1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Setup a new API manufacturing unit of 500 TPA at Village- Bhagwanpur, Tehsil- Derabassi, District- SAS Nagar, State- Punjab | (b)Name of the Company / Organisation | UNITED BIOTECH PVT LTD | (c)Registered Address | FC/B-1(Extn), Mohan co-operative Industrial estate, Mathura Road, New Delhi,,SAS Nagar,Punjab-110044 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Rajiv kumar | (b)Designation (Owner/ Partner/ CEO) | Director | (c)Address | United state E-142 saket, New Delhi,,Hauz Khas,South,Delhi-110017 | (d)Pin code | 110017 | (e)E-mail | unitedbiotech2018@gmail.com | (f)STD Code. | 124(f)Telephone No. | 4291036 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/PB/IND2/83229/2018 | (d)Master Proposal Number(Single Window) | SW/83218/2018 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Khasra no. 543(5-14), 546(4-0), 547(4-0), 523/1(0- | (b)Pincode | 140507 | (c)Bounded Latitudes (North) | | From | | Degree | 30.5747 | Minutes | | Second | | From | | Degree | 30.5758 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 76.8897 | Minutes | | Second | | From | | Degree | 76.8908 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | H43K14& H43K15 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 310 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 6 | (j)Seismic Zone | 4 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Punjab | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11011/159/2018-IA-II(I) | (b)Date of Apply of TOR | 25 Mar 2018 | (c)Date of Issue of TOR / Standard ToR | 01 Jun 2018 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 17 Sep 2018 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| Project site | State : | Punjab | District : | SAS Nagar | Tehsil : | Derabassi | Village : | Bhagwanpur |
| 59 | 1. Pollution (Air and Water)
2. Local Employment
3. Help for girls marriage of poor local communities. | Others | ADM | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Reactor-2 | 4500 | liter | (2.) | ETP | 400 KLD | | (3.) | Reactor 1 | 1500 | liter | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Oncology API | 43.55 | Tons per Annum | | Road | | (2.) | Generals | 28.45 | Tons per Annum | | Road | | (3.) | Penicillin API | 300 | Tons per Annum | | Road | | (4.) | Macrolide | 36.45 | Tons per Annum | | Road | | (5.) | Cephalosporin API | 44 | Tons per Annum | | Road | | (6.) | Hormones | 20.28 | Tons per Annum | | Road | | (7.) | Penems API | 26.70 | Tons per Annum | | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 100 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 2.15 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 2 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.6 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 700 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 700 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Acetic Acid | 2 | Tons per Annum | | local market | Road | | 50 | Open Market | | Copy of Linkage | (2.) | Acetone | 25 | Tons per Annum | | local market | Road | | 500 | Open Market | | Copy of Linkage | (3.) | Sodium hydroxide | 4 | Tons per Annum | | local market | Road | | 50 | Open Market | | Copy of Linkage | (4.) | Dimethyl formamide | 7 | Tons per Annum | | local market | Road | | 500 | Open Market | | Copy of Linkage | (5.) | Wood Briquette | 5000 | Tons per Annum | | local market | Road | | 15 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2018 To 31 May 2018 | (b)Season | Pre-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 95.6 | 78.6 | 94.7 | 100 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 49.4 | 39.7 | 48.49 | 60 | (3.) | NOx | | Micro Gram per Meter Cube | 31.5 | 16.1 | 29.34 | 80 | (4.) | SO2 | | Micro Gram per Meter Cube | 13.4 | 5.2 | 11.8 | 80 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.93 | 7.38 | 6.5 | 8.5 | (2.) | TDS | | | mg/l | | 582 | 393 | 500 | 2000 | (3.) | Total Hardness | | | mg/l | | 318 | 212 | 200 | 600 | (4.) | Heavy Metals | | Mercury | mg/l | | 0.001 | 0.001 | 0.001 | 0.05 | (5.) | Fluoride | | | mg/l | | 0.86 | 0.48 | 1.0 | 1.5 | (6.) | Chlorides | | | mg/l | | 123.61 | 63.78 | 250 | 1000 | (7.) | TSS | | | NA | | 0 | 0 | 0 | 0 | |
14.3. No. of Surface Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | BOD | | mg/l | | 22 | 6.56 | A | (2.) | DO | | mg/l | | 6.4 | 5.5 | A | (3.) | COD | | mg/l | | 62.45 | 16.32 | B | (4.) | pH | | NA | | 8.23 | 7.51 | A | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 53.40 | 35.60 | 70 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 72.10 | 42.60 | 75 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | N(Nitrogen) | Kilogram per hectare | | 275 | 248 | (2.) | P(Phosphorus) | Kilogram per hectare | | 18.58 | 12.74 | (3.) | K(Potassium) | Kilogram per hectare | | 210 | 157 | (4.) | Electric Conductivity | Millisiemens per Centimetre | | 0.42 | 0.24 | (5.) | pH | Others | no unit | 8.20 | 6.85 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2.14 To 32.24 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2.61 To 33.37 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 230 | 0 | Copy of Permission Letter | Pipeline | | Others | Bore well | 21-4/4512/PB/IND/2018 | 28 Sep 2018 | 230 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Industrial Use | 350 | 400 | ETP | Reuse within the Plant & Recycling,Green Belt Renewal Plant | | 350 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 350 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 350 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | ETP Sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 16.5 | Tons | 0 | Road | | Authorized Recyclers | | (2.) | Boiler Ash | Municipal Solid Waste | | 231 | Tons | 0 | Road | | Authorized Recyclers | given to farmer | (3.) | Used Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.19 | Kilolitre | 0 | Road | | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 95.6 | 4.5 | 0.15 | 97.35 | 100 | (2.) | NOx | | Microgram per Meter Cube | 31.23 | 4.5 | 0.03 | 31.23 | 80 | (3.) | SO2 | | Microgram per Meter Cube | 13.68 | 6.6 | 0.03 | 13.43 | 80 | (4.) | PM2.5 | | Microgram per Meter Cube | 57.16 | 4.5 | 0.061 | 57.16 | 60 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Boiler | Wood Briquettes | 30 | 6 | PM10 | | 0.30 | (2.) | D.G Set | HSD | 5 | 0.15 | SO2 | | 0.11 | (3.) | Boiler | wood briquettes | 30 | 6 | NOx | | 0.061 | (4.) | D.G Set | HSD | 5 | 0.15 | PM10 | | 0.0022 | (5.) | D.G set | HSD | 5 | 0.15 | NOx | | 0.0011 | (6.) | Boiler | Wood Briquettes | 30 | 6 | SO2 | | 0.024 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 2000 | (b)Source | PSTCL (Punjab State Transmission Corporation Limit | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 4 D.G. sets each of capacity 500 KVA is also propo | (e)Stack Height (in m) | 5 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 4.4 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 4.4 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 11773 | (b)Waste/Barren Land (ha.) | 2296 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 75 | (e)Settlements (ha.) | 2927 | (f)Industrial (ha.) | 725 | (g)Forest (ha.) | 421 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Fallow Land, Sandy Area, Open Scrub | 14253 | Total (ha.) | 32470 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Green belt | | 1.4 | | (2.) | Main Plant | | 2.94 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | Not Applicable | 0 | Not applicable in study area | (2.) | ESAs | Not Applicable | 0 | Not applicable in study area | (3.) | Wildlife Corridors | Not Applicable | 0 | Not applicable in study area | (4.) | WLS | khol hi raitan | 11.1 | Outside the study area | (5.) | NPA | Not Applicable | 0 | Not applicable in study area | (6.) | Corridors | Not Applicable | 0 | Not applicable in study area | (7.) | ESZs | Not Applicable | 0 | Outside the study area | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | not applicable | 0 | Not applicable in study area | (2.) | Forest | | not applicable | 0 | Not applicable in study area | (3.) | Defence Installations | | not applicable | 0 | Not applicable in study area | |
|
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 4.4 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Aquired | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Pavo cristatus & Panthera pardus | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 20 lakhs | (iii)Period of Implementation | 5 year | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | ghaggar river | (ii)Direction of Water Bodies in Buffer Area | North West | (iii)Distance of Water Bodies in Buffer Area | 6 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 125 | (c)Temporary Employment- During Construction | 25 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 330 | (f)Total Manpower | 150 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 1.452 | (b)Percentage of Total Project Area | 33.00 | (c)No. of Plants to be Planted | 2904 | (d)Funds Allocated for Plantation | 1287000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | Socio-economic benefit to the locals as it would provide both
direct employment and indirect employment. | (2.) | Financial | It will attract generation of additional revenue to the
Government by means of Taxes and duties.
The project is envisaged to meet the demand supply gap of
domestic & international market. | (3.) | Environmental | The present proposal is for ZLD plant . No waste will be discharged outside without its proper treatment and company will spend Rs 2.15 crore as capital cost for environment protection measures and Rs 60 lakhs per annum for EMP. Company will also developed green belt as per the CPCB guidelines to reduce the impact. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA0037 | (ii)Name of the EIA Consultant | Vardan EnviroNet | (iii)Address | D-142, Golf Course Ext Rd, Sushant Lok III Extension, Sector 57, Gurugram, Haryana 122002 | (iv)Mobile No. | 9953147268 | (v)Landline No. | 0124429103 | (vi)Email Id | industry@vardanenvironet.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 09 Nov 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Please inform/clarify the following:-
- Whether the proposed industrial operations are permitted at the project site and/or in conformity with land use of the area. That needs to be confirmed along with the supporting documents.
- Whether the proposed industrial activity is allowed by SPCB in non-industrial area, and/or any prior permission is required from the SPCB.
- As per the details given in Form-2, the EIA Consultant is not accredited for preparing the EIA/EMP report for the proposed industrial activity. The proposal is, therefore, not admissible. | 06 Nov 2018 | 2. | NA | The correction have been made as per the instruction received | 12 Nov 2018 | 3. | NA | Reply to our earlier observations vide query dated 6/11/2018 to be submitted for further consideration of the proposal. | 20 Nov 2018 | 4. | NA | The correction have been made as per the instruction received | 20 Nov 2018 | 5. | NA | Please see our earlier observations vide query dated 6/11/2018. the matter regarding accreditation of the consultants is yet to be resolved to ascertain admissibility of the proposal. | 03 Dec 2018 | 6. | NA | The correction have been made as per the instruction received | 03 Dec 2018 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | The case was considered in the 4th EAC (Industry-2) meeting dated- 30.05.19. Additional details are sought by concerned Member Secretary after consideration of proposal in EAC Meeting
1-The EIA Coordinator was, however, not present during the meeting
Reply- We ensure you that the QCI/NABET accredited EIA coordinator of the project shall be present during the next EAC meeting.
2- The Committee also desired that the product list and capacity shall be uniform and consistent.
Reply- The revised product list and capacity in uniform and consistent manner is already send on 31.05.19 | 18 Jun 2019 | 2. | NA | |
|