Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Enhancement of production capacity of ROM Iron Ore from 2.88 million TPA to 6.0 million TPA and reduction in dry processing (Crushing/Screening) of low grade iron ore from old stack/dumps from 4.571 m
(b)Name of the Company / Organisation FEEGRADE COMPANY PVT LTD
(c)Registered Address Main road Barbil,Keonjhar,Odisha,,Keonjhar,Orissa-758035
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant HIRAK MAZUMDER
(b)Designation (Owner/ Partner/ CEO) VICE PRESIDENT(G&E)
(c)Address Feegrade company pvt ltd,Main road,Barbil,,Barbil,Keonjhar,Orissa-758035
(d)Pin code 758035
(e)E-mail feegrade.forest@gmail.com
(f)STD Code. 6767(f)Telephone No. 275361
(g)Fax No. 275361
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity
(b)Category A
(c)Proposal Number IA/OR/MIN/19312/2013
(d)Master Proposal Number(Single Window) SW/84611/2018
(e)EAC concerned (for category A Projects only) Non-Coal Mining
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 1/P, 103/P, 104/P,1, 2/P, 3, 4/P, 5/P, 6/P, 7/P, 8
(b)Pincode 770048
(c)Bounded Latitudes (North)
From
Degree 21.956486
Minutes
Second
From
Degree 21.972263
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 85.249538
Minutes
Second
From
Degree 85.259677
Minutes
Second
(e)Survey of India Topo Sheet No. 73G/5
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 615
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.025
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Orissa
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)OrissaSundargarhKoidaNadikasira & Rengalbeda
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11015/249/2016-IA.II(M)
(c)Date of Issue of TOR
(f)Previous TOR Letter NA
(b)Date of Apply of EC 02 Aug 2013
(c)Date of Issue of EC 11 Sep 2019
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :23 Sep 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :25 Oct 2018
Distance of Public Hearing Venue from the Proposed Project :0.05
Play Ground near Nadidihi Primary School of village Nadikasira under KoiraBlock of Sundargarh district
State :Orissa
District :Sundargarh
Tehsil :Koida
Village :Nadikasira
5001.Construction of a bridge over Karo River for easy movement of villagers. 2.Provision of transformer for Koira stadium. 3.Provision of DG sets for Nadidih, Nadikasira & Rengalbeda villages for uniOthersAdditional District Magistrate, Sundargarh
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhubaneswar
(iii)Letter No. 101-872/13/EPE/1414
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Apr 16 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Iron Ore288000031200006000000Tons per Annum(TPA)Road,Rail
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Dumper 20 MT4300
(2.)Dumper 30 MT04040
(3.)Screening Plant (Mobile) 250 TPH455
(4.)Dozer222
(5.)Jeep066
(6.)Static Water Sprinkler 1 set (5.3 km)111covering 5.3 km
(7.)Generator 5KVA101010
(8.)Loader 1.2 m391414
(9.)Water Sprinkler 20 KL122
(10.)Ambulance111
(11.)Screening Plant (Mobile) 200TPH333
(12.)DTH Drill & Compressor 110 mm111
(13.)Rock breaker777
(14.)Excavator 1.16 m3 /2.3 m3141414
(15.)Screening Plant (Mobile) 150TPH022
(16.)Crushing Plant (Mobile) 250TPH4442 sets
(17.)Water Sprinkler 12 KL233
(18.)School van011
(19.)Generator 50 KVA122
(20.)Generator 110KVA111
(21.)Crushing Plant (Mobile) 150 TPH6663 sets
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception Copy of Consent to Operate
(iii)Date of Issue 20 Mar 2017
(iv)Valid Upto 31 Mar 2020
(v)File No. 4256/IND-I-CON-2265
(vi)Application No. 899182
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 200
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.37
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.5
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.377
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 11
(b)Existing quantity of raw material/fuel 11.92
(c)Total quantity of raw material/fuel 22.92
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)HSD22.92Otherslac liters/annumHaldiaRoad350 Otherspurchase orderCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube27.1710.4127.1080
(2.)PM10Micro Gram per Meter Cube85.550.4884.8100
(3.)PM2.5Micro Gram per Meter Cube56.5326.8155.9460
(4.)SO2Micro Gram per Meter Cube16.766.5416.5680
    14.2.     No. of Ground Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.67.16.58.5
(2.)Total Hardnessmg/l196168200600
(3.)Chloridesmg/l36222501000
(4.)Fluoridemg/l0.620.4711.5
(5.)Heavy MetalsLeadmg/l0.010.010.010.01
(6.)OthersTotal ColiformOthersMPN/100ml0000
(7.)TSSmg/l0000
(8.)TDSmg/l4603155002000
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.37C
(2.)DOmg/l4.94.3C
(3.)BODmg/l22C
(4.)CODmg/l00C
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))68.545.275
(2.)Leq(Night)A-weighted decibels(dB(A))46.942.170
    14.5.     No. of Soil Sample Monitored locations : 4
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNA6.25.29
(2.)P(Phosphorus)Kilogram per hectare148122
(3.)Electric ConductivityMillisiemens per Centimetre0.0550.0356
(4.)N(Nitrogen)Kilogram per hectare294263
(5.)K(Potassium)Kilogram per hectare5048
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 46 To 48.3
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 44.4 To 46
(c)Whether Ground Water Intersection will be there ? Yes
(d)Upload Copy of Central Ground Water Authority Letter Copy of Central Ground Water Authority Letter
(e)Letter No. FEE/ED/GEO/2019-19/312
(f)Date of Issue 03 Nov 2018
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface767.50.5 Not Appliacble modeOthersWATER TANKEROthersPUMPINGAgreement no. 3427 Feb 2018767.5
(2.)GroundWater2260Copy of Permission LettermodeOthersWATER TANKEROthersPUMPING21-4(312)/SER/CGWA/2011-72305 May 2016226
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic waste water/Residential Colony100100Aerobic Biological treatment (MBBR TechnogyOthersEnvironmental maintenance1000
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 100
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 100
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Mine wasteOthersover burden & inter burden1085006Tons0RoadDumpersOthersDUMP C
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube80.670.252.5312283.20122100
(2.)PM2.5Microgram per Meter Cube51.580.250.9930852.5730860
(3.)NOxMicrogram per Meter Cube23.153.50.0227723.1727780
(4.)SO2Microgram per Meter Cube000080
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NANA00OthersNA0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 563
(b)Source WESCO
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 440 KVA
(e)Stack Height (in m) 4
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 89.87
(b)Private Land (ha.) 8.866
(c)Government Land (ha.) 22.669
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 121.405
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 89.87
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Govt. & Pvt. land 31.535
    Total (ha.) 121.405
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt12.134
(2.)Quarry Area58.613
(3.)OB Dump Area27.889
(4.)Main Plant2
(5.)Built Up Area15.326MINERAL STORAGE, INFRASTRUCTURE,MINE CAMP
(6.)OthersNon mineralized forest area applied for surrender5.443Non mineralized forest area applied for surrender
Total (ha.) 121.405
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA0NOT APPLICABLE
(2.)ESZsNA0NOT APPLICABLE
(3.)Wildlife CorridorsNA0NOT APPLICABLE
(4.)ESAsNA0NOT APPLICABLE
(5.)NPANA0NOT APPLICABLE
(6.)CorridorsNA0NOT APPLICABLE
(7.)WLSNA0NOT APPLICABLE
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestKARO0WEST
(2.)Archaeological SitesNA0Not Applicable
(3.)Defence InstallationsNA0Not Applicable
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? Yes
(a)Forests Clearance Status Final(Stage-II) Approval Obtained
(i)MoEFCC file number FP/OR/MIN/979/2011
(ii)Date of final approval 30 Oct 2013
(iii)Date of In-Principle Approval 30 Oct 2013
(iv)Area diverted 45.118
(v)Uploaded FC Letter Copy of FC Letter
(b)Legal Status of Forest Land DLC forest 41.218 ha, Khesra Forest 35.819 ha, RF
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 121.405
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Not Applicable
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made RS 157 LACS
(iii)Period of Implementation 10 years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? Yes
(i)Uploaded copy of approval Copy of approval
(ii)Letter No. 6644
(iii)Date of issue 31 Oct 2009
(iv)Recommendation NA
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Karo River
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Suna Nadi,Teherai Nala
(ii)Direction of Water Bodies in Buffer Area South East
(iii)Distance of Water Bodies in Buffer Area 6.2
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 426
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 300
(f)Total Manpower 426
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt7.544.59412.134
(2.)Percentage of Total Project Area6.213.789.99
(3.)No. of Plants188501148530335
(4.)Funds Allocated6000006000001200000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Sociali) Medical facilities: The mine management will arrange medical camps in different villages. Occupation health study will be done in core zone. For the purpose of malaria eradication proper steps will be taken which include sprinkling of bleaching power, fogging, distribution of mosquito net etc. The existing dispensary having a pathological lab will take medical care of the staff & villagers. ii) Drinking Water: Facility of drinking water to the core zone as well as buffer zone
(2.)EnvironmentalThe mine helps conserve the surrounding environment by regular monitoring of relevant environmental parameters & take corrective measures as and when required.
(3.)FinancialState Govt . will get royalty & tax which will be used for public
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)Iron oreMajor
2.
Mine Capacity in ROM (Run of Mine) 6 MILLION TPA,TOTAL HANDLING 7.451 MILLION TPA
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. MSM/FM/24-ORI/BHU/2016-17/7405
(b)Date of Approval 30 Dec 2016
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department IBM
(e)Approved Mining Lease Area 121.405
(f)Approved Capacity 7451000
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 30.35
(b)Mineable Reserves (Million Ton) 28.02
(c)Extractable Reserves(Million Ton) 28.02
(d)Percent(%) of Extraction 92
(e)Grade of Coal /Ore /Mineral 45% FE AND ABOVE
(f)Stripping Ratio 1 : 0.15
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) Not Applicable
(h)Average Gradient(Degree) 45
(i)Mining Method Opencast
(j)Life of Mine (Years) 5
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 121.405
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 18 Dec 1959
(iii)Validity of LOI 20
(iv)Reference No. of LOI RML No. 99
(c)Whether Lease Deed Executed ? Yes
(i)Copy of Executed Lease deed valid as on Date Copy of Executed Lease deed
(ii)Provide area in Hectare as per executed lease deed (initial) document 121.405
(iii)Validity of the lease deed From : 18 Dec 1959 To : 17 Dec 1979
(iv)Date of Execution of Mining Lese 18 Dec 1959
(v)Reference Number RML.No.99
(d)Whether Lease Deed Renewed ? Yes
     8.1.    Earlier Renewals:
S. No.Lease Details Date of Renewal Period Copy of Earlier Lease Letter No.Area Remarks
(1.)Initial 01 Jan 1900 From : 18 Dec 1959 To : 17 Dec 1979 Copy of Earlier LeaseRML No. 99 121.405 original lease ,deed no. not available.
(2.)Renewal 28 Jan 1981 From : 18 Dec 1979 To : 17 Dec 1999 Copy of Earlier LeaseRML No. 99 121.405
(3.)Transfer 02 May 2015 From : 18 Dec 1999 To : 31 Mar 2020 Copy of Earlier LeaseRegistration Id 17215000222 121.405 In pursuance to section 8-A (6) of MMDR Amendment Act, 2015, the mining lease period has been extended up to 31/03/2020 by execution of a Supplementary Lease Deed on 02.05.2015 over an area of 121.405
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 2
(ii)Total Area (in Hectare) 20.394
(iii)Height (in meter) 59
(iv)Quantity (in Million Cubic meter) 8.3
(v)No. of year back fill up 2
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 1
(ii)Total Area (in Hectare) 3.5
(iii)Height (in meter) 10
(iv)Quantity (in Million Cubic meter) 0.366
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 55.113
(b)Depth (in meter) 12
(c)Volume (in Million Cubic meter) 5.8
12.
Details of Quarry:
(a)Final Void of 55.113 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 55.113
13.
Details of Transportation:
(a)In Pit/Underground to Surface Excavator
(b)Surface to Siding/Loading Dumper
(c)Transportation / Conveyor Details Dumpers to railway siding then through rail rake
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)SETTLEMENTS000
(2.)GRAZING LAND000
(3.)WASTE LAND31.435031.435
(4.)AGRICULTURE LAND000
(5.)SURFACE WATER BODIES000
(6.)FOREST LAND89.97089.97
TOTAL121.4050121.405
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)EXTERNAL OB DUMPS0000
(2.)GREEN BELT12.1340012.134
(3.)TOP SOIL STORAGE0000
(4.)ROADS004.2464.246
(5.)BUILT UP AREA (COLONY/OFFICE)003.6593.659
(6.)OtherSTORING ORE PLANT NON MINERALISED AREA7.42107.44314.864
(7.)EXCAVATION/QUARRY58.6130058.613
(8.)INTERNAL OB DUMPS27.8890027.889
(9.)VIRGIN AREA0000
TOTAL106.057015.3480121.405
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 15.48
(b)Internal Dump(in hectare) 3.5
(c)Quarry(in hectare) 0
(d)Safety Zone(in hectare) 12.134
(e)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 2500
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0
(h)Total afforestation plant (in hectare) 12.134
17.
Status of progressive Mining Closure Plan:
Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan
Any Deviation from the Approved Progressive Mine Closure Plan No
Total Area Excavated (in hectare) 58.613
Total Area Backfilled after Excavation (in hectare) 3.5
Total Area Reclaimed (in hectare) 6
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)19940.00750905120021253.430
(2.)19970.007509051200162140
(3.)19980.00750900174560
(4.)19990.007509095070.5120140
(5.)20010.00750918000113102.5185370.011028
(6.)20040.00750918000111552129911.5440.122403
(7.)20050.00750901119025422300.534721
(8.)20060.0075095120015814541180310.61.172802
(9.)20070.007509020113871164370.651.156862
(10.)20080.2167026578301461357.9631.24469133
(11.)20092.6826026797442122334.2610
(12.)20102.6260000050260801880057.180
(13.)20112.626000004564000907795.390
(14.)20132.6260000045940002160059.90
(15.)20167.451745100050800002543360.270
(16.)20000.0075090104772.5167340.009225
(17.)19930.0075090075090
(18.)19950.007509051200301570
(19.)19960.007509051200242550
(20.)20020.00750918000113515.5173840.009875
(21.)20030.00750918000111807.563194.9860.055686
(22.)20122.626000004594000824731.1780
(23.)20142.626000004500000312383.510
(24.)20157.451745100074510001665517.020
(25.)20177.451745100064510002878463.680
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? Yes
(b)Name of the Court Tribunals
(c)Name of the Sub Court Central Administrative Tribunal
(d)Case No. 22/ (67)/2012/RC-I,Ministry of Mines, Govt. of Ind
(e)Orders/Directions of the court ,if any and its relevance with the proposed project Revision Application bearing No. 22/ (67)/2012/RC
(f)Case Details COVERED ABOVE
(g)Uploaded Court Order Copy of Court Order
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? Yes
(b)Details of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act 2(C) C Case No.51/2013 has been filed in the court of SDJM, Bonai, Sundargarh, for violation of Sec.15 of the Environment (Protection) Act, 1986. The said case has been stayed on 28.01.2014 by the Hon’ble High Court of Orissa in CRLMP NO. 47/2014 in Misc. Case No. 25/2014.
(c)Uploaded Copy of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act Copy of Direction Issued
(d)Compliance status of the directions COVERED ABPVE
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/RA027/023(Sl.No. 43 Rev. 69, September
(ii)Name of the EIA Consultant Ecomen Laboratories Pvt. Ltd.
(iii)Address Flat No. 8, 2nd Floor , Arif Chamber –V, Sector –H, Aliganj, Lucknow-226024
(iv)Mobile No. 9335205453
(v)Landline No. 0522276188
(vi)Email Id ravi.bhargava@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 06 Dec 2018
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterSub: Submission of information/documents sought for in respect of Nadidih Iron & Manganese Mine of M/s Feegrade & Co. Pvt. Ltd. for enhancement of production capacity of ROM Iron ore from 2.88 million TPA to 6.0 million TPA and reduction in dry processing (crushing/screening) of low grade iron ore from old stack/dumps from 4.571 million TPA to 1.451 million TPA (Total handling 7.451 million TPA), located at villages Nadikasira & Rengalbeda, Tehsil-Koira, District-Sundargarh, Odisha (MLA 121.405 ha) (Consultant M/s. Ecomen Laboratories Pvt. Limited) – (Proposal no.: IA/OR/MIN/60756/2016) Ref.: Your Office F. No. J-11015/249/2016/-IA.II (M), dated 30.04.2019. 28 May 2019
2. ADS Raise LetterADS 24 May 2019
3. ADS Reply Lettersub:Submission of information/documents sought for in respect of Nadidih Iron & Manganese Mine of M/s Feegrade & Co. Pvt. Ltd. located at villages Nadikasira and Rengalbeda , Tehsil – Koira, Dist. Sundargarh, Odisha. Ref.: Minutes of 3rd EAC meeting held in March 26th , 2019 downloaded from MoEF&CC website (File No. J-11015/249/2016-IA.II(M); Proposal No. IA/OR/MIN/60756/2016) Agenda Item no. 2.16. 29 Apr 2019
4.NA

returned the proposal in present form

12 Apr 2019
5. ADS Reply LetterSub: Submission of information/documents sought for in respect of Nadidih Iron & Manganese Mine of M/s Feegrade & Co. Pvt. Ltd. located in villages – Nadikasira and Rengalbeda, Tehsil – Koira, Dist. Sundargarh, Odisha. Ref.: Minutes of 1st Reconstituted EAC meeting held in January 22nd, 2019 downloaded from MoEF & CC website (File No. J-11015/136/2012-IA.II(M); Proposal No. IA/OR/MIN/19312/2013) Agenda Item no. 2.2. 02 Feb 2019
6.NANA 01 Feb 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantHIRAK MAZUMDER
DesignationVICE PRESIDENT(G&E)
Name of Company (Applicant Name should not be given here)FEEGRADE COMPANY PVT LTD
AddressMain road Barbil,Keonjhar,Odisha
Print