1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed manufacturing unit for production food preservatives
(b)Name of the Company / Organisation FINE ORGANIC INDUSTRIES PVT LTD
(c)Registered Address Plot No. G-1, G-1/1, MIDC Kherwai, Badlapur, Dist. Thane,,Thane,Maharashtra-421503
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Amol Kamat Kamat
(b)Designation (Owner/ Partner/ CEO) GM (Manufacturing & Operation)
(c)Address Fine Organic Industries,Plot no 124, MIDC ,Dombivali (East) Dist. Thane, Pin code 421201,,Thane,Thane,Maharashtra-421201
(d)Pin code 421201
(e)E-mail nilambari_daripkar@fineorganics.com
(f)STD Code. 22(f)Telephone No. 21025000
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/MH/IND2/83527/2018
(d)Master Proposal Number(Single Window) SW/83521/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. E-73
(b)Pincode 400077
(c)Bounded Latitudes (North)
From
Degree 18.875791
Minutes
Second
From
Degree 73.163077
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 18.874896
Minutes
Second
From
Degree 73.163919
Minutes
Second
(e)Survey of India Topo Sheet No. 47 F/1, 47 F/5
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 10
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/47/2018-IA-II(I)
(b)Date of Apply of TOR 03 Feb 2018
(c)Date of Issue of TOR / Standard ToR 22 Mar 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Located in notified MIDC area
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Food preservatives25,000 MTPANo
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Salts of Propionic & Acetic acid25000Tons per AnnumRoad,Rail
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 26 Oct 2018
(iv)Valid Upto 26 Oct 2018
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 52.96
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.97
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.0
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 55.5
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
a)Protected areas notified under the wildlife (Protection) Act, 1972 Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 30350
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 30350
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Sodium hydroxide /Potassium hydroxide450Tons per AnnumMarketRoad100 Open MarketCopy of Linkage
(2.)Hydrated Lime / quicklime9900Tons per AnnumMarketRoad100 Open MarketCopy of Linkage
(3.)Propionic acid /Acetic acid20000Tons per AnnumOpen marketRoad100 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube15.78.314.280
(2.)PM2.5Micro Gram per Meter Cube45.120.538.860
(3.)PM10Micro Gram per Meter Cube50.332.845100
(4.)NOxMicro Gram per Meter Cube18.512.217.680
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l10562485002000
(2.)Total Hardnessmg/l57065.05200600
(3.)Chloridesmg/l90.6614.782501000
(4.)Heavy MetalsLeadmg/l000.010.01
(5.)pHNA7.747.278.58.5
(6.)TSSmg/l8400
(7.)Fluoridemg/l0.010.0111.5
(8.)OthersCadmiummg/l000.00030.0003
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l6.46.2A
(2.)CODmg/l55A
(3.)pHNA7.247.18A
(4.)BODmg/l11A
    14.4.     No. of Ambient Noise monitoring locations : 9
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))42.236.245
(2.)Leq(Day)A-weighted decibels(dB(A))55.244.655
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Otherskg/ha171.9138.2
(2.)K(Potassium)Otherskg/ha149.7127.6
(3.)pHOthersNA7.907.64
(4.)Electric ConductivityOthersµs/cm478.4385.9
(5.)N(Nitrogen)Otherskg/ha171.9138.2
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersMIDC water supply22010.0 Not Appliacble PipelineOthersMIDC supplyNA26 Oct 2018250
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)cooling, lab and Domestic3.825ETP, pri, sec and Tertiary treatmentReuse within the Plant & Recycling3.82
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 3.82
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 3.82
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)ETP SludgeIndustrial Waste0.025Tons0.03RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)Filtered sludgeIndustrial Waste0.085Tons0.03RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube15.70.7501126.780
(2.)NOxMicrogram per Meter Cube17.60.80010.027.680
(3.)PM10Microgram per Meter Cube47.20.750047.2100
(4.)PM2.5Microgram per Meter Cube45.10.750045.160
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Boiler stackFurnace Oil39.50.375SO28.8
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 2000
(b)Source MSEDCL grid
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 2X 1000kVA
(e)Stack Height (in m) 5
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 1.2
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 1.2
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 15976
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 383
(e)Settlements (ha.) 7616
(f)Industrial (ha.) 0
(g)Forest (ha.) 7438
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NA 0
    Total (ha.) 31413
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant10509No
(2.)Green belt1491No
Total (ha.) 12000
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANo any0No
(2.)ESAsNo any0No
(3.)ESZsNo any0No
(4.)Critically Polluted AreaNO0No
(5.)WLSKarnala Bird Sanctuary2.5No
(6.)CorridorsNo any0No
(7.)Wildlife CorridorsNo any0No
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesKarnala Fort5NO
(2.)ForestReserve Forest2No
(3.)Defence InstallationsNo any0NO
(4.)OthersRiverPatalganga0.6No
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? Yes
(i)Status of NBWL NIL
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1.2
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Patalganga River
(ii)Direction of Water Bodies in Buffer Area North West
(iii)Distance of Water Bodies in Buffer Area 0.6
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 10
(b)Permanent Employment-During Operation 50
(c)Temporary Employment- During Construction 10
(d)Temporary Employment- During Operation 10
(e)No. of working days 365
(f)Total Manpower 80
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.1491
(b)Percentage of Total Project Area 12.43
(c)No. of Plants to be Planted 320
(d)Funds Allocated for Plantation 10
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Environmental• Factory proposes zero liquid discharge method for waste water treatment. Maximum waste water will be recycled back into the system.
(2.)FinancialThe proposed establishment of these products are due to market demand. Nearly 80% of the products are getting exported to different countries which are certainly increasing the foreign exchange. Also many of these products are equal or better in quality to that of certain imported products. This reduces the dependency on importing the products.
(3.)SocialProject will definitely open an avenue for the young generation of our nation by generating employment. Company will be hiring the local residents nearby project site for employment, as per their competency.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/RA0075
(ii)Name of the EIA Consultant MITCON Consultancy & Engineering Services Ltd.
(iii)Address MITCON Consultancy & Engineering Services Ltd. Environment Management and Engineering Division Behind DIC Office, Agri College Campus, Shivajinagar, Pune – 411 005, Maharashtra (INDIA)
(iv)Mobile No. 9665043400
(v)Landline No. 0206628940
(vi)Email Id eme@mitconindia.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 17 Mar 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease inform/clarify the following:- - The project/activity is covered under category B of item 5(f) of the schedule to the EIA Notification, 2006. Please confirm whether the EIA consultant is accredited for preparing EIA/EMP report for the proposed project. - Whether applied for NBWL clearance and the status thereof. 06 Nov 2018
2.NAThe correction have been made as per the instruction received 14 Nov 2018
3.NAPlease reply to our observations vide query dated 6/11/2018 for further action. 25 Nov 2018
4.NAThe correction have been made as per the instruction received 27 Nov 2018
5.NAPlease confirm location of the project site in notified industrial area, and applicability of general conditions through supporting documents. 06 Dec 2018
6.NAThe correction have been made as per the instruction received 08 Dec 2018
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAmol Kamat Kamat
DesignationGM (Manufacturing & Operation)
Name of Company (Applicant Name should not be given here)FINE ORGANIC INDUSTRIES PVT LTD
AddressPlot No. G-1, G-1/1, MIDC Kherwai, Badlapur, Dist. Thane