Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Existing Ferro Alloys Plant for production of either or combination of High Carbon Ferro Chrome, Ferro Manganese & Silico Manganese with installation of additional 4 X 9 MVA capacity Sub
(b)Name of the Company / Organisation MISRILALL MINES PRIVATE LIMITED UNIT FERRO ALLOYS DIVISION
(c)Registered Address AT/PO - PANKAPAL, VIA DANAGADI, DIST - JAJPUR, ODISHA.,,Jajpur,Orissa-755026
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Ujjwal Kumar Sinha
(b)Designation (Owner/ Partner/ CEO) Cheif Executive Mines
(c)Address AT/PO - PANKAPAL, VIA DANAGADI, DIST - JAJPUR, ODISHA - 755026,,,Kolkata,West Bengal-700016
(d)Pin code 700016
(e)E-mail misrilallminesuk@yahoo.com
(f)STD Code. 933(f)Telephone No. 2304544
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
Minor Activity2(b) Mineral beneficiation
(b)Category A
(c)Proposal Number IA/OR/IND/84572/2016
(d)Master Proposal Number(Single Window) SW/84535/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Khata No 43 Tehsil No 188 and Khata No. 8 Tehsil N
(b)Pincode 755026
(c)Bounded Latitudes (North)
From
Degree 86.0100
Minutes
Second
From
Degree 86.9605
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 20.9195
Minutes
Second
From
Degree 20.9239
Minutes
Second
(e)Survey of India Topo Sheet No. F45L1
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 42.4
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 3.5
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Orissa
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/307/2011/IA-II(I)
(c)Date of Issue of TOR 25 Oct 2016
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 16 Nov 2018
(c)Date of Issue of EC 06 Mar 2019
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason As per Order of Hon’ble High Court of Odisha, Cond
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By SPCB
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on
(iii)Letter No. 1365/Con-355 dtd01.06.2018
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit May 31 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)HC FeCr75006600073500Tons per Annum(TPA)Road
(2.)FeMn08000080000Tons per Annum(TPA)Road
(3.)SiMn06000060000Tons per Annum(TPA)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)SAF1 X 4.5 MVA4 X 9 MVA1 X 4.5 MVA and 4 X 9 MVA
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 29 Jan 2018
(iv)Valid Upto 31 Jan 2019
(v)File No. 180/CON-355
(vi)Application No. 1971394 dtd 17.01.2018
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 75
(b) Funds Allocated for Environment Management (Capital) (in Crores) 8.5
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 3.75
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.8515
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 259188
(b)Existing quantity of raw material/fuel 26813
(c)Total quantity of raw material/fuel 286001
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Chrome Ore169050Tons per AnnumSaruabil Chromite Mines, SukindaRoad50 CaptiveCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 03 Oct 2016 To 30 Dec 2016
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube79.8552.1774.41100
(2.)PM2.5Micro Gram per Meter Cube49.6721.4244.0860
(3.)NOxMicro Gram per Meter Cube29.7810.2615.3180
(4.)OthersCOMicro Gram per Meter Cube0.340.110.212.0
(5.)SO2Micro Gram per Meter Cube17.434.2110.3380
    14.2.     No. of Ground Water monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Chloridesmg/l56.2010.610250
(2.)Fluoridemg/l0001.0
(3.)Heavy MetalsChromium (Total)mg/l0000.05
(4.)OthersIronmg/l0.450.0100.3
(5.)TDSmg/l374860500
(6.)pHOthersNo7.506.006.58.5
(7.)TSSmg/l0000
(8.)Total Hardnessmg/l204450200
    14.3.     No. of Surface Water monitoring locations : 12
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHOthersNo7.706.27B
(2.)DOmg/l4.01.5B
(3.)BODmg/l71B
(4.)CODmg/l24.908.40B
(5.)OthersTDSmg/l469.8078B
    14.4.     No. of Ambient Noise monitoring locations : 9
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))69.2064.8075
(2.)Leq(Night)A-weighted decibels(dB(A))60.6058.9070
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Percent0.020.01
(2.)Electric ConductivityOthersmicroS/cm162.8036.30
(3.)K(Potassium)Kilogram per hectare422.20134
(4.)pHOthersNo8.125.36
(5.)P(Phosphorus)Kilogram per hectare2811
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 4.46 To 9.47
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.41 To 3.63
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater3680Copy of Permission LetterPipelineOthersDeep Bore Well21-4/866/OR/IND/2016-53308 Mar 2017372
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Water SoftnerPlant250NAOthersUsed for Dust Suppression250
(2.)Cooling Tower Blowdown20NAOthersUsed For Dust Suppression20
(3.)Chemical Lab22Neutralisation PitOthersUsed for Dust Suppression20
(4.)MRP3650Sedimentation TankOthersRecirculation in MRP360
(5.)Domestic/Office/Canteen7.510Septic TankOthersThrough Soak Pit07.5
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 72.5
(b)Total Discharged Water (Kilolitre per Day) 7.5
(c)Total Reused Water (Kilolitre per Day) 65
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)SlagIndustrial Waste88200Tons50RoadOthersOB Dump of Captive Mines
(2.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.6Kilolitre30RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)Others(Specify)PMMicrogram per Meter Cube78.160.513.810991.9709100
(2.)PM10Microgram per Meter Cube78.160.513.810991.9709100
(3.)PM2.5Microgram per Meter Cube49.670.5049.6760
(4.)SO2Microgram per Meter Cube17.430.5017.4380
(5.)NOxMicrogram per Meter Cube29.780.5029.7880
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)1 X 4.5 MVA SAFCrome Ore and Coke, Flux401.8OthersPM0.270
(2.)4 X 9 MVAChrome Ore, Coke and Flux401.8OthersPM9.504
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 41
(b)Source State Grid
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 125 KVA
(e)Stack Height (in m) 4.3
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 19.975
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 19.975
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0.396
(e)Settlements (ha.) 0
(f)Industrial (ha.) 19.579
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : 0 0
    Total (ha.) 19.975
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Area for Solid Waste Management0.809
(2.)Green belt6.475
(3.)Built Up Area4.047
(4.)OthersOpen area and Road8.644
Total (ha.) 19.975
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNIL10As per identification of CPCB/MOEFCC
(2.)CorridorsNIL10As per identification of CPCB/MOEFCC
(3.)ESAsNIL10As per identification of CPCB/MOEFCC
(4.)Wildlife CorridorsNIL10As per identification of CPCB/MOEFCC
(5.)ESZsNIL10As per identification of CPCB/MOEFCC
(6.)WLSNIL10As per identification of CPCB/MOEFCC
(7.)NPANIL10As per identification of CPCB/MOEFCC
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestBadasila1Open Mixed Jungle at North of Project Site
(2.)OthersRiverRiver Brahmani3.3at 3.3 Kms South of Project Site Toposheet F45L1
(3.)Defence Installationsnil10District Profile
(4.)Archaeological Sitesnil10As the Archaeological Monuments List
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 19.975
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired already acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Nalla
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area River Brahmani
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 3.3
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 40
(b)Permanent Employment-During Operation 212
(c)Temporary Employment- During Construction 200
(d)Temporary Employment- During Operation 300
(e)No. of working days 365
(f)Total Manpower 752
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt4.721.8716.590999999999999
(2.)Percentage of Total Project Area23.639.3733
(3.)No. of Plants11800965021450
(4.)Funds Allocated30.006.0036
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Environmental1. Plantation in Open Areas helps reduction of Green House Gas in the Ambient Air. 2. Planned surface runoff Management helps recharge of Ground Water Table
(2.)Social1. Employment Generation both direct and indirect 2. Peripheral Development 3. Upliftment of Socio-Economic Condition of people living in immediate vicinity. 3. Growth of other ancillary industries. 4. Improved Infrastructure
(3.)Financial1. Financial gains for the state and central Exchequer, through collection of various taxes like royalty, welfare cess, and central excise etc. 2. Reduction in Public Expenditure of Government on social consumption need to some extent. 3. Financial growth of the Company.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. Order Sl No 07 dtd 5.10.2012 of High Court of Odi
(ii)Name of the EIA Consultant Environmental Research and Services (India) Privat
(iii)Address B-22, Sector - B, Chandaka Industrial Estate, Infocity Road, KIIT Post Office
(iv)Mobile No. 9437021932
(v)Landline No. 0674272584
(vi)Email Id ersibbsr@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 31 Dec 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantUjjwal Kumar Sinha
DesignationCheif Executive Mines
Name of Company (Applicant Name should not be given here)MISRILALL MINES PRIVATE LIMITED UNIT FERRO ALLOYS DIVISION
AddressAT/PO - PANKAPAL, VIA DANAGADI, DIST - JAJPUR, ODISHA.