1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Expansion of Onshore Oil and Gas Production from Existing 300,000 barrels of oil per day (BOPD) to 400,000 BOPD and 165 Million Standard Feet per Day (MMSCFD) to 750 MMSCFD from RJ-ON-90/1 Block, Barm | (b)Name of the Company / Organisation | M/s Vedanta Limited(Division Cairn Oil & Gas) | (c)Registered Address | Cairn Oil & Gas, Vedanta Limited, DLF Atria, DLF Phase-2, DLF City, Gurgaon, Haryana - 122002,Cairn Oil & Gas, Vedanta Limited, DLF Atria, DLF Phase-2, DLF City, Gurgaon, Haryana - 122002,Gurgaon,Haryana-122002 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Dilip Kumar Bera | (b)Designation (Owner/ Partner/ CEO) | Sr. Manager - Environment | (c)Address | Cairn Oil & Gas, Vedanta Limited, DLF Atria, DLF Phase-2, DLF City, Gurgaon, Haryana - 122002,Cairn Oil & Gas, Vedanta Limited, DLF Atria, DLF Phase-2, DLF City, Gurgaon, Haryana - 122002,,Gurgaon,Haryana-122002 | (d)Pin code | 122002 | (e)E-mail | dilipkumar.bera@cairnindia.com | (f)STD Code. | 124(f)Telephone No. | 4594176 | (g)Fax No. | 4145612 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(b) Offshore and onshore oil and gas exploration, development & production
| Minor Activity | 1(b) Offshore and onshore oil and gas exploration, development & production
| (b)Category | A | (c)Proposal Number | IA/GJ/IND2/83890/2018 | (d)Master Proposal Number(Single Window) | SW/83886/2018 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Baitu, Gudamalani, Shio, Barmer, Barmer district, | (b)Pincode | 344001 | (c)Bounded Latitudes (North) | | From | | Degree | 25.996947 | Minutes | | Second | | From | | Degree | 26.137733 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 24.969392 | Minutes | | Second | | From | | Degree | 24.986983 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | G42R5 to G42R16 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 155 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 4 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 2 | (c)Main State of the project | Gujarat | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Orissa | Sundargarh | Koida | Koira, Kashira and Kathamala RF | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/13/2018-IA-II(I) | (c)Date of Issue of TOR | 11 Feb 2018 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 26 Nov 2018 | (c)Date of Issue of EC | 11 Apr 2019 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 28 Sep 2018 | Distance of Public Hearing Venue from the Proposed Project : | 8 |
| Sar Ka Par school, Kawas | State : | Rajasthan | District : | Barmer | Tehsil : | Barmer | Village : | Kawas |
| 289 | Employment, tree cuttings, CSR activities | District Collector | | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Lucknow | (iii)Letter No. | File No.: IV /ENV /R/PL-6/621/2008/259 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Jul 21 2018 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Crude oil & Gas in BOPD and MMSCFD | 165 | 585 | 750 | Others | MMSCFD | Others | underground pipeline | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Hydro carbon processing | 3 Lakh BOPD and 165 MMSCFD | 1 Lakh BOPD and 585 MMSCFD | 4 Lakh BOPD and 750 MMSCFD | Oil and gas terminal augmentation with in RJ-ON-90/1 Block | (2.) | Hydro carbon processing | 3 Lakh BOPD and 165 MMSCFD | 1 Lakh BOPD and 585 MMSCFD | 4 Lakh BOPD and 750 MMSCFD | Oil and gas terminal augmentation with in RJ-ON-90/1 Block | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 24 Nov 2016 | (iv)Valid Upto | 31 Mar 2021 | (v)File No. | F(HDF)/Barmer(Barmer)/7(1)/2016-2017/8442-8443 | (vi)Application No. | 2016-2017/HDF/2473 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 12000 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 1200 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 15 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 10 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 585 | (b)Existing quantity of raw material/fuel | 165 | (c)Total quantity of raw material/fuel | 750 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | NG | 165 | Others | MMSCFD | subsurface reservoir | Others | Underground Pipeline | 20 | Others | Production Sharing Contract | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 11 Nov 2017 To 30 Mar 2018 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 25 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 65.2 | 24.2 | 64.35 | 60 | (2.) | NOx | | Micro Gram per Meter Cube | 30.4 | 6.1 | 28.95 | 80 | (3.) | SO2 | | Micro Gram per Meter Cube | 16.2 | 0.01 | 16 | 80 | (4.) | PM10 | | Micro Gram per Meter Cube | 112.2 | 49.5 | 104.75 | 100 | |
14.2. No. of Ground Water monitoring locations : 17 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 8.31 | 7.14 | 6.5 | 8.5 | (2.) | TSS | | | mg/l | | 227.4 | 1 | 100 | 100 | (3.) | TDS | | | mg/l | | 24855 | 1204 | 500 | 2000 | (4.) | Fluoride | | | mg/l | | 2.6 | 0.16 | 1.0 | 1.5 | (5.) | Total Hardness | | | mg/l | | 3966 | 58 | 200 | 600 | (6.) | Heavy Metals | | Iron | mg/l | | 0.31 | 0.004 | 0.3 | 0.3 | (7.) | Chlorides | | | mg/l | | 13281.8 | 536 | 250 | 1000 | |
14.3. No. of Surface Water monitoring locations : 5 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 8.35 | 7.16 | E | (2.) | DO | | mg/l | | 6.9 | 4.2 | E | (3.) | COD | | mg/l | | 32.6 | 22.8 | E | (4.) | Others | Suspended Solids | mg/l | | 122 | 5.2 | E | (5.) | BOD | | mg/l | | 8.6 | 5 | E | |
14.4. No. of Ambient Noise monitoring locations : 25 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 66.04 | 39.9 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 64.2 | 36.64 | 70 | |
14.5. No. of Soil Sample Monitored locations : 20 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | Others | NA | 8.24 | 7.48 | (2.) | K(Potassium) | Milligram per Kilogram | | 1301.7 | 9 | (3.) | Electric Conductivity | Others | microsiemens per cm | 896.0 | 65.0 | (4.) | P(Phosphorus) | Milligram per Kilogram | | 9.3 | 0.1 | (5.) | N(Nitrogen) | Milligram per Kilogram | | 18.8 | 1.2 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 20 To 80 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 15 To 80 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 93500 | 15 | Copy of Permission Letter | Pipeline | | Tube Well | | No.21-4(22)/WR /CGWA /2005-1940 | 20 Nov 2017 | 53500 | |
|
15.1. | (a)Whether Desalination is proposed | Yes | (b)Desalination Capacity (KLD) | 4500 | (c)Quantity of Brine (KLD) | 1350 | (d)Mode of Disposal of Brine | Deep dump well disposal of depth 2500 m bgl | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | saline ground water and produced water blend | 75000 | 80000 | Nano and RO plant | Others | Deep dump well > 2500 m bgl | 65000 | 10000 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 75000 | (b)Total Discharged Water (Kilolitre per Day) | 10000 | (c)Total Reused Water (Kilolitre per Day) | 65000 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | used oil or spent oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 3600 | Kilolitre | 3 | Road | | Authorized Recyclers | | (2.) | Food waste | Municipal Solid Waste | | 150 | Tons | 3 | Road | | Others | Composting | (3.) | Plastic waste | Plastic Waste | | 5 | Tons | 3 | Road | | Authorized Recyclers | | (4.) | ETP Sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 400 | Tons | 3 | Road | | Others | captive TSDF | (5.) | Contaminated cotton rags | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 600 | Tons | 3 | Road | | Co-Processing | | (6.) | Empty barrels | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1200 | Tons | 3 | Road | | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 105.6 | .28 | 0.39 | 105.99 | 100 | (2.) | NOx | | Microgram per Meter Cube | 26.10 | .28 | 12.83 | 38.93 | 80 | (3.) | Others(Specify) | CO | Microgram per Meter Cube | 0.56 | 1.36 | 19.25 | 19.81 | 2000 | (4.) | PM2.5 | | Microgram per Meter Cube | 105.6 | .28 | 0.39 | 108.99 | 100 | (5.) | SO2 | | Microgram per Meter Cube | 14.7 | .28 | 1.55 | 16.25 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Flare | Gas | 30 | 1.85 | PM10 | | 5.30 gram / sec | (2.) | Flare | Gas | 30 | 1.85 | Others | CO | 33.12 gram / sec | (3.) | Flare | Gas | 30 | 1.85 | NOx | | 69.7 gram / sec | (4.) | Flare | Gas | 30 | 1.85 | SO2 | | 21.45 gram / sec | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 200000 | (b)Source | captive power | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 15000 | (e)Stack Height (in m) | 30 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 150 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 150 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 92320.2 | (b)Waste/Barren Land (ha.) | 146238.7 | (c)Grazing/ Community Land (ha.) | 611.3 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 3061 | (f)Industrial (ha.) | 4133.7 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : sand dune and river sane | 227252 | Total (ha.) | 473616.9 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 120 | Well pad and terminals | (2.) | Township | | 30 | Living quarters and township | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | NPA | Desert National Park, Jaisalmer | 35 | Nearest distance from the Block Boundary | (2.) | Wildlife Corridors | Mount Abu sanctuary | 285 | Nearest distance from the Block Boundary | (3.) | WLS | Desert National Park, Jaisalmer | 35 | Nearest distance from the Block Boundary | (4.) | Corridors | Mount Abu sanctuary | 285 | Nearest distance from the Block Boundary | (5.) | ESZs | Mount Abu sanctuary | 285 | Nearest distance from the Block Boundary | (6.) | Critically Polluted Area | Jodhpur | 155 | Nearest distance from the Block Boundary | (7.) | ESAs | Mount Abu | 285 | Nearest distance from the Block Boundary | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Defence Installations | | Uttralai Indian air force station | 20 | With in the Block area | (2.) | Forest | | Drava | 35 | Nearest distance from the Block Boundary | (3.) | Archaeological Sites | | Akal wood fossil park< Jaisalmer | 200 | Nearest distance from the Block Boundary | |
|
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 3607 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 150 | (c)Status of Land acquisition if not acquired | Yet to be aquired | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | In-Progress | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Bengal monitor lizard and Desert monitor lizard | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Luni non perennial river | (ii)Direction of Water Bodies in Buffer Area | South | (iii)Distance of Water Bodies in Buffer Area | 3 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 50 | (b)Permanent Employment-During Operation | 50 | (c)Temporary Employment- During Construction | 1000 | (d)Temporary Employment- During Operation | 900 | (e)No. of working days | 2000 | (f)Total Manpower | 2000 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 75 | 25 | 100 | (2.) | Percentage of Total Project Area | 32 | 1 | 33 | (3.) | No. of Plants | 56113 | 5000 | 61113 | (4.) | Funds Allocated | 3 | 1 | 4 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Financial | Project will help the Indian Government in addressing its energy security needs. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA 0055 | (ii)Name of the EIA Consultant | ERM India Private Limited | (iii)Address | Building 10, Tower - A, 4th Floor, DLF Cyber City, Gurgaon | (iv)Mobile No. | 8238088022 | (v)Landline No. | 0124417030 | (vi)Email Id | sankalp.anad@erm.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 31 Oct 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Please inform/clarify the following:-
- As per the CTO dated 24/11/2016, gas production capacity is 65 MMSCFD. Whereas, the instant EC proposal is for increase in production from 165 to 750 MMSCFD.
- Copy of the existing EC for the present operations, and the compliance status thereof. No document/file found against item 9(b).
- Baseline air quality in terms of PM10 & PM2.5 already exceeding the prescribed standards, which are bound to increase further with the proposed expansion. | 13 Nov 2018 | 2. | NA | The correction have been made as per the instruction received | 14 Nov 2018 | 3. | NA | - Please submit copy of the EC dated 11/8/2014. Whether the said EC finds mention of the two terminals namely, Raageshwari Gas Terminal and Mangala Processing Terminal, for which separate ECs have been obtained.
- Justification for having two CTOs against one EC.
- As per the CTOs, oil production capacity is 306600 bopd, which is not consistent with that mentioned at S. No.9(b) of Form-2. In fact, similar discrepancy still persists in respect of production of natural gas also. | 25 Nov 2018 | 4. | NA | The correction have been made as per the instruction received | 26 Nov 2018 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Dilip Kumar Bera | Designation | Sr. Manager - Environment | Name of Company (Applicant Name should not be given here) | M/s Vedanta Limited(Division Cairn Oil & Gas) | Address | 4th Floor, Vipul Plaza, Suncity
Sector 54, Gurgaon, Haryana - 122002 |
|