1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | M/s. Hexane Pharmachem Industries | (b)Name of the Company / Organisation | HEXANE PHARMACHEM INDUSTRIES | (c)Registered Address | PLOT NO. 4, BLOCK NO. 253, VILL: NANANPUR, TALUKA : PRANTIJ, DISTRICT : SABARKANTHA,,Sabar Kantha,Gujarat-383210 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | NAVNEET PATEL PATEL | (b)Designation (Owner/ Partner/ CEO) | PARTNER | (c)Address | PLOT NO. 4, BLOCK NO. 253, VILLAGE NANANPUR, TALUKA PRANTIJ, DISTRICT SABARKANTHA,,Prantij,Sabar Kantha,Gujarat-383210 | (d)Pin code | 383210 | (e)E-mail | hexanepharmachem@gmail.com | (f)STD Code. | 79(f)Telephone No. | 27450694 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/GJ/IND2/64726/2017 | (d)Master Proposal Number(Single Window) | SW/84566/2018 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | plot no. 4, Block no 253 paiki 1 | (b)Pincode | 383210 | (c)Bounded Latitudes (North) | | From | | Degree | 72.949760 | Minutes | | Second | | From | | Degree | 72.949861 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 23.524779 | Minutes | | Second | | From | | Degree | 23.524990 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F43A14 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 135 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 4.6 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Gujarat | Sabar Kantha | Prantij | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11011/232/2017-IA-II(I) | (b)Date of Apply of TOR | 16 May 2017 | (c)Date of Issue of TOR / Standard ToR | 01 Aug 2017 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 18 Sep 2018 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| plot no. 4, block no. 253 paiki 1, Nananpur, Prantij, Sabarkantha | State : | Gujarat | District : | Sabar Kantha | Tehsil : | Prantij | Village : | nananpur |
| 63 | employment of local people, safety of workers, CSR activity & environment protection | Others | Additional District Magistrate | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | production plant | manufacturing of product | | (2.) | utility, fuel storage & stack | utility area | | (3.) | ETP & solid waste storage area | effluent treatment facility & waste storage | | (4.) | office | administrative works | | (5.) | security cabin | allocated area of security officer | | (6.) | Solvent & raw material storage | solvent & raw material storage | | (7.) | drying, grinding, packaging | dryer, grinder & package area | | (8.) | finished good storage | product storage area | | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Cetyl Pyridinium Choride | 12 | Tons per Annum | | Road,Rail | | (2.) | Tetra Butyl Ammonium Chloride | 24 | Tons per Annum | | Road,Rail | | (3.) | Cetramide | 12 | Tons per Annum | | Road,Rail | | (4.) | Cetramide Strong Solution 40 % | 12 | Tons per Annum | | Road,Rail | | (5.) | Ethyl Triphenyl Phosphonium Bromide | 12 | Tons per Annum | | Road,Rail | | (6.) | Lauryl Pyridinium Chloride | 12 | Tons per Annum | | Road,Rail | | (7.) | Methyl Triphenyl Phosphonium Bromide | 36 | Tons per Annum | | Road,Rail | | (8.) | Tetra Butyl Ammonium Bromide (Powder) | 120 | Tons per Annum | | Road,Rail | | (9.) | Tetra Butyl Ammonium Bromide (Solution) | 300 | Tons per Annum | | Road,Rail | | (10.) | Tetra Butyl Ammonium Iodide | 12 | Tons per Annum | | Road,Rail | | (11.) | Tetra Methyl Ammonium Chloride | 24 | Tons per Annum | | Road,Rail | | (12.) | Tetra Octyl Ammonium Bromide | 24 | Tons per Annum | | Road,Rail | | (13.) | Tetra Ethyl Ammonium Bromide | 60 | Tons per Annum | | Road,Rail | | (14.) | Benzyl Tri Butyl Ammonium Chloride | 12 | Tons per Annum | | Road,Rail | | (15.) | Cetyl Dimethyl Benzyl Ammonium Bromide | 12 | Tons per Annum | | Road,Rail | | (16.) | Mesetronium Etho Sulphate | 12 | Tons per Annum | | Road,Rail | | (17.) | Methyl Triphenyl Phosphonium Chloride | 24 | Tons per Annum | | Road,Rail | | (18.) | Methyl Triphenyl Phosphonium Iodide | 12 | Tons per Annum | | Road,Rail | | (19.) | Tetra Phenyl Phosphonium Bromide | 12 | Tons per Annum | | Road,Rail | | (20.) | Benzyl Tri Methyl Ammonium Chloride (Powder) | 192 | Tons per Annum | | Road,Rail | | (21.) | Cetyl Trimethyl Ammonium Bromide | 12 | Tons per Annum | | Road,Rail | | (22.) | Cetyl Trimethyl Ammonium Chloride 30 % | 12 | Tons per Annum | | Road,Rail | | (23.) | Benzyl Triphenyl Phosphonium Chloride | 12 | Tons per Annum | | Road,Rail | | (24.) | Methyl Tributyl Ammonium Chloride 75 % | 60 | Tons per Annum | | Road,Rail | | (25.) | Methyl Trioctyl Ammonium Chloride 95 % | 12 | Tons per Annum | | Road,Rail | | (26.) | Phenyl Trimethyl Ammonium Chloride | 24 | Tons per Annum | | Road,Rail | | (27.) | Tetra Butyl Ammonium Hydrogen Sulphate | 24 | Tons per Annum | | Road,Rail | | (28.) | Tri Ethyl Benzyl Ammonium Chloride | 60 | Tons per Annum | | Road,Rail | | (29.) | Benzalkonium Chloride 50 % | 12 | Tons per Annum | | Road,Rail | | (30.) | Benzyl Tri Butyl Ammonium Bromide | 12 | Tons per Annum | | Road,Rail | | (31.) | Butyl Triphenyl Phosphonium Bromide | 24 | Tons per Annum | | Road,Rail | | (32.) | Butyl Triphenyl Phosphonium Chloride | 12 | Tons per Annum | | Road,Rail | | (33.) | Cetyl Dimethyl Benzyl Ammonium Chloride | 12 | Tons per Annum | | Road,Rail | | (34.) | Dodecyl Trimethyl Ammonium Chloride | 12 | Tons per Annum | | Road,Rail | | (35.) | Tri Ethyl Methyl Ammonium Chloride | 12 | Tons per Annum | | Road,Rail | | (36.) | Tri Ethyl Butyl Ammonium Bromide | 12 | Tons per Annum | | Road,Rail | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | not applicable | (vi)Application No. | not applicable | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 3.60 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.4 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.072 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.31 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 202.56 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 202.56 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | tri phenyl phosphine | 105.96 | Tons per Annum | | local suppliers/traders | Road,Rail | | 460 | Open Market | | Copy of Linkage | (2.) | Benzyl chloride | 175.56 | Tons per Annum | | local trader/supplier | Road,Rail | | 300 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 23 Sep 2017 To 22 Dec 2017 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | SO2 | | Micro Gram per Meter Cube | 31.69 | 5.70 | 31.37 | 80 | (2.) | NOx | | Micro Gram per Meter Cube | 45.55 | 9.41 | 45.30 | 80 | (3.) | PM10 | | Micro Gram per Meter Cube | 81.36 | 50.12 | 81.04 | 100 | (4.) | PM2.5 | | Micro Gram per Meter Cube | 58.43 | 24.97 | 58.36 | 60 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Chlorides | | | mg/l | | 183 | 62.4 | 250 | 1000 | (2.) | Others | Turbidity | | Others | NTU | 5.6 | 2.8 | 1 | 5 | (3.) | Fluoride | | | mg/l | | 0.85 | 0.3 | 1 | 1.5 | (4.) | Heavy Metals | | Magnesium | mg/l | | 82.6 | 11.7 | 30 | 100 | (5.) | pH | | | NA | | 7.96 | 7.3 | 8.5 | 8.5 | (6.) | TSS | | | mg/l | | 116 | 16 | 0 | 0 | (7.) | TDS | | | mg/l | | 1296 | 324 | 500 | 2000 | (8.) | Total Hardness | | | mg/l | | 820 | 98 | 200 | 600 | |
14.3. No. of Surface Water monitoring locations : 6 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 8.95 | 8.15 | B | (2.) | DO | | mg/l | | 5.2 | 3.9 | B | (3.) | COD | | mg/l | | 97.9 | 12 | B | (4.) | BOD | | mg/l | | 28.8 | 6.9 | B | (5.) | Others | TDS | mg/l | | 1620 | 208 | B | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 47.3 | 34.2 | 45 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 57.3 | 40.6 | 55 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | P(Phosphorus) | Milligram per Kilogram | | 5.36 | 0.52 | (2.) | Electric Conductivity | Millisiemens per Centimetre | | 3.520 | 0.235 | (3.) | K(Potassium) | Milliequivalents per 100 Gram | | 26.34 | 9.32 | (4.) | N(Nitrogen) | Others | NOT MEASURED | 0 | 0 | (5.) | pH | Others | Not applicable | 8.41 | 7.11 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 4.68 To 41.40 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.73 To 41.00 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 29.5 | 0 | Copy of Permission Letter | Pipeline | | Others | borewell | 21-4/3517/GJ/IND/2018 | 15 Feb 2018 | 29.5 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | domestic | 0 | 0 | total 1.6 KLD domestic effluent will be generated & will be disposed off into soak pit via septic tank | Others | septic tank / soak pit | 0 | 0 | (2.) | Industrial | 0 | 10 | total 8.3 KLD wastewater will be generated & treated in ETP followed by condenser system, so 5.4 KLD condensate will be reused in inudustrial process | Reuse within the Plant & Recycling | | 0 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 0 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 0 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | process waste (organic) | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 116.76 | Tons | 300 | Road | | Others | common hazardous waste incineration facility | (2.) | ETP sludge + evaporation residue | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 60 | Tons | 300 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (3.) | catalyst waste | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 2.4 | Tons | 300 | Road | | Others | CHWIF | (4.) | off-specification product | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0 | Tons | 300 | Road | | Others | CHWIF | (5.) | discarded containers | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 21.6 | Tons | 0 | Road | | Authorized Recyclers | | (6.) | process waste (inorganic) | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 72.96 | Tons | 300 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (7.) | used oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.048 | Tons | 0 | Road | | Authorized Recyclers | | (8.) | date expired product / raw material | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0 | Tons | 300 | Road | | Others | CHWIF | (9.) | distillation residue | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 19.68 | Tons | 300 | Road | | Others | CHWIF | (10.) | spent charcoal + spent carbon | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 31.92 | Tons | 300 | Road | | Others | Common Hazardous waste incineration facility | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | NA | 0 | 0 | 0 | 0 | 0 | (2.) | NOx | | Microgram per Meter Cube | 45.55 | 1.63 | 0.06 | 45.61 | 80 | (3.) | PM10 | | Microgram per Meter Cube | 81.36 | 1.63 | 0.15 | 81.51 | 100 | (4.) | SO2 | | Microgram per Meter Cube | 31.69 | 1.63 | 0.03 | 31.72 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | stack attached with Boiler | white coal / briquettes | 30 | 1.0 | PM10 | | 0.77 | (2.) | stack attached with boiler | white coal / briquetters | 30 | 1.0 | SO2 | | 0.03 | (3.) | stack attached with boiler | white coal / briquettes | 30 | 1.0 | NOx | | 0.16 | (4.) | process stack attached with process room | - | 6 | 0.5 | Others | VOC | - | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 235 | (b)Source | UGVCL | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | DG set of 60 KVA | (e)Stack Height (in m) | 10 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0.6077 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 0.6077 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 22541 | (b)Waste/Barren Land (ha.) | 3138 | (c)Grazing/ Community Land (ha.) | 2321 | (d)Surface Water Bodies (ha.) | 714 | (e)Settlements (ha.) | 2181 | (f)Industrial (ha.) | 269 | (g)Forest (ha.) | 251 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : other land | 0 | Total (ha.) | 31415 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Built Up Area | | 0.1902 | | (2.) | Green belt | | 0.2085 | | (3.) | Others | open area | 0.2090 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | none within 10 km radius area | 0 | N.A. | (2.) | ESZs | none within 10 km radius area | 0 | N.A. | (3.) | Wildlife Corridors | none within 10 km radius area | 0 | N.A. | (4.) | WLS | none within 10 km radius area | 0 | N.A. | (5.) | NPA | none within 10 km radius area | 0 | N.A. | (6.) | Corridors | none within 10 km radius area | 0 | N.A. | (7.) | ESAs | none within 10 km radius area | 0 | N.A. | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Defence Installations | | None within 10 km radius area | 0 | not applicable | (2.) | Archaeological Sites | | None within 10 km radius area | 0 | not applicable | (3.) | Forest | | Berna Reserve Forest | 11.94 | Berna reserve forest is outside 10 km radius area from project site | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0.6077 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | not applicable | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Yet To Start | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Indian Peafawl | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | included in conservation plan | (iii)Period of Implementation | 1 to 5 years | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Hathmati river | (ii)Direction of Water Bodies in Buffer Area | South East | (iii)Distance of Water Bodies in Buffer Area | 4.6 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 12 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 25 | (f)Total Manpower | 12 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 0.2085 | (b)Percentage of Total Project Area | 34.31 | (c)No. of Plants to be Planted | 300 | (d)Funds Allocated for Plantation | 100000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | social & financial benefits | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA 0033 | (ii)Name of the EIA Consultant | T. R. Associates | (iii)Address | A-401, S.G. Business Hub, B/w. Sola Bhagwat & Gota over bridge, near umiya campus, S. G. Highway, Ahmedabad - 380060 | (iv)Mobile No. | 9825371099 | (v)Landline No. | 0792745069 | (vi)Email Id | adm.trassocaites@gmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 17 Mar 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Please inform/clarify the following:-
- Whether the proposed industrial operations are permitted at the identified site and/or in conformity with land use of the area. That needs to be confirmed along with supporting documents.
- Permission required from SPCB to allow such polluting units in non industrial area.
- Clearance for ground water withdrawal. | 11 Nov 2018 | 2. | NA | The correction have been made as per the instruction received | 30 Jul 2019 | 3. | NA | Please reply to our observations dated 11/11/2018 to take the proposal forward. | 27 Aug 2019 | 4. | NA | The correction have been made as per the instruction received | 27 Aug 2019 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | NAVNEET PATEL PATEL | Designation | PARTNER | Name of Company (Applicant Name should not be given here) | HEXANE PHARMACHEM INDUSTRIES | Address | PLOT NO. 4, BLOCK NO. 253, VILL: NANANPUR, TALUKA : PRANTIJ, DISTRICT : SABARKANTHA |
|