Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Setup a new API manufacturing unit of 500 TPA at Village- Bhagwanpur, Tehsil- Derabassi, District- SAS Nagar, State- Punjab
(b)Name of the Company / Organisation UNITED BIOTECH PVT LTD
(c)Registered Address FC/B-1(Extn), Mohan co-operative Industrial estate, Mathura Road, New Delhi,,SAS Nagar,Punjab-110044
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Rajiv kumar
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address United state E-142 saket, New Delhi,,Hauz Khas,South,Delhi-110017
(d)Pin code 110017
(e)E-mail unitedbiotech2018@gmail.com
(f)STD Code. 124(f)Telephone No. 4291036
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/PB/IND2/83229/2018
(d)Master Proposal Number(Single Window) SW/83218/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Khasra no. 543(5-14), 546(4-0), 547(4-0), 523/1(0-
(b)Pincode 140507
(c)Bounded Latitudes (North)
From
Degree 30.5747
Minutes
Second
From
Degree 30.5758
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 76.8897
Minutes
Second
From
Degree 76.8908
Minutes
Second
(e)Survey of India Topo Sheet No. H43K14& H43K15
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 310
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 6
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Punjab
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/159/2018-IA-II(I)
(b)Date of Apply of TOR 25 Mar 2018
(c)Date of Issue of TOR / Standard ToR 01 Jun 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :15 Aug 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :17 Sep 2018
Distance of Public Hearing Venue from the Proposed Project :0
Project site
State :Punjab
District :SAS Nagar
Tehsil :Derabassi
Village :Bhagwanpur
591. Pollution (Air and Water) 2. Local Employment 3. Help for girls marriage of poor local communities.OthersADM
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Reactor-24500liter
(2.)ETP400 KLD
(3.)Reactor 11500liter
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Oncology API43.55Tons per AnnumRoad
(2.)Generals28.45Tons per AnnumRoad
(3.)Penicillin API300Tons per AnnumRoad
(4.)Macrolide36.45Tons per AnnumRoad
(5.)Cephalosporin API44Tons per AnnumRoad
(6.)Hormones20.28Tons per AnnumRoad
(7.)Penems API26.70Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 100
(b) Funds Allocated for Environment Management (Capital) (in Crores) 2.15
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 2
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.6
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 700
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 700
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Acetic Acid2Tons per Annumlocal marketRoad50 Open MarketCopy of Linkage
(2.)Acetone25Tons per Annumlocal marketRoad500 Open MarketCopy of Linkage
(3.)Sodium hydroxide4Tons per Annumlocal marketRoad50 Open MarketCopy of Linkage
(4.)Dimethyl formamide7Tons per Annumlocal marketRoad500 Open MarketCopy of Linkage
(5.)Wood Briquette5000Tons per Annumlocal marketRoad15 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube95.678.694.7100
(2.)PM2.5Micro Gram per Meter Cube49.439.748.4960
(3.)NOxMicro Gram per Meter Cube31.516.129.3480
(4.)SO2Micro Gram per Meter Cube13.45.211.880
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.937.386.58.5
(2.)TDSmg/l5823935002000
(3.)Total Hardnessmg/l318212200600
(4.)Heavy MetalsMercurymg/l0.0010.0010.0010.05
(5.)Fluoridemg/l0.860.481.01.5
(6.)Chloridesmg/l123.6163.782501000
(7.)TSSNA0000
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l226.56A
(2.)DOmg/l6.45.5A
(3.)CODmg/l62.4516.32B
(4.)pHNA8.237.51A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))53.4035.6070
(2.)Leq(Day)A-weighted decibels(dB(A))72.1042.6075
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare275248
(2.)P(Phosphorus)Kilogram per hectare18.5812.74
(3.)K(Potassium)Kilogram per hectare210157
(4.)Electric ConductivityMillisiemens per Centimetre0.420.24
(5.)pHOthersno unit8.206.85
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.14 To 32.24
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.61 To 33.37
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater2300Copy of Permission LetterPipelineOthersBore well21-4/4512/PB/IND/201828 Sep 2018230
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial Use350400ETPReuse within the Plant & Recycling,Green Belt Renewal Plant350
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 350
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 350
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)16.5Tons0RoadAuthorized Recyclers
(2.)Boiler AshMunicipal Solid Waste231Tons0RoadAuthorized Recyclersgiven to farmer
(3.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.19Kilolitre0RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube95.64.50.1597.35100
(2.)NOxMicrogram per Meter Cube31.234.50.0331.2380
(3.)SO2Microgram per Meter Cube13.686.60.0313.4380
(4.)PM2.5Microgram per Meter Cube57.164.50.06157.1660
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)BoilerWood Briquettes306PM100.30
(2.)D.G SetHSD50.15SO20.11
(3.)Boilerwood briquettes306NOx0.061
(4.)D.G SetHSD50.15PM100.0022
(5.)D.G setHSD50.15NOx0.0011
(6.)BoilerWood Briquettes306SO20.024
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 2000
(b)Source PSTCL (Punjab State Transmission Corporation Limit
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 4 D.G. sets each of capacity 500 KVA is also propo
(e)Stack Height (in m) 5
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 4.4
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 4.4
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 11773
(b)Waste/Barren Land (ha.) 2296
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 75
(e)Settlements (ha.) 2927
(f)Industrial (ha.) 725
(g)Forest (ha.) 421
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Fallow Land, Sandy Area, Open Scrub 14253
    Total (ha.) 32470
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt1.4
(2.)Main Plant2.94
Total (ha.) 4.34
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNot Applicable0Not applicable in study area
(2.)ESAsNot Applicable0Not applicable in study area
(3.)Wildlife CorridorsNot Applicable0Not applicable in study area
(4.)WLSkhol hi raitan11.1Outside the study area
(5.)NPANot Applicable0Not applicable in study area
(6.)CorridorsNot Applicable0Not applicable in study area
(7.)ESZsNot Applicable0Outside the study area
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological Sitesnot applicable0Not applicable in study area
(2.)Forestnot applicable0Not applicable in study area
(3.)Defence Installationsnot applicable0Not applicable in study area
23.3.
(a)Whether Noc / Permission from the competent authority is required? Yes
(i)Uploaded Noc / Permission from the competent authority Copy of Noc / Permission from the competent authority
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 4.4
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Aquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Pavo cristatus & Panthera pardus
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 20 lakhs
(iii)Period of Implementation 5 year
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area ghaggar river
(ii)Direction of Water Bodies in Buffer Area North West
(iii)Distance of Water Bodies in Buffer Area 6
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 125
(c)Temporary Employment- During Construction 25
(d)Temporary Employment- During Operation 0
(e)No. of working days 330
(f)Total Manpower 150
32.
Green Belt in Ha:
(a)Total Area of Green Belt 1.452
(b)Percentage of Total Project Area 33.00
(c)No. of Plants to be Planted 2904
(d)Funds Allocated for Plantation 1287000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialSocio-economic benefit to the locals as it would provide both direct employment and indirect employment.
(2.)FinancialIt will attract generation of additional revenue to the Government by means of Taxes and duties. The project is envisaged to meet the demand supply gap of domestic & international market.
(3.)EnvironmentalThe present proposal is for ZLD plant . No waste will be discharged outside without its proper treatment and company will spend Rs 2.15 crore as capital cost for environment protection measures and Rs 60 lakhs per annum for EMP. Company will also developed green belt as per the CPCB guidelines to reduce the impact.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0037
(ii)Name of the EIA Consultant Vardan EnviroNet
(iii)Address D-142, Golf Course Ext Rd, Sushant Lok III Extension, Sector 57, Gurugram, Haryana 122002
(iv)Mobile No. 9953147268
(v)Landline No. 0124429103
(vi)Email Id industry@vardanenvironet.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 09 Nov 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease inform/clarify the following:- - Whether the proposed industrial operations are permitted at the project site and/or in conformity with land use of the area. That needs to be confirmed along with the supporting documents. - Whether the proposed industrial activity is allowed by SPCB in non-industrial area, and/or any prior permission is required from the SPCB. - As per the details given in Form-2, the EIA Consultant is not accredited for preparing the EIA/EMP report for the proposed industrial activity. The proposal is, therefore, not admissible. 06 Nov 2018
2.NAThe correction have been made as per the instruction received 12 Nov 2018
3.NAReply to our earlier observations vide query dated 6/11/2018 to be submitted for further consideration of the proposal. 20 Nov 2018
4.NAThe correction have been made as per the instruction received 20 Nov 2018
5.NAPlease see our earlier observations vide query dated 6/11/2018. the matter regarding accreditation of the consultants is yet to be resolved to ascertain admissibility of the proposal. 03 Dec 2018
6.NAThe correction have been made as per the instruction received 03 Dec 2018
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterThe case was considered in the 4th EAC (Industry-2) meeting dated- 30.05.19. Additional details are sought by concerned Member Secretary after consideration of proposal in EAC Meeting 1-The EIA Coordinator was, however, not present during the meeting Reply- We ensure you that the QCI/NABET accredited EIA coordinator of the project shall be present during the next EAC meeting. 2- The Committee also desired that the product list and capacity shall be uniform and consistent. Reply- The revised product list and capacity in uniform and consistent manner is already send on 31.05.19 18 Jun 2019
2.NA