|
1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Proposed manufacturing unit for production food preservatives | (b)Name of the Company / Organisation | FINE ORGANIC INDUSTRIES PVT LTD | (c)Registered Address | Plot No. G-1, G-1/1, MIDC Kherwai, Badlapur, Dist. Thane,,Thane,Maharashtra-421503 | (d)Legal Status of the Company | Others | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Amol Kamat Kamat | (b)Designation (Owner/ Partner/ CEO) | GM (Manufacturing & Operation) | (c)Address | Fine Organic Industries,Plot no 124, MIDC ,Dombivali (East)
Dist. Thane, Pin code 421201,,Thane,Thane,Maharashtra-421201 | (d)Pin code | 421201 | (e)E-mail | nilambari_daripkar@fineorganics.com | (f)STD Code. | 22(f)Telephone No. | 21025000 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/MH/IND2/83527/2018 | (d)Master Proposal Number(Single Window) | SW/83521/2018 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | E-73 | (b)Pincode | 400077 | (c)Bounded Latitudes (North) | | From | | Degree | 18.875791 | Minutes | | Second | | From | | Degree | 73.163077 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 18.874896 | Minutes | | Second | | From | | Degree | 73.163919 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 47 F/1, 47 F/5 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 10 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Maharashtra | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11011/47/2018-IA-II(I) | (b)Date of Apply of TOR | 03 Feb 2018 | (c)Date of Issue of TOR / Standard ToR | 22 Mar 2018 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | Located in notified MIDC area | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Food preservatives | 25,000 MTPA | No | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Salts of Propionic & Acetic acid | 25000 | Tons per Annum | | Road,Rail | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 26 Oct 2018 | (iv)Valid Upto | 26 Oct 2018 | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 52.96 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.97 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 1.0 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 55.5 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | Yes | a)Protected areas notified under the wildlife (Protection) Act, 1972 | Yes | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 30350 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 30350 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Sodium hydroxide /Potassium hydroxide | 450 | Tons per Annum | | Market | Road | | 100 | Open Market | | Copy of Linkage | (2.) | Hydrated Lime / quicklime | 9900 | Tons per Annum | | Market | Road | | 100 | Open Market | | Copy of Linkage | (3.) | Propionic acid /Acetic acid | 20000 | Tons per Annum | | Open market | Road | | 100 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2018 To 31 May 2018 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | SO2 | | Micro Gram per Meter Cube | 15.7 | 8.3 | 14.2 | 80 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 45.1 | 20.5 | 38.8 | 60 | (3.) | PM10 | | Micro Gram per Meter Cube | 50.3 | 32.8 | 45 | 100 | (4.) | NOx | | Micro Gram per Meter Cube | 18.5 | 12.2 | 17.6 | 80 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TDS | | | mg/l | | 1056 | 248 | 500 | 2000 | (2.) | Total Hardness | | | mg/l | | 570 | 65.05 | 200 | 600 | (3.) | Chlorides | | | mg/l | | 90.66 | 14.78 | 250 | 1000 | (4.) | Heavy Metals | | Lead | mg/l | | 0 | 0 | 0.01 | 0.01 | (5.) | pH | | | NA | | 7.74 | 7.27 | 8.5 | 8.5 | (6.) | TSS | | | mg/l | | 8 | 4 | 0 | 0 | (7.) | Fluoride | | | mg/l | | 0.01 | 0.01 | 1 | 1.5 | (8.) | Others | Cadmium | | mg/l | | 0 | 0 | 0.0003 | 0.0003 | |
14.3. No. of Surface Water monitoring locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | DO | | mg/l | | 6.4 | 6.2 | A | (2.) | COD | | mg/l | | 5 | 5 | A | (3.) | pH | | NA | | 7.24 | 7.18 | A | (4.) | BOD | | mg/l | | 1 | 1 | A | |
14.4. No. of Ambient Noise monitoring locations : 9 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 42.2 | 36.2 | 45 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 55.2 | 44.6 | 55 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | P(Phosphorus) | Others | kg/ha | 171.9 | 138.2 | (2.) | K(Potassium) | Others | kg/ha | 149.7 | 127.6 | (3.) | pH | Others | NA | 7.90 | 7.64 | (4.) | Electric Conductivity | Others | µs/cm | 478.4 | 385.9 | (5.) | N(Nitrogen) | Others | kg/ha | 171.9 | 138.2 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 5 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2 To 5 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | MIDC water supply | 220 | 10.0 | Not Appliacble | Pipeline | | Others | MIDC supply | NA | 26 Oct 2018 | 250 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | cooling, lab and Domestic | 3.82 | 5 | ETP, pri, sec and Tertiary treatment | Reuse within the Plant & Recycling | | 3.82 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 3.82 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 3.82 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | ETP Sludge | Industrial Waste | | 0.025 | Tons | 0.03 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (2.) | Filtered sludge | Industrial Waste | | 0.085 | Tons | 0.03 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | SO2 | | Microgram per Meter Cube | 15.7 | 0.750 | 11 | 26.7 | 80 | (2.) | NOx | | Microgram per Meter Cube | 17.6 | 0.800 | 10.0 | 27.6 | 80 | (3.) | PM10 | | Microgram per Meter Cube | 47.2 | 0.750 | 0 | 47.2 | 100 | (4.) | PM2.5 | | Microgram per Meter Cube | 45.1 | 0.750 | 0 | 45.1 | 60 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Boiler stack | Furnace Oil | 39.5 | 0.375 | SO2 | | 8.8 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 2000 | (b)Source | MSEDCL grid | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 2X 1000kVA | (e)Stack Height (in m) | 5 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 1.2 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 1.2 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 15976 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 383 | (e)Settlements (ha.) | 7616 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 7438 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : NA | 0 | Total (ha.) | 31413 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 10509 | No | (2.) | Green belt | | 1491 | No | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | NPA | No any | 0 | No | (2.) | ESAs | No any | 0 | No | (3.) | ESZs | No any | 0 | No | (4.) | Critically Polluted Area | NO | 0 | No | (5.) | WLS | Karnala Bird Sanctuary | 2.5 | No | (6.) | Corridors | No any | 0 | No | (7.) | Wildlife Corridors | No any | 0 | No | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | Karnala Fort | 5 | NO | (2.) | Forest | | Reserve Forest | 2 | No | (3.) | Defence Installations | | No any | 0 | NO | (4.) | Others | River | Patalganga | 0.6 | No | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | Yes | (i)Status of NBWL | NIL | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 1.2 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | NA | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Yet To Start | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Patalganga River | (ii)Direction of Water Bodies in Buffer Area | North West | (iii)Distance of Water Bodies in Buffer Area | 0.6 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 10 | (b)Permanent Employment-During Operation | 50 | (c)Temporary Employment- During Construction | 10 | (d)Temporary Employment- During Operation | 10 | (e)No. of working days | 365 | (f)Total Manpower | 80 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 0.1491 | (b)Percentage of Total Project Area | 12.43 | (c)No. of Plants to be Planted | 320 | (d)Funds Allocated for Plantation | 10 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | • Factory proposes zero liquid discharge method for waste water treatment. Maximum waste water will be recycled back into the system. | (2.) | Financial | The proposed establishment of these products are due to market demand. Nearly 80% of the products are getting exported to different countries which are certainly increasing the foreign exchange. Also many of these products are equal or better in quality to that of certain imported products. This reduces the dependency on importing the products. | (3.) | Social | Project will definitely open an avenue for the young generation of our nation by generating employment. Company will be hiring the local residents nearby project site for employment, as per their competency. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1720/RA0075 | (ii)Name of the EIA Consultant | MITCON Consultancy & Engineering Services Ltd. | (iii)Address | MITCON Consultancy & Engineering Services Ltd. Environment Management and Engineering Division Behind DIC Office, Agri College Campus, Shivajinagar, Pune – 411 005, Maharashtra (INDIA) | (iv)Mobile No. | 9665043400 | (v)Landline No. | 0206628940 | (vi)Email Id | eme@mitconindia.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 17 Mar 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Please inform/clarify the following:-
- The project/activity is covered under category B of item 5(f) of the schedule to the EIA Notification, 2006. Please confirm whether the EIA consultant is accredited for preparing EIA/EMP report for the proposed project.
- Whether applied for NBWL clearance and the status thereof. | 06 Nov 2018 | 2. | NA | The correction have been made as per the instruction received | 14 Nov 2018 | 3. | NA | Please reply to our observations vide query dated 6/11/2018 for further action. | 25 Nov 2018 | 4. | NA | The correction have been made as per the instruction received | 27 Nov 2018 | 5. | NA | Please confirm location of the project site in notified industrial area, and applicability of general conditions through supporting documents. | 06 Dec 2018 | 6. | NA | The correction have been made as per the instruction received | 08 Dec 2018 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Amol Kamat Kamat | Designation | GM (Manufacturing & Operation) | Name of Company (Applicant Name should not be given here) | FINE ORGANIC INDUSTRIES PVT LTD | Address | Plot No. G-1, G-1/1, MIDC Kherwai, Badlapur, Dist. Thane |
|