1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | M/s. Deccan Fine Chemicals (India) Pvt. Ltd. | (b)Name of the Company / Organisation | DECCAN FINE CHEMICALS INDIA PVT LTD ANKLESHWAR | (c)Registered Address | Plot No. 3505 to 3515, 6008 to 6010, 6301 to 6313 & 6316/B1, GIDC Industrial estate, P.B. No. 142, Ankleshwar-393002, Gujarat,,Bharuch,Gujarat-393002 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Parag Shah | (b)Designation (Owner/ Partner/ CEO) | Site Head | (c)Address | Plot No. 3505 to 3515, 6008 to 6010, 6301 to 6313 and 6316/B1, GIDC Industrial estate, P.B. No. 142, Ankleshwar-393002, Gujarat,,Anklesvar,Bharuch,Gujarat-393002 | (d)Pin code | 393002 | (e)E-mail | parag.shah@deccanchemicals.com | (f)STD Code. | 2646(f)Telephone No. | 391000 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(b) Pesticides industry and pesticide specific intermediates (excluding formulations) 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/GJ/IND2/84526/2008 | (d)Master Proposal Number(Single Window) | SW/84523/2018 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Plot no. 3501 -3515, 6301 -6313 & 16 M Road/ B1, a | (b)Pincode | 393002 | (c)Bounded Latitudes (North) | | From | | Degree | 21.624539 | Minutes | | Second | | From | | Degree | 21.624761 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 73.037856 | Minutes | | Second | | From | | Degree | 73.041803 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 5O1,46C14,46O02 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 29 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 8.07 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/749/2008-IA II(I) | (b)Date of Apply of TOR | 26 Aug 2008 | (c)Date of Issue of TOR / Standard ToR | 20 Sep 2008 | (d)Date of Apply of EC | 20 Sep 2008 | (e)Date of Issue of EC | 08 Dec 2008 | (f)Previous TOR Letter | Copy of Previous TOR letter | (g)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | No | (c)Reason | The site is located within notified industrial estate notified before 2006 | (d)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bhopal | (iii)Letter No. | 5-45/2009(ENV)/166 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Apr 11 2018 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Pyridate & Amicarbazone & Flucarbozone & Diuron | 0 | 1500 | 1500 | Tons per Annum(TPA) | | Road | | (2.) | Para Benzoquinone | 0 | 1800 | 1800 | Tons per Annum(TPA) | | Road | | (3.) | Deltamethrin & Flumethrin & Permethrin | 70 | 30 | 100 | Tons per Annum(TPA) | | Road | | (4.) | Propiconazole & Tricyclazole & Fenbuconazole | 00 | 900 | 900 | Tons per Annum(TPA) | | Road | | (5.) | Triazophoses | 2800 | 0 | 2800 | Tons per Annum(TPA) | | Road | | (6.) | Vulcuren & Vulkalent-E | 0 | 1000 | 1000 | Tons per Annum(TPA) | | Road | | (7.) | NN SOD & DS36 NBA & DS 38 NBE | 1100 | 100 | 1200 | Tons per Annum(TPA) | | Road | | (8.) | Aclonifen & Oxadiargyl | 2350 | 1050 | 3400 | Tons per Annum(TPA) | | Road | | (9.) | Methoxy AA & ABA HCl & DAT & Azura 5 | 00 | 2000 | 2000 | Tons per Annum(TPA) | | Road | | (10.) | Dimethy Dithiophosphoric Acid(DMTA) | 255 | 0 | 255 | Tons per Annum(TPA) | | Road | | (11.) | Anilophos | 300 | 0 | 300 | Tons per Annum(TPA) | | Road | | (12.) | Benfuresate & Flupicolide | 555 | 245 | 800 | Tons per Annum(TPA) | | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Solvent Tank Farm | 16 | 20 | 36 | For Agrochemical active ingredients, intermediates and fine chemicals Plant | (2.) | D. G. Set – 250 kVA | 1 | 0 | 1 | For Agrochemical active ingredients, intermediates and fine chemicals Plant | (3.) | Distillation unit (recovery unit) | 10 | 15 | 25 | For Agrochemical active ingredients, intermediates and fine chemicals Plant | (4.) | N. G. Based Captive Co-Gen Plant (1.4 MW) | 1 | 0 | 1 | For Agrochemical active ingredients, intermediates and fine chemicals Plant | (5.) | Filtration unit | 20 | 28 | 48 | For Agrochemical active ingredients, intermediates and fine chemicals Plant | (6.) | Day Vessel & Storage Vessel (1 kl to 50 kl) | 300 | 350 | 650 | For Agrochemical active ingredients, intermediates and fine chemicals Plant | (7.) | DCS room | 5 | 8 | 13 | For Agrochemical active ingredients, intermediates and fine chemicals Plant | (8.) | Panel Room | 8 | 12 | 20 | For Agrochemical active ingredients, intermediates and fine chemicals Plant | (9.) | UPS Room | 5 | 8 | 13 | For Agrochemical active ingredients, intermediates and fine chemicals Plant | (10.) | Cooling tower | 1100 m3/hr | 4550 m3/hr | 5650 m3/hr | For Agrochemical active ingredients, intermediates and fine chemicals Plant | (11.) | Scrubber | 10 | 31 | 41 | For Agrochemical active ingredients, intermediates and fine chemicals Plant | (12.) | Boiler - 8 TPH | 2 | 0 | 2 | For Agrochemical active ingredients, intermediates and fine chemicals Plant | (13.) | Boiler 25 TPH | 0 | 2 | 2 | For Agrochemical active ingredients, intermediates and fine chemicals Plant | (14.) | D. G. Set – 1500 kVA | 0 | 10 | 10 | For Agrochemical active ingredients, intermediates and fine chemicals Plant | (15.) | Incinerator | 1 | 0 | 1 | For Agrochemical active ingredients, intermediates and fine chemicals Plant | (16.) | Reactor | 150 | 180 | 330 | For Agro chemical active ingredients, intermediates and fine chemicals Plant | (17.) | Dryer | 40 | 49 | 89 | For Agrochemical active ingredients, intermediates and fine chemicals Plant | (18.) | Pumps | 420 | 614 | 1034 | For Agrochemical active ingredients, intermediates and fine chemicals Plant | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 17 Oct 2014 | (iv)Valid Upto | 11 Mar 2019 | (v)File No. | AWH-65686 | (vi)Application No. | 79320 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 437.70 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 19.81 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 3.55 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 12.96 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 141207 | (b)Existing quantity of raw material/fuel | 36372 | (c)Total quantity of raw material/fuel | 177579 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Natural Gas | 37295856 | Others | SCM | Gujarat Gas Company Ltd. | Others | Pipelines | 0 | Linkage | | Copy of Linkage | (2.) | diesel | 2340000 | Others | Litre | Local Market | Road | | 20 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 03 Mar 2017 To 04 Jun 2017 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 59 | 33 | 59 | 60 | (2.) | NOx | | Micro Gram per Meter Cube | 44 | 16 | 44 | 80 | (3.) | SO2 | | Micro Gram per Meter Cube | 40 | 13 | 40 | 80 | (4.) | PM10 | | Micro Gram per Meter Cube | 94 | 48 | 94 | 100 | (5.) | Others | CO | Mili Gram per Meter Cube | 0.63 | 0.22 | 0.63 | 200 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Total Hardness | | | mg/l | | 664 | 506 | 200 | 600 | (2.) | Fluoride | | | mg/l | | 0.1 | 0.1 | 1 | 1.5 | (3.) | Heavy Metals | | Nickel | mg/l | | 0.01 | 0.01 | 0.01 | 0.01 | (4.) | TSS | | | NA | | 0 | 0 | 0 | 0 | (5.) | TDS | | | mg/l | | 1281 | 1098 | 500 | 2000 | (6.) | pH | | | NA | | 7.9 | 7.2 | 6.5 | 8.5 | (7.) | Chlorides | | | mg/l | | 537 | 436 | 250 | 1000 | |
14.3. No. of Surface Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.9 | 7.2 | A | (2.) | DO | | mg/l | | 7.4 | 6.1 | A | (3.) | COD | | mg/l | | 44 | 5.2 | E | (4.) | BOD | | mg/l | | 18 | 3 | E | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 67 | 63 | 70 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 70 | 60 | 75 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | Others | NA | 7.7 | 7.3 | (2.) | N(Nitrogen) | Kilogram per hectare | | 216.6 | 140.4 | (3.) | K(Potassium) | Kilogram per hectare | | 390.4 | 264 | (4.) | P(Phosphorus) | Kilogram per hectare | | 5.7 | 2.8 | (5.) | Electric Conductivity | Millisiemens per Centimetre | | 0.27 | 0.15 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 15 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 8 To 10 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | GIDC Water Supply Department | 1650 | 0 | Copy of Permission Letter | Pipeline | | Others | Pipe Water Supply | NA//DEE(W/S)/1233 | 23 Jul 2018 | 1650 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | High TDS stream | 325 | 325 | MEE ETP | Discharge into Seawater Body | | | 325 | (2.) | Process/ washing | 407 | 407 | ETP | Discharge into Seawater Body | | | 407 | (3.) | utility/softner/dm | 160 | 160 | RO/MEE | Reuse within the Plant & Recycling | | 160 | | (4.) | domestic | 130 | 130 | ETP | Discharge into Seawater Body | | | 130 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 1022 | (b)Total Discharged Water (Kilolitre per Day) | 862 | (c)Total Reused Water (Kilolitre per Day) | 160 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Discarded Asbestos | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 25 | Tons | 100 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (2.) | Solid Waste from surface preparation for painting | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 2.5 | Tons | 100 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (3.) | Sulphuric Acid | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 650 | Tons | 100 | Road | | Others | Selling to actual users | (4.) | Spent Carbon | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 2 | Tons | 100 | Road | | Others | Authorized Recycler/ CHWIF | (5.) | Spent Solvents | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 67560 | Tons | 100 | Road | | Others | Reuse within industrial unit in process | (6.) | Contaminated Cotton waste, containers and liners | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 10 | Tons | 100 | Road | | Others | In house CHWIF | (7.) | Brick or refractory | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 40 | Tons | 100 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (8.) | NaSH | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 50 | Tons | 100 | Road | | Others | selling to actual user | (9.) | Date expired products or pesticides | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 23.5 | Tons | 100 | Road | | Others | In house incineration/ CHWIF | (10.) | Used Liners | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 20 | Tons | 100 | Road | | Others | In house inceneration/CHWIF | (11.) | used oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 20 | Tons | 100 | Road | | Authorized Recyclers | | (12.) | Solvent recovery or recovered solvent | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 3500 | Tons | 100 | Road | | Others | In house CHWIF or GPCB approved end user | (13.) | Spent Solvents | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 13947 | Tons | 100 | Road | | Others | authorized recyclers/ CHWIF | (14.) | Distillation Residue | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 2600 | Tons | 100 | Road | | Others | In house CHWIF | (15.) | Inorganic salt from MEE plant | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 11520 | Tons | 100 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (16.) | Inorganic salt from MEE plant | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 11520 | Tons | 100 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (17.) | Oil Filter | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1 | Tons | 100 | Road | | Others | In House CHWIF | (18.) | Waste from Containment or clean up of spills | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1 | Tons | 100 | Road | | Others | In house CHWIF | (19.) | Used PPE | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 10 | Tons | 100 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (20.) | waste Insulation and lining materials | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 60 | Tons | 100 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (21.) | Used Empty packing material | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 200 | Tons | 100 | Road | | Others | Decontamination and dispose by incineration | (22.) | Discarded empty containers | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 4960 | Tons | 100 | Road | | Others | Soled to approved vendors | (23.) | Ash from incineration of hazardous waste | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 100 | Tons | 100 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (24.) | Chemical sludge from wastewater treatment | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1500 | Tons | 100 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 94 | 0.06 | 0.190 | 94.19 | 100 | (2.) | NOx | | Microgram per Meter Cube | 23 | 2.67 | 3.271 | 26.271 | 80 | (3.) | SO2 | | Microgram per Meter Cube | 20 | 2.676 | 3.328 | 23.328 | 80 | (4.) | PM2.5 | | Microgram per Meter Cube | 55 | 0.06 | 0.190 | 55.190 | 60 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | 9 | Natural Gas & HSD | 33 | 0.6 | PM10 | | 0.683 | (2.) | 9 | Natural Gas & HSD | 33 | 0.6 | NOx | | 9.987 | (3.) | 9 | Natural Gas & HSD | 33 | 0.6 | SO2 | | 2.781 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 18000 | (b)Source | DGVCL | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 10 DG sets of 1500 kVA AND 1 OF 250 kVA | (e)Stack Height (in m) | 33 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 7.6691 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 7.6691 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 9377 | (b)Waste/Barren Land (ha.) | 3116 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 1019 | (e)Settlements (ha.) | 2763 | (f)Industrial (ha.) | 1218 | (g)Forest (ha.) | 18 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Others | 13916 | Total (ha.) | 31427 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 2.0974 | | (2.) | Green belt | | 2.7393 | | (3.) | Others | Road, open, parking area | 2.8324 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | NPA | NONE | 0 | The study area does not have any designated forest, national park, wildlife sanctuaries etc. | (2.) | ESAs | NONE | 0 | The study area does not have any designated forest, national park, wildlife sanctuaries etc. | (3.) | ESZs | NONE | 0 | The study area does not have any designated forest, national park, wildlife sanctuaries etc. | (4.) | Corridors | NONE | 0 | The study area does not have any designated forest, national park, wildlife sanctuaries etc. | (5.) | Wildlife Corridors | NONE | 0 | Not any | (6.) | WLS | NONE | 0 | The study area does not have any designated forest, national park, wildlife sanctuaries etc. | (7.) | Critically Polluted Area | NONE | 0 | Not any | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Others | None within study area | None | 0 | No within study area | (2.) | Forest | | None | 0 | No within study area | (3.) | Archaeological Sites | | None | 0 | No within study area | (4.) | Defence Installations | | None | 0 | No within study area | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 7.6691 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Common Indian monitor and Indian Flapshell Turtle | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | NO | (iii)Period of Implementation | As per conservation plan | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Narmada River | (ii)Direction of Water Bodies in Buffer Area | North | (iii)Distance of Water Bodies in Buffer Area | 8.55 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 300 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 312 | (f)Total Manpower | 300 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 2.7393 | 0 | 2.7393 | (2.) | Percentage of Total Project Area | 35 | 0 | 35 | (3.) | Funds Allocated | 1.5 | 1.75 | 3.25 | (4.) | No. of Plants | 1000 | 0 | 1000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Financial | Generation of direct employment opportunities. Additional 300 people will be employed from the proposed expansion project which will result growth in the economic conditions. | (2.) | Social | Development of the social stature & improvement of the quality of life in the surrounding area due to growth in the economic conditions and Rs. 3.55 will be allocated for next 5 years for CER activities. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1518/RA012 | (ii)Name of the EIA Consultant | M/s. Precitech Laboratories Pvt. Ltd. | (iii)Address | C5/27, 1st floor, Bhanujyot complex,GIDC char rasta, Vapi, Gujarat. | (iv)Mobile No. | 9925008673 | (v)Landline No. | 0260242490 | (vi)Email Id | rhb@precitechlab.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 28 Jul 2018 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Please inform/clarify the following:-
- Status of transfer of EC dated 8/12/2008 in the name of M/s Deccan Fine Chemicals (India) Pvt Ltd,
- Product details given at column 9(b) of Form-2 is not consistent with that mentioned in the covering letter.
- EIA consultant not accredited for preparing EIA/EMP reports for the projects covered under category B of item 5(f) 'Synthetic organic chemicals industry'. | 12 Nov 2018 | 2. | NA | The correction have been made as per the instruction received | 15 Nov 2018 | 3. | NA | Please refer our earlier observations vide query dated 12/11/2008. It is to reiterate that the EIA Consultant is not accredited for preparing EIA/EMP reports for the products covered under category B of item 5(f) 'Synthetic organic chemicals industry'. | 24 Nov 2018 | 4. | NA | Please refer our earlier observations vide query dated 12/11/2008. It is to reiterate that the EIA Consultant is not accredited for preparing EIA/EMP reports for the products covered under category B of item 5(f) 'Synthetic organic chemicals industry'. | 24 Nov 2018 | 5. | NA | The correction have been made as per the instruction received | 28 Nov 2018 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | NA | The EAC, after deliberations and in view of the above and the project site in GIDC
Ankleshwar (having CEPI score 80.21) covered under the said orders of NGT, preferred not to
take the proposal forward for the present, but to seek advice of the Ministry for appropriate
course of action in such cases. The Committee also opined that in case, such proposals are to
be considered on merits, environmental conditions and other stringent measures would have to
be looked into comprehensively in complete perspective and in consultation with CPCB. | 20 Aug 2019 | 2. | ADS Reply Letter | NA | 22 Feb 2019 | 3. | NA | NA | 13 Feb 2019 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Parag Shah | Designation | Site Head | Name of Company (Applicant Name should not be given here) | DECCAN FINE CHEMICALS INDIA PVT LTD ANKLESHWAR | Address | Plot No. 3505 to 3515, 6008 to 6010, 6301 to 6313 & 6316/B1, GIDC Industrial estate, P.B. No. 142, Ankleshwar-393002, Gujarat |
|