Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) M/s. Shree Chemopharma Ankleshwar Pvt. Ltd. (Unit-1)
(b)Name of the Company / Organisation SHREE CHEMOPHARMA ANKLESHWAR PVT LTD
(c)Registered Address PLOT NO. 313/13 & 313/14, GIDC ESTATE,ANKLESHWAR, DIST. BHARUCH, GUJARAT,Bharuch,Gujarat-393002
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant JAY DAVE
(b)Designation (Owner/ Partner/ CEO) DIRECTOR
(c)Address PLOT NO. 313/13, 313/14, GIDC ESTATE,,ANKLESHWAR, DIST. BHARUCH, GUJARAT,Anklesvar,Bharuch,Gujarat-393002
(d)Pin code 393002
(e)E-mail jaydave@shreechemicals.com
(f)STD Code. 2646(f)Telephone No. 252739
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/74657/2018
(d)Master Proposal Number(Single Window) SW/83723/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No. 313/13 & 313/14
(b)Pincode 393002
(c)Bounded Latitudes (North)
From
Degree 21.623519
Minutes
Second
From
Degree 21.623561
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 73.021336
Minutes
Second
From
Degree 73.021361
Minutes
Second
(e)Survey of India Topo Sheet No. F43N2
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 23
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 25
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratBharuchAnklesvar
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number NIL
(b)Date of Apply of EC NIL
(c)Date of Issue of EC NIL
(d)Previous EC Letter NIL
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Project is located in Notified Industrial Area of
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhopal
(iii)Letter No. NA
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jun 1 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Production32.9175207.9OthersMT/MonthRoad
(2.)Area0.1400.14Hectares(ha)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)SS Reactor82105000 LTR
(2.)HDPE Reactor1015000 LTR
(3.)Agitated Nutsche Filter1015000 LTR
(4.)SS Reactor1013000 LTR
(5.)SS Reactor3032000 LTR
(6.)Centrifuge SS Basket10136" Dia.
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 01 Apr 2017
(iv)Valid Upto 20 Feb 2022
(v)File No. AWH-85152
(vi)Application No. GPCB/ANK/CCA-382(2)/ID-15649/411435
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 3.5
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.56
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.015
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.21
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
b)Critically polluted areas as notified by the Central Pollution Control Board(CPCB) from time to time Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 352.5
(b)Existing quantity of raw material/fuel 77.3
(c)Total quantity of raw material/fuel 429.8
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Potassium Permanganate1594.8Tons per AnnumNearby areaRoad11 LinkageCopy of Linkage
(2.)Sodium hydroxide1363.2Tons per AnnumNearby areaRoad9 LinkageCopy of Linkage
(3.)Briquettes990Tons per AnnumNearby areaRoad15 Fuel Supply AgreementCopy of Linkage
(4.)Natural Gas330000OthersSm3/dayNearby areaRoad9 Fuel Supply AgreementCopy of Linkage
(5.)Sulphuric Acid681.6Tons per AnnumNearby areaRoad10 LinkageCopy of Linkage
(6.)Caustic lye225Tons per AnnumNearby areaRoad10 LinkageCopy of Linkage
(7.)Nitric acid1594.8Tons per AnnumNearby areaRoad8 LinkageCopy of Linkage
(8.)Orthochloro Toluene1594.8Tons per AnnumNearby areaRoad12 LinkageCopy of Linkage
(9.)Para Chloro Toluene1594.8Tons per AnnumNearby areaRoad10 LinkageCopy of Linkage
(10.)diesel800OthersLit/DayNearby areaRoad9 Fuel Supply AgreementCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2017 To 31 May 2017
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube20.4216.4218.4180
(2.)OthersO3Micro Gram per Meter Cube11.1910.5510.91180
(3.)PM10Micro Gram per Meter Cube97.382.1391.14100
(4.)PM2.5Micro Gram per Meter Cube57.5143.9851.8460
(5.)NOxMicro Gram per Meter Cube23.0518.1621.1980
    14.2.     No. of Ground Water monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.266.476.58.5
(2.)Total Hardnessmg/l1251.990.72300600
(3.)TSSmg/l40250100
(4.)Chloridesmg/l862.344.342501000
(5.)TDSmg/l19841465002000
(6.)OthersSulfatesmg/l183.26.95200400
(7.)Fluoridemg/l0.20.111.5
(8.)Heavy MetalsIronmg/l0.220.130.31
    14.3.     No. of Surface Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.697.69C
(2.)BODmg/l0.010.01C
(3.)OthersChloridesmg/l19.7119.71C
(4.)DOmg/l5.465.46C
(5.)CODmg/l25.1325.13C
    14.4.     No. of Ambient Noise monitoring locations : 9
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))72.246.775
(2.)Leq(Night)A-weighted decibels(dB(A))64.837.270
    14.5.     No. of Soil Sample Monitored locations : 9
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNA7.957.09
(2.)N(Nitrogen)Milligram per Kilogram156.496.22
(3.)K(Potassium)Milligram per Kilogram988302
(4.)P(Phosphorus)Milligram per Kilogram20.2512
(5.)Electric ConductivityMillisiemens per Centimetre4.122.08
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 65 To 70
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 75 To 80
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersGIDC Water Supply6310Copy of Permission LetterPipelineOthersGIDC Water SupplyNTA/ANK/DEE(WS)/108101 Jun 201963
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial Project-211.911.9ETP-2OthersCMEE of BEIL, Ankleshwar011.9
(2.)Industrial Project-11414ETP-1OthersCETP of ETL014
(3.)Domestic66Septic tank/ Soak pitOthersSeptic tank/ Soak pit06
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 31.9
(b)Total Discharged Water (Kilolitre per Day) 31.9
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Discarded Drums or BagsIndustrial Waste25.2Tons11RoadAuthorized Recyclers
(2.)MnO2 SolutionIndustrial Waste132Tons14RoadOthersSell to end user under Rule-9 permission
(3.)Used OilIndustrial Waste120Tons10RoadAuthorized Recyclers
(4.)Sodium Nitrite Soln.Industrial Waste1020Tons12RoadOthersSell to end user under Rule-9 permission
(5.)Recovered Nitric AcidIndustrial Waste1594.8Tons0RoadOthersReuse within premises
(6.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)516Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
(7.)Off-Specification ProductsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)12Tons10RoadOthersCHWIF
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube44.63.180.0244.7160
(2.)PM10Microgram per Meter Cube81.303.180.0381.37100
(3.)SO2Microgram per Meter Cube16.93.180.117.0380
(4.)NOxMicrogram per Meter Cube18.23.180.0318.2880
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Thermic Fluid Heater-2Briquettes of Bio-Coal180.15PM10PM 10 150 SO2 262 NOx 94
(2.)Process Vent-2--180.1NOx25
(3.)Thermic Fluid HeaterNatural Gas180.15PM10PM 10 150, SO2 262, NOx 94
(4.)Boiler-2Briquettes of Bio-Coal180.15PM10PM 10 150 SO2 262 NOx 94
(5.)Boiler-1Natural Gas120.15PM10PM 10 150 SO2 262 NOx 94
(6.)DG Set (160 KVA)Diesel60.15PM10PM 10 150 SO2 262 NOx 94
(7.)Process Vent-1--180.1NOx25
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 200
(b)Source DGVCL
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 125
(e)Stack Height (in m) 11
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 1.4
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 1.4
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 80.32
(b)Waste/Barren Land (ha.) 33.37
(c)Grazing/ Community Land (ha.) 1.98
(d)Surface Water Bodies (ha.) 2.36
(e)Settlements (ha.) 31.34
(f)Industrial (ha.) 0.2
(g)Forest (ha.) 135.48
(h)Mangroves (ha.) 28.44
(i)Marine Area (ha.) 0.54
(j)Others (ha.) : Marshy Land 0.2
    Total (ha.) 314.22999999999996
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt0.01
(2.)Main Plant0.08
(3.)OthersRoad0.05
Total (ha.) 0.14
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPA--0--
(2.)Critically Polluted Area--0--
(3.)WLS--0--
(4.)ESAs--0--
(5.)ESZs--0--
(6.)Corridors--0--
(7.)Wildlife Corridors--0--
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Forest--0--
(2.)Defence Installations--0--
(3.)Archaeological Sites--0--
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 00
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 00
(b)Land yet to be acquired(Ha) 00
(c)Status of Land acquisition if not acquired 00
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 00
(b)No. of Households 00
(c)No. of PDFs (Project Displaced Families) 00
(d)No. of PAFs (Project Affected Families) 00
(e)Funds Allocated for R&R(in INR) (in Lacs) 00
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 10
(b)Permanent Employment-During Operation 10
(c)Temporary Employment- During Construction 20
(d)Temporary Employment- During Operation 20
(e)No. of working days 330
(f)Total Manpower 60
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt2200220
(2.)Percentage of Total Project Area15.71015.71
(3.)No. of Plants55055
(4.)Funds Allocated1650000165000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialAddition of GDP to country
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. Stay Order Against QCI NABET
(ii)Name of the EIA Consultant Aqua Air Environmental Engineers Pvt. Ltd.
(iii)Address 403, Center Point, Nr. Kadiwala School, Ring Road, Surat– 395002, Gujarat, India.
(iv)Mobile No. 9904433995
(v)Landline No. 0261246085
(vi)Email Id aqua_eia@yahoo.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 04 Jun 2016
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NANeither EIA/EMP nor the certified compliance report (item 9) uploaded. 06 Nov 2018
2.NAThe correction have been made as per the instruction received 12 Nov 2018
3.NAPlease inform/clarify the following:- - Status of EC for the present industrial operations (Specialty chemicals-32.9 TPM) and the compliance status thereof, to be mentioned against column 9(a) of Form-2. - No details provided against column 6 of Form-2. - Whether 4 new products (75 TPM) are technical grade pesticides, or pesticide intermediates only. 20 Nov 2018
4.NAThe correction have been made as per the instruction received 07 Dec 2018
5.NAIn continuation to our earlier observations, following need to be further clarified:- - Whether the specialty chemicals mentioned in the CTE dated 4/6/2002 of production capacity 32.9 TPM, were not required prior EC in terms of the provisions of the EIA Notification, 1994, - As per the present provisions, Category A of item 5(b) covers only those units producing technical grade pesticides, and as such, new products of capacity 75 TPM need to be re-categorized vis-a-vis the schedule to the EIA Notification, 2006. 15 Dec 2018
6.NAThe correction have been made as per the instruction received 02 Jan 2019
7.NAOur last observations dated 15/12/2018 need to be addressed properly along with supporting documents to ascertain the requirement of prior EC for the present industrial operations, and also categorization of the project (A/B) for mfg pesticide intermediates. 11 Jan 2019
8.NAThe correction have been made as per the instruction received 22 Nov 2019
9.NA(i) It is noted that there are various deficiencies in Form 2 (viz. S. no. 6, 9.1, etc.) uploaded by the PP and accordingly Revised Form 2 shall be submitted incorporating all the information related to the project. (ii) Detailed Plan for Corporate Environmental Responsibility and its implementable schedule with budgetary provisions needs to be resubmitted. (iii) Consent to Operate for the present Industrial operations needs to be submitted. (iv) Accurate water balance with details of total water and fresh water requirement, and permission/MoU/NOC from concerned regulatory authority needs to be submitted. (v) Effluent treatment mechanism with plan for Zero Liquid Discharge needs to be submitted. (vi) Details of Raw material linkage and its mitigation measure during transportation needs to be submitted. (vii) Submit details of existing products as the same is not mentioned in the Form-2. (i) Submit plan as per the Ministry’s office memorandum 31st October, 2019 regarding projects located in critically and Severely Polluted Area. 05 Dec 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.