1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Enhancement of production capacity of ROM Iron Ore from 2.88 million TPA to 6.0 million TPA and reduction in dry processing (Crushing/Screening) of low grade iron ore from old stack/dumps from 4.571 m | (b)Name of the Company / Organisation | FEEGRADE COMPANY PVT LTD | (c)Registered Address | Main road Barbil,Keonjhar,Odisha,,Keonjhar,Orissa-758035 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | HIRAK MAZUMDER | (b)Designation (Owner/ Partner/ CEO) | VICE PRESIDENT(G&E) | (c)Address | Feegrade company pvt ltd,Main road,Barbil,,Barbil,Keonjhar,Orissa-758035 | (d)Pin code | 758035 | (e)E-mail | feegrade.forest@gmail.com | (f)STD Code. | 6767(f)Telephone No. | 275361 | (g)Fax No. | 275361 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(a) Mining of minerals
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/OR/MIN/19312/2013 | (d)Master Proposal Number(Single Window) | SW/84611/2018 | (e)EAC concerned (for category A Projects only) | Non-Coal Mining | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 1/P, 103/P, 104/P,1, 2/P, 3, 4/P, 5/P, 6/P, 7/P, 8 | (b)Pincode | 770048 | (c)Bounded Latitudes (North) | | From | | Degree | 21.956486 | Minutes | | Second | | From | | Degree | 21.972263 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 85.249538 | Minutes | | Second | | From | | Degree | 85.259677 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 73G/5 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 615 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0.025 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Orissa | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Orissa | Sundargarh | Koida | Nadikasira & Rengalbeda | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11015/249/2016-IA.II(M) | (c)Date of Issue of TOR | | (f)Previous TOR Letter | NA | (b)Date of Apply of EC | 02 Aug 2013 | (c)Date of Issue of EC | 11 Sep 2019 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 25 Oct 2018 | Distance of Public Hearing Venue from the Proposed Project : | 0.05 |
| Play Ground near Nadidihi Primary School of village Nadikasira under KoiraBlock of Sundargarh district | State : | Orissa | District : | Sundargarh | Tehsil : | Koida | Village : | Nadikasira |
| 500 | 1.Construction of a bridge over Karo River for easy movement of villagers.
2.Provision of transformer for Koira stadium.
3.Provision of DG sets for Nadidih, Nadikasira & Rengalbeda villages for uni | Others | Additional District Magistrate, Sundargarh | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bhubaneswar | (iii)Letter No. | 101-872/13/EPE/1414 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Apr 16 2018 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Iron Ore | 2880000 | 3120000 | 6000000 | Tons per Annum(TPA) | | Road,Rail | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Dumper 20 MT | 43 | 0 | 0 | | (2.) | Dumper 30 MT | 0 | 40 | 40 | | (3.) | Screening Plant (Mobile) 250 TPH | 4 | 5 | 5 | | (4.) | Dozer | 2 | 2 | 2 | | (5.) | Jeep | 0 | 6 | 6 | | (6.) | Static Water Sprinkler 1 set (5.3 km) | 1 | 1 | 1 | covering 5.3 km | (7.) | Generator 5KVA | 10 | 10 | 10 | | (8.) | Loader 1.2 m3 | 9 | 14 | 14 | | (9.) | Water Sprinkler 20 KL | 1 | 2 | 2 | | (10.) | Ambulance | 1 | 1 | 1 | | (11.) | Screening Plant (Mobile) 200TPH | 3 | 3 | 3 | | (12.) | DTH Drill & Compressor 110 mm | 1 | 1 | 1 | | (13.) | Rock breaker | 7 | 7 | 7 | | (14.) | Excavator 1.16 m3 /2.3 m3 | 14 | 14 | 14 | | (15.) | Screening Plant (Mobile) 150TPH | 0 | 2 | 2 | | (16.) | Crushing Plant (Mobile) 250TPH | 4 | 4 | 4 | 2 sets | (17.) | Water Sprinkler 12 KL | 2 | 3 | 3 | | (18.) | School van | 0 | 1 | 1 | | (19.) | Generator 50 KVA | 1 | 2 | 2 | | (20.) | Generator 110KVA | 1 | 1 | 1 | | (21.) | Crushing Plant (Mobile) 150 TPH | 6 | 6 | 6 | 3 sets | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | Copy of Consent to Operate | (iii)Date of Issue | 20 Mar 2017 | (iv)Valid Upto | 31 Mar 2020 | (v)File No. | 4256/IND-I-CON-2265 | (vi)Application No. | 899182 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 200 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.37 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 1.5 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.377 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 11 | (b)Existing quantity of raw material/fuel | 11.92 | (c)Total quantity of raw material/fuel | 22.92 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | HSD | 22.92 | Others | lac liters/annum | Haldia | Road | | 350 | Others | purchase order | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2018 To 31 May 2018 | (b)Season | Pre-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | NOx | | Micro Gram per Meter Cube | 27.17 | 10.41 | 27.10 | 80 | (2.) | PM10 | | Micro Gram per Meter Cube | 85.5 | 50.48 | 84.8 | 100 | (3.) | PM2.5 | | Micro Gram per Meter Cube | 56.53 | 26.81 | 55.94 | 60 | (4.) | SO2 | | Micro Gram per Meter Cube | 16.76 | 6.54 | 16.56 | 80 | |
14.2. No. of Ground Water monitoring locations : 4 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.6 | 7.1 | 6.5 | 8.5 | (2.) | Total Hardness | | | mg/l | | 196 | 168 | 200 | 600 | (3.) | Chlorides | | | mg/l | | 36 | 22 | 250 | 1000 | (4.) | Fluoride | | | mg/l | | 0.62 | 0.47 | 1 | 1.5 | (5.) | Heavy Metals | | Lead | mg/l | | 0.01 | 0.01 | 0.01 | 0.01 | (6.) | Others | Total Coliform | | Others | MPN/100ml | 0 | 0 | 0 | 0 | (7.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (8.) | TDS | | | mg/l | | 460 | 315 | 500 | 2000 | |
14.3. No. of Surface Water monitoring locations : 3 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.3 | 7 | C | (2.) | DO | | mg/l | | 4.9 | 4.3 | C | (3.) | BOD | | mg/l | | 2 | 2 | C | (4.) | COD | | mg/l | | 0 | 0 | C | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 68.5 | 45.2 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 46.9 | 42.1 | 70 | |
14.5. No. of Soil Sample Monitored locations : 4 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | Others | NA | 6.2 | 5.29 | (2.) | P(Phosphorus) | Kilogram per hectare | | 148 | 122 | (3.) | Electric Conductivity | Millisiemens per Centimetre | | 0.055 | 0.0356 | (4.) | N(Nitrogen) | Kilogram per hectare | | 294 | 263 | (5.) | K(Potassium) | Kilogram per hectare | | 50 | 48 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 46 To 48.3 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 44.4 To 46 | (c)Whether Ground Water Intersection will be there ? | Yes | (d)Upload Copy of Central Ground Water Authority Letter | Copy of Central Ground Water Authority Letter | (e)Letter No. | FEE/ED/GEO/2019-19/312 | (f)Date of Issue | 03 Nov 2018 | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 767.5 | 0.5 | Not Appliacble | modeOthers | WATER TANKER | Others | PUMPING | Agreement no. 34 | 27 Feb 2018 | 767.5 | (2.) | GroundWater | | 226 | 0 | Copy of Permission Letter | modeOthers | WATER TANKER | Others | PUMPING | 21-4(312)/SER/CGWA/2011-723 | 05 May 2016 | 226 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic waste water/Residential Colony | 100 | 100 | Aerobic Biological treatment (MBBR Technogy | Others | Environmental maintenance | 100 | 0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 100 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 100 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Mine waste | Others | over burden & inter burden | 1085006 | Tons | 0 | Road | Dumpers | Others | DUMP C | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 80.67 | 0.25 | 2.53122 | 83.20122 | 100 | (2.) | PM2.5 | | Microgram per Meter Cube | 51.58 | 0.25 | 0.99308 | 52.57308 | 60 | (3.) | NOx | | Microgram per Meter Cube | 23.15 | 3.5 | 0.02277 | 23.17277 | 80 | (4.) | SO2 | | Microgram per Meter Cube | 0 | 0 | 0 | 0 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | NA | NA | 0 | 0 | Others | NA | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 563 | (b)Source | WESCO | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 440 KVA | (e)Stack Height (in m) | 4 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 89.87 | (b)Private Land (ha.) | 8.866 | (c)Government Land (ha.) | 22.669 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 121.405 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 89.87 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Govt. & Pvt. land | 31.535 | Total (ha.) | 121.405 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Green belt | | 12.134 | | (2.) | Quarry Area | | 58.613 | | (3.) | OB Dump Area | | 27.889 | | (4.) | Main Plant | | 2 | | (5.) | Built Up Area | | 15.326 | MINERAL STORAGE, INFRASTRUCTURE,MINE CAMP | (6.) | Others | Non mineralized forest area applied for surrender | 5.443 | Non mineralized forest area applied for surrender | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | NA | 0 | NOT APPLICABLE | (2.) | ESZs | NA | 0 | NOT APPLICABLE | (3.) | Wildlife Corridors | NA | 0 | NOT APPLICABLE | (4.) | ESAs | NA | 0 | NOT APPLICABLE | (5.) | NPA | NA | 0 | NOT APPLICABLE | (6.) | Corridors | NA | 0 | NOT APPLICABLE | (7.) | WLS | NA | 0 | NOT APPLICABLE | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | KARO | 0 | WEST | (2.) | Archaeological Sites | | NA | 0 | Not Applicable | (3.) | Defence Installations | | NA | 0 | Not Applicable | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | Yes | (a)Forests Clearance Status | Final(Stage-II) Approval Obtained | (i)MoEFCC file number | FP/OR/MIN/979/2011 | (ii)Date of final approval | 30 Oct 2013 | (iii)Date of In-Principle Approval | 30 Oct 2013 | (iv)Area diverted | 45.118 | (v)Uploaded FC Letter | Copy of FC Letter | (b)Legal Status of Forest Land | DLC forest 41.218 ha, Khesra Forest 35.819 ha, RF | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 121.405 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Not Applicable | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | RS 157 LACS | (iii)Period of Implementation | 10 years | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | Yes | (i)Uploaded copy of approval | Copy of approval | (ii)Letter No. | 6644 | (iii)Date of issue | 31 Oct 2009 | (iv)Recommendation | NA | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Karo River | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Suna Nadi,Teherai Nala | (ii)Direction of Water Bodies in Buffer Area | South East | (iii)Distance of Water Bodies in Buffer Area | 6.2 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 426 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 300 | (f)Total Manpower | 426 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 7.54 | 4.594 | 12.134 | (2.) | Percentage of Total Project Area | 6.21 | 3.78 | 9.99 | (3.) | No. of Plants | 18850 | 11485 | 30335 | (4.) | Funds Allocated | 600000 | 600000 | 1200000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | i) Medical facilities: The mine management will arrange medical camps in different villages. Occupation health study will be done in core zone. For the purpose of malaria eradication proper steps will be taken which include sprinkling of bleaching power, fogging, distribution of mosquito net etc. The existing dispensary having a pathological lab will take medical care of the staff & villagers. ii) Drinking Water: Facility of drinking water to the core zone as well as buffer zone | (2.) | Environmental | The mine helps conserve the surrounding environment by regular monitoring of relevant environmental parameters & take corrective measures as and when required. | (3.) | Financial | State Govt . will get royalty & tax which will be used for public | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Non-Coal Mining |
|
1. No. of Mineral(s) to be Mined : 1 |
---|
S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
---|
(1.) | Iron ore | Major | |
|
2. | Mine Capacity in ROM (Run of Mine) | 6 MILLION TPA,TOTAL HANDLING 7.451 MILLION TPA | |
|
|
4. | Mining Plan: | (a)Approval Letter No. | MSM/FM/24-ORI/BHU/2016-17/7405 | (b)Date of Approval | 30 Dec 2016 | (c)Approved Letter | Copy of Approved Letter | (d)Approved By State Mining and Geology Department | IBM | (e)Approved Mining Lease Area | 121.405 | (f)Approved Capacity | 7451000 | |
|
5. | Technical Details: | (a)Total Geological Reserves (Million Ton) | 30.35 | (b)Mineable Reserves (Million Ton) | 28.02 | (c)Extractable Reserves(Million Ton) | 28.02 | (d)Percent(%) of Extraction | 92 | (e)Grade of Coal /Ore /Mineral | 45% FE AND ABOVE | (f)Stripping Ratio | 1 : 0.15 | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | Not Applicable | (h)Average Gradient(Degree) | 45 | (i)Mining Method | Opencast | (j)Life of Mine (Years) | 5 | |
|
6. | Details of Beneficiations: | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | No | (b)Whether it is proposed to install crusher within the mining lease area | No | |
|
7. | Details of Seams: | (a)Whether details of seam applicable | No | |
|
8. | Details of Mining Lease: | (a)Mining Lease Area (in Hectare) | 121.405 | (b)Whether obtained Letter of Intent (LOI) from the state government ? | Yes | (i)Copy of Letter of Intent | Copy of Letter of Intent | (ii)Date of issue of LOI | 18 Dec 1959 | (iii)Validity of LOI | 20 | (iv)Reference No. of LOI | RML No. 99 | (c)Whether Lease Deed Executed ? | Yes | (i)Copy of Executed Lease deed valid as on Date | Copy of Executed Lease deed | (ii)Provide area in Hectare as per executed lease deed (initial) document | 121.405 | (iii)Validity of the lease deed | From : 18 Dec 1959 To : 17 Dec 1979 | (iv)Date of Execution of Mining Lese | 18 Dec 1959 | (v)Reference Number | RML.No.99 | (d)Whether Lease Deed Renewed ? | Yes | |
|
8.1. Earlier Renewals: |
---|
S. No. | Lease Details | Date of Renewal | Period | Copy of Earlier Lease | Letter No. | Area | Remarks |
---|
(1.) | Initial | 01 Jan 1900 | From : 18 Dec 1959 To : 17 Dec 1979 | Copy of Earlier Lease | RML No. 99 | 121.405 | original lease ,deed no. not available. | (2.) | Renewal | 28 Jan 1981 | From : 18 Dec 1979 To : 17 Dec 1999 | Copy of Earlier Lease | RML No. 99 | 121.405 | | (3.) | Transfer | 02 May 2015 | From : 18 Dec 1999 To : 31 Mar 2020 | Copy of Earlier Lease | Registration Id 17215000222 | 121.405 | In pursuance to section 8-A (6) of MMDR Amendment Act, 2015, the mining lease period has been extended up to 31/03/2020 by execution of a Supplementary Lease Deed on 02.05.2015 over an area of 121.405 | |
|
9. | OB (Over Burden) Management: | (a) Details of External Dumps: | (i)No. of OB Dumps | 2 | (ii)Total Area (in Hectare) | 20.394 | (iii)Height (in meter) | 59 | (iv)Quantity (in Million Cubic meter) | 8.3 | (v)No. of year back fill up | 2 | (b) Details of Internal Dumps: | (i)No. of Internal Dumps | 1 | (ii)Total Area (in Hectare) | 3.5 | (iii)Height (in meter) | 10 | (iv)Quantity (in Million Cubic meter) | 0.366 | |
|
10. | Details of Topsoil Management: | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 0 | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 0 | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 0 | |
|
11. | Details of Final Mine Void: | (a)Area (in Hectare) | 55.113 | (b)Depth (in meter) | 12 | (c)Volume (in Million Cubic meter) | 5.8 | |
|
12. | Details of Quarry: | (a)Final Void of 55.113 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body. | (b)Total Quarry Area (ha) | 55.113 | |
|
13. | Details of Transportation: | (a)In Pit/Underground to Surface | Excavator | (b)Surface to Siding/Loading | Dumper | (c)Transportation / Conveyor Details | Dumpers to railway siding then through rail rake | |
|
|
14. Details of Land Usage (Pre-Mining) |
---|
S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
---|
(1.) | SETTLEMENTS | | 0 | 0 | 0 | (2.) | GRAZING LAND | | 0 | 0 | 0 | (3.) | WASTE LAND | | 31.435 | 0 | 31.435 | (4.) | AGRICULTURE LAND | | 0 | 0 | 0 | (5.) | SURFACE WATER BODIES | | 0 | 0 | 0 | (6.) | FOREST LAND | | 89.97 | 0 | 89.97 | |
TOTAL | 121.405 | 0 | 121.405 | |
|
15. Details of Land Usage (Post-Mining) |
---|
S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
---|
(1.) | EXTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (2.) | GREEN BELT | | 12.134 | 0 | 0 | | 12.134 | (3.) | TOP SOIL STORAGE | | 0 | 0 | 0 | | 0 | (4.) | ROADS | | 0 | 0 | 4.246 | | 4.246 | (5.) | BUILT UP AREA (COLONY/OFFICE) | | 0 | 0 | 3.659 | | 3.659 | (6.) | Other | STORING ORE PLANT NON MINERALISED AREA | 7.421 | 0 | 7.443 | | 14.864 | (7.) | EXCAVATION/QUARRY | | 58.613 | 0 | 0 | | 58.613 | (8.) | INTERNAL OB DUMPS | | 27.889 | 0 | 0 | | 27.889 | (9.) | VIRGIN AREA | | 0 | 0 | 0 | | 0 | |
TOTAL | 106.057 | 0 | 15.348 | 0 | 121.405 | |
16. | Details of Reclamation: | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | (a)External OB Dump(in hectare) | 15.48 | (b)Internal Dump(in hectare) | 3.5 | (c)Quarry(in hectare) | 0 | (d)Safety Zone(in hectare) | 12.134 | (e)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body. | (f)Density of Tree Plantation per ha (in no.) | 2500 | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | 0 | (h)Total afforestation plant (in hectare) | 12.134 | |
|
|
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
---|
S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
---|
(1.) | 1994 | 0.007509 | 0 | 51200 | 21253.43 | 0 | (2.) | 1997 | 0.007509 | 0 | 51200 | 16214 | 0 | (3.) | 1998 | 0.007509 | 0 | 0 | 17456 | 0 | (4.) | 1999 | 0.007509 | 0 | 95070.5 | 12014 | 0 | (5.) | 2001 | 0.007509 | 18000 | 113102.5 | 18537 | 0.011028 | (6.) | 2004 | 0.007509 | 18000 | 111552 | 129911.544 | 0.122403 | (7.) | 2005 | 0.007509 | 0 | 111902 | 542230 | 0.534721 | (8.) | 2006 | 0.007509 | 51200 | 1581454 | 1180310.6 | 1.172802 | (9.) | 2007 | 0.007509 | 0 | 2011387 | 1164370.65 | 1.156862 | (10.) | 2008 | 0.2167 | 0 | 2657830 | 1461357.963 | 1.24469133 | (11.) | 2009 | 2.6 | 8260 | 2679744 | 2122334.261 | 0 | (12.) | 2010 | 2.6 | 2600000 | 5026080 | 1880057.18 | 0 | (13.) | 2011 | 2.6 | 2600000 | 4564000 | 907795.39 | 0 | (14.) | 2013 | 2.6 | 2600000 | 4594000 | 2160059.9 | 0 | (15.) | 2016 | 7.451 | 7451000 | 5080000 | 2543360.27 | 0 | (16.) | 2000 | 0.007509 | 0 | 104772.5 | 16734 | 0.009225 | (17.) | 1993 | 0.007509 | 0 | 0 | 7509 | 0 | (18.) | 1995 | 0.007509 | 0 | 51200 | 30157 | 0 | (19.) | 1996 | 0.007509 | 0 | 51200 | 24255 | 0 | (20.) | 2002 | 0.007509 | 18000 | 113515.5 | 17384 | 0.009875 | (21.) | 2003 | 0.007509 | 18000 | 111807.5 | 63194.986 | 0.055686 | (22.) | 2012 | 2.6 | 2600000 | 4594000 | 824731.178 | 0 | (23.) | 2014 | 2.6 | 2600000 | 4500000 | 312383.51 | 0 | (24.) | 2015 | 7.451 | 7451000 | 7451000 | 1665517.02 | 0 | (25.) | 2017 | 7.451 | 7451000 | 6451000 | 2878463.68 | 0 | |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | Yes | (b)Name of the Court | Tribunals | (c)Name of the Sub Court | Central Administrative Tribunal | (d)Case No. | 22/ (67)/2012/RC-I,Ministry of Mines, Govt. of Ind | (e)Orders/Directions of the court ,if any and its relevance with the proposed project | Revision Application
bearing No. 22/ (67)/2012/RC | (f)Case Details | COVERED ABOVE | (g)Uploaded Court Order | Copy of Court Order | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | Yes | (b)Details of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act | 2(C) C Case No.51/2013 has been filed in the court of SDJM, Bonai, Sundargarh, for violation of Sec.15 of the Environment (Protection) Act, 1986. The said case has been stayed on 28.01.2014 by the Hon’ble High Court of Orissa in CRLMP NO. 47/2014 in Misc. Case No. 25/2014. | (c)Uploaded Copy of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act | Copy of Direction Issued | (d)Compliance status of the directions | COVERED ABPVE | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/RA027/023(Sl.No. 43 Rev. 69, September | (ii)Name of the EIA Consultant | Ecomen Laboratories Pvt. Ltd. | (iii)Address | Flat No. 8, 2nd Floor , Arif Chamber –V, Sector –H, Aliganj, Lucknow-226024 | (iv)Mobile No. | 9335205453 | (v)Landline No. | 0522276188 | (vi)Email Id | ravi.bhargava@gmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Non-Coal Mining | (ix)Validity of Accreditation | 06 Dec 2018 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Sub: Submission of information/documents sought for in respect of Nadidih Iron & Manganese Mine of M/s Feegrade & Co. Pvt. Ltd. for enhancement of production capacity of ROM Iron ore from 2.88 million TPA to 6.0 million TPA and reduction in dry processing (crushing/screening) of low grade iron ore from old stack/dumps from 4.571 million TPA to 1.451 million TPA (Total handling 7.451 million TPA), located at villages Nadikasira & Rengalbeda, Tehsil-Koira, District-Sundargarh, Odisha (MLA 121.405 ha) (Consultant M/s. Ecomen Laboratories Pvt. Limited) – (Proposal no.: IA/OR/MIN/60756/2016)
Ref.: Your Office F. No. J-11015/249/2016/-IA.II (M), dated 30.04.2019. | 28 May 2019 | 2. | ADS Raise Letter | ADS | 24 May 2019 | 3. | ADS Reply Letter | sub:Submission of information/documents sought for in respect of Nadidih Iron & Manganese Mine of M/s Feegrade & Co. Pvt. Ltd. located at villages Nadikasira and Rengalbeda , Tehsil – Koira, Dist. Sundargarh, Odisha.
Ref.: Minutes of 3rd EAC meeting held in March 26th , 2019 downloaded from MoEF&CC website (File No. J-11015/249/2016-IA.II(M); Proposal No. IA/OR/MIN/60756/2016) Agenda Item no. 2.16. | 29 Apr 2019 | 4. | NA | returned the proposal in present form
| 12 Apr 2019 | 5. | ADS Reply Letter | Sub: Submission of information/documents sought for in respect of Nadidih Iron & Manganese Mine of M/s Feegrade & Co. Pvt. Ltd. located in villages – Nadikasira and Rengalbeda, Tehsil – Koira, Dist. Sundargarh, Odisha.
Ref.: Minutes of 1st Reconstituted EAC meeting held in January 22nd, 2019 downloaded from MoEF & CC website (File No. J-11015/136/2012-IA.II(M); Proposal No. IA/OR/MIN/19312/2013) Agenda Item no. 2.2. | 02 Feb 2019 | 6. | NA | NA | 01 Feb 2019 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | HIRAK MAZUMDER | Designation | VICE PRESIDENT(G&E) | Name of Company (Applicant Name should not be given here) | FEEGRADE COMPANY PVT LTD | Address | Main road Barbil,Keonjhar,Odisha |
|