Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Narayanposhi Iron & Manganese Ore Mines of M/s. Aryan Mining & Trading Corporation Pvt. Ltd.
(b)Name of the Company / Organisation ARYAN MINING AND TRADING CORPORATION PVT LTD
(c)Registered Address Village- Koira,Tehesil - Bonai,Sundargarh,Orissa-770048
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Naman Saraf
(b)Designation (Owner/ Partner/ CEO) Executive Director
(c)Address Aryan house, 8th floor,,P1- Hide lane, Kolkata,Kolkata,Kolkata,West Bengal-700073
(d)Pin code 700073
(e)E-mail satish.mohanty@aryanmining.in
(f)STD Code. 33(f)Telephone No. 22364601
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity2(b) Mineral beneficiation
(b)Category A
(c)Proposal Number IA/OR/MIN/8345/2008
(d)Master Proposal Number(Single Window) SW/83577/2018
(e)EAC concerned (for category A Projects only) Non-Coal Mining
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 1,150,152,153,139,44,35,64,53,25,57,66,21,24,etc.
(b)Pincode 770048
(c)Bounded Latitudes (North)
From
Degree 2424227.94
Minutes
Second
From
Degree 2427196.23
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 316977.65
Minutes
Second
From
Degree 319121.89
Minutes
Second
(e)Survey of India Topo Sheet No. 73 G/1 and 73 G/5
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 640
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.005
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Orissa
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11015/288/2008-IA.II(M)
(c)Date of Issue of TOR 22 Dec 2008
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 12 Jul 2010
(c)Date of Issue of EC 21 Feb 2011
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :13 Sep 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :15 Oct 2018
Distance of Public Hearing Venue from the Proposed Project :0.1
Playground of Kashira Village
State :Orissa
District :Sundargarh
Tehsil :Koida
Village :Kashira
800Env. protection, Jobs,Water supply,Education,etc.OthersAdditional District Magistrate, Sundargarh
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhubaneswar
(iii)Letter No. 101-729/EPE/3317
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Aug 9 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Iron300000030000006000000Tons per Annum(TPA)Road
(2.)Manganese36000036000Tons per Annum(TPA)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Mobile Screening336Total 6 numbers of 200,150,100TPH
(2.)Excavator5384.3 m3 and 0.9m3
(3.)Tipper54910 t
(4.)Dozer213300 HP
(5.)Water Tanker41510kL
(6.)Standby mobile screen1344 mobile screen: 2x150,1x100,1x200TPH
(7.)JCB101
(8.)Revolving screen10110TPH revolving screen existing for manganese ore
(9.)Pay loader3142.5m3
(10.)Dumper991840 t
(11.)Crusher235Total 5 crusher: 2 mobile(150,100TPH) 1 fixed (350TPH), 2 Standby(150,100TPH)
(12.)DTH drills224100mm dia
(13.)Beneficiation Plant020000002000000Proposed Beneficiation Plant of 2MTPA capacity
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception Copy of Consent to Operate
(iii)Date of Issue 17 Mar 2016
(iv)Valid Upto 31 Mar 2020
(v)File No. 4646/IND-I-CON-2258
(vi)Application No. 402416
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 85
(b) Funds Allocated for Environment Management (Capital) (in Crores) 3.44
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 7.5593
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 2.0912
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0.6
(b)Existing quantity of raw material/fuel 0.8
(c)Total quantity of raw material/fuel 1.4
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)HSD1.4Kilo Litre per DayLocalRoad3 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2017 To 28 Feb 2018
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube18.66.116.880
(2.)PM10Micro Gram per Meter Cube84.745.782.4100
(3.)SO2Micro Gram per Meter Cube7.636.980
(4.)PM2.5Micro Gram per Meter Cube45.719.441.260
    14.2.     No. of Ground Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA6.826.556.58.5
(2.)TDSmg/l7095002000
(3.)Total Hardnessmg/l62.41.9200600
(4.)Chloridesmg/l11.33.42501000
(5.)Fluoridemg/l0.270.111.5
(6.)Heavy MetalsIronmg/l0.210.030.30.3
(7.)OthersManganesemg/l0.050.050.10.3
(8.)TSSmg/l0000
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l6.66.5C
(2.)pHNA7.476.7C
(3.)CODmg/l22C
(4.)BODmg/l44C
    14.4.     No. of Ambient Noise monitoring locations : 9
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))51.944.855
(2.)Leq(Night)A-weighted decibels(dB(A))4538.745
    14.5.     No. of Soil Sample Monitored locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNA4.614.22
(2.)N(Nitrogen)Milligram per Kilogram5292
(3.)K(Potassium)Milligram per Kilogram777423
(4.)P(Phosphorus)Milligram per Kilogram0.680.24
(5.)Electric ConductivityOthersµmhos/cm48.815.95
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10.5 To 8
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 4 To 6
(c)Whether Ground Water Intersection will be there ? Yes
(d)Upload Copy of Central Ground Water Authority Letter Copy of Central Ground Water Authority Letter
(e)Letter No. CGWA/NOC/MIN/ORIG/2017/2415
(f)Date of Issue 16 Feb 2017
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater17150Copy of Permission LettermodeOthersPipeline & TankersTube WellCGWA/NOC/MIN/ORIG/2017/241516 Feb 20171715
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Workshop Effluent1.72Effluent Treatment PlantReuse within the Plant & Recycling1.7
(2.)Beneficiation Plant2980830000Thickener, Filter PressReuse within the Plant & Recycling29808
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 29809.7
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 29809.7
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Mineral RejectOthersManganese ore zone3600Tons0RoadOthersBlended with high grade ore & marketed.
(2.)OB/IB/SBOthersWaste from Manganese ore zone182111Tons0RoadOthersRoad making, partly in external dump & backfilling
(3.)Top soilOthersTop Soil3375Tons0RoadOthersSpread over at reclaimed sites for plantation
(4.)Used/ spent oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)6Kilolitre350RoadOthersStorage & sale to users having valid authorization
(5.)OB/IB/SBOthersWaste from Iron ore zone556050Tons0RoadOthersRoad making, partly in external dump & backfilling
(6.)Mineral rejectOthersIron ore zone1474275Tons0RoadOthers50% blend with high grade ore 50% fed to B.F plant
(7.)Waste or residue containing oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.04Tons250RoadOthersStored-pit/containers& dispose to authorized agent
(8.)Filter cake, screened mineral rejectOthersBeneficiation plant waste600000Tons0RoadOthersStacked in temporarily in dump yard & backfilled
(9.)Discarded containers, barrels, etc.Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)1.5Tons250RoadOthersStorage & sale / disposal to authorized agent
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube36.402.538.960
(2.)SO2Microgram per Meter Cube5.100.55.680
(3.)NOxMicrogram per Meter Cube12.803.516.380
(4.)PM10Microgram per Meter Cube71.20576.2100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG setHSD100.3SO275
(2.)DG setHSD100.3NOx75
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 4000
(b)Source State grid and backup power from DG Sets
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) Backup power is to be sourced from DG Sets
(e)Stack Height (in m) 10
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 259.191
(b)Private Land (ha.) 32.023
(c)Government Land (ha.) 58.040
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 349.254
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 46.858
(b)Waste/Barren Land (ha.) 6.357
(c)Grazing/ Community Land (ha.) 2.347
(d)Surface Water Bodies (ha.) 1.926
(e)Settlements (ha.) 4.220
(f)Industrial (ha.) 0
(g)Forest (ha.) 131.273
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Broken up area and Road 156.273
    Total (ha.) 349.254
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant7.5Beneficiation plant with emergency slime pond
(2.)Quarry Area152.896Reclamation 52.53 ha & Bench plantation 100.366 Ha
(3.)OB Dump Area10Will be reclaimed by plantation
(4.)Safety Zone34.911Greenbelt
(5.)Built Up Area10Infrastructure will be dismantled and reclaimed
(6.)OthersPlantation+Storage+Processing+Untouched133.947Plantation+Storage+Processing+Untouched
Total (ha.) 349.254
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNil0Nil within 10km radius
(2.)ESAsNil0Nil within 10km radius
(3.)Wildlife CorridorsNil0Nil within 10km radius
(4.)CorridorsNil0Nil within 10km radius
(5.)ESZsNil0Nil within 10km radius
(6.)NPANil0Nil within 10km radius
(7.)WLSNil0Nil within 10km radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestKathamala RF & PRF0Kathamala RF & PRF - In core zone, RFs namely in Km: Mendamarni-1,Tohra-1.1,Karo -1,Uliburu-5.5 , Lakraghat-8.1, Sidhamath-9.3,Karampada-7.5, Sarkanda -7.5,Khajuridihi -9.2 within 10Km radius.
(2.)Archaeological SitesNil0Nil within 10km radius
(3.)Defence InstallationsNil0Nil within 10km radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? Yes
(a)Forests Clearance Status Final(Stage-II) Approval Obtained
(i)MoEFCC file number 8-34/2000-FC
(ii)Date of final approval 15 Sep 2007
(iii)Date of In-Principle Approval 11 Mar 2005
(iv)Area diverted 244.327
(v)Uploaded FC Letter Copy of FC Letter
(b)Legal Status of Forest Land Reserve forest, PRF, Khesra Forest
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 324.694
(b)Land yet to be acquired(Ha) 24.560
(c)Status of Land acquisition if not acquired No additional land acquisition envisaged
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Elephant, Sloth bear, Python and Monitor Lizard
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made Rs. 288 lakhs
(iii)Period of Implementation 2010-11 to 2019-20
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? Yes
(i)Uploaded copy of approval Copy of approval
(ii)Letter No. 1WL-C-SSP-260/2010
(iii)Date of issue 04 Sep 2010
(iv)Recommendation NA
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Karo Nala is flowing adjacent to lease area. Also, Lekera Pani Nala, Karo Nadi ,Teheri Nala, Kalmang Nala,Samij Nala etc. are in 10Km radius.
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 0.005
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 620
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 1500
(e)No. of working days 300
(f)Total Manpower 2120
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt34.911034.911
(2.)Percentage of Total Project Area10010
(3.)No. of Plants69822069822
(4.)Funds Allocated523665005236650
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployment generation ,Regional Deveopment
(2.)EnvironmentalImproved Vegetative growth
(3.)FinancialRevenue to state and central exchequer
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 2
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)Iron (3MTPA to 6MTPA (ROM) Expansion)Major
(2.)Manganese (Existing 0.036MTPA)Major
2.
Mine Capacity in ROM (Run of Mine) Fe-6000000 Mn-36000
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. MS/FM/40-ORI/BHU/2015-16
(b)Date of Approval 02 Jun 2016
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department IBM
(e)Approved Mining Lease Area 349.254
(f)Approved Capacity 6036000
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) Fe-197.844 Mn-0.542
(b)Mineable Reserves (Million Ton) Fe-185.004 Mn-0.534
(c)Extractable Reserves(Million Ton) Fe-185.004 Mn-0.534
(d)Percent(%) of Extraction Fe-93.5 Mn-98.52
(e)Grade of Coal /Ore /Mineral Fe-45 Mn-10
(f)Stripping Ratio Fe-1 Mn-1 : Fe-0.172 Mn-7.00
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 40
(i)Mining Method Opencast
(j)Life of Mine (Years) Fe-31 Mn-16
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area Yes
(b)Beneficiation / Washing Technology Wet process with the latest State of Art technolog
(c)Capacity 2000000
(d)Whether it is proposed to install crusher within the mining lease area Yes
(e)No. of crushers 3
     6.1.    Details of crusher:
S. No.Crusher ID Capacity (in PH)Remarks
(1.)1150 Mobile Crusher-Proposed For Iron ore(1 No)
(2.)2100 Mobile Crusher-Proposed For Iron ore(1 No)
(3.)3150 Stand by mobile crusher-Proposed For Iron ore(1 No)
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 349.254
(b)Whether obtained Letter of Intent (LOI) from the state government ? No
(i)Reason thereof Initial lease obtained in year 1945.
(c)Whether Lease Deed Executed ? Yes
(i)Copy of Executed Lease deed valid as on Date Copy of Executed Lease deed
(ii)Provide area in Hectare as per executed lease deed (initial) document 345.301
(iii)Validity of the lease deed From : 03 Feb 1945 To : 02 Feb 1965
(iv)Date of Execution of Mining Lese 03 Feb 1965
(v)Reference Number Lease deed 1945-1965
(d)Whether Lease Deed Renewed ? Yes
     8.1.    Earlier Renewals:
S. No.Lease Details Date of Renewal Period Copy of Earlier Lease Letter No.Area Remarks
(1.)Renewal 29 Sep 1970 From : 03 Feb 1965 To : 02 Feb 1985 Copy of Earlier LeaseMemo No-6866 MG.BBSR 349.254 Lease approval letter number is given in the Letter No. column.
(2.)Initial 01 Jan 1900 From : 03 Feb 1945 To : 02 Feb 1965 Copy of Earlier LeaseLease deed 1945-1965 345.301
(3.)Renewal 06 Nov 1985 From : 03 Feb 1985 To : 02 Feb 2005 Copy of Earlier LeaseMemo No-12414 MG.BBSR 349.254 Lease approval letter number is given in the Letter No. column.
(4.)Renewal 18 Apr 2015 From : 03 Feb 2005 To : 30 Oct 2018 Copy of Earlier Lease3320/S&M- Bhubaneswar 349.254 Lease period is valid upto 31.03.2020
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 3
(ii)Total Area (in Hectare) 10
(iii)Height (in meter) 47
(iv)Quantity (in Million Cubic meter) 2.171
(v)No. of year back fill up 33
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 2
(ii)Total Area (in Hectare) 52.53
(iii)Height (in meter) 36
(iv)Quantity (in Million Cubic meter) 13.409
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0.022
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0.022
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 0
(b)Depth (in meter) 0
(c)Volume (in Million Cubic meter) 0
12.
Details of Quarry:
(a)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 152.896
13.
Details of Transportation:
(a)In Pit/Underground to Surface By road
(b)Surface to Siding/Loading By road
(c)Transportation / Conveyor Details Tippers
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)AGRICULTURE LAND73.336073.336
(2.)SURFACE WATER BODIES1.92601.926
(3.)OTHERS(Specify)Road1.87701.877
(4.)GRAZING LAND2.34702.347
(5.)FOREST LAND259.1910259.191
(6.)WASTE LAND6.35706.357
(7.)SETTLEMENTS4.22004.22
TOTAL349.2540349.254
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)EXCAVATION/QUARRY152.89600152.896
(2.)TOP SOIL STORAGE0.231000.231
(3.)VIRGIN AREA0000
(4.)EXTERNAL OB DUMPS100010
(5.)ROADS001515
(6.)BUILT UP AREA (COLONY/OFFICE)100010
(7.)GREEN BELT34.9110034.911
(8.)Other0.81Ha of RWH+ Mineral&Topsoil+ processing Plant83.04800.8183.858
(9.)INTERNAL OB DUMPS0000
TOTAL291.086015.810306.896
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 10
(b)Internal Dump(in hectare) 52.53
(c)Quarry(in hectare) 100.366
(d)Safety Zone(in hectare) 34.911
(e)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 2000
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 93.279
(h)Total afforestation plant (in hectare) 291.086
17.
Status of progressive Mining Closure Plan:
Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan
Any Deviation from the Approved Progressive Mine Closure Plan No
Total Area Excavated (in hectare) 152.896
Total Area Backfilled after Excavation (in hectare) 52.53
Total Area Reclaimed (in hectare) 152.896
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)201620170.0360.0360.0360.00390
(2.)201520160.0360.0360.010400
(3.)201320140.0360.0360.01370.00180
(4.)201220130.0360.0360.03310.00110
(5.)200920100.00780.00780.03610.00150
(6.)200820090.00780.00780.03350.00150
(7.)200720080.00780.00780.03350.00150
(8.)2000200100000
(9.)20162017336.00062.99530
(10.)20152016335.03572.99730
(11.)20122013335.67010.94860
(12.)20112012335.18891.85190
(13.)200920100.60.63.051.10060.5006
(14.)200820090.60.62.50111.09840.4984
(15.)201120120.0360.0360.02640.00290
(16.)20142015333.96930.83350
(17.)20132014333.96932.99380
(18.)200720080.60.030.57350.28590
(19.)2003200400.030.41570.05290.0529
(20.)2001200200.030.02330.01670.0167
(21.)2000200100.030.02270.00980.0098
(22.)201020110.0360.0360.01810.00270
(23.)2006200700.0090.008700
(24.)20052006000.00860.00110.001
(25.)2006200700.030.55270.06680.0668
(26.)201420150.0360.0360.039600
(27.)2004200500.0090.00870.00070.0006
(28.)201720180.0360.0360.0360.0040
(29.)2003200400.0090.00750.00020.0001
(30.)2002200300.00900.00110.001
(31.)2001200200.009000
(32.)20172018336.00112.99710
(33.)20102011334.00040.59940
(34.)20052006000.54050.08930.0893
(35.)2004200500.030.49710.06510.0651
(36.)2002200300.030.02530.01760.0176
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. QCI/NABET/ENV/ACO/17/0423
(ii)Name of the EIA Consultant Creative Engineers & Consultants
(iii)Address 9B/4, Bharathwajar Street, East Tambaram,Chennai-600059.
(iv)Mobile No. 9444133619
(v)Landline No. 0442239517
(vi)Email Id cecgiri@yahoo.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 24 Mar 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterNarayanposhi Iron & Mn Mines, M/s Aryan Mining & Trading Corporation Pvt. Ltd. ADS compliance submitted on 29.11.2018 29 Nov 2018
2.NADeferred 22 Nov 2018
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantNaman Saraf
DesignationExecutive Director
Name of Company (Applicant Name should not be given here)ARYAN MINING AND TRADING CORPORATION PVT LTD
AddressVillage- Koira