Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) KRISHI RASAYAN EXPORTS PVT. LTD.
(b)Name of the Company / Organisation KRISHI RASAYAN EXPORTS PVT. LTD.
(c)Registered Address plot no 19/1,GIDC Industrial Estate,Panoli,,Bharuch,Gujarat-394115
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant V K SINGH
(b)Designation (Owner/ Partner/ CEO) DGM
(c)Address 1115 HEMKUNT MODI TOWER 98 NEHRU PLACE NEWDELHI,,Connaught Place,New Delhi,Delhi-110019
(d)Pin code 110019
(e)E-mail vksingh@krepl.in
(f)STD Code. 79(f)Telephone No. 3008832
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/69917/2017
(d)Master Proposal Number(Single Window) SW/83433/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No. 19/1
(b)Pincode 394115
(c)Bounded Latitudes (North)
From
Degree 21.537930
Minutes
Second
From
Degree 21.539553
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72.998331
Minutes
Second
From
Degree 73.000459
Minutes
Second
(e)Survey of India Topo Sheet No. F43M14
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 34
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 15
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratBharuchAnklesvar
(2.)GujaratBharuchAnklesvar
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/488/2017-IA-II(I)
(b)Date of Apply of TOR 27 Sep 2017
(c)Date of Issue of TOR / Standard ToR 06 Nov 2017
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Industry is located in Notified Industrial Area at
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)SS-316 Centrifuge48"2 Nos.
(2.)MS Glass Lined Reactor3 KL1
(3.)SS-316 Reactor1.5 KL2 Nos.
(4.)SS-316 Reactor6.3 KL12
(5.)SS-316 Distillation Column500 mm dia * 10000 mm height2 Nos.
(6.)SS-316 Falling film evaporator8 sqm2 Nos.
(7.)SS-316 Heat exchangers20 sqm6 Nos
(8.)SS-316 Agitated Nutsch filter dryer5.0 KL
(9.)SS-316 Heat exchangers25 sqm2 Nos.
(10.)SS-316 Agitated Nutsch Filter2 KL10 Nos
(11.)SS-316 FBD200 Kg
(12.)SS-316 Centrifugal pump5 m3/hr18 Nos.
(13.)PP Centrifugal pump5 m3/hr10 Nos
(14.)2 Stage Vac. System with 1 steam + 1 water jet10 torr16 Nos
(15.)MS Storage tank25 KL8 Nos.
(16.)HDPE Storage tank10 KL8 Nos
(17.)Boiler4 T/hr
(18.)D.G. set500 KVA
(19.)RO5 m³/hr
(20.)MEE8 m³/hr
(21.)CS centrifugal pump5 m3/hr8 Nos
(22.)MS Glass Lined Reactor6.3 KL12 nos
(23.)SS-316 Sparkler filter1.5 sqm4 Nos.
(24.)SS-316 Rotary vacuum dryer4.0 KL3 Nos.
(25.)SS-316 Receiver3 KL10 Nos
(26.)TFH10 lac Kcal/hr
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Metalaxyl100Tons per AnnumRoad
(2.)Clodinafop Propargyl100Tons per AnnumRoad
(3.)Permethrin200Tons per AnnumRoad
(4.)Azoxystrobin250Tons per AnnumRoad
(5.)Carbendazim1000Tons per AnnumRoad
(6.)Captan300Tons per AnnumRoad
(7.)Metribuzine500Tons per AnnumRoad
(8.)Met Sulfuron Methyl30Tons per AnnumRoad
(9.)Tebuconazole300Tons per AnnumRoad
(10.)Thiram500Tons per AnnumRoad
(11.)Ziram300Tons per AnnumRoad
(12.)Profenophos500Tons per AnnumRoad
(13.)Tricyclazole500Tons per AnnumRoad
(14.)Bispyribac Sodium200Tons per AnnumRoad
(15.)Diafenthuron300Tons per AnnumRoad
(16.)Difenconazole300Tons per AnnumRoad
(17.)MPBD1000Tons per AnnumRoad
(18.)Pendimethalin500Tons per AnnumRoad
(19.)Sulfosulfuron50Tons per AnnumRoad
(20.)Glyphosate2000Tons per AnnumRoad
(21.)Propiconazole500Tons per AnnumRoad
(22.)Thiophanate Methyl500Tons per AnnumRoad
(23.)2-4 D Acid2000Tons per AnnumRoad
(24.)Ethephon500Tons per AnnumRoad
(25.)Imizathapyr100Tons per AnnumRoad
(26.)Thiomethoxam400Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 35
(b) Funds Allocated for Environment Management (Capital) (in Crores) 3.5
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.875
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 5.4
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 34977
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 34977
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)34977Tons per AnnumAs AttachedRoad50 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Jan 2018 To 31 Mar 2018
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube80.252.874.2100
(2.)PM2.5Micro Gram per Meter Cube48.927.843.460
(3.)NOxMicro Gram per Meter Cube27.21622.880
(4.)SO2Micro Gram per Meter Cube20.212.41980
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l18455475002000
(2.)Chloridesmg/l9011942501000
(3.)Total Hardnessmg/l492265300600
(4.)Fluoridemg/l0.850.5611.5
(5.)pHOtherspH unit7.697.298.58.5
(6.)TSSmg/l13.66.500
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.877.24A
(2.)BODmg/l18.512.1D
(3.)CODmg/l30.721.5D
(4.)DOmg/l7.25.3B
    14.4.     No. of Ambient Noise monitoring locations : 10
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))55.547.375
(2.)Leq(Night)A-weighted decibels(dB(A))44.535.770
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Milligram per Kilogram23.516.9
(2.)P(Phosphorus)Milligram per Kilogram35.926.3
(3.)pHOtherspH unit87.15
(4.)Electric ConductivityOthersdS/m2.11.4
(5.)K(Potassium)Milligram per Kilogram9164
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersGIDC water suply1721Copy of Permission LetterPipelineOthersGIDC water suplyGIDC/RM/ANK/ALT/169314 Mar 2017172
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Utilities & washing7175ETP-ROReuse within the Plant & Recycling71
(2.)Process & lab97120ETP-MEEReuse within the Plant & Recycling97
(3.)Domestic1010Soak pitOthersdischarged into soak pit010
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 178
(b)Total Discharged Water (Kilolitre per Day) 10
(c)Total Reused Water (Kilolitre per Day) 168
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Process residue (inorganic salts)Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)600Tons11RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)Discarded containers and linersHazardous Waste (as per Hazardous and Other Waste Management rules 2016)150Tons15RoadAuthorized Recyclers
(3.)MEE saltHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1500Tons11RoadTreatment, Storage and Disposal Facility(TSDF)
(4.)ETP sludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)420Tons11RoadTreatment, Storage and Disposal Facility(TSDF)
(5.)Distillation residueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)480Tons11RoadOthersIncineation or co-processing
(6.)Used lubricating oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1Kilolitre15RoadAuthorized Recyclers
(7.)Spent catalystHazardous Waste (as per Hazardous and Other Waste Management rules 2016)12Tons15RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube67.414.171.5100
(2.)SO2Microgram per Meter Cube16.812.319.180
(3.)NOxMicrogram per Meter Cube19.511.420.980
(4.)PM2.5Microgram per Meter Cube37.214.141.260
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Process reactor of MetalaxylNone150.3OthersHCl00
(2.)Boiler (4 TPH)Coal300.540OthersPM, SO2, NOx00
(3.)TFH (10 lakhs Kcal/hr)Coal210.375OthersPM, SO2, NOx00
(4.)Process reactor of CaptanNone150.3OthersHCl00
(5.)Process reactor of PermethrinNone150.3OthersHCl00
(6.)Process reactor of PendimethalinNone150.3OthersHCl00
(7.)Process reacto of CabendazimNone150.3OthersHCl00
(8.)Process reactor of 2,4 D acidNone150.3OthersSO2, HCl00
(9.)D.G. set (500kva)Diesel110.225OthersPM, SO2, NOx00
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 750
(b)Source Dakshin Gujarat Vij Company Limited
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 500 kVA
(e)Stack Height (in m) 11
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 3.7242
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 3.7242
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 3.7242
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : 0 0
    Total (ha.) 3.7242
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0.4687
(2.)Green belt1.2551
(3.)Built Up Area0.5758
(4.)OthersRoads, Parking, Margins & Open space1.4246Roads, Parking, Margins & Open space
Total (ha.) 3.7242
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNone Within 10 Kilometers00None Within 10 Kilometers
(2.)NPABlackbuck National Park Velavadar115None Within 10 Kilometers
(3.)WLSShoolpaneswar (Dhumkhal) WLS56None Within 10 Kilometers
(4.)Wildlife CorridorsNone Within 10 Kilometers00None Within 10 Kilometers
(5.)ESAsNone Within 10 Kilometers00None Within 10 Kilometers
(6.)ESZsNone Within 10 Kilometers00None Within 10 Kilometers
(7.)CorridorsNone Within 10 Kilometers00None Within 10 Kilometers
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNone Within 10 Kilometers00None Within 10 Kilometers
(2.)Archaeological SitesLothal133None Within 10 Kilometers
(3.)ForestShoolpaneshwar56None Within 10 Kilometers
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 3.7242
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Not applicable
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area ponds of villages - Kharod, Bhadi & Dhamdod
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 100
(c)Temporary Employment- During Construction 20
(d)Temporary Employment- During Operation 0
(e)No. of working days 25
(f)Total Manpower 120
32.
Green Belt in Ha:
(a)Total Area of Green Belt 1.2551
(b)Percentage of Total Project Area 33.70
(c)No. of Plants to be Planted 1300
(d)Funds Allocated for Plantation 3
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployment generation, CSR activities
(2.)FinancialContributing to nation via paying various taxes
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0084
(ii)Name of the EIA Consultant San Envirotech Pvt. Ltd. (SEPL)
(iii)Address 424, Medicine Market, Paldi, Ahmedabad, Gujarat
(iv)Mobile No. 9825007201
(v)Landline No. 0792658307
(vi)Email Id mahendra.sepl@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 23 Dec 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantV K SINGH
DesignationDGM
Name of Company (Applicant Name should not be given here)KRISHI RASAYAN EXPORTS PVT. LTD.
Addressplot no 19/1,GIDC Industrial Estate,Panoli