1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Endoc Lifecare Pvt. Ltd. | (b)Name of the Company / Organisation | ENDOC LIFECARE PRIVATE LIMITED | (c)Registered Address | Plot No. 4-7, Survey No. 52 & 53,
B/H Saurashtra Paper Board Mill,
Shapar (Veraval), Ta: Kotda Sanghani,
District: Rajkot (Gujarat),,Rajkot,Gujarat-360024 | (d)Legal Status of the Company | Others | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Laljibhai Patel | (b)Designation (Owner/ Partner/ CEO) | Director | (c)Address | Plot No. 4-7, Survey No. 52 & 53,
B/H Saurashtra Paper Board Mill, Shapar (Veraval), Ta: Kotda Sanghani,
Dist: Rajkot (Gujarat),,Kotda Sangani,Rajkot,Gujarat-360024 | (d)Pin code | 360024 | (e)E-mail | ldp@endocpharma.com | (f)STD Code. | 2827(f)Telephone No. | 253690 | (g)Fax No. | 254245 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Minor Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| (b)Category | A | (c)Proposal Number | IA/GJ/IND2/28061/2008 | (d)Master Proposal Number(Single Window) | SW/83039/2018 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Plot No. 4-7, Survey No. 52 & 53 | (b)Pincode | 360024 | (c)Bounded Latitudes (North) | | From | | Degree | 22.14822 | Minutes | | Second | | From | | Degree | 22.14893 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 70.78152 | Minutes | | Second | | From | | Degree | 70.78172 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F42K16 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 572 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 50 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/176/2015-IA-II (I) | (c)Date of Issue of TOR | 23 Sep 2008 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 13 Mar 2019 | (c)Date of Issue of EC | 19 Jul 2019 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 22 Aug 2017 | Distance of Public Hearing Venue from the Proposed Project : | 00 |
| In the compound of M/s. Endoc Lifecare Pvt. Ltd., at Plot No. 4-7, Survey No. 52 & 53 | State : | Gujarat | District : | Rajkot | Tehsil : | Kotda Sangani | Village : | Shapar (Veraval) |
| 71 | Public asked about project benefits and overall EMS. For details pls. see minutes of meeting of PH | Others | Resident Additional Collector and Additional District Magistrate | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bhopal | (iii)Letter No. | 5-14/2009(ENV)/476 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Jun 16 2018 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Tizanidine Hydrochloride | 00 | 5 | 5 | Others | MTPM | Road | | (2.) | Ornidazole | 46 | 54 | 100 | Others | MTPM | Road | | (3.) | R&D Product | 00 | 2 | 2 | Others | MTPM | Road | | (4.) | Fluoxetine Hydrochloride | 00 | 5 | 5 | Others | MTPM | Road | | (5.) | Flucanazole | 5 | 5 | 10 | Others | MTPM | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | SS 316 SS Jacketed Reactor | 1 no. (4000 lit) | 2 nos. (4000 lit each) | 3 nos. | | (2.) | SS 316 SS Jacketed Reactor | 1 no. (5000 lit) | 1 no. (5000 lit) | 2 nos. | | (3.) | SS 316 MS Jacketed Reactor | 1 no. (1200 lit) | 0 | 1 no. | | (4.) | Centrifuge SS 316 | 2 nos. (48” Dia.) | 2 nos. (48” Dia.) | 4 nos. | | (5.) | Sparkler Filter | 1 no. (14” D x 10) | 1 no. (14” D x 10) | 2 nos. | | (6.) | Jacketed Reactor With column Condenser & receiver | 1 no. (1600 lit) | 0 | 1 no. | | (7.) | Jacketed Reactor With column Condenser & receiver | 3 nos. (2000 lit each) | 3 nos. (2000 lit each) | 6 nos. | | (8.) | SS 316 SS Condenser | 1 no. (10 m2) | 1 no. (10 m2) | 2 nos. | | (9.) | Fluid Bed Dryer | 1 no. (250 kg) | 0 | 1 no. | | (10.) | SS 316 SS Jacketed Reactor | 2 nos. (2400 lit each) | 3 nos. (2400 lit each) | 5 nos. | | (11.) | SS 316 SS Jacketed Reactor | 1 no. (2100 Ltr.) | 0 | 1 no. | | (12.) | MSGL MS Jacketed Reactor | 1 (1600 lit) | 0 | 1 no. | | (13.) | SS 316 SS Jacketed Reactor | 1 no. (5800 lit) | 0 | 1 no. | | (14.) | SS 316 SS Jacketed Reactor | 1 no. (1200 lit) | 1 no. (1200 lit) | 2 nos. | | (15.) | MSGL MS | 1 no. (1600 lit) | 0 | 1 | | (16.) | SS 316 SS Jacketed Reactor | 1 no. (6000 lit) | 0 | 1 no. | | (17.) | SS 316 SS Jacketed Reactor | 1 no. (7000 lit) | 0 | 1 no. | | (18.) | SS 317L SS Jkt Reactor | 1 no. (6000 lit) | 0 | 1 no. | | (19.) | Centrifuge SS 316 | 3 nos. (36” Dia.) | 3 nos. (36” Dia.) | 6 nos. | | (20.) | Sparkler Filter | 1 no. (14” D x 10) | 1 no. (14” D x 10) | 2 nos. | | (21.) | Sparkler Filter | 1 no. (14” D x 10) | 1 no. (14” D x 10) | 2 nos. | | (22.) | Sparkler Filter | 1 no. (14” D x 10) | 1 no. (14” D x 10) | 2 nos. | | (23.) | Sparkler Filter | 1 no. (18” D x 15) | 0 | 1 no. | | (24.) | Sparkler Filter | 2 nos. (18” D x 12 Nos.) | 1 no. (18” D x 12 Nos.) | 3 nos. | | (25.) | Octagonal Blender | 1 no. (5000 lit) | 0 | 1 no. | | (26.) | SS Hot Air Dryer | 2 nos. (48 tray) | 1 no. (48 tray) | 3 nos. | | (27.) | Ejector vaccum Pump | 1 no. (50 m3/hr.) | 0 | 1 no. | | (28.) | SS Condenser | 3 nos. (10 m2 each) | 2 nos. (10 m2 each) | 5 nos. | | (29.) | SS Condenser | 2 nos. (13 m2 each) | 1 no. (13 m2) | 3 nos. | | (30.) | SS 316 SS Jacketed Reactor | 2 nos. (1000 lit each) | 1 no. (1000 lit each) | 3 | | (31.) | SS 316 SS Condenser | 1 no. (20 m2) | 1 no. (20 m2) | 2 | | (32.) | SS 316 SS Condenser | 1 no. (15 m2) | 1 no. (15 m2) | 2 nos. | | (33.) | SS 317L SS Jkt Reactor | 1 no. (5000 lit) | 0 | 1 no. | | (34.) | SS 317L SS Jkt Reactor | 1 no. (3500 lit) | 0 | 1 | | (35.) | Sparkler Filter | 1 no. (14” D x 10) | 1 no. (14” D x 10) | 2 nos. | | (36.) | Fluid Bed Dryer | 1 no. (120 kg) | 0 | 1 no. | | (37.) | Octagonal Blender | 0 | 1 no. (1250 lit) | 1 no. | | (38.) | Ejector Vacuum Pump | 1 no. (81 m3/hr. each) | 1 no. (81 m3/hr. each) | 2 nos. | | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 07 Aug 2014 | (iv)Valid Upto | 04 May 2019 | (v)File No. | PC/CCA-RJ-24(2)/ID-19546 | (vi)Application No. | AWH-75382 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 8.33 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.35 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.1125 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.30 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 893.34 | (b)Existing quantity of raw material/fuel | 1013.28 | (c)Total quantity of raw material/fuel | 1906.62 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Attached file | 1906.62 | Tons per Annum | | Local | Road | by Sea | 70 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2016 To 31 May 2016 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 40.6 | 28.2 | 36.8 | 60 | (2.) | SO2 | | Micro Gram per Meter Cube | 31.6 | 15.2 | 25.28 | 80 | (3.) | NOx | | Micro Gram per Meter Cube | 35.3 | 18.6 | 28.74 | 80 | (4.) | PM10 | | Micro Gram per Meter Cube | 79.9 | 56.9 | 73.36 | 100 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.83 | 7.42 | 8.5 | 8.5 | (2.) | TDS | | | mg/l | | 1042 | 887 | 500 | 2000 | (3.) | Total Hardness | | | mg/l | | 356 | 242 | 300 | 600 | (4.) | Chlorides | | | mg/l | | 489 | 399 | 250 | 1000 | (5.) | Fluoride | | | mg/l | | 0.81 | 0.45 | 1 | 1.5 | (6.) | TSS | | | mg/l | | 10.1 | 7.9 | 00 | 00 | |
14.3. No. of Surface Water monitoring locations : 00 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 00 | 00 | A | (2.) | DO | | mg/l | | 00 | 00 | B | (3.) | COD | | mg/l | | 00 | 00 | B | (4.) | BOD | | mg/l | | 00 | 00 | B | |
14.4. No. of Ambient Noise monitoring locations : 9 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 54.9 | 40.1 | 70 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 68.3 | 44.2 | 75 | |
14.5. No. of Soil Sample Monitored locations : 6 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | Others | pH unit | 7.82 | 7.55 | (2.) | N(Nitrogen) | Milligram per Kilogram | | 189 | 147 | (3.) | P(Phosphorus) | Milligram per Kilogram | | 110 | 79 | (4.) | K(Potassium) | Milligram per Kilogram | | 92 | 58 | (5.) | Electric Conductivity | Others | ds/m | 1.8 | 1.1 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 25 To 30 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 20 To 25 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 87.17 | 00 | Copy of Permission Letter | Pipeline | | Others | Bore well | 21-4/4542/GJ/IND/2018 | 12 Nov 2018 | 59.72 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Industrial | 27.45 | 35.0 | ETP and MEE | Others | Treated water reused for Greenbelt | 27.45 | 00 | (2.) | Domestic | 4.5 | 0 | Soak pit | Others | Soak Pit | 0 | 4.5 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 31.95 | (b)Total Discharged Water (Kilolitre per Day) | 4.5 | (c)Total Reused Water (Kilolitre per Day) | 27.45 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | ETP Sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 210 | Tons | 135 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (2.) | Distillation Residue | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 168 | Tons | 135 | Road | | Others | CHWIF | (3.) | Filters & Filter Material | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 12 | Tons | 135 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (4.) | Used Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.150 | Kilolitre | 25 | Road | | Authorized Recyclers | | (5.) | Spent Ion Exchange resin | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.150 | Kilolitre | 135 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (6.) | MEE salt | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 30 | Tons | 135 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (7.) | Discarded Containers/Barrels | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 144 | Tons | 25 | Road | | Authorized Recyclers | | (8.) | Spent Catalyst/Spent Carbon | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 18 | Tons | 135 | Road | | Others | CHWIF | (9.) | Fly Ash | Fly Ash | | 120 | Tons | 25 | Road | | Others | Brick Manufacturer | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 33.8 | 1.41 | 0.5 | 34.3 | 60 | (2.) | SO2 | | Microgram per Meter Cube | 25.8 | 1.41 | 0.2 | 26.0 | 80 | (3.) | PM10 | | Microgram per Meter Cube | 68.9 | 1.41 | 0.5 | 69.4 | 100 | (4.) | NOx | | Microgram per Meter Cube | 22.4 | 1.41 | 0.4 | 22.8 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Boiler (2 TPH) | Agro Briquette/Coal | 21 | 0.45 | Others | SPM, SO2, NOx | 0 | (2.) | Boiler (2 TPH) | CNG | 21 | 0.45 | Others | SPM, SO2, NOx | 0 | (3.) | Boiler (1 TPH) | CNG | 15 | 0.45 | Others | SPM, SO2, NOx | 0 | (4.) | D G Set (400 kVA) | HSD | 4 | 0.3 | Others | SPM, SO2, NOx | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 700 | (b)Source | Paschim Gujarat Vij Company Limited (PGVCL) | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | D G Set of 400 kVA | (e)Stack Height (in m) | 4 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 2.539 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 2.539 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0.0224 | (b)Waste/Barren Land (ha.) | 0.0062 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0.0002 | (e)Settlements (ha.) | 00 | (f)Industrial (ha.) | 0.0026 | (g)Forest (ha.) | 00 | (h)Mangroves (ha.) | 00 | (i)Marine Area (ha.) | 00 | (j)Others (ha.) : 0 | 00 | Total (ha.) | 0.0314 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 0.25 | | (2.) | Green belt | | 0.84 | | (3.) | Others | Road, Parking, open area | 1.09 | | (4.) | Built Up Area | | 0.359 | Storage, Tank Farm, Sec. Cabin, ETP | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | NPA | None within 10 km radius | 00 | None within 10 km | (2.) | ESZs | None within 10 km radius | 00 | None within 10 km | (3.) | Corridors | None within 10 km radius | 00 | None within 10 km | (4.) | WLS | None within 10 km radius | 00 | None within 10 km | (5.) | ESAs | None within 10 km radius | 00 | None within 10 km | (6.) | Critically Polluted Area | None within 10 km radius | 00 | None within 10 km | (7.) | Wildlife Corridors | None within 10 km radius | 00 | None within 10 km | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | None within 10 km | 00 | None within 10 km | (2.) | Defence Installations | | None within 10 km | 00 | None within 10 km | (3.) | Archaeological Sites | | None within 10 km | 00 | None within 10 km | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 00 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 2.539 | (b)Land yet to be acquired(Ha) | 00 | (c)Status of Land acquisition if not acquired | Already Acquired | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 00 | (b)No. of Households | 00 | (c)No. of PDFs (Project Displaced Families) | 00 | (d)No. of PAFs (Project Affected Families) | 00 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 00 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 5 | (b)Permanent Employment-During Operation | 55 | (c)Temporary Employment- During Construction | 5 | (d)Temporary Employment- During Operation | 5 | (e)No. of working days | 26 | (f)Total Manpower | 70 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 0.15 | 0.69 | 0.84 | (2.) | Percentage of Total Project Area | 6 | 27 | 33 | (3.) | No. of Plants | 375 | 1725 | 2100 | (4.) | Funds Allocated | 100000 | 400000 | 500000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | Employment generation, CSR activities | (2.) | Financial | Contributing to nation by paying various taxes | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA 0084 | (ii)Name of the EIA Consultant | San Envirotech Pvt. Ltd. | (iii)Address | 424, Medicine Market, Paldi Cross Road, Paldi, Ahmedabad | (iv)Mobile No. | 9825007201 | (v)Landline No. | 0792658307 | (vi)Email Id | mahendra.sepl@gmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 23 Dec 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Please clarify/inform the following:-
- EC dated 30/10/2008 is yet to be transferred in the name of M/s Endoc Lifecare Pvt Ltd.
- As per the application submitted to CGWA, there would be no change in fresh water requirement from the present of 59.72 cum/day. This needs to be confirmed.
- How the unit is operational with ground water withdrawal without any clearance for that. | 01 Nov 2018 | 2. | NA | The correction have been made as per the instruction received | 12 Nov 2018 | 3. | NA | Please inform whether any proposal for transfer of EC dated 30/10/2008 is submitted, and the status thereof. | 21 Nov 2018 | 4. | NA | The correction have been made as per the instruction received | 21 Nov 2018 | 5. | NA | Please submit the proposal on the Ministry's portal for transfer of EC dated 30/10/2008 in the name of M/s Endoc Lifecare Pvt Ltd. | 04 Dec 2018 | 6. | NA | The correction have been made as per the instruction received | 14 Dec 2018 | 7. | NA | Please get the EC dated 30/10/2008 transferred in your name for further consideration of the proposal. | 22 Dec 2018 | 8. | NA | The correction have been made as per the instruction received | 24 Dec 2018 | 9. | NA | Please see our observations dated 22/12/2018 for the needful. | 31 Dec 2018 | 10. | NA | The correction have been made as per the instruction received | 11 Jan 2019 | 11. | NA | - How the present proposal has been assigned different No. (IA/GJ/IND2/28061/2008) from that of the ToR dated 13/10/2015 (IA/GJ/IND2/28063/2015).
- Proposal for EC, complying with the ToR (including condition for the requirement of CCR), was not submitted within the validity period of 3 years of the ToR dated 13/10/2015. | 19 Jan 2019 | 12. | NA | The correction have been made as per the instruction received | 13 Mar 2019 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Laljibhai Patel | Designation | Director | Name of Company (Applicant Name should not be given here) | ENDOC LIFECARE PRIVATE LIMITED | Address | Plot No. 4-7, Survey No. 52 & 53,
B/H Saurashtra Paper Board Mill,
Shapar (Veraval), Ta: Kotda Sanghani,
District: Rajkot (Gujarat) |
|