Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) M/s. Deccan Fine Chemicals (India) Pvt. Ltd.
(b)Name of the Company / Organisation DECCAN FINE CHEMICALS INDIA PVT LTD ANKLESHWAR
(c)Registered Address Plot No. 3505 to 3515, 6008 to 6010, 6301 to 6313 & 6316/B1, GIDC Industrial estate, P.B. No. 142, Ankleshwar-393002, Gujarat,,Bharuch,Gujarat-393002
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Parag Shah
(b)Designation (Owner/ Partner/ CEO) Site Head
(c)Address Plot No. 3505 to 3515, 6008 to 6010, 6301 to 6313 and 6316/B1, GIDC Industrial estate, P.B. No. 142, Ankleshwar-393002, Gujarat,,Anklesvar,Bharuch,Gujarat-393002
(d)Pin code 393002
(e)E-mail parag.shah@deccanchemicals.com
(f)STD Code. 2646(f)Telephone No. 391000
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/84526/2008
(d)Master Proposal Number(Single Window) SW/84523/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot no. 3501 -3515, 6301 -6313 & 16 M Road/ B1, a
(b)Pincode 393002
(c)Bounded Latitudes (North)
From
Degree 21.624539
Minutes
Second
From
Degree 21.624761
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 73.037856
Minutes
Second
From
Degree 73.041803
Minutes
Second
(e)Survey of India Topo Sheet No. 5O1,46C14,46O02
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 29
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 8.07
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/749/2008-IA II(I)
(b)Date of Apply of TOR 26 Aug 2008
(c)Date of Issue of TOR / Standard ToR 20 Sep 2008
(d)Date of Apply of EC 20 Sep 2008
(e)Date of Issue of EC 08 Dec 2008
(f)Previous TOR Letter Copy of Previous TOR letter
(g)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? No
(c)Reason The site is located within notified industrial estate notified before 2006
(d)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhopal
(iii)Letter No. 5-45/2009(ENV)/166
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Apr 11 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Pyridate & Amicarbazone & Flucarbozone & Diuron015001500Tons per Annum(TPA)Road
(2.)Para Benzoquinone018001800Tons per Annum(TPA)Road
(3.)Deltamethrin & Flumethrin & Permethrin7030100Tons per Annum(TPA)Road
(4.)Propiconazole & Tricyclazole & Fenbuconazole00900900Tons per Annum(TPA)Road
(5.)Triazophoses280002800Tons per Annum(TPA)Road
(6.)Vulcuren & Vulkalent-E010001000Tons per Annum(TPA)Road
(7.)NN SOD & DS36 NBA & DS 38 NBE11001001200Tons per Annum(TPA)Road
(8.)Aclonifen & Oxadiargyl235010503400Tons per Annum(TPA)Road
(9.)Methoxy AA & ABA HCl & DAT & Azura 50020002000Tons per Annum(TPA)Road
(10.)Dimethy Dithiophosphoric Acid(DMTA)2550255Tons per Annum(TPA)Road
(11.)Anilophos3000300Tons per Annum(TPA)Road
(12.)Benfuresate & Flupicolide555245800Tons per Annum(TPA)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Solvent Tank Farm162036For Agrochemical active ingredients, intermediates and fine chemicals Plant
(2.)D. G. Set – 250 kVA101For Agrochemical active ingredients, intermediates and fine chemicals Plant
(3.)Distillation unit (recovery unit)101525For Agrochemical active ingredients, intermediates and fine chemicals Plant
(4.)N. G. Based Captive Co-Gen Plant (1.4 MW)101For Agrochemical active ingredients, intermediates and fine chemicals Plant
(5.)Filtration unit202848For Agrochemical active ingredients, intermediates and fine chemicals Plant
(6.)Day Vessel & Storage Vessel (1 kl to 50 kl)300350650For Agrochemical active ingredients, intermediates and fine chemicals Plant
(7.)DCS room5813For Agrochemical active ingredients, intermediates and fine chemicals Plant
(8.)Panel Room81220For Agrochemical active ingredients, intermediates and fine chemicals Plant
(9.)UPS Room5813For Agrochemical active ingredients, intermediates and fine chemicals Plant
(10.)Cooling tower1100 m3/hr4550 m3/hr5650 m3/hrFor Agrochemical active ingredients, intermediates and fine chemicals Plant
(11.)Scrubber103141For Agrochemical active ingredients, intermediates and fine chemicals Plant
(12.)Boiler - 8 TPH202For Agrochemical active ingredients, intermediates and fine chemicals Plant
(13.)Boiler 25 TPH022For Agrochemical active ingredients, intermediates and fine chemicals Plant
(14.)D. G. Set – 1500 kVA01010For Agrochemical active ingredients, intermediates and fine chemicals Plant
(15.)Incinerator101For Agrochemical active ingredients, intermediates and fine chemicals Plant
(16.)Reactor150180330For Agro chemical active ingredients, intermediates and fine chemicals Plant
(17.)Dryer404989For Agrochemical active ingredients, intermediates and fine chemicals Plant
(18.)Pumps4206141034For Agrochemical active ingredients, intermediates and fine chemicals Plant
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 17 Oct 2014
(iv)Valid Upto 11 Mar 2019
(v)File No. AWH-65686
(vi)Application No. 79320
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 437.70
(b) Funds Allocated for Environment Management (Capital) (in Crores) 19.81
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 3.55
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 12.96
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 141207
(b)Existing quantity of raw material/fuel 36372
(c)Total quantity of raw material/fuel 177579
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Natural Gas37295856OthersSCMGujarat Gas Company Ltd.OthersPipelines0 LinkageCopy of Linkage
(2.)diesel2340000OthersLitreLocal MarketRoad20 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 03 Mar 2017 To 04 Jun 2017
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube59335960
(2.)NOxMicro Gram per Meter Cube44164480
(3.)SO2Micro Gram per Meter Cube40134080
(4.)PM10Micro Gram per Meter Cube944894100
(5.)OthersCOMili Gram per Meter Cube0.630.220.63200
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Total Hardnessmg/l664506200600
(2.)Fluoridemg/l0.10.111.5
(3.)Heavy MetalsNickelmg/l0.010.010.010.01
(4.)TSSNA0000
(5.)TDSmg/l128110985002000
(6.)pHNA7.97.26.58.5
(7.)Chloridesmg/l5374362501000
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.97.2A
(2.)DOmg/l7.46.1A
(3.)CODmg/l445.2E
(4.)BODmg/l183E
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))676370
(2.)Leq(Day)A-weighted decibels(dB(A))706075
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNA7.77.3
(2.)N(Nitrogen)Kilogram per hectare216.6140.4
(3.)K(Potassium)Kilogram per hectare390.4264
(4.)P(Phosphorus)Kilogram per hectare5.72.8
(5.)Electric ConductivityMillisiemens per Centimetre0.270.15
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 15
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 8 To 10
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersGIDC Water Supply Department16500Copy of Permission LetterPipelineOthersPipe Water SupplyNA//DEE(W/S)/123323 Jul 20181650
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)High TDS stream325325MEE ETPDischarge into Seawater Body325
(2.)Process/ washing407407ETPDischarge into Seawater Body407
(3.)utility/softner/dm160160RO/MEEReuse within the Plant & Recycling160
(4.)domestic130130ETPDischarge into Seawater Body130
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 1022
(b)Total Discharged Water (Kilolitre per Day) 862
(c)Total Reused Water (Kilolitre per Day) 160
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Discarded AsbestosHazardous Waste (as per Hazardous and Other Waste Management rules 2016)25Tons100RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)Solid Waste from surface preparation for paintingHazardous Waste (as per Hazardous and Other Waste Management rules 2016)2.5Tons100RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)Sulphuric AcidHazardous Waste (as per Hazardous and Other Waste Management rules 2016)650Tons100RoadOthersSelling to actual users
(4.)Spent CarbonHazardous Waste (as per Hazardous and Other Waste Management rules 2016)2Tons100RoadOthersAuthorized Recycler/ CHWIF
(5.)Spent SolventsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)67560Tons100RoadOthersReuse within industrial unit in process
(6.)Contaminated Cotton waste, containers and linersHazardous Waste (as per Hazardous and Other Waste Management rules 2016)10Tons100RoadOthersIn house CHWIF
(7.)Brick or refractoryHazardous Waste (as per Hazardous and Other Waste Management rules 2016)40Tons100RoadTreatment, Storage and Disposal Facility(TSDF)
(8.)NaSHHazardous Waste (as per Hazardous and Other Waste Management rules 2016)50Tons100RoadOthersselling to actual user
(9.)Date expired products or pesticidesHazardous Waste (as per Hazardous and Other Waste Management rules 2016)23.5Tons100RoadOthersIn house incineration/ CHWIF
(10.)Used LinersHazardous Waste (as per Hazardous and Other Waste Management rules 2016)20Tons100RoadOthersIn house inceneration/CHWIF
(11.)used oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)20Tons100RoadAuthorized Recyclers
(12.)Solvent recovery or recovered solventHazardous Waste (as per Hazardous and Other Waste Management rules 2016)3500Tons100RoadOthersIn house CHWIF or GPCB approved end user
(13.)Spent SolventsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)13947Tons100RoadOthersauthorized recyclers/ CHWIF
(14.)Distillation ResidueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)2600Tons100RoadOthersIn house CHWIF
(15.)Inorganic salt from MEE plantHazardous Waste (as per Hazardous and Other Waste Management rules 2016)11520Tons100RoadTreatment, Storage and Disposal Facility(TSDF)
(16.)Inorganic salt from MEE plantHazardous Waste (as per Hazardous and Other Waste Management rules 2016)11520Tons100RoadTreatment, Storage and Disposal Facility(TSDF)
(17.)Oil FilterHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1Tons100RoadOthersIn House CHWIF
(18.)Waste from Containment or clean up of spillsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1Tons100RoadOthersIn house CHWIF
(19.)Used PPEHazardous Waste (as per Hazardous and Other Waste Management rules 2016)10Tons100RoadTreatment, Storage and Disposal Facility(TSDF)
(20.)waste Insulation and lining materialsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)60Tons100RoadTreatment, Storage and Disposal Facility(TSDF)
(21.)Used Empty packing materialHazardous Waste (as per Hazardous and Other Waste Management rules 2016)200Tons100RoadOthersDecontamination and dispose by incineration
(22.)Discarded empty containersHazardous Waste (as per Hazardous and Other Waste Management rules 2016)4960Tons100RoadOthersSoled to approved vendors
(23.)Ash from incineration of hazardous wasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)100Tons100RoadTreatment, Storage and Disposal Facility(TSDF)
(24.)Chemical sludge from wastewater treatmentHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1500Tons100RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube940.060.19094.19100
(2.)NOxMicrogram per Meter Cube232.673.27126.27180
(3.)SO2Microgram per Meter Cube202.6763.32823.32880
(4.)PM2.5Microgram per Meter Cube550.060.19055.19060
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)9Natural Gas & HSD330.6PM100.683
(2.)9Natural Gas & HSD330.6NOx9.987
(3.)9Natural Gas & HSD330.6SO22.781
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 18000
(b)Source DGVCL
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 10 DG sets of 1500 kVA AND 1 OF 250 kVA
(e)Stack Height (in m) 33
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 7.6691
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 7.6691
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 9377
(b)Waste/Barren Land (ha.) 3116
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 1019
(e)Settlements (ha.) 2763
(f)Industrial (ha.) 1218
(g)Forest (ha.) 18
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Others 13916
    Total (ha.) 31427
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant2.0974
(2.)Green belt2.7393
(3.)OthersRoad, open, parking area2.8324
Total (ha.) 7.6691
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANONE0The study area does not have any designated forest, national park, wildlife sanctuaries etc.
(2.)ESAsNONE0The study area does not have any designated forest, national park, wildlife sanctuaries etc.
(3.)ESZsNONE0The study area does not have any designated forest, national park, wildlife sanctuaries etc.
(4.)CorridorsNONE0The study area does not have any designated forest, national park, wildlife sanctuaries etc.
(5.)Wildlife CorridorsNONE0Not any
(6.)WLSNONE0The study area does not have any designated forest, national park, wildlife sanctuaries etc.
(7.)Critically Polluted AreaNONE0Not any
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)OthersNone within study areaNone0No within study area
(2.)ForestNone0No within study area
(3.)Archaeological SitesNone0No within study area
(4.)Defence InstallationsNone0No within study area
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 7.6691
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Common Indian monitor and Indian Flapshell Turtle
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made NO
(iii)Period of Implementation As per conservation plan
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Narmada River
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 8.55
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 300
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 312
(f)Total Manpower 300
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt2.739302.7393
(2.)Percentage of Total Project Area35035
(3.)Funds Allocated1.51.753.25
(4.)No. of Plants100001000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialGeneration of direct employment opportunities. Additional 300 people will be employed from the proposed expansion project which will result growth in the economic conditions.
(2.)SocialDevelopment of the social stature & improvement of the quality of life in the surrounding area due to growth in the economic conditions and Rs. 3.55 will be allocated for next 5 years for CER activities.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1518/RA012
(ii)Name of the EIA Consultant M/s. Precitech Laboratories Pvt. Ltd.
(iii)Address C5/27, 1st floor, Bhanujyot complex,GIDC char rasta, Vapi, Gujarat.
(iv)Mobile No. 9925008673
(v)Landline No. 0260242490
(vi)Email Id rhb@precitechlab.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 28 Jul 2018
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease inform/clarify the following:- - Status of transfer of EC dated 8/12/2008 in the name of M/s Deccan Fine Chemicals (India) Pvt Ltd, - Product details given at column 9(b) of Form-2 is not consistent with that mentioned in the covering letter. - EIA consultant not accredited for preparing EIA/EMP reports for the projects covered under category B of item 5(f) 'Synthetic organic chemicals industry'. 12 Nov 2018
2.NAThe correction have been made as per the instruction received 15 Nov 2018
3.NAPlease refer our earlier observations vide query dated 12/11/2008. It is to reiterate that the EIA Consultant is not accredited for preparing EIA/EMP reports for the products covered under category B of item 5(f) 'Synthetic organic chemicals industry'. 24 Nov 2018
4.NAPlease refer our earlier observations vide query dated 12/11/2008. It is to reiterate that the EIA Consultant is not accredited for preparing EIA/EMP reports for the products covered under category B of item 5(f) 'Synthetic organic chemicals industry'. 24 Nov 2018
5.NAThe correction have been made as per the instruction received 28 Nov 2018
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1.NAThe EAC, after deliberations and in view of the above and the project site in GIDC Ankleshwar (having CEPI score 80.21) covered under the said orders of NGT, preferred not to take the proposal forward for the present, but to seek advice of the Ministry for appropriate course of action in such cases. The Committee also opined that in case, such proposals are to be considered on merits, environmental conditions and other stringent measures would have to be looked into comprehensively in complete perspective and in consultation with CPCB. 20 Aug 2019
2. ADS Reply LetterNA 22 Feb 2019
3.NANA 13 Feb 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantParag Shah
DesignationSite Head
Name of Company (Applicant Name should not be given here)DECCAN FINE CHEMICALS INDIA PVT LTD ANKLESHWAR
AddressPlot No. 3505 to 3515, 6008 to 6010, 6301 to 6313 & 6316/B1, GIDC Industrial estate, P.B. No. 142, Ankleshwar-393002, Gujarat
Print