|
1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Expansion of M/s Sri Venkatesh Iron & Alloys (India) Limited for production of 72,000 TPA Billet by installation of 2 x12 Ton Induction Furnaces with Billet Caster along with Captive Power Plant of ca | (b)Name of the Company / Organisation | SRI VENKATESH IRON AND ALLOYS (INDIA)LIMITED | (c)Registered Address | Village :Lapanga, P.O - Bhadaninagar,District-Rangarh,Jharkhand,,Ramgarh,Jharkhand-571511 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Ankit kedia | (b)Designation (Owner/ Partner/ CEO) | Director | (c)Address | South City Garden ,Tower-6,Flat No.4A,Tollygunge Fari,Mahavirtolla,Kolkata ,W.B,,Kolkata,Kolkata,West Bengal-700053 | (d)Pin code | 700053 | (e)E-mail | venkateshiron2017@gmail.com | (f)STD Code. | 124(f)Telephone No. | 4291036 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 3(a) Metallurgical industries (ferrous & non ferrous)
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/JH/IND/83979/2004 | (d)Master Proposal Number(Single Window) | SW/83971/2018 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 1 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Plot No.- 888, 895, Khata No.- 34, 47 | (b)Pincode | 829105 | (c)Bounded Latitudes (North) | | From | | Degree | 23.6402 | Minutes | | Second | | From | | Degree | 23.6425 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 85.3958 | Minutes | | Second | | From | | Degree | 85.3988 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 73E/6 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 338 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0.9 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Jharkhand | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Jharkhand | Ramgarh | No Data | Koira, Kashira and Kathamala RF | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/417/2007-IA II (I) | (c)Date of Issue of TOR | 22 Apr 2004 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 24 Jan 2019 | (c)Date of Issue of EC | 24 Jan 2020 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 09 Jun 2018 | Distance of Public Hearing Venue from the Proposed Project : | 4 |
| Middle school of Bhadaninagar | State : | Jharkhand | District : | Ramgarh | Tehsil : | No Data | Village : | Lapanga |
| 219 | During Public Hearing, Issues regarding the Air pollution control and employment generation were raised. | Others | ADM | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Ranchi | (iii)Letter No. | 662 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Jun 9 2018 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Billet Caster | 0 | 72000 | 72000 | Tons per Annum(TPA) | | Road | In House Consumption | (2.) | Sponge Iron Plant | 120000 | 0 | 120000 | Tons per Annum(TPA) | | Road,Others | In House Consumption | (3.) | Captive Power Plant | 0 | 16 | 16 | Mega Watt(MW) | | Others | Captive Use | (4.) | Induction Furnace | 0 | 73500 | 73500 | Tons per Annum(TPA) | | Others | In House Consumption | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Captive Power Plant | 0 | WHRB – 4x9 TPH, AFBC-1x50 TPH | WHRB – 4x9 TPH, AFBC-1x50 TPH | | (2.) | Sponge Iron Plant | 4x100 TPD DRI Kiln | 0 | 4x100 TPD DRI Kiln | | (3.) | SMS - Billet Caster | 0 | 2 strand (6X11 m) | 2 strand (6X11 m) | | (4.) | SMS - Induction Furnace | 0 | 2x12 T | 2x12 T | | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 16 Oct 2017 | (iv)Valid Upto | 30 Sep 2018 | (v)File No. | 1409 | (vi)Application No. | JSPCB/HO/RNC/CTO-1548081/2017/1409 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 86.67 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 5.935 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.87 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.61 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 351600 | (b)Existing quantity of raw material/fuel | 61500 | (c)Total quantity of raw material/fuel | 413100 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Iron ore | 192000 | Tons per Annum | | Odisha | Road | | 300 | Linkage | | Copy of Linkage | (2.) | Pig Iron | 16500 | Tons per Annum | | Local Markets | Road | | 40 | Linkage | | Copy of Linkage | (3.) | Coal | 45000 | Tons per Annum | | CCL | Road | | 40 | Linkage | | Copy of Linkage | (4.) | Non coking coal for COP | 156000 | Tons per Annum | | CCL | Road | | 40 | Linkage | | Copy of Linkage | (5.) | Dolomite | 3600 | Tons per Annum | | UTTAR PRADESH | Road | | 400 | Linkage | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Oct 2017 To 31 Dec 2017 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 08 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 87.6 | 52 | 85.95 | 100 | (2.) | NOx | | Micro Gram per Meter Cube | 11.3 | 4.6 | 11.1 | 80 | (3.) | SO2 | | Micro Gram per Meter Cube | 26.9 | 10.2 | 26.3 | 80 | (4.) | PM2.5 | | Micro Gram per Meter Cube | 48.7 | 22.1 | 43.45 | 60 | (5.) | Others | CO | Mili Gram per Meter Cube | 0.93 | 0.32 | 0.92 | 4 | |
14.2. No. of Ground Water monitoring locations : 08 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (2.) | Total Hardness | | | mg/l | | 332.2 | 198.2 | 200 | 600 | (3.) | Chlorides | | | mg/l | | 143 | 75.5 | 250 | 1000 | (4.) | Fluoride | | | mg/l | | 1.43 | 0.82 | 1.0 | 1.5 | (5.) | Heavy Metals | | zn | mg/l | | 2.38 | 0.96 | 5 | 15 | (6.) | pH | | | NA | | 8.08 | 7.46 | 6.5 | 8.5 | (7.) | TDS | | | mg/l | | 638 | 410 | 500 | 2000 | |
14.3. No. of Surface Water monitoring locations : 5 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | DO | | mg/l | | 7.60 | 5.30 | C | (2.) | COD | | mg/l | | 81.14 | 10.63 | C | (3.) | BOD | | mg/l | | 21.57 | 15.20 | C | (4.) | pH | | NA | | 8.10 | 7.75 | C | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 64.63 | 51.35 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 54.27 | 41.45 | 70 | |
14.5. No. of Soil Sample Monitored locations : 7 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | Others | NA | 7.03 | 6.52 | (2.) | N(Nitrogen) | Kilogram per hectare | | 310.46 | 210.18 | (3.) | Electric Conductivity | Millisiemens per Centimetre | | 0.401 | 0.295 | (4.) | P(Phosphorus) | Kilogram per hectare | | 22.51 | 11.65 | (5.) | K(Potassium) | Kilogram per hectare | | 174.42 | 118.20 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 11.19 To 2.25 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.6 To 5.9 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 1655 | 2 | Copy of Permission Letter | Pipeline | | Others | PIPELINE | 378 | 04 Oct 2018 | 1655 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | NA | 0 | 0 | 0 | Others | NA | 0 | 0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 0 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 0 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | IRON ORE FINES AND DUST | Others | DUST | 5000 | Tons | 30 | Road | | Others | SOLD TO SINTER PLANT | (2.) | COAL FINES | Others | COAL FINES | 4000 | Tons | 0 | Others | INHOUSE | Others | REUSED | (3.) | DUST | Others | BAG FILTER DUST | 2730 | Tons | 30 | Road | | Others | SOLD TO SINTER PLANT | (4.) | FLY ASH | Fly Ash | | 41400 | Tons | 40 | Road | | Others | BLOCK BRICK MANUFACTURING | (5.) | CHAR | Others | CHAR | 30000 | Tons | 0 | Others | INHOUSE | Others | REUSED | (6.) | SLAG | Others | SLAG | 13200 | Tons | 0 | Others | INHOUSE | Others | ROAD MAKING AND CONSTRUCTION | (7.) | BOTTOM ASH | Bottom Ash | | 5100 | Tons | 30 | Road | | Others | ROAD MAKING | (8.) | SCALE | Others | MILL SCALE | 500 | Tons | 30 | Road | | Others | SOLD TO SINTER PLANT | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 46.10 | 6.3 | 0.82 | 46.92 | 60 | (2.) | SO2 | | Microgram per Meter Cube | 25.40 | 6.3 | 10.96 | 36.36 | 80 | (3.) | NOx | | Microgram per Meter Cube | 10.40 | 6.3 | 0.65 | 11.05 | 80 | (4.) | PM10 | | Microgram per Meter Cube | 87.60 | 6.3 | 1.02 | 88.62 | 100 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | COAL CRUSHING AND SCREENING | - | 45 | 0.5 | PM10 | | 0.136 | (2.) | STOCK HOUSE | - | 40 | 0.6 | PM10 | | 0.119 | (3.) | INTERMEDIATE BIN | - | 60 | 0.6 | PM10 | | 0.112 | (4.) | COOLER DISCHARGE 2 | - | 70 | 0.75 | PM10 | | 0.283 | (5.) | DRI KILN 1 AND 2 WITH WHRB | COAL | 42 | 1.8 | PM10 | | 0.793 | (6.) | CPP AFBC BOILER | COAL CHAR | 70 | 1.8 | PM10 | | 0.494 | (7.) | STEEL MELT SHOP | - | 30 | 1.2 | PM10 | | 0.448 | (8.) | COOLER DISCHARGE 1 | - | 70 | 0.75 | PM10 | | 0.283 | (9.) | CPP MATERIAL HANDLING SECTION | - | 30 | 0.8 | PM10 | | 0.212 | (10.) | PRODUCT HOUSE | - | 55 | 0.6 | PM10 | | 0.110 | (11.) | DRI KILN 3 AND 4 WITH WHRB | COAL | 42 | 1.8 | PM10 | | 0.793 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 15800 | (b)Source | JSEB/CPP | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 2x500 and 1x250 KVA | (e)Stack Height (in m) | 30 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 5.82 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 5.82 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 9979 | (b)Waste/Barren Land (ha.) | 11325 | (c)Grazing/ Community Land (ha.) | 1054 | (d)Surface Water Bodies (ha.) | 467 | (e)Settlements (ha.) | 2148 | (f)Industrial (ha.) | 131 | (g)Forest (ha.) | 6865 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : River Bed area | 548 | Total (ha.) | 32517 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 2.55 | Area After Expansion | (2.) | Others | Administrative Office and other buildings | 0.06 | | (3.) | Area for Solid Waste Management | | 0.77 | | (4.) | Green belt | | 1.93 | | (5.) | Built Up Area | | 0.51 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | NPA | No NPA | 0 | No NPA within 10 km radius of Project site | (2.) | ESZs | No ESZ | 0 | No ESZs within 10 km radius of Project site | (3.) | Corridors | No Corridors | 0 | No Migratory Corridors within 10 km radius of Project site | (4.) | WLS | No WLS | 0 | No WLS within 10 km radius of Project site | (5.) | Wildlife Corridors | No Wildlife Corridors | 0 | No Wildlife corridors within 10 km radius of Project site | (6.) | Critically Polluted Area | No Critically Polluted Area | 0 | No Critically Polluted area within 10 km radius of Project site | (7.) | ESAs | No ESA | 0 | No ESAs within 10 km radius of Project site | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | No Archaeological Sites | 0 | No Archaeological sites within 10 km radius of Project site | (2.) | Others | Religious Place | Tuti Jarna Mandir | 11.2 | NE from site | (3.) | Defence Installations | | No Defence Installation | 0 | No Defence Installation within 10 km radius of Project site | (4.) | Forest | | Armadag | 3 | SE from Project Site | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 5.82 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Damodar River | (ii)Direction of Water Bodies in Buffer Area | North | (iii)Distance of Water Bodies in Buffer Area | 1.15 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 60 | (b)Permanent Employment-During Operation | 250 | (c)Temporary Employment- During Construction | 20 | (d)Temporary Employment- During Operation | 100 | (e)No. of working days | 300 | (f)Total Manpower | 430 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 0 | 1.93 | 1.93 | (2.) | Percentage of Total Project Area | 0 | 33 | 33 | (3.) | No. of Plants | 0 | 4500 | 4500 | (4.) | Funds Allocated | 0 | 1350000 | 1350000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
NIL | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 1 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | QCI/NABET/ENV/ACO/17/ 0279 | (ii)Name of the EIA Consultant | Vardan Environet | (iii)Address | D-142, Ground Floor, Sushant Lok-III, Golf Course Ext. Road, Sector-57, Gurugram, Haryana- 122002 | (iv)Mobile No. | 9953147268 | (v)Landline No. | 0124429103 | (vi)Email Id | vardanenviro165@gmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 1 | (ix)Validity of Accreditation | 09 Nov 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Please mention ToR details in the Form-2 | 14 Nov 2018 | 2. | NA | The correction have been made as per the instruction received | 13 Dec 2018 | 3. | NA | May kindly refer to the Form-2. The following are observed.
1. The details against the ToR and MOEFCC file number given as Nil.
2. As per the specific ToR, the certificate of compliance of CTO from the regional officer needs to be submitted. Whereas, you have submitted your report to the regional officer aganiest the ToR.
3. Corporate Environment Policy is not as per the ToR 9(i), 9(ii), 9(iii) and 9(iv)
In light of the above, you are requested to re-submit the application ensuring the compliance to all the ToR points | 23 Dec 2018 | 4. | NA | The correction have been made as per the instruction received | 24 Jan 2019 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Ankit kedia | Designation | Director | Name of Company (Applicant Name should not be given here) | SRI VENKATESH IRON AND ALLOYS (INDIA)LIMITED | Address | Village :Lapanga, P.O - Bhadaninagar,District-Rangarh,Jharkhand |
|