Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed Greenfield project for the Manufacturing of Formaldehyde 100 MTPD at Village Toffanpur, Tehsil Derabassi, District S.A.S. Nagar, and State Punjab by M/s. Trigun Organics
(b)Name of the Company / Organisation TRIGUN ORGANICS
(c)Registered Address M/s Trigun Organics, village Toffanpur, Tehsil Derabassi, District SAS Nagar, State Punjab,,SAS Nagar,Punjab-140506
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Rajinder Paul Singla
(b)Designation (Owner/ Partner/ CEO) GM
(c)Address M/s Trigun Organics, Village Toffanpur, Tehsil Derabassi, District SAS Nagar,,S.A.S.Nagar (Mohali),SAS Nagar,Punjab-140506
(d)Pin code 140506
(e)E-mail trigunorganics165@gmail.com
(f)STD Code. 124(f)Telephone No. 4291036
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/PB/IND2/72942/2018
(d)Master Proposal Number(Single Window) SW/83074/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 42//3
(b)Pincode 140506
(c)Bounded Latitudes (North)
From
Degree 30.29.50
Minutes
Second
From
Degree 30.29.52
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 76.50.48
Minutes
Second
From
Degree 76.50.50
Minutes
Second
(e)Survey of India Topo Sheet No. H43K10, H43K11, H43K14 & H43K15
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 287
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 8
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Punjab
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)PunjabSAS NagarDerabassi
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/54/2018-IA-II(I)
(b)Date of Apply of TOR 13 Feb 2018
(c)Date of Issue of TOR / Standard ToR 22 Mar 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :11 Aug 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :18 Sep 2018
Distance of Public Hearing Venue from the Proposed Project :0
Project site at Village Toffanpur, Tehsil Derabassi, District S.A.S. Nagar, and State Punjab
State :Punjab
District :SAS Nagar
Tehsil :Derabassi
Village :Toffanpur
501- Employment to locals 2- Waste water discharge 3-Any adverse effect from the proposed projectOthersADM (Add. Deputy Commissioner)
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Boiler600 kg/hrone industrial boiler
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Formaldehyde (Product)100OthersMTPDRoad
(2.)AREA0.255HectaresOthersLand
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 4.3
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.115
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.105
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.08
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
d)Inter-State boundaries and international boundaries Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 165
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 165
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Methanol15000Tons per AnnumKandla Port & nearby local marketRoad,Rail1350 Open MarketCopy of Linkage
(2.)Wood165Tons per AnnumLocal marketRoad25 Open MarketCopy of Linkage
(3.)Silver Catalyst (granular)16.5OthersKG/DayLocal marketRoad50 Open MarketCopy of Linkage
(4.)Water42Kilo Litre per DayBorewellPipe Conveyor0 OthersOwn borewell after CGWA approvalCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube50.425.442.5560
(2.)PM10Micro Gram per Meter Cube92.460.986.1100
(3.)NOxMicro Gram per Meter Cube31.416.125.980
(4.)SO2Micro Gram per Meter Cube11.24.210.580
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHOthersph7.827.376.58.5
(2.)TDSmg/l5703865002000
(3.)Heavy Metalsarsenic as Asmg/l0.0010.0010.010.05
(4.)Total Hardnessmg/l327.52198.77200600
(5.)Chloridesmg/l120.5268.942501000
(6.)Fluoridemg/l0.790.5611.5
(7.)TSSmg/l0000
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.927.27A
(2.)CODmg/l55.2112.74C
(3.)DOmg/l6.55.6B
(4.)BODmg/l185C
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))42.5738.145
(2.)Leq(Day)A-weighted decibels(dB(A))52.6348.355
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNA7.946.96
(2.)P(Phosphorus)Kilogram per hectare21.1613.85
(3.)K(Potassium)Kilogram per hectare210145
(4.)N(Nitrogen)Kilogram per hectare270245
(5.)Electric ConductivityMillisiemens per Centimetre0.4540.216
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 5
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater500Copy of Permission LetterPipelineTube Well170418000046617 Apr 201850
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial510ETP & ROReuse within the Plant & Recycling,Green Belt Renewal Plant5
(2.)Domestic1.20Soak pitGreen Belt Renewal Plant1.2
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 6.2
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 6.2
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1Tons15RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)Spent catalystIndustrial Waste0.02Tons15RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)used oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.05Kilolitre15RoadAuthorized Recyclers
(4.)boiler ashBottom Ash8Tons15RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube92.410.01792.417100
(2.)PM2.5Microgram per Meter Cube50.400.01850.41860
(3.)SO2Microgram per Meter Cube11.230.00411.20480
(4.)NOxMicrogram per Meter Cube31.430.00531.40580
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)BoilerWood Briqquette205PM100.0139
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 220
(b)Source PSTCL (Punjab State Transmission Corporation Ltd)
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 2x175 KVA
(e)Stack Height (in m) 4
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0.255
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 0.255
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0.255
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : 0 0
    Total (ha.) 0.255
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt0.0841533% of total area
(2.)Built Up Area0.17085
Total (ha.) 0.255
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSKhol hi raitan20.8out side the study area
(2.)Critically Polluted AreaNot applicable0Not in study area
(3.)Wildlife CorridorsNot applicable0Not in study area
(4.)ESAsNot applicable0Not in study area
(5.)NPANot applicable0Not in study area
(6.)ESZsNot applicable0Not in study area
(7.)CorridorsNot applicable0Not in study area
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)OthersPFBir Kheri PF5Bir Kheri PF
(2.)Defence InstallationsNot available in study area0Not available in study area
(3.)Archaeological SitesNot available in study area0Not available in study area
(4.)ForestBir Kheri PF5near Mukandpur
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.255
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species peafowl
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 15 lakhs
(iii)Period of Implementation 5 years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Jarmal Nadi
(ii)Direction of Water Bodies in Buffer Area North West
(iii)Distance of Water Bodies in Buffer Area 3.6
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 25
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 330
(f)Total Manpower 25
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.085
(b)Percentage of Total Project Area 33.33
(c)No. of Plants to be Planted 125
(d)Funds Allocated for Plantation 50000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialCompany allocated a fund of Rs. 10.5 Lakhs under ESC which will be utilized under the consultation with Sarpanch, Gram pradhan & District administration.
(2.)FinancialProposed project will generate employment opportunity for the local, which will help in their financial development. Also the project will generate the revenue in terms of taxes for the country & helps in development of the nation
(3.)EnvironmentalThe proposed project is based on (ZLD) zero liquid discharge. Excess treated water will be reused back into the process for various industrial activities. No wastewater will be discharged outside the boundary of the project. Hence, there will be no adverse impact on the agriculture crops or on the animals moving around the industry. Also the development of greenbelt helps the environment
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0037
(ii)Name of the EIA Consultant VARDAN ENVIRONET
(iii)Address VardanEnvironet,, D-142 Ground Floor, Sushant Lok-III, Sec-57, Gurgaon
(iv)Mobile No. 9953147268
(v)Landline No. 0124429103
(vi)Email Id industry@vardanenvironet.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 09 Nov 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease inform/clarify the following:- - Whether the proposed industrial operations are permitted at the project site and/or in conformity with land use of the area. That needs to be confirmed along with supporting documents. - Whether any permission is required from the SPCB to allow such a polluting unit in non-industrial area. 01 Nov 2018
2.NAThe correction have been made as per the instruction received 16 Nov 2018
3.NA- As per the information given in column 13.1 of Form-2, total water requirement is 16500 cum/day. Whereas, request has been made to CGWA for withdrawal of 50 cum/day only. This needs to be clarified along with the present status. - Accreditation of the consultant for preparing EIA/EMP report for category A projects under item 5(f) needs confirmation. - Please submit consent to establish issued by SPCB. 03 Dec 2018
4.NAThe correction have been made as per the instruction received 10 Dec 2018
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRajinder Paul Singla
DesignationGM
Name of Company (Applicant Name should not be given here)TRIGUN ORGANICS
AddressM/s Trigun Organics, village Toffanpur, Tehsil Derabassi, District SAS Nagar, State Punjab
Print