1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Development Drilling of 4 wells in Borholla ML block, Jorhat District and development drilling of 8 wells in Nambar ML area, East Lakhibari ML area, Khoraghat ML and Khorghat extension ML area in Gola | (b)Name of the Company / Organisation | ONGC | (c)Registered Address | NIL | (d)Legal Status of the Company | NIL | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | | (b)Designation (Owner/ Partner/ CEO) | ChiefGeneralManager | (c)Address | NIL | (d)Pin code | 110070 | (e)E-mail | kumar_rajeeva@ongc.co.in | (f)STD Code. | (f)Telephone No. | | (g)Fax No. | 26129067 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(b) Offshore and onshore oil and gas exploration, development & production
| Minor Activity | 1(b) Offshore and onshore oil and gas exploration, development & production
| (b)Category | A | (c)Proposal Number | IA/AS/IND2/83554/2014 | (d)Master Proposal Number(Single Window) | SW/83543/2018 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Jorhat and Golaghat districts | (b)Pincode | 785685 | (c)Bounded Latitudes (North) | | From | | Degree | 2930625.5 | Minutes | | Second | | From | | Degree | 621248.4 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 2880626.8 | Minutes | | Second | | From | | Degree | 586856.6 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 00 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 100 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 00 | (j)Seismic Zone | 5 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Assam | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | J-11011/49/2014- IA II | (b)Date of Apply of TOR | 03 Feb 2014 | (c)Date of Issue of TOR / Standard ToR | 18 Dec 2014 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 06 May 2017 | Distance of Public Hearing Venue from the Proposed Project : | 10 |
| Bodosa Club cum Bodo library, Rangjali Nagar, near KHDC, Uriamghat, Dist- Golaghat Assam | State : | Assam | District : | Golaghat | Tehsil : | Golaghat | Village : | Uriamghat |
| 63 | Effects of drilling on paddy fields, compensation issues, pollution control measures. | Others | | (2.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 09 May 2017 | Distance of Public Hearing Venue from the Proposed Project : | 5 |
| Sonowal Kachari kala Kristi Bikash kendra | State : | Assam | District : | Jorhat | Tehsil : | Titabar | Village : | Borholla |
| 45 | Drill site affects agricultural area, more CSR activities, compensation payment | Others | | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Development Drilling | Total 12 wells | | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Oil | 220 | Kilo Litre per Day | | Others | pipeline and tankers | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 240 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.17 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 3.6 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.28 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 06 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 6 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | diesel | 6 | Kilo Litre per Day | | NA | Others | NA | 0 | Others | NA | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Oct 2015 To 31 Dec 2015 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 08 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 64.4 | 43.5 | 00 | NAAQS guidelines | (2.) | PM2.5 | | Micro Gram per Meter Cube | 00 | 00 | 00 | 00 | (3.) | NOx | | Micro Gram per Meter Cube | 16.53 | 9.24 | 00 | NAAQS guidelines | (4.) | SO2 | | Micro Gram per Meter Cube | 8.26 | 5.23 | 00 | NAAQS guidelines | |
14.2. No. of Ground Water monitoring locations : 07 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 8.2 | 6.81 | 8.5 | 7.0 | (2.) | TDS | | | mg/l | | 388 | 240 | 500 | 2000 | (3.) | Chlorides | | | mg/l | | 5.96 | 3.97 | 250 | 1000 | (4.) | Fluoride | | | mg/l | | 0.52 | 0.23 | 1.0 | 1.5 | (5.) | TSS | | | mg/l | | 34 | 19 | 00 | 00 | (6.) | Total Hardness | | | mg/l | | 114 | 88 | 200 | 600 | (7.) | Heavy Metals | | Zn | mg/l | | 0.21 | 0.06 | 5 | 15 | |
14.3. No. of Surface Water monitoring locations : 07 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 8.5 | 7.2 | D | (2.) | COD | | mg/l | | 23.0 | 13.0 | D | (3.) | DO | | mg/l | | 7.6 | 5.2 | D | (4.) | BOD | | mg/l | | 5.0 | 2.5 | D | |
14.4. No. of Ambient Noise monitoring locations : 08 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 67.8 | 41.5 | CPCB Guidelines | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 59.8 | 30.0 | CPCB Guidelines | |
14.5. No. of Soil Sample Monitored locations : 05 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | Others | NA | 7.2 | 6.1 | (2.) | N(Nitrogen) | Others | Percentage by mass | 3.14 | 1.23 | (3.) | K(Potassium) | Milliequivalents per 100 Gram | | 0.07 | 0.02 | (4.) | P(Phosphorus) | Milliequivalents per 100 Gram | | 1.9 | 1.3 | (5.) | Electric Conductivity | Others | micro siemens per centimeter | 97.4 | 67.8 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 3.8 To 7.96 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 3.31 To 6.89 | (c)Whether Ground Water Intersection will be there ? | NA | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Tankers | 25 | 0 | Not Appliacble | modeOthers | Tankers | Others | NA | NA | 18 Dec 2014 | 25 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Sewage Water | 10 | 12 | septic tanks followed by soak pits | Others | septic tanks followed by soak pits | 10 | 0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 10 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 10 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Waste lube/System oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.15 | Kilolitre | 00 | Road | | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 00 | 00 | 00 | 00 | 00 | (2.) | SO2 | | Microgram per Meter Cube | 8.26 | 00 | 5.0 | 13.26 | NAAQS | (3.) | Others(Specify) | HC | Microgram per Meter Cube | 2.67 | 00 | 4.0 | 6.67 | NAAQS | (4.) | NOx | | Microgram per Meter Cube | 16.53 | 00 | 2.0 | 18.53 | NAAQS | (5.) | PM10 | | Microgram per Meter Cube | 64.4 | 00 | 16.28 | 80.68 | NAAQS | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | DG Sets | Diesel | 7.7 | 0.5 | SO2 | | 0.0025 | (2.) | DG Sets | Diesel | 7.7 | 0.5 | NOx | | 0.001 | (3.) | DG Sets | Diesel | 7.7 | 0.5 | PM10 | | 0.008 | (4.) | DG Sets | Diesel | 7.7 | 0.5 | Others | HC | 0.036 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 1430 | (b)Source | DG Set | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 1430 | (e)Stack Height (in m) | 7.7 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 13.27 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 8.0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 21.27 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 1067 | (b)Waste/Barren Land (ha.) | 190 | (c)Grazing/ Community Land (ha.) | 00 | (d)Surface Water Bodies (ha.) | 557 | (e)Settlements (ha.) | 366 | (f)Industrial (ha.) | 00 | (g)Forest (ha.) | 390 | (h)Mangroves (ha.) | 00 | (i)Marine Area (ha.) | 00 | (j)Others (ha.) : Follow land | 582 | Total (ha.) | 3152 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Others | NA | 00 | 00 | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | ESAs | NA | 00 | NA | (2.) | Critically Polluted Area | NA | 00 | NA | (3.) | WLS | NA | 00 | NA | (4.) | Corridors | NA | 00 | NA | (5.) | Wildlife Corridors | NA | 00 | NA | (6.) | ESZs | NA | 00 | NA | (7.) | NPA | NA | 00 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | NA | 00 | NA | (2.) | Defence Installations | | NA | 00 | NA | (3.) | Forest | | Nambar Forest | 00 | 8 wells are falling in the Nambar Forest area. | |
|
|
24. | Forest Land: | Whether any Forest Land involved? | Yes | (a)Forests Clearance Status | Application for Forest Clearance yet to be submitted | (b)Legal Status of Forest Land | Reserved | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 13.27 | (b)Land yet to be acquired(Ha) | 8 | (c)Status of Land acquisition if not acquired | Forest land acquired.Nonforest land to be acquired | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Yet To Start | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | 1 pond in East Likhibari ML area and 2 Ponds in Nambar ML area | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | 1 River (Dhans-iri) which passes through Nambar ML area, Khoraghat ML area and Khoraghat extension ML area) | (ii)Direction of Water Bodies in Buffer Area | North | (iii)Distance of Water Bodies in Buffer Area | 0 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 5 | (b)Permanent Employment-During Operation | 50 | (c)Temporary Employment- During Construction | 20 | (d)Temporary Employment- During Operation | 30 | (e)No. of working days | 120 | (f)Total Manpower | 105 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 00 | (b)Percentage of Total Project Area | 0.00 | (c)No. of Plants to be Planted | 00 | (d)Funds Allocated for Plantation | 00 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
NIL | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1417/ SA 030 | (ii)Name of the EIA Consultant | Asian Consulting Engineers Pvt Ltd. | (iii)Address | 66, 2nd FLOOR Hemkunt Colony, Nehru Place, Delhi- 110048 | (iv)Mobile No. | 9312693905 | (v)Landline No. | 41635644 | (vi)Email Id | info@asianconsulting.org | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 17 Nov 2017 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Please inform/clarify the following:-
- Copy of the ToR dated 18/12/2014 not attached. Any extension thereof.
- Certificate of Accreditation for the EIA consultant not attached.
- Status of the proposal for forest clearance as indicated at item 24 of Form-2.
- Status of acquisition of land of 13.27 ha of land. | 11 Nov 2018 | 2. | NA | The correction have been made as per the instruction received | 19 Nov 2018 | 3. | NA | - Details provided in response to our earlier observations dated 11/11/2018, are not consistent/matching with those mentioned in column 24 (for forest clearance) & column 26 (land acquisition status) of Form-2, and need to be corrected for factual information.
- Please inform present status of accreditation of the EIA Consultant M/s Asian Consulting Engineers Pvt Ltd. | 03 Dec 2018 | 4. | NA | The correction have been made as per the instruction received | 10 Dec 2018 | 5. | NA | In view of the discrepancies still persisting (Column 24 shows application for forest clearance yet to be submitted, Column 26 shows forest land acquired), we reiterate our observations dated 3/12/2018 for the needful. | 16 Dec 2018 | 6. | NA | The correction have been made as per the instruction received | 31 Dec 2018 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | | Designation | ChiefGeneralManager | Name of Company (Applicant Name should not be given here) | ONGC | Address | Corporate HSE, 8th Floor Core IV, SCOPE Minar, Delhi 10092 |
|