Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of M/s Maa Chhinnmastika Cement and Ispat Pvt. Ltd. for production of 67,500 TPA Rolled Product by installation of 2x12 Ton Induction Furnace with Billet Caster, Iron Ore Crushing & Benefici
(b)Name of the Company / Organisation MAA CHHINNMASTIKA CEMENT AND ISPAT PRIVATE LIMITED
(c)Registered Address At: Hehal, Post: Barkakana, District: Ramgarh, Jharkhand,,Ramgarh,Jharkhand-829103
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Alok Rungta
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address Near: P.N. Bank, Main Road, Ramgarh Cantt., District: Ramgarh, Jharkhand,,Patratu,Ramgarh,Jharkhand-829122
(d)Pin code 829122
(e)E-mail alok_rungta@hotmail.com
(f)STD Code. 6553(f)Telephone No. 226846
(g)Fax No. 226845
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
Minor Activity
(b)Category A
(c)Proposal Number IA/JH/IND/84413/2004
(d)Master Proposal Number(Single Window) SW/84411/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No. 563, 386, 383, 384, 385, 387, 388 Khata N
(b)Pincode 829103
(c)Bounded Latitudes (North)
From
Degree 23.6158
Minutes
Second
From
Degree 23.6213
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 85.4250
Minutes
Second
From
Degree 85.4313
Minutes
Second
(e)Survey of India Topo Sheet No. 73E/6 & 73E/10
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 260
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1.5
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Jharkhand
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number N-502
(c)Date of Issue of TOR 25 Dec 2004
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 10 Jan 2019
(c)Date of Issue of EC 07 Aug 2019
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :21 Dec 2017
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :30 Jan 2018
Distance of Public Hearing Venue from the Proposed Project :2
Rejkiykrit Utkremit Madhye Vidyalaya
State :Jharkhand
District :Ramgarh
Tehsil :No Data
Village :Hehal
84During Public Hearing, Issues regarding the Air pollution control and employment generation were raised.OthersADM
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By SPCB
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on
(iii)Letter No. JSPCB/HO/RNC/CTO-1146757/2017/1096
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jul 20 2017 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Liquid Steel07350073500Tons per Annum(TPA)OthersIn House Consumption
(2.)Power01515Mega Watt(MW)OthersCaptive Use
(3.)Rolled Product (TMT Bars)06750067500Tons per Annum(TPA)Road
(4.)Iron ore Crushing & Beneficiation Plant0201000201000Tons per Annum(TPA)OthersIn House Consumption
(5.)Billet07200072000Tons per Annum(TPA)Road
(6.)Slag Crushing plant of SMS slag01200012000Tons per Annum(TPA)OthersIn House Consumption
(7.)Sponge Iron90000090000Tons per Annum(TPA)OthersIn House Consumption
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Sponge Iron Plant3x100 TPD DRI Kiln03x100 TPD DRI Kiln
(2.)Iron ore Crushing and Beneficiation plant-80-100 TPH Single stream80-100 TPH Single stream
(3.)SMS - Induction Furnace02x12 T2x12 T
(4.)SMS - Billet Caster-2 strand (6x11 m)2 strand (6x11 m)
(5.)Captive Power Plant-WHRB – 3x2 MW, AFBC-1x9 MWWHRB – 3x2 MW, AFBC-1x9 MW
(6.)Slag Crushing plant-5 TPH Single Stream5 TPH Single Stream
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 06 Jun 2018
(iv)Valid Upto 31 Dec 2022
(v)File No. JSPCB/HO/RNC/CTO-2204067/2018/958
(vi)Application No. 958
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 155.5
(b) Funds Allocated for Environment Management (Capital) (in Crores) 8.20
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.42
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.984
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 317300
(b)Existing quantity of raw material/fuel 260200
(c)Total quantity of raw material/fuel 577500
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Dolomite2300Tons per AnnumDaltonganj, Jharkhand. Katni, M.P.Road400 LinkageCopy of Linkage
(2.)Coal45000Tons per AnnumCCLRoad150 LinkageCopy of Linkage
(3.)Iron ore201000Tons per AnnumWest Singhbhum, Jharkhand & Barbil, OdishaRoad300 LinkageCopy of Linkage
(4.)Non coking coal for COP144000Tons per AnnumCCLRoad150 LinkageCopy of Linkage
(5.)Sponge Iron73500Tons per AnnumIn houseConveyor Belt0 OthersIn HouseCopy of Linkage
(6.)Pig Iron, Purchased & Return Steel Scrap14200Tons per AnnumTata, Bokaro & other places of JharkhandRoad200 LinkageCopy of Linkage
(7.)Char22000Tons per AnnumInhouseConveyor Belt0 OthersIn HouseCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2016 To 31 Dec 2016
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube96.4045.294.70100
(2.)PM2.5Micro Gram per Meter Cube57.727.657.2560
(3.)NOxMicro Gram per Meter Cube27.922.127.8080
(4.)OthersCOMili Gram per Meter Cube2.130.372.114
(5.)SO2Micro Gram per Meter Cube16.17.716.0580
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.047.276.58.5
(2.)TSSmg/l0000
(3.)Chloridesmg/l139.364.22501000
(4.)TDSmg/l6293575002000
(5.)Fluoridemg/l1.320.8811.5
(6.)Heavy MetalsZincmg/l2.150.90515
(7.)Total Hardnessmg/l328.7187200600
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l50.1048.73C
(2.)BODmg/l13.0911.60C
(3.)pHNA7.807.78C
(4.)DOmg/l5.95.5C
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))55.3652.1875
(2.)Leq(Night)A-weighted decibels(dB(A))44.8440.1670
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare260.5198.7
(2.)P(Phosphorus)Kilogram per hectare20.410.9
(3.)Electric ConductivityMillisiemens per Centimetre0.3330.276
(4.)pHOthersNA7.086.19
(5.)K(Potassium)Kilogram per hectare170.0398.05
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 11.19 To 2.25
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.6 To 5.9
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface23352Copy of Permission LetterPipelineOthersPipeline2812 Apr 20172335
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Zero liquid Discharge00NAOthersReused00
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 0
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)CharOthersChar22000Tons0OthersIn House ConsumptionOthersReused
(2.)Coal FinesOthersCoal Fines4000Tons0OthersIn House ConsumptionOthersReused
(3.)SlagOthersSlag13200Tons0OthersIn House ConsumptionOthersReused
(4.)ScaleOthersMill Scale500Tons30RoadOthersSold to Sinter plants
(5.)DustOthersBag Filter dust2730Tons30RoadOthersSold to Sinter plants
(6.)Bottom AshBottom Ash5100Tons30RoadOthersRoad Making
(7.)Bottom AshBottom Ash5100Tons30RoadOthersRoad Making
(8.)Fly AshFly Ash41400Tons40RoadOthersBlock/Brick Manufacturers
(9.)Iron Ore FinesOthersDust5000Tons30RoadOthersSold To Sinter Plants
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube90.700.56.7897.48100
(2.)PM2.5Microgram per Meter Cube54.700.52.0656.7660
(3.)SO2Microgram per Meter Cube140.522.9632.4680
(4.)NOxMicrogram per Meter Cube27.400.52.9956.1980
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Stock House-300.6PM100.119
(2.)Product House 1-300.75PM100.170
(3.)AFBC Boiler-701.25PM100.630
(4.)Material Handling Area-400.75PM100.174
(5.)Crusher (Ore Crushing)-300.5PM100.083
(6.)Crusher (Slag Crushing)-300.5PM100.083
(7.)Material Handling area-400.75PM100.174
(8.)Material Handling area-400.75PM100.174
(9.)Cooler Discharge 2-300.6PM100.162
(10.)Cooler Discharge 1-300.53PM100.127
(11.)Material Handling Area-400.75PM100.174
(12.)Intermediate bin-300.7PM100.162
(13.)Product House 2-300.75PM100.170
(14.)2x12T Induction Furnace-400.55PM100.560
(15.)DRI Kiln #1 with WHRB-651.6PM101.579
(16.)DRI Kiln #2 & #3 with WHRB-651.8PM101.999
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 15000
(b)Source DVC/Captive Power Plant
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1×1010 KVA, 1×500 KVA & 1×320 KVA
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 12.42
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 12.42
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 12093
(b)Waste/Barren Land (ha.) 1881.9
(c)Grazing/ Community Land (ha.) 3133.1
(d)Surface Water Bodies (ha.) 284.8
(e)Settlements (ha.) 1809
(f)Industrial (ha.) 0
(g)Forest (ha.) 12422.5
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : River Bed 0
    Total (ha.) 31624.3
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant6.34
(2.)Tailing Pond0.28
(3.)Green belt4.36
(4.)OthersVacant and Parking Area1.44
Total (ha.) 12.42
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNo WLS0No WLS within 10 km radius of Project site
(2.)ESAsNo ESAs0No ESAs within 10 km radius of Project site
(3.)CorridorsNo Corridors0No Corridors within 10 km radius of Project site
(4.)Wildlife CorridorsNo Wildlife Corridor0No Wildlife corridors within 10 km radius of Project site
(5.)ESZsNo ESZs0No ESZs within 10 km radius of Project site
(6.)Critically Polluted AreaNo CPA0No Critically Polluted area within 10 km radius of Project site
(7.)NPANo NPA0No NPA within 10 km radius of Project site
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNo Archaeological sites0No Archaeological sites within 10 km radius of Project site
(2.)Defence InstallationsNo Defence Installation0No Defence Installation within 10 km radius of Project site
(3.)OthersReligious PlaceMaa Chinnamastika Temple29East direction from project site
(4.)ForestBundu PF4.5North Direction from the project site
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 12.42
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Not Applicable
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Damodar River
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 2
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 80
(b)Permanent Employment-During Operation 396
(c)Temporary Employment- During Construction 20
(d)Temporary Employment- During Operation 0
(e)No. of working days 300
(f)Total Manpower 496
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt04.364.36
(2.)Percentage of Total Project Area03333
(3.)No. of Plants060006000
(4.)Funds Allocated030000003000000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialThe region shall also be benefited from the project as there will be direct and indirect employment of people in the steel plant. Preference will be given to the people of the state possessing requisite skill and qualification criteria. Also there will be lot of scope for indirect employment of the people of the state in and around the project site.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. QCI/NABET/ENV/ACO/17/ 0279
(ii)Name of the EIA Consultant Vardan Environet
(iii)Address D-142, Ground Floor, Sushant Lok-III, Golf Course Ext. Road, Sector-57, Gurugram, Haryana- 122002
(iv)Mobile No. 9953147268
(v)Landline No. 0124429103
(vi)Email Id vardanenviro165@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 09 Nov 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAYou are requested to submit details of ToR in the Form-2 and certificate of compliance of earlier EC from the regional office of MOEFCC 14 Nov 2018
2.NAThe correction have been made as per the instruction received 10 Jan 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterReply of ADS generated on 27/02/2019. 18 Apr 2019
2.NAADS 27 Feb 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAlok Rungta
DesignationDirector
Name of Company (Applicant Name should not be given here)MAA CHHINNMASTIKA CEMENT AND ISPAT PRIVATE LIMITED
AddressAt: Hehal, Post: Barkakana, District: Ramgarh, Jharkhand