Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Existing Common Hazardous Waste Treatment Storage and Disposal Facility’ (CHWTSDF) to Integrated Common Hazardous Waste Treatment Storage and Disposal Facility (ICHWTSDF) at survey no 101
(b)Name of the Company / Organisation RAMKY ENVIRO ENGINEERS LTD
(c)Registered Address Ramky Enviro Engineers Limited 13th Floor Ramky Grandiose Ramky Tower Complex Gachibowli Hyderabad,,Rangareddi,Telangana-500032
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Sanjiv Kumar
(b)Designation (Owner/ Partner/ CEO) IWMHead
(c)Address Ramky Enviro Engineers Limited 13 th Floor Ramky Grandiose Ramky Tower Complex Gachibowli Hyderabad,,Serilingampalle,Rangareddi,Telangana-500032
(d)Pin code 500032
(e)E-mail consultancygroup@ramky.com
(f)STD Code. 0(f)Telephone No. 23015000
(g)Fax No. 04023015000
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(d) Common hazardous waste treatment, storage and disposal facilities (TSDFs)
Minor Activity7(d) Common hazardous waste treatment, storage and disposal facilities (TSDFs)
(b)Category A
(c)Proposal Number IA/RJ/MIS/63355/2017
(d)Master Proposal Number(Single Window) SW/84578/2018
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Survey No 1018/3
(b)Pincode 313024
(c)Bounded Latitudes (North)
From
Degree 24.613
Minutes
Second
From
Degree 24.616
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 73.8133
Minutes
Second
From
Degree 73.8136
Minutes
Second
(e)Survey of India Topo Sheet No. G43T10, G43T14
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 586
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 3.75
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Rajasthan
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)RajasthanUdaipurMavli
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number 10-19/2017-IA-III
(c)Date of Apply of TOR 23 Mar 2017
(d)Date of Issue of TOR / Standard ToR 07 Jul 2017
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :17 May 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :14 Jun 2018
Distance of Public Hearing Venue from the Proposed Project :4
Atal Seva Centre government Bhavan at Gudli
State :Rajasthan
District :Udaipur
Tehsil :Mavli
Village :Gudli
61Issues raised during PH is attached in PH ProceedingsOthersAdditional District Collector
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)ICHWTSDF21 acresArea
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Secured Landfill (DLF)20000Tons per AnnumRoad
(2.)Landfill After Treatment40000Tons per AnnumRoad
(3.)Incinerator12OthersTONS PER DAY (TPD)Road
(4.)Alternative Fuels and Raw Materials Waste18000Tons per AnnumRoad
(5.)E Waste4000Tons per AnnumRoad
(6.)Paper Recycling2OthersTONS PER DAY (TPD)Road
(7.)Plastic Recycling2OthersTONS PER DAY (TPD)Road
(8.)Used Oil Recycling2Kilo Litre per DayRoad
(9.)Bio Medical Waste5OthersTONS PER DAY (TPD)Road
(10.)Spent Solvent Recycling5Kilo Litre per DayRoad
(11.)Lead Recycling Facility2000Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 27 Oct 2017
(iv)Valid Upto 31 Mar 2022
(v)File No. F(HSW)/Udaipur(Mavli)/15(1)/2016-2017/6700-6702
(vi)Application No. 2017-2018/HSW/3932
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 40
(b) Funds Allocated for Environment Management (Capital) (in Crores) 4.50
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.4
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.52
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0.4
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0.4
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Coal5OthersTONS PER DAY (TPD)Local DealersRoad5 Open MarketCopy of Linkage
(2.)Diesel04Kilo Litre per DayLocal DealersRoad5 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 02 Oct 2017 To 30 Dec 2017
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube65.450.165.4100
(2.)PM2.5Micro Gram per Meter Cube36.821.636.860
(3.)SO2Micro Gram per Meter Cube17.49.217.380
(4.)NOxMicro Gram per Meter Cube31.820.131.880
(5.)OthersCOMicro Gram per Meter Cube6804106802000
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.77.26.58.5
(2.)TDSmg/l15249765002000
(3.)TSSmg/l0000
(4.)Heavy MetalsIronmg/l0.20.20.30.3
(5.)Total Hardnessmg/l570395200600
(6.)Fluoridemg/l1.20.5811.5
(7.)Chloridesmg/l3221662501000
(8.)OthersAlkalinitymg/l329225200600
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.67.2A
(2.)DOmg/l5.75.6B
(3.)CODmg/l4842E
(4.)OthersTDSmg/l905545C
(5.)BODmg/l1614D
    14.4.     No. of Ambient Noise monitoring locations : 08
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))43.940.845/55
(2.)Leq(Day)A-weighted decibels(dB(A))61.650.855/65
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthers-8.27.6
(2.)Electric ConductivityOthersmicrosiemens per centimeters288148
(3.)K(Potassium)Kilogram per hectare358291
(4.)P(Phosphorus)Kilogram per hectare17.312.3
(5.)N(Nitrogen)Kilogram per hectare336282
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 23 To 3
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1 To 22
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersTankers605Copy of Permission LettermodeOthersTankersOthersTankers/Borewells006 Nov 201860
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial1220Chemical Treatment, sand filter, and activated carbon filterReuse within the Plant & Recycling12
(2.)Domestic45Septic tank and Soak pit/Mobile STPGreen Belt Renewal Plant4
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 16
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 16
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Incinerator AshHazardous Waste (as per Hazardous and Other Waste Management rules 2016)500Tons0RoadSanitary Landfills
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube65.40.750.666.0100
(2.)PM2.5Microgram per Meter Cube36.40.750.63760
(3.)SO2Microgram per Meter Cube17.30.752.219.580
(4.)NOxMicrogram per Meter Cube31.80.756.238.080
(5.)Others(Specify)LeadMicrogram per Meter Cube00.750.130.131
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)IncineratorHazardous Wast300.85SO21.68
(2.)BoilerCoal300.85PM100.09
(3.)DGDiesel70.2PM100.011
(4.)DGDiesel70.2SO20.01
(5.)IncineratorHazardous Waste300.85NOx3.37
(6.)BoilerCoal300.85NOx0.39
(7.)Lead RecoveryHazardous waste300.5OthersLead0.02
(8.)IncineratorHazardous Waste300.85PM100.42
(9.)BoilerCoal300.85SO20.58
(10.)DGDiesel70.2NOx0.22
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 450
(b)Source Ajmer Vidyut Vitran Nigam Ltd.
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1*250 kVA
(e)Stack Height (in m) 7
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 8.5
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 8.5
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 8.5
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Other 0
    Total (ha.) 8.5
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)LandFill2.13
(2.)Built Up Area2.13
(3.)Green belt2.8
(4.)OthersOthers1.44
Total (ha.) 8.5
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNil0None in 10 km radius
(2.)NPANil0None in 10 km radius
(3.)Wildlife CorridorsNil0None in 10 km radius
(4.)WLSNil0None in 10 km radius
(5.)ESAsNil0None in 10 km radius
(6.)ESZsNil0None in 10 km radius
(7.)CorridorsNil0None in 10 km radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNil0None in 10 km radius
(2.)Defence InstallationsNIl0None in 10 km radius
(3.)OthersOtherNil0None in 10 km radius
(4.)ForestBara Magra RF0.8West direction
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 8.5
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired nil
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Pavo cristatus
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Berach River
(ii)Direction of Water Bodies in Buffer Area South East
(iii)Distance of Water Bodies in Buffer Area 1.6
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 25
(b)Permanent Employment-During Operation 25
(c)Temporary Employment- During Construction 25
(d)Temporary Employment- During Operation 25
(e)No. of working days 365
(f)Total Manpower 100
32.
Green Belt in Ha:
(a)Total Area of Green Belt 2.8
(b)Percentage of Total Project Area 32.94
(c)No. of Plants to be Planted 3360
(d)Funds Allocated for Plantation 30
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalFacilitating better management of hazardous wastes. Provides a one stop solution for the management of various types of wastes. Minimizes pollution load on environment with an additional benefit of green and clean surroundings. Possibility for recovery of materials thereby conserving the natural resources. Management of wastes is relatively easier and economically viable at a common facility Reduced environmental liability due to captive storage of hazardous waste in the premises of industries
(2.)SocialThe proposed project would proactively promote the public interest through provision of basic amenities such as roads, transportation, electricity, education, sanitation and healthcare facilities, this would also encourage community growth, development, and improved Socio-economic conditions and quality of life of the people living in the project area. Better standards of living and greater social awareness.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 10
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 1
(d)Total plot area (sqm) 85000
(e)Total built up area (sqm) 42600
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 1
(b)Capacity 1000
(c)No. of Recharge Pits 0
(d)Capacity 0
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 300 sqm
5.
Energy Saving Measures:
(a)Source/Mode LED bulbs shall be used for street lights, High ef
(b)Percentage 10
(c)Quantity 100
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area Wastewater from process shall be treated and reuse
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1518/SA 061
(ii)Name of the EIA Consultant Ramky Enviro Services Private Limited
(iii)Address Ramky Grandiose, Ramky Towers complex, Gachibowli, Hyderabad
(iv)Mobile No. 9949991029
(v)Landline No. 0402301535
(vi)Email Id drchakradhar@ramky.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 20 May 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSanjiv Kumar
DesignationIWMHead
Name of Company (Applicant Name should not be given here)RAMKY ENVIRO ENGINEERS LTD
AddressRamky Enviro Engineers Limited 13th Floor Ramky Grandiose Ramky Tower Complex Gachibowli Hyderabad
Print