Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Endoc Lifecare Pvt. Ltd.
(b)Name of the Company / Organisation ENDOC LIFECARE PRIVATE LIMITED
(c)Registered Address Plot No. 4-7, Survey No. 52 & 53, B/H Saurashtra Paper Board Mill, Shapar (Veraval), Ta: Kotda Sanghani, District: Rajkot (Gujarat),,Rajkot,Gujarat-360024
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Laljibhai Patel
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address Plot No. 4-7, Survey No. 52 & 53, B/H Saurashtra Paper Board Mill, Shapar (Veraval), Ta: Kotda Sanghani, Dist: Rajkot (Gujarat),,Kotda Sangani,Rajkot,Gujarat-360024
(d)Pin code 360024
(e)E-mail ldp@endocpharma.com
(f)STD Code. 2827(f)Telephone No. 253690
(g)Fax No. 254245
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
(b)Category A
(c)Proposal Number IA/GJ/IND2/28061/2008
(d)Master Proposal Number(Single Window) SW/83039/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No. 4-7, Survey No. 52 & 53
(b)Pincode 360024
(c)Bounded Latitudes (North)
From
Degree 22.14822
Minutes
Second
From
Degree 22.14893
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 70.78152
Minutes
Second
From
Degree 70.78172
Minutes
Second
(e)Survey of India Topo Sheet No. F42K16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 572
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 50
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/176/2015-IA-II (I)
(c)Date of Issue of TOR 23 Sep 2008
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 13 Mar 2019
(c)Date of Issue of EC 19 Jul 2019
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :15 Jul 2017
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :22 Aug 2017
Distance of Public Hearing Venue from the Proposed Project :00
In the compound of M/s. Endoc Lifecare Pvt. Ltd., at Plot No. 4-7, Survey No. 52 & 53
State :Gujarat
District :Rajkot
Tehsil :Kotda Sangani
Village :Shapar (Veraval)
71Public asked about project benefits and overall EMS. For details pls. see minutes of meeting of PHOthersResident Additional Collector and Additional District Magistrate
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhopal
(iii)Letter No. 5-14/2009(ENV)/476
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jun 16 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Tizanidine Hydrochloride0055OthersMTPMRoad
(2.)Ornidazole4654100OthersMTPMRoad
(3.)R&D Product0022OthersMTPMRoad
(4.)Fluoxetine Hydrochloride0055OthersMTPMRoad
(5.)Flucanazole5510OthersMTPMRoad
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)SS 316 SS Jacketed Reactor1 no. (4000 lit)2 nos. (4000 lit each)3 nos.
(2.)SS 316 SS Jacketed Reactor1 no. (5000 lit)1 no. (5000 lit)2 nos.
(3.)SS 316 MS Jacketed Reactor1 no. (1200 lit)01 no.
(4.)Centrifuge SS 3162 nos. (48” Dia.)2 nos. (48” Dia.)4 nos.
(5.)Sparkler Filter1 no. (14” D x 10)1 no. (14” D x 10)2 nos.
(6.)Jacketed Reactor With column Condenser & receiver1 no. (1600 lit)01 no.
(7.)Jacketed Reactor With column Condenser & receiver3 nos. (2000 lit each)3 nos. (2000 lit each)6 nos.
(8.)SS 316 SS Condenser1 no. (10 m2)1 no. (10 m2)2 nos.
(9.)Fluid Bed Dryer1 no. (250 kg)01 no.
(10.)SS 316 SS Jacketed Reactor2 nos. (2400 lit each)3 nos. (2400 lit each)5 nos.
(11.)SS 316 SS Jacketed Reactor1 no. (2100 Ltr.)01 no.
(12.)MSGL MS Jacketed Reactor1 (1600 lit)01 no.
(13.)SS 316 SS Jacketed Reactor1 no. (5800 lit)01 no.
(14.)SS 316 SS Jacketed Reactor1 no. (1200 lit)1 no. (1200 lit)2 nos.
(15.)MSGL MS1 no. (1600 lit)01
(16.)SS 316 SS Jacketed Reactor1 no. (6000 lit)01 no.
(17.)SS 316 SS Jacketed Reactor1 no. (7000 lit)01 no.
(18.)SS 317L SS Jkt Reactor1 no. (6000 lit)01 no.
(19.)Centrifuge SS 3163 nos. (36” Dia.)3 nos. (36” Dia.)6 nos.
(20.)Sparkler Filter1 no. (14” D x 10)1 no. (14” D x 10)2 nos.
(21.)Sparkler Filter1 no. (14” D x 10)1 no. (14” D x 10)2 nos.
(22.)Sparkler Filter1 no. (14” D x 10)1 no. (14” D x 10)2 nos.
(23.)Sparkler Filter1 no. (18” D x 15)01 no.
(24.)Sparkler Filter2 nos. (18” D x 12 Nos.)1 no. (18” D x 12 Nos.)3 nos.
(25.)Octagonal Blender1 no. (5000 lit)01 no.
(26.)SS Hot Air Dryer2 nos. (48 tray)1 no. (48 tray)3 nos.
(27.)Ejector vaccum Pump1 no. (50 m3/hr.)01 no.
(28.)SS Condenser3 nos. (10 m2 each)2 nos. (10 m2 each)5 nos.
(29.)SS Condenser2 nos. (13 m2 each)1 no. (13 m2)3 nos.
(30.)SS 316 SS Jacketed Reactor2 nos. (1000 lit each)1 no. (1000 lit each)3
(31.)SS 316 SS Condenser1 no. (20 m2)1 no. (20 m2)2
(32.)SS 316 SS Condenser1 no. (15 m2)1 no. (15 m2)2 nos.
(33.)SS 317L SS Jkt Reactor1 no. (5000 lit)01 no.
(34.)SS 317L SS Jkt Reactor1 no. (3500 lit)01
(35.)Sparkler Filter1 no. (14” D x 10)1 no. (14” D x 10)2 nos.
(36.)Fluid Bed Dryer1 no. (120 kg)01 no.
(37.)Octagonal Blender01 no. (1250 lit)1 no.
(38.)Ejector Vacuum Pump1 no. (81 m3/hr. each)1 no. (81 m3/hr. each)2 nos.
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 07 Aug 2014
(iv)Valid Upto 04 May 2019
(v)File No. PC/CCA-RJ-24(2)/ID-19546
(vi)Application No. AWH-75382
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 8.33
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.35
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.1125
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.30
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 893.34
(b)Existing quantity of raw material/fuel 1013.28
(c)Total quantity of raw material/fuel 1906.62
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Attached file1906.62Tons per AnnumLocalRoadby Sea70 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2016 To 31 May 2016
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube40.628.236.860
(2.)SO2Micro Gram per Meter Cube31.615.225.2880
(3.)NOxMicro Gram per Meter Cube35.318.628.7480
(4.)PM10Micro Gram per Meter Cube79.956.973.36100
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.837.428.58.5
(2.)TDSmg/l10428875002000
(3.)Total Hardnessmg/l356242300600
(4.)Chloridesmg/l4893992501000
(5.)Fluoridemg/l0.810.4511.5
(6.)TSSmg/l10.17.90000
    14.3.     No. of Surface Water monitoring locations : 00
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA0000A
(2.)DOmg/l0000B
(3.)CODmg/l0000B
(4.)BODmg/l0000B
    14.4.     No. of Ambient Noise monitoring locations : 9
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))54.940.170
(2.)Leq(Day)A-weighted decibels(dB(A))68.344.275
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOtherspH unit7.827.55
(2.)N(Nitrogen)Milligram per Kilogram189147
(3.)P(Phosphorus)Milligram per Kilogram11079
(4.)K(Potassium)Milligram per Kilogram9258
(5.)Electric ConductivityOthersds/m1.81.1
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 25 To 30
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 20 To 25
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater87.1700Copy of Permission LetterPipelineOthersBore well21-4/4542/GJ/IND/201812 Nov 201859.72
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial27.4535.0ETP and MEEOthersTreated water reused for Greenbelt27.4500
(2.)Domestic4.50Soak pitOthersSoak Pit04.5
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 31.95
(b)Total Discharged Water (Kilolitre per Day) 4.5
(c)Total Reused Water (Kilolitre per Day) 27.45
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)210Tons135RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)Distillation ResidueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)168Tons135RoadOthersCHWIF
(3.)Filters & Filter MaterialHazardous Waste (as per Hazardous and Other Waste Management rules 2016)12Tons135RoadTreatment, Storage and Disposal Facility(TSDF)
(4.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.150Kilolitre25RoadAuthorized Recyclers
(5.)Spent Ion Exchange resinHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.150Kilolitre135RoadTreatment, Storage and Disposal Facility(TSDF)
(6.)MEE saltHazardous Waste (as per Hazardous and Other Waste Management rules 2016)30Tons135RoadTreatment, Storage and Disposal Facility(TSDF)
(7.)Discarded Containers/BarrelsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)144Tons25RoadAuthorized Recyclers
(8.)Spent Catalyst/Spent CarbonHazardous Waste (as per Hazardous and Other Waste Management rules 2016)18Tons135RoadOthersCHWIF
(9.)Fly AshFly Ash120Tons25RoadOthersBrick Manufacturer
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube33.81.410.534.360
(2.)SO2Microgram per Meter Cube25.81.410.226.080
(3.)PM10Microgram per Meter Cube68.91.410.569.4100
(4.)NOxMicrogram per Meter Cube22.41.410.422.880
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Boiler (2 TPH)Agro Briquette/Coal210.45OthersSPM, SO2, NOx0
(2.)Boiler (2 TPH)CNG210.45OthersSPM, SO2, NOx0
(3.)Boiler (1 TPH)CNG150.45OthersSPM, SO2, NOx0
(4.)D G Set (400 kVA)HSD40.3OthersSPM, SO2, NOx0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 700
(b)Source Paschim Gujarat Vij Company Limited (PGVCL)
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) D G Set of 400 kVA
(e)Stack Height (in m) 4
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 2.539
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 2.539
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0.0224
(b)Waste/Barren Land (ha.) 0.0062
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0.0002
(e)Settlements (ha.) 00
(f)Industrial (ha.) 0.0026
(g)Forest (ha.) 00
(h)Mangroves (ha.) 00
(i)Marine Area (ha.) 00
(j)Others (ha.) : 0 00
    Total (ha.) 0.0314
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0.25
(2.)Green belt0.84
(3.)OthersRoad, Parking, open area1.09
(4.)Built Up Area0.359Storage, Tank Farm, Sec. Cabin, ETP
Total (ha.) 2.539
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANone within 10 km radius00None within 10 km
(2.)ESZsNone within 10 km radius00None within 10 km
(3.)CorridorsNone within 10 km radius00None within 10 km
(4.)WLSNone within 10 km radius00None within 10 km
(5.)ESAsNone within 10 km radius00None within 10 km
(6.)Critically Polluted AreaNone within 10 km radius00None within 10 km
(7.)Wildlife CorridorsNone within 10 km radius00None within 10 km
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNone within 10 km00None within 10 km
(2.)Defence InstallationsNone within 10 km00None within 10 km
(3.)Archaeological SitesNone within 10 km00None within 10 km
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 00
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 2.539
(b)Land yet to be acquired(Ha) 00
(c)Status of Land acquisition if not acquired Already Acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 00
(b)No. of Households 00
(c)No. of PDFs (Project Displaced Families) 00
(d)No. of PAFs (Project Affected Families) 00
(e)Funds Allocated for R&R(in INR) (in Lacs) 00
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 5
(b)Permanent Employment-During Operation 55
(c)Temporary Employment- During Construction 5
(d)Temporary Employment- During Operation 5
(e)No. of working days 26
(f)Total Manpower 70
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt0.150.690.84
(2.)Percentage of Total Project Area62733
(3.)No. of Plants37517252100
(4.)Funds Allocated100000400000500000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployment generation, CSR activities
(2.)FinancialContributing to nation by paying various taxes
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA 0084
(ii)Name of the EIA Consultant San Envirotech Pvt. Ltd.
(iii)Address 424, Medicine Market, Paldi Cross Road, Paldi, Ahmedabad
(iv)Mobile No. 9825007201
(v)Landline No. 0792658307
(vi)Email Id mahendra.sepl@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 23 Dec 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease clarify/inform the following:- - EC dated 30/10/2008 is yet to be transferred in the name of M/s Endoc Lifecare Pvt Ltd. - As per the application submitted to CGWA, there would be no change in fresh water requirement from the present of 59.72 cum/day. This needs to be confirmed. - How the unit is operational with ground water withdrawal without any clearance for that. 01 Nov 2018
2.NAThe correction have been made as per the instruction received 12 Nov 2018
3.NAPlease inform whether any proposal for transfer of EC dated 30/10/2008 is submitted, and the status thereof. 21 Nov 2018
4.NAThe correction have been made as per the instruction received 21 Nov 2018
5.NAPlease submit the proposal on the Ministry's portal for transfer of EC dated 30/10/2008 in the name of M/s Endoc Lifecare Pvt Ltd. 04 Dec 2018
6.NAThe correction have been made as per the instruction received 14 Dec 2018
7.NAPlease get the EC dated 30/10/2008 transferred in your name for further consideration of the proposal. 22 Dec 2018
8.NAThe correction have been made as per the instruction received 24 Dec 2018
9.NAPlease see our observations dated 22/12/2018 for the needful. 31 Dec 2018
10.NAThe correction have been made as per the instruction received 11 Jan 2019
11.NA- How the present proposal has been assigned different No. (IA/GJ/IND2/28061/2008) from that of the ToR dated 13/10/2015 (IA/GJ/IND2/28063/2015). - Proposal for EC, complying with the ToR (including condition for the requirement of CCR), was not submitted within the validity period of 3 years of the ToR dated 13/10/2015. 19 Jan 2019
12.NAThe correction have been made as per the instruction received 13 Mar 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantLaljibhai Patel
DesignationDirector
Name of Company (Applicant Name should not be given here)ENDOC LIFECARE PRIVATE LIMITED
AddressPlot No. 4-7, Survey No. 52 & 53, B/H Saurashtra Paper Board Mill, Shapar (Veraval), Ta: Kotda Sanghani, District: Rajkot (Gujarat)
Print