Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed 225 KLPD molasses based distillery along with 12 MW co-generation power plant at village Ajbapur, Tehsil Mohammadi, District Lakhimpur Kheri, Uttar Pradesh by DSCL Sugar - Ajbapur, Distillery
(b)Name of the Company / Organisation DCM SHRIRAM LIMITED
(c)Registered Address 5th Floor, Kanchenjunga Building, 18, Barakhamba Road, New Delhi,,New Delhi,Delhi-110001
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Rajeev Krishna Bharati
(b)Designation (Owner/ Partner/ CEO) Addl General Manager
(c)Address 5th Floor, Kanchenjunga Building, 18 Barakhamba Road, New Delhi,,Connaught Place,New Delhi,Delhi-110001
(d)Pin code 110001
(e)E-mail rkbharati@dcmshriram.com
(f)STD Code. 0(f)Telephone No. 42100211
(g)Fax No. 23318072
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(g) Distilleries
Minor Activity
(b)Category A
(c)Proposal Number IA/UP/IND2/84145/2018
(d)Master Proposal Number(Single Window) SW/84139/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 547, 549, 550, 671, 672, 673, 680, 681, 682, 685 a
(b)Pincode 261505
(c)Bounded Latitudes (North)
From
Degree 27.77638889
Minutes
Second
From
Degree 27.7811111
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 80.200277
Minutes
Second
From
Degree 80.204444
Minutes
Second
(e)Survey of India Topo Sheet No. 63A/1, 63A/2, 63A/5 & 63A/6
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 155
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 6
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Uttar Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Uttar PradeshLakhimpur KheriMohammadiKoira, Kashira and Kathamala RF
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/137/2018-IA II (I)
(b)Date of Apply of TOR 12 Apr 2018
(c)Date of Issue of TOR / Standard ToR 18 May 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :31 Aug 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :04 Oct 2018
Distance of Public Hearing Venue from the Proposed Project :0
Project Site
State :Uttar Pradesh
District :Lakhimpur Kheri
Tehsil :Mohammadi
Village :Ajbapur
151Employment, CSR, Water and air pollution, payment of sugar caneDistrict Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Co-generation Power Plant12MW
(2.)Molasses based Distillery225KLPD
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Power12Mega Watt(MW)OthersThrough Cables
(2.)Ethanol/ENA/RS/ Impure Alcohol (Technical Alcohol)225Kilo Litre per DayRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 250
(b) Funds Allocated for Environment Management (Capital) (in Crores) 75
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 3.75
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 6
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 405150
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 405150
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Molasses as raw material for distillery405150Tons per AnnumFrom own and nearby sugar millsRoad,OthersPipelines200 OthersNearby Sugar MillsCopy of Linkage
(2.)Bagasse as fuel for co generation power plant124100Tons per AnnumOwn and nearby sugar millsRoad,Conveyor Belt100 OthersOwn and nearby Sugar millsCopy of Linkage
(3.)Conc Spent wash as fuel for co generation power plant306600Tons per AnnumOwn PlantPipe Conveyor0 OthersIn-house generationCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube44.724.243.0260
(2.)NOxMicro Gram per Meter Cube24.610.024.0680
(3.)SO2Micro Gram per Meter Cube16.45.816.1980
(4.)PM10Micro Gram per Meter Cube86.853.086.17100
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.707.356.58.5
(2.)TDSmg/l5942945002000
(3.)Total Hardnessmg/l278.1133.9200600
(4.)Chloridesmg/l146.2751.872501000
(5.)Fluoridemg/l0.920.691.01.5
(6.)TSSmg/l0000
    14.3.     No. of Surface Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l5.305.30E
(2.)CODmg/l18.6418.64E
(3.)DOmg/l6.106.10B
(4.)pHNA7.927.92A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))44.142.245
(2.)Leq(Day)A-weighted decibels(dB(A))54.752.855
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare244.02123.65
(2.)pHOthersNA8.177.16
(3.)K(Potassium)Kilogram per hectare138.4253.25
(4.)P(Phosphorus)Kilogram per hectare16.549.87
(5.)Electric ConductivityMillisiemens per Centimetre0.340.14
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 3 To 8
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 5
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater22050Copy of Permission LetterPipelineTube Well21-4/6440/UP/IND/2018 dated 25.10.201825 Oct 20182205
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial29233200Biological treatment with RO system in Condensate polishing unitReuse within the Plant & Recycling2923
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 2923
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 2923
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)AshFly Ash43800Tons100RoadOthersUsed in soil amelioration
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube82.410.11882.518100
(2.)PM2.5Microgram per Meter Cube37.40037.460
(3.)SO2Microgram per Meter Cube11.911.0212.9280
(4.)NOxMicrogram per Meter Cube20.610.7921.3980
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)90 TPH BoilerCon. spent wash and Bagasse / Rice husk /Coal842.6PM1050
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 144000
(b)Source Own 12 MW co-generation power plant
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 2x1500 KVA
(e)Stack Height (in m) 12
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 10.52
    Total Land (ha.) 10.52
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 10.52
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Under possession of the company 0
    Total (ha.) 10.52
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant10.52Main Plant, Storage, Greenbelt
Total (ha.) 10.52
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsNot Applicable0No ESAs within 10 km radius
(2.)ESZsNot Applicable0No ESZs within 10 km radius
(3.)Wildlife CorridorsNot Applicable0No Wildlife Corridors within 10 km radius
(4.)Critically Polluted AreaNot Applicable0No CPA within 10 km radius
(5.)NPANot Applicable0No NPA within 10 km radius
(6.)WLSNot Applicable0No WLS within 10 km radius
(7.)CorridorsNot Applicable0No Corridors within 10 km radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestBari Reserved Forest8.5SW
(2.)Defence InstallationsNot Applicable0No Defence installation within 10 km radius
(3.)Archaeological SitesNot Applicable0No Archaeological sites within 10 km radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 10.52
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Already Acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Gomati River
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 6.0
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 50
(c)Temporary Employment- During Construction 2000
(d)Temporary Employment- During Operation 50
(e)No. of working days 365
(f)Total Manpower 2100
32.
Green Belt in Ha:
(a)Total Area of Green Belt 3.47
(b)Percentage of Total Project Area 32.98
(c)No. of Plants to be Planted 5300
(d)Funds Allocated for Plantation 2500000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalProject will contribute in Ethanol Blending Program (EBP) driven by Govt. of India
(2.)SocialEmployment generation
(3.)FinancialImproved Livelihood with increased business opportunities
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA 0069
(ii)Name of the EIA Consultant JM EnviroNet Pvt. Ltd.
(iii)Address 202 A, ABW Tower, MG Road, Gurgaon Haryana
(iv)Mobile No. 9910494521
(v)Landline No. 9015209362
(vi)Email Id jmenviron@hotmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 18 May 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRajeev Krishna Bharati
DesignationAddl General Manager
Name of Company (Applicant Name should not be given here)DCM SHRIRAM LIMITED
Address5th Floor, Kanchenjunga Building, 18, Barakhamba Road, New Delhi