Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Onshore Oil and Gas Production from Existing 300,000 barrels of oil per day (BOPD) to 400,000 BOPD and 165 Million Standard Feet per Day (MMSCFD) to 750 MMSCFD from RJ-ON-90/1 Block, Barm
(b)Name of the Company / Organisation M/s Vedanta Limited(Division Cairn Oil & Gas)
(c)Registered Address Cairn Oil & Gas, Vedanta Limited, DLF Atria, DLF Phase-2, DLF City, Gurgaon, Haryana - 122002,Cairn Oil & Gas, Vedanta Limited, DLF Atria, DLF Phase-2, DLF City, Gurgaon, Haryana - 122002,Gurgaon,Haryana-122002
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Dilip Kumar Bera
(b)Designation (Owner/ Partner/ CEO) Sr. Manager - Environment
(c)Address Cairn Oil & Gas, Vedanta Limited, DLF Atria, DLF Phase-2, DLF City, Gurgaon, Haryana - 122002,Cairn Oil & Gas, Vedanta Limited, DLF Atria, DLF Phase-2, DLF City, Gurgaon, Haryana - 122002,,Gurgaon,Haryana-122002
(d)Pin code 122002
(e)E-mail dilipkumar.bera@cairnindia.com
(f)STD Code. 124(f)Telephone No. 4594176
(g)Fax No. 4145612
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(b) Offshore and onshore oil and gas exploration, development & production
Minor Activity1(b) Offshore and onshore oil and gas exploration, development & production
(b)Category A
(c)Proposal Number IA/GJ/IND2/83890/2018
(d)Master Proposal Number(Single Window) SW/83886/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Baitu, Gudamalani, Shio, Barmer, Barmer district,
(b)Pincode 344001
(c)Bounded Latitudes (North)
From
Degree 25.996947
Minutes
Second
From
Degree 26.137733
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 24.969392
Minutes
Second
From
Degree 24.986983
Minutes
Second
(e)Survey of India Topo Sheet No. G42R5 to G42R16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 155
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 4
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 2
(c)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)OrissaSundargarhKoidaKoira, Kashira and Kathamala RF
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/13/2018-IA-II(I)
(c)Date of Issue of TOR 11 Feb 2018
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 26 Nov 2018
(c)Date of Issue of EC 11 Apr 2019
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :29 Aug 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :28 Sep 2018
Distance of Public Hearing Venue from the Proposed Project :8
Sar Ka Par school, Kawas
State :Rajasthan
District :Barmer
Tehsil :Barmer
Village :Kawas
289Employment, tree cuttings, CSR activitiesDistrict Collector
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Lucknow
(iii)Letter No. File No.: IV /ENV /R/PL-6/621/2008/259
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jul 21 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Crude oil & Gas in BOPD and MMSCFD165585750OthersMMSCFDOthersunderground pipeline
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Hydro carbon processing3 Lakh BOPD and 165 MMSCFD1 Lakh BOPD and 585 MMSCFD4 Lakh BOPD and 750 MMSCFDOil and gas terminal augmentation with in RJ-ON-90/1 Block
(2.)Hydro carbon processing3 Lakh BOPD and 165 MMSCFD1 Lakh BOPD and 585 MMSCFD4 Lakh BOPD and 750 MMSCFDOil and gas terminal augmentation with in RJ-ON-90/1 Block
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 24 Nov 2016
(iv)Valid Upto 31 Mar 2021
(v)File No. F(HDF)/Barmer(Barmer)/7(1)/2016-2017/8442-8443
(vi)Application No. 2016-2017/HDF/2473
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 12000
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1200
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 15
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 10
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 585
(b)Existing quantity of raw material/fuel 165
(c)Total quantity of raw material/fuel 750
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)NG165OthersMMSCFDsubsurface reservoirOthersUnderground Pipeline20 OthersProduction Sharing ContractCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 11 Nov 2017 To 30 Mar 2018
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 25
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube65.224.264.3560
(2.)NOxMicro Gram per Meter Cube30.46.128.9580
(3.)SO2Micro Gram per Meter Cube16.20.011680
(4.)PM10Micro Gram per Meter Cube112.249.5104.75100
    14.2.     No. of Ground Water monitoring locations : 17
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.317.146.58.5
(2.)TSSmg/l227.41100100
(3.)TDSmg/l2485512045002000
(4.)Fluoridemg/l2.60.161.01.5
(5.)Total Hardnessmg/l396658200600
(6.)Heavy MetalsIronmg/l0.310.0040.30.3
(7.)Chloridesmg/l13281.85362501000
    14.3.     No. of Surface Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.357.16E
(2.)DOmg/l6.94.2E
(3.)CODmg/l32.622.8E
(4.)OthersSuspended Solidsmg/l1225.2E
(5.)BODmg/l8.65E
    14.4.     No. of Ambient Noise monitoring locations : 25
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))66.0439.975
(2.)Leq(Night)A-weighted decibels(dB(A))64.236.6470
    14.5.     No. of Soil Sample Monitored locations : 20
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNA8.247.48
(2.)K(Potassium)Milligram per Kilogram1301.79
(3.)Electric ConductivityOthersmicrosiemens per cm896.065.0
(4.)P(Phosphorus)Milligram per Kilogram9.30.1
(5.)N(Nitrogen)Milligram per Kilogram18.81.2
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 20 To 80
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 15 To 80
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater9350015Copy of Permission LetterPipelineTube WellNo.21-4(22)/WR /CGWA /2005-194020 Nov 201753500
15.1.
(a)Whether Desalination is proposed Yes
(b)Desalination Capacity (KLD) 4500
(c)Quantity of Brine (KLD) 1350
(d)Mode of Disposal of Brine Deep dump well disposal of depth 2500 m bgl
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)saline ground water and produced water blend7500080000Nano and RO plantOthersDeep dump well > 2500 m bgl6500010000
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 75000
(b)Total Discharged Water (Kilolitre per Day) 10000
(c)Total Reused Water (Kilolitre per Day) 65000
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)used oil or spent oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)3600Kilolitre3RoadAuthorized Recyclers
(2.)Food wasteMunicipal Solid Waste150Tons3RoadOthersComposting
(3.)Plastic wastePlastic Waste5Tons3RoadAuthorized Recyclers
(4.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)400Tons3RoadOtherscaptive TSDF
(5.)Contaminated cotton ragsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)600Tons3RoadCo-Processing
(6.)Empty barrelsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1200Tons3RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube105.6.280.39105.99100
(2.)NOxMicrogram per Meter Cube26.10.2812.8338.9380
(3.)Others(Specify)COMicrogram per Meter Cube0.561.3619.2519.812000
(4.)PM2.5Microgram per Meter Cube105.6.280.39108.99100
(5.)SO2Microgram per Meter Cube14.7.281.5516.2580
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)FlareGas301.85PM105.30 gram / sec
(2.)FlareGas301.85OthersCO33.12 gram / sec
(3.)FlareGas301.85NOx69.7 gram / sec
(4.)FlareGas301.85SO221.45 gram / sec
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 200000
(b)Source captive power
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 15000
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 150
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 150
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 92320.2
(b)Waste/Barren Land (ha.) 146238.7
(c)Grazing/ Community Land (ha.) 611.3
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 3061
(f)Industrial (ha.) 4133.7
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : sand dune and river sane 227252
    Total (ha.) 473616.9
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant120Well pad and terminals
(2.)Township30Living quarters and township
Total (ha.) 150
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPADesert National Park, Jaisalmer35Nearest distance from the Block Boundary
(2.)Wildlife CorridorsMount Abu sanctuary285Nearest distance from the Block Boundary
(3.)WLSDesert National Park, Jaisalmer35Nearest distance from the Block Boundary
(4.)CorridorsMount Abu sanctuary285Nearest distance from the Block Boundary
(5.)ESZsMount Abu sanctuary285Nearest distance from the Block Boundary
(6.)Critically Polluted AreaJodhpur155Nearest distance from the Block Boundary
(7.)ESAsMount Abu285Nearest distance from the Block Boundary
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsUttralai Indian air force station20With in the Block area
(2.)ForestDrava35Nearest distance from the Block Boundary
(3.)Archaeological SitesAkal wood fossil park< Jaisalmer200Nearest distance from the Block Boundary
23.3.
(a)Whether Noc / Permission from the competent authority is required? Yes
(i)Uploaded Noc / Permission from the competent authority Copy of Noc / Permission from the competent authority
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 3607
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 150
(c)Status of Land acquisition if not acquired Yet to be aquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Bengal monitor lizard and Desert monitor lizard
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Luni non perennial river
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 3
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 50
(b)Permanent Employment-During Operation 50
(c)Temporary Employment- During Construction 1000
(d)Temporary Employment- During Operation 900
(e)No. of working days 2000
(f)Total Manpower 2000
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt7525100
(2.)Percentage of Total Project Area32133
(3.)No. of Plants56113500061113
(4.)Funds Allocated314
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialProject will help the Indian Government in addressing its energy security needs.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA 0055
(ii)Name of the EIA Consultant ERM India Private Limited
(iii)Address Building 10, Tower - A, 4th Floor, DLF Cyber City, Gurgaon
(iv)Mobile No. 8238088022
(v)Landline No. 0124417030
(vi)Email Id sankalp.anad@erm.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 31 Oct 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease inform/clarify the following:- - As per the CTO dated 24/11/2016, gas production capacity is 65 MMSCFD. Whereas, the instant EC proposal is for increase in production from 165 to 750 MMSCFD. - Copy of the existing EC for the present operations, and the compliance status thereof. No document/file found against item 9(b). - Baseline air quality in terms of PM10 & PM2.5 already exceeding the prescribed standards, which are bound to increase further with the proposed expansion. 13 Nov 2018
2.NAThe correction have been made as per the instruction received 14 Nov 2018
3.NA- Please submit copy of the EC dated 11/8/2014. Whether the said EC finds mention of the two terminals namely, Raageshwari Gas Terminal and Mangala Processing Terminal, for which separate ECs have been obtained. - Justification for having two CTOs against one EC. - As per the CTOs, oil production capacity is 306600 bopd, which is not consistent with that mentioned at S. No.9(b) of Form-2. In fact, similar discrepancy still persists in respect of production of natural gas also. 25 Nov 2018
4.NAThe correction have been made as per the instruction received 26 Nov 2018
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantDilip Kumar Bera
DesignationSr. Manager - Environment
Name of Company (Applicant Name should not be given here)M/s Vedanta Limited(Division Cairn Oil & Gas)
Address4th Floor, Vipul Plaza, Suncity Sector 54, Gurgaon, Haryana - 122002
Print