment- During Construction | 5 | (d)Temporary Employment- During Operation | 15 | (e)No. of working days | 30 | (f)Total Manpower | 100 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 1.728 | (b)Percentage of Total Project Area | 36.75 | (c)No. of Plants to be Planted | 2592 | (d)Funds Allocated for Plantation | 500000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Financial | Archimedis Laboratories Pvt. Ltd will spend about 2.5% (Rs. 75 Lakhs) for CSR & 2% (Rs. 60Lakhs) for CER activities like potable water supply & educational aid and conduct medical camps & Self Help Skill Training to the nearby villages. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1821/RA0100 | (ii)Name of the EIA Consultant | Rightsource Industrial Solutions Private Limited | (iii)Address | Rightsource Industrial Solutions Pvt Limited Plot No: 203, H.No:5-36/203, Prashanthi Nagar, IDA, Kukatpally, Hyderabad – 500072. | (iv)Mobile No. | 9885560011 | (v)Landline No. | 0402306070 | (vi)Email Id | Info@rightsource.co.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 25 Feb 2021 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Please confirm whether such polluting units are allowed by SPCB at the identified project site in non-industrial area. | 12 Nov 2018 | 2. | NA | The correction have been made as per the instruction received | 16 Nov 2018 | 3. | NA | - In continuation to our earlier observations, please confirm whether all the products (27 nos) with total production capacity of 115 TPM are actually covered under synthetic organic chemicals and thus requiring prior environmental clearance.
- Plan to achieve ZLD and disposal of hazardous waste. | 01 Dec 2018 | 4. | NA | The correction have been made as per the instruction received | 26 Dec 2018 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | VenkateswaraReddy Maddireddy | Designation | ManagingDirector | Name of Company (Applicant Name should not be given here) | ARCHIMEDIS LABORATORIES PRIVATE LIMITED | Address | Survey No. 108 & 109, (Village) Jayanthipuram, (Mandal) Jaggayyapeta, (District) Krishna |
|