Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) M/s. J. R. Corporation
(b)Name of the Company / Organisation J R CORPORATION
(c)Registered Address B/1085, Lamdapara Road, Village: Manjusar, Taluka: Savli,,Vadodara,Gujarat-391770
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Nirmal Chaudhary
(b)Designation (Owner/ Partner/ CEO) Chief Executive Officer
(c)Address 15-17, Akash-1, 2nd Floor, Near Narayan Garden,Gotri-Laxmipura Road, Vadodara,Savli,Vadodara,Gujarat-390021
(d)Pin code 390021
(e)E-mail nirmal501@yahoo.com
(f)STD Code. 2667(f)Telephone No. 262251
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/83015/2018
(d)Master Proposal Number(Single Window) SW/83013/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. B/1085
(b)Pincode 391770
(c)Bounded Latitudes (North)
From
Degree 22.27
Minutes
Second
From
Degree 22.28
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 73.12
Minutes
Second
From
Degree 73.12
Minutes
Second
(e)Survey of India Topo Sheet No. F43H3
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 39
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 8
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/356/2016-IA-II (I)
(c)Date of Issue of TOR 23 Mar 2018
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 07 Jan 2019
(c)Date of Issue of EC 25 Oct 2019
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :03 Aug 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :05 Sep 2018
Distance of Public Hearing Venue from the Proposed Project :00
Plot No. B/1085, Lamdapura Road, Village: Manjusar, Tal: savli, Dist.: Vadodara, Gujarat
State :Gujarat
District :Vadodara
Tehsil :Savli
Village :Manjusar
68There was no major issues raised during public hearing.District Magistrate
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By SPCB
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on
(iii)Letter No. ABCD
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Oct 11 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)2827.2127.227002827.2Tons per Annum(TPA)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Reactors104252Reactors size are different in KL
(2.)Cooling Tower1 Nos2 Nos3 NosMOC is MS
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 18 Oct 2005
(iv)Valid Upto 10 Feb 2020
(v)File No. AWH-69376
(vi)Application No. 90202
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 9.02
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1.60
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.125
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.91
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 941.976
(b)Existing quantity of raw material/fuel 5.1
(c)Total quantity of raw material/fuel 947.076
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Furnace Oil0.2Kilo Litre per DayLocal suppliersRoad15 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2017 To 31 May 2017
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 11
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube877087100
(2.)PM2.5Micro Gram per Meter Cube36203660
(3.)SO2Micro Gram per Meter Cube25102580
(4.)NOxMicro Gram per Meter Cube29162880
(5.)OthersNH3Micro Gram per Meter Cube616400
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Total Hardnessmg/l66790300600
(2.)pHOthers---7.27.018.58.5
(3.)TDSmg/l10801535002000
(4.)Chloridesmg/l292262501000
(5.)OthersSulphatemg/l825200400
(6.)Fluoridemg/l0011.5
(7.)TSSmg/l0000
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)OthersFluoridemg/l00E
(2.)pHNA--7.087.01E
(3.)DOmg/l---4.02.2E
(4.)BODmg/l---00E
(5.)CODmg/l100E
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))725475
(2.)Leq(Night)A-weighted decibels(dB(A))594670
    14.5.     No. of Soil Sample Monitored locations : 11
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)K(Potassium)Othersgm/ kg0.8540.175
(2.)pHOthers---7.807.15
(3.)N(Nitrogen)OthersNot Available00
(4.)P(Phosphorus)OthersNot available00
(5.)Electric ConductivityOthersNot available00
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10.0 To 5.0
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.0 To 5.0
(c)Whether Ground Water Intersection will be there ? Yes
(d)Upload Copy of Central Ground Water Authority Letter Copy of Central Ground Water Authority Letter
(e)Letter No. ---
(f)Date of Issue 11 Aug 2018
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater48.0250Copy of Permission LetterPipelineOthersGround Waterwater consumption is same after proposed expansion11 Aug 201886.52
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial Projects - I53.556Treated in ETP & then in MEEOthersCETP of M/s. Enviro Infrastructure Co. Ltd.,38.515
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 53.5
(b)Total Discharged Water (Kilolitre per Day) 15
(c)Total Reused Water (Kilolitre per Day) 38.5
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)residue & wasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)60.0Tons0RoadCo-Processing
(2.)Crude sodium AcetateIndustrial Waste96.0Tons0RoadOtherssale to actual end users having rule 9 permission
(3.)MEE Salt/ETP SludgeIndustrial Waste540.0Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
(4.)scrubbing solutionIndustrial Waste72.0Tons0RoadOtherstreatment in in-house ETP
(5.)distilled solvents/Stripper SolventIndustrial Waste600.0Tons0RoadOthersSell to actual users
(6.)spent catalyst/ Spent carbonHazardous Waste (as per Hazardous and Other Waste Management rules 2016)24.0Tons0RoadCo-Processing
(7.)discarded containersPlastic Waste10.8Tons0RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube001.83600
(2.)SO2Microgram per Meter Cube001.43200
(3.)NOxMicrogram per Meter Cube001.01300
(4.)Others(Specify)HClMicrogram per Meter Cube000.00400
(5.)PM2.5NA00000
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Boiler- 0.8 TPHWood- 1.5 MT/Day11.00.4PM10150 mg/NM3
(2.)Thermo pack - 2 lac k lac/hrFurnace Oil - 200 Lit/Day300.4SO2100 ppm
(3.)Boiler- 1 TPH(2 Nos.) 1 working+ 1 standbybio coal- 4.0 MT/Day30.00.6PM10150.0 mg/NM3
(4.)DG set - 50 KVA (2 NOS.)Diesel- 100 Lit/Day90.3NOx50 ppm
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 672
(b)Source MGVCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) D.G Set-2 nos.(350 KVA) & 1 nos.(100 KVA)
(e)Stack Height (in m) 11.0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0.0
(b)Private Land (ha.) 0.0
(c)Government Land (ha.) 0.0
(d)Revenue Land (ha.) 0.0
(e)Other Land (ha.) 0.9765
    Total Land (ha.) 0.9765
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 5989.18
(b)Waste/Barren Land (ha.) 753.61
(c)Grazing/ Community Land (ha.) 0.0
(d)Surface Water Bodies (ha.) 839.95
(e)Settlements (ha.) 781.45
(f)Industrial (ha.) 1523.31
(g)Forest (ha.) 0.0
(h)Mangroves (ha.) 0.0
(i)Marine Area (ha.) 0.0
(j)Others (ha.) : Canal, road, open plot,water body,.etc 22003.42
    Total (ha.) 31890.92
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Township0---
(2.)Green belt0.293---
(3.)Ash Pond0---
(4.)Quarry Area0---
(5.)OB Dump Area0---
(6.)Safety Zone0---
(7.)Tailing Pond0---
(8.)LandFill0---
(9.)Water Reservoir0---
(10.)Desalination Plant0---
(11.)Area for Solid Waste Management0.001646---
(12.)OthersArea of road, margin & open land0.558589
(13.)Main Plant0.05523Plant building
(14.)Built Up Area0.068035---
Total (ha.) 0.9765
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLS----0Details of Ecological Sensitivity- Not Applicable
(2.)NPA----0Details of Ecological Sensitivity- Not Applicable
(3.)Corridors----0Details of Ecological Sensitivity- Not Applicable
(4.)Wildlife Corridors----0Details of Ecological Sensitivity- Not Applicable
(5.)Critically Polluted Area----0Details of Ecological Sensitivity- Not Applicable
(6.)ESAs----0Details of Ecological Sensitivity- Not Applicable
(7.)ESZs----0Details of Ecological Sensitivity- Not Applicable
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Forest----0details of Environmental Sensitivity- Not Applicable
(2.)Archaeological Sites----0details of Environmental Sensitivity- Not Applicable
(3.)Defence Installations----0details of Environmental Sensitivity- Not Applicable
(4.)Others-------0details of Environmental Sensitivity- Not Applicable
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 00
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.0
(b)Land yet to be acquired(Ha) 0.0
(c)Status of Land acquisition if not acquired 0.0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 00
(b)No. of Households 00
(c)No. of PDFs (Project Displaced Families) 00
(d)No. of PAFs (Project Affected Families) 00
(e)Funds Allocated for R&R(in INR) (in Lacs) 00
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 35
(c)Temporary Employment- During Construction 50
(d)Temporary Employment- During Operation 45
(e)No. of working days 26
(f)Total Manpower 130
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt293002930
(2.)Percentage of Total Project Area30030
(3.)No. of Plants000
(4.)Funds Allocated150000001500000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployment generation
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. Not Applicable
(ii)Name of the EIA Consultant Jyoti Om Chemical Research Centre Pvt. Ltd.
(iii)Address K-1, 7705/2-4, GIDC Estate, Ankleshwar
(iv)Mobile No. 9824150383
(v)Landline No. 0264622029
(vi)Email Id info@jyotiom.com
(vii)Category of Accreditation B
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 04 Apr 2016
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA- No details are provided against many of the items/columns (6,20,21, 26-31,38) of Form-2. - Details of EC for the existing production of 10.6 TPM, and the compliance status thereof. - No increase in fresh water requirement due to the proposed expansion needs to be clarified. 06 Nov 2018
2.NAThe correction have been made as per the instruction received 13 Nov 2018
3.NA- As requested earlier, please reply regarding no increase in fresh water requirement due to the proposed expansion from 10.6 to 235.6 TPM. - Documentary evidence for the unit established in 2005 to be submitted. - Whether such an expansion would be allowed by SPCB at the given project site in non-industrial area. 23 Nov 2018
4.NAThe correction have been made as per the instruction received 14 Dec 2018
5.NAPlease refer our earlier observations. Following are yet to be informed and/or clarified:- - Application submitted to CGWA for permission to abstract ground water shows present fresh requirement/withdrawal as 48.025 cum/day, which would remain same even after the proposed expansion. - Whether the existing products (3 nos) and the proposed ones (21 nos) are synthetic organic chemicals, and thus covered under the domain of the EIA Notification, 2006. Entries at column 9(b) of Form-2 needs to be revised accordingly. 22 Dec 2018
6.NAThe correction have been made as per the instruction received 28 Dec 2018
7.NAPlease refer our earlier observations dated 23/11/2018 & 22/12/2018. Following are yet to submitted and/or clarified:- - Establishment of the unit prior to inception of EIA Notification, 1994/2006, along with supporting documents. - In view of the proposed expansion, existing fresh water requirement of 48.02 cum/day is not correct. Reply provided in this regard is not convincing. - Products list still shows the by-products, and needs to be revised. 05 Jan 2019
8.NAThe correction have been made as per the instruction received 07 Jan 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantNirmal Chaudhary
DesignationChief Executive Officer
Name of Company (Applicant Name should not be given here)J R CORPORATION
AddressB/1085, Lamdapara Road, Village: Manjusar, Taluka: Savli