Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of M/s Sri Venkatesh Iron & Alloys (India) Limited for production of 72,000 TPA Billet by installation of 2 x12 Ton Induction Furnaces with Billet Caster along with Captive Power Plant of ca
(b)Name of the Company / Organisation SRI VENKATESH IRON AND ALLOYS (INDIA)LIMITED
(c)Registered Address Village :Lapanga, P.O - Bhadaninagar,District-Rangarh,Jharkhand,,Ramgarh,Jharkhand-571511
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Ankit kedia
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address South City Garden ,Tower-6,Flat No.4A,Tollygunge Fari,Mahavirtolla,Kolkata ,W.B,,Kolkata,Kolkata,West Bengal-700053
(d)Pin code 700053
(e)E-mail venkateshiron2017@gmail.com
(f)STD Code. 124(f)Telephone No. 4291036
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
Minor Activity
(b)Category A
(c)Proposal Number IA/JH/IND/83979/2004
(d)Master Proposal Number(Single Window) SW/83971/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No.- 888, 895, Khata No.- 34, 47
(b)Pincode 829105
(c)Bounded Latitudes (North)
From
Degree 23.6402
Minutes
Second
From
Degree 23.6425
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 85.3958
Minutes
Second
From
Degree 85.3988
Minutes
Second
(e)Survey of India Topo Sheet No. 73E/6
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 338
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.9
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Jharkhand
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)JharkhandRamgarhNo DataKoira, Kashira and Kathamala RF
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/417/2007-IA II (I)
(c)Date of Issue of TOR 22 Apr 2004
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 24 Jan 2019
(c)Date of Issue of EC 24 Jan 2020
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :03 May 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :09 Jun 2018
Distance of Public Hearing Venue from the Proposed Project :4
Middle school of Bhadaninagar
State :Jharkhand
District :Ramgarh
Tehsil :No Data
Village :Lapanga
219During Public Hearing, Issues regarding the Air pollution control and employment generation were raised.OthersADM
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Ranchi
(iii)Letter No. 662
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jun 9 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Billet Caster07200072000Tons per Annum(TPA)RoadIn House Consumption
(2.)Sponge Iron Plant1200000120000Tons per Annum(TPA)Road,OthersIn House Consumption
(3.)Captive Power Plant01616Mega Watt(MW)OthersCaptive Use
(4.)Induction Furnace07350073500Tons per Annum(TPA)OthersIn House Consumption
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Captive Power Plant0WHRB – 4x9 TPH, AFBC-1x50 TPHWHRB – 4x9 TPH, AFBC-1x50 TPH
(2.)Sponge Iron Plant4x100 TPD DRI Kiln04x100 TPD DRI Kiln
(3.)SMS - Billet Caster02 strand (6X11 m)2 strand (6X11 m)
(4.)SMS - Induction Furnace02x12 T2x12 T
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 16 Oct 2017
(iv)Valid Upto 30 Sep 2018
(v)File No. 1409
(vi)Application No. JSPCB/HO/RNC/CTO-1548081/2017/1409
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 86.67
(b) Funds Allocated for Environment Management (Capital) (in Crores) 5.935
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.87
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.61
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 351600
(b)Existing quantity of raw material/fuel 61500
(c)Total quantity of raw material/fuel 413100
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Iron ore192000Tons per AnnumOdishaRoad300 LinkageCopy of Linkage
(2.)Pig Iron16500Tons per AnnumLocal MarketsRoad40 LinkageCopy of Linkage
(3.)Coal45000Tons per AnnumCCLRoad40 LinkageCopy of Linkage
(4.)Non coking coal for COP156000Tons per AnnumCCLRoad40 LinkageCopy of Linkage
(5.)Dolomite3600Tons per AnnumUTTAR PRADESHRoad400 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2017 To 31 Dec 2017
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 08
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube87.65285.95100
(2.)NOxMicro Gram per Meter Cube11.34.611.180
(3.)SO2Micro Gram per Meter Cube26.910.226.380
(4.)PM2.5Micro Gram per Meter Cube48.722.143.4560
(5.)OthersCOMili Gram per Meter Cube0.930.320.924
    14.2.     No. of Ground Water monitoring locations : 08
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l0000
(2.)Total Hardnessmg/l332.2198.2200600
(3.)Chloridesmg/l14375.52501000
(4.)Fluoridemg/l1.430.821.01.5
(5.)Heavy Metalsznmg/l2.380.96515
(6.)pHNA8.087.466.58.5
(7.)TDSmg/l6384105002000
    14.3.     No. of Surface Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l7.605.30C
(2.)CODmg/l81.1410.63C
(3.)BODmg/l21.5715.20C
(4.)pHNA8.107.75C
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))64.6351.3575
(2.)Leq(Night)A-weighted decibels(dB(A))54.2741.4570
    14.5.     No. of Soil Sample Monitored locations : 7
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNA7.036.52
(2.)N(Nitrogen)Kilogram per hectare310.46210.18
(3.)Electric ConductivityMillisiemens per Centimetre0.4010.295
(4.)P(Phosphorus)Kilogram per hectare22.5111.65
(5.)K(Potassium)Kilogram per hectare174.42118.20
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 11.19 To 2.25
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.6 To 5.9
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface16552Copy of Permission LetterPipelineOthersPIPELINE37804 Oct 20181655
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)NA000OthersNA00
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 0
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)IRON ORE FINES AND DUSTOthersDUST5000Tons30RoadOthersSOLD TO SINTER PLANT
(2.)COAL FINESOthersCOAL FINES4000Tons0OthersINHOUSEOthersREUSED
(3.)DUSTOthersBAG FILTER DUST2730Tons30RoadOthersSOLD TO SINTER PLANT
(4.)FLY ASHFly Ash41400Tons40RoadOthersBLOCK BRICK MANUFACTURING
(5.)CHAROthersCHAR30000Tons0OthersINHOUSEOthersREUSED
(6.)SLAGOthersSLAG13200Tons0OthersINHOUSEOthersROAD MAKING AND CONSTRUCTION
(7.)BOTTOM ASHBottom Ash5100Tons30RoadOthersROAD MAKING
(8.)SCALEOthersMILL SCALE500Tons30RoadOthersSOLD TO SINTER PLANT
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube46.106.30.8246.9260
(2.)SO2Microgram per Meter Cube25.406.310.9636.3680
(3.)NOxMicrogram per Meter Cube10.406.30.6511.0580
(4.)PM10Microgram per Meter Cube87.606.31.0288.62100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)COAL CRUSHING AND SCREENING-450.5PM100.136
(2.)STOCK HOUSE-400.6PM100.119
(3.)INTERMEDIATE BIN-600.6PM100.112
(4.)COOLER DISCHARGE 2-700.75PM100.283
(5.)DRI KILN 1 AND 2 WITH WHRBCOAL421.8PM100.793
(6.)CPP AFBC BOILERCOAL CHAR701.8PM100.494
(7.)STEEL MELT SHOP-301.2PM100.448
(8.)COOLER DISCHARGE 1-700.75PM100.283
(9.)CPP MATERIAL HANDLING SECTION-300.8PM100.212
(10.)PRODUCT HOUSE-550.6PM100.110
(11.)DRI KILN 3 AND 4 WITH WHRBCOAL421.8PM100.793
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 15800
(b)Source JSEB/CPP
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 2x500 and 1x250 KVA
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 5.82
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 5.82
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 9979
(b)Waste/Barren Land (ha.) 11325
(c)Grazing/ Community Land (ha.) 1054
(d)Surface Water Bodies (ha.) 467
(e)Settlements (ha.) 2148
(f)Industrial (ha.) 131
(g)Forest (ha.) 6865
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : River Bed area 548
    Total (ha.) 32517
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant2.55Area After Expansion
(2.)OthersAdministrative Office and other buildings0.06
(3.)Area for Solid Waste Management0.77
(4.)Green belt1.93
(5.)Built Up Area0.51
Total (ha.) 5.82
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANo NPA0No NPA within 10 km radius of Project site
(2.)ESZsNo ESZ0No ESZs within 10 km radius of Project site
(3.)CorridorsNo Corridors0No Migratory Corridors within 10 km radius of Project site
(4.)WLSNo WLS0No WLS within 10 km radius of Project site
(5.)Wildlife CorridorsNo Wildlife Corridors0No Wildlife corridors within 10 km radius of Project site
(6.)Critically Polluted AreaNo Critically Polluted Area0No Critically Polluted area within 10 km radius of Project site
(7.)ESAsNo ESA0No ESAs within 10 km radius of Project site
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNo Archaeological Sites0No Archaeological sites within 10 km radius of Project site
(2.)OthersReligious PlaceTuti Jarna Mandir11.2NE from site
(3.)Defence InstallationsNo Defence Installation0No Defence Installation within 10 km radius of Project site
(4.)ForestArmadag3SE from Project Site
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 5.82
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Damodar River
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 1.15
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 60
(b)Permanent Employment-During Operation 250
(c)Temporary Employment- During Construction 20
(d)Temporary Employment- During Operation 100
(e)No. of working days 300
(f)Total Manpower 430
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt01.931.93
(2.)Percentage of Total Project Area03333
(3.)No. of Plants045004500
(4.)Funds Allocated013500001350000
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. QCI/NABET/ENV/ACO/17/ 0279
(ii)Name of the EIA Consultant Vardan Environet
(iii)Address D-142, Ground Floor, Sushant Lok-III, Golf Course Ext. Road, Sector-57, Gurugram, Haryana- 122002
(iv)Mobile No. 9953147268
(v)Landline No. 0124429103
(vi)Email Id vardanenviro165@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 09 Nov 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease mention ToR details in the Form-2 14 Nov 2018
2.NAThe correction have been made as per the instruction received 13 Dec 2018
3.NAMay kindly refer to the Form-2. The following are observed. 1. The details against the ToR and MOEFCC file number given as Nil. 2. As per the specific ToR, the certificate of compliance of CTO from the regional officer needs to be submitted. Whereas, you have submitted your report to the regional officer aganiest the ToR. 3. Corporate Environment Policy is not as per the ToR 9(i), 9(ii), 9(iii) and 9(iv) In light of the above, you are requested to re-submit the application ensuring the compliance to all the ToR points 23 Dec 2018
4.NAThe correction have been made as per the instruction received 24 Jan 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAnkit kedia
DesignationDirector
Name of Company (Applicant Name should not be given here)SRI VENKATESH IRON AND ALLOYS (INDIA)LIMITED
AddressVillage :Lapanga, P.O - Bhadaninagar,District-Rangarh,Jharkhand