1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Development of Commercial Airport at Mundra, Kutch District, Gujarat by MIs Mundra International Airport Pvt. Ltd
(b)Name of the Company / Organisation MUNDRA INTERNATIONAL AIRPORT PVT LTD
(c)Registered Address M/s Mundra International Airport Pvt. Ltd., Adani House, Near Mithakhali Six Roads, Navrangpura, Ahmedabad, Gujarat,,,Ahmedabad,Gujarat-380009
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Unmesh Abhayankar
(b)Designation (Owner/ Partner/ CEO) Joint president
(c)Address M/s Mundra International Airport Pvt. Ltd., Adani house, Near Mithakhali Six Road. Ahmedabad, Gujarat,,Ahmedabad City,Ahmedabad,Gujarat-380009
(d)Pin code 380009
(e)E-mail mundraairport@gmail.com
(f)STD Code. 79(f)Telephone No. 25557362
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(a) Air ports
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/MIS/84054/2016
(d)Master Proposal Number(Single Window) SW/82614/2018
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot Number Baroi 244, 207, 238, Goarsama 52, 53,
(b)Pincode 370421
(c)Bounded Latitudes (North)
From
Degree 224919.5
Minutes
Second
From
Degree 225115.6
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 694440.7
Minutes
Second
From
Degree 694731.2
Minutes
Second
(e)Survey of India Topo Sheet No. 41F/5, 41F/9,41F/10
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 9
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 2.2
(j)Seismic Zone 5
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number F.No.10-22/2016-IA.111
(c)Date of Apply of TOR 27 Feb 2016
(d)Date of Issue of TOR / Standard ToR 18 Sep 2017
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :22 Jun 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :24 Jul 2018
Distance of Public Hearing Venue from the Proposed Project :0
Goyarsama – Baroi
State :Gujarat
District :kutch
Tehsil :Mundra
Village :Goyarsama – Baroi
258Management of Water Bodies: There are some water bodies (nalas) flowing through the project site. The apprehension was that after construction of the airport, these nalas will be blocked leadingDistrict Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Airportairport
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Airport1OthersairportRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 1400.00
(b) Funds Allocated for Environment Management (Capital) (in Crores) 30.96
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 3.51
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.848
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)0000Tons per Annumnot applicableRoad00 OthersothersCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2016 To 31 May 2016
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube91.279.990.8100
(2.)SO2Micro Gram per Meter Cube16.913.516.880
(3.)NOxMicro Gram per Meter Cube24.220.324.080
(4.)PM2.5Micro Gram per Meter Cube36.531.136.060
(5.)OthersCOMili Gram per Meter Cube1.311.051.274
    14.2.     No. of Ground Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHOthersothers7.87.56.58.5
(2.)Chloridesmg/l4523322501000
(3.)TDSmg/l8616845002000
(4.)Fluoridemg/l0.380.361.01.5
(5.)Total Hardnessmg/l49.234.4300600
(6.)TSSOthersnot detectable0000
(7.)Heavy Metalszincmg/l2.411.45515
    14.3.     No. of Surface Water monitoring locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA00E
(2.)DOOthersNA00E
(3.)BODNA00E
(4.)CODNA00E
    14.4.     No. of Ambient Noise monitoring locations : 7
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))37.834.855
(2.)Leq(Day)A-weighted decibels(dB(A))56.850.865
    14.5.     No. of Soil Sample Monitored locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)OthersKg/h as P7148
(2.)P(Phosphorus)Otherskg/ha as P3218.5
(3.)Electric ConductivityOthersµmhos /cm2932653
(4.)pHOthersNA87.40
(5.)K(Potassium)Otherskg/ha as K48.2031.0
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersAPSEZ12040Copy of Permission LetterPipelineOthersSea/othersAPSEZ/MIAPL/2911201829 Nov 2018120
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)sewage3650To be decided at detailed engineering stageGreen Belt Renewal Plantreused for landscaping and flushing360
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 36
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 36
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)MSWMunicipal Solid Waste182.5Tons0RoadOthersBio gas and organic converter
(2.)street sweepingOthersstreet sweeping91.25Tons0Otherswill be managed at siteOtherscomposting
(3.)Horticulture wasteOthersHorticulture waste21.9Tons0OthersWill be managed at siteOtherscomposting
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5NA0000100
(2.)SO2Microgram per Meter Cube10.3011.521.880
(3.)PM10NA0000100
(4.)NOxMicrogram per Meter Cube14.60152166.680
(5.)Others(Specify)CONA1020042514454
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)0000OthersNA0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 10000
(b)Source MPSEZ Utilities Pvt. Ltd.
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 3 x 500 KVA DG Sets
(e)Stack Height (in m) 20
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 185
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 337
    Total Land (ha.) 522
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 177
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Abandoned Salt Pan, Existing Air Strip , open scru 345
    Total (ha.) 522
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt179.8
(2.)Built Up Area142.0
(3.)OthersFuel dump, Road, taxiway and Runway strip200.2
Total (ha.) 522
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsNA0NA
(2.)Critically Polluted Area000000
(3.)WLS000000
(4.)NPANA0NA
(5.)CorridorsNA0NA
(6.)Wildlife CorridorsNA0NA
(7.)ESZsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestLuni RF0project site
(2.)Defence InstallationsNA0Not applicable
(3.)Archaeological SitesNA0Not applicable
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? Yes
(a)Forests Clearance Status In-Principle(Stage-I) Approval Obtained
(i)MoEFCC file number FP/GJ/IND/17613/2004
(ii)Date of In-Principle (Stage-I) approval 16 Nov 2018
(iii)Area diverted 1576.81
(iv)Uploaded FC Letter Copy of FC Letter
(b)Legal Status of Forest Land Reserved
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 579497
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 170
(b)Land yet to be acquired(Ha) 167
(c)Status of Land acquisition if not acquired 167Ha abandoned salt works
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Indian peafowl
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 3 lakhs per year
(iii)Period of Implementation During operation phase
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Gulf of Kutch
(ii)Direction of Water Bodies in Buffer Area South East
(iii)Distance of Water Bodies in Buffer Area 1.2
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 825
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 7500
(e)No. of working days 365
(f)Total Manpower 8325
32.
Green Belt in Ha:
(a)Total Area of Green Belt 179
(b)Percentage of Total Project Area 34.29
(c)No. of Plants to be Planted 295350
(d)Funds Allocated for Plantation 20000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialThe construction phase of the project generates employment over a period of 24 months. In the post construction phase, the project will provide social benefits in terms of direct / indirect employment by way of better commercial development of the area due to increase in number of tourists. Due to this project, the 4local population will get the employment based on their skills. The facility is expected to generate direct employment opportunities for 825 persons and indirect employment for 7,500
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 0
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 0
(d)Total plot area (sqm) 0
(e)Total built up area (sqm) 0
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 5
(b)Capacity 285
(c)No. of Recharge Pits 0
(d)Capacity 0
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking Parking for 150 cars, 5 buses, 20 VIP cars will be
5.
Energy Saving Measures:
(a)Source/Mode 0
(b)Percentage 0
(c)Quantity 0
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area The waste generation from the labour camps may fin
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0058
(ii)Name of the EIA Consultant Greencindia Consulting Private Limited
(iii)Address 609-611, Level-5, Shopprix Mall, Vaishal
(iv)Mobile No. 9891906015
(v)Landline No. 0120411152
(vi)Email Id information@greencindia.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 27 Oct 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NACopy of EIA/EMP Report is not uploaded on the portal. Public hearing documents is also not legible. Kindly submit copy of EIA/EMP Report and clear copy of public hearing documents. 23 Jan 2019
2.NAThe correction have been made as per the instruction received 23 Jan 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterQuery raised vide 38th EAC Infra meeting, is responded. Kindly consider for Environment Clearance 26 Apr 2019
2.NAKindly see the Final Minutes of 38th EAC Infra-2 meeting held on 6-8 Feb. 2019 15 Feb 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantUnmesh Abhayankar
DesignationJoint president
Name of Company (Applicant Name should not be given here)MUNDRA INTERNATIONAL AIRPORT PVT LTD
AddressM/s Mundra International Airport Pvt. Ltd., Adani House, Near Mithakhali Six Roads, Navrangpura, Ahmedabad, Gujarat,
Print