|
1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | M/s. J. R. Corporation | (b)Name of the Company / Organisation | J R CORPORATION | (c)Registered Address | B/1085, Lamdapara Road, Village: Manjusar, Taluka: Savli,,Vadodara,Gujarat-391770 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Nirmal Chaudhary | (b)Designation (Owner/ Partner/ CEO) | Chief Executive Officer | (c)Address | 15-17, Akash-1, 2nd Floor, Near Narayan Garden,Gotri-Laxmipura Road, Vadodara,Savli,Vadodara,Gujarat-390021 | (d)Pin code | 390021 | (e)E-mail | nirmal501@yahoo.com | (f)STD Code. | 2667(f)Telephone No. | 262251 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/GJ/IND2/83015/2018 | (d)Master Proposal Number(Single Window) | SW/83013/2018 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | B/1085 | (b)Pincode | 391770 | (c)Bounded Latitudes (North) | | From | | Degree | 22.27 | Minutes | | Second | | From | | Degree | 22.28 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 73.12 | Minutes | | Second | | From | | Degree | 73.12 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F43H3 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 39 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 8 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/356/2016-IA-II (I) | (c)Date of Issue of TOR | 23 Mar 2018 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 07 Jan 2019 | (c)Date of Issue of EC | 25 Oct 2019 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 05 Sep 2018 | Distance of Public Hearing Venue from the Proposed Project : | 00 |
| Plot No. B/1085, Lamdapura Road, Village: Manjusar, Tal: savli, Dist.: Vadodara, Gujarat | State : | Gujarat | District : | Vadodara | Tehsil : | Savli | Village : | Manjusar |
| 68 | There was no major issues raised during public hearing. | District Magistrate | | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | SPCB | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | | (iii)Letter No. | ABCD | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Oct 11 2018 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | 2827.2 | 127.2 | 2700 | 2827.2 | Tons per Annum(TPA) | | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Reactors | 10 | 42 | 52 | Reactors size are different in KL | (2.) | Cooling Tower | 1 Nos | 2 Nos | 3 Nos | MOC is MS | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 18 Oct 2005 | (iv)Valid Upto | 10 Feb 2020 | (v)File No. | AWH-69376 | (vi)Application No. | 90202 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 9.02 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 1.60 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.125 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 1.91 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 941.976 | (b)Existing quantity of raw material/fuel | 5.1 | (c)Total quantity of raw material/fuel | 947.076 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Furnace Oil | 0.2 | Kilo Litre per Day | | Local suppliers | Road | | 15 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2017 To 31 May 2017 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 11 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 87 | 70 | 87 | 100 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 36 | 20 | 36 | 60 | (3.) | SO2 | | Micro Gram per Meter Cube | 25 | 10 | 25 | 80 | (4.) | NOx | | Micro Gram per Meter Cube | 29 | 16 | 28 | 80 | (5.) | Others | NH3 | Micro Gram per Meter Cube | 6 | 1 | 6 | 400 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Total Hardness | | | mg/l | | 667 | 90 | 300 | 600 | (2.) | pH | | | Others | --- | 7.2 | 7.01 | 8.5 | 8.5 | (3.) | TDS | | | mg/l | | 1080 | 153 | 500 | 2000 | (4.) | Chlorides | | | mg/l | | 292 | 26 | 250 | 1000 | (5.) | Others | Sulphate | | mg/l | | 82 | 5 | 200 | 400 | (6.) | Fluoride | | | mg/l | | 0 | 0 | 1 | 1.5 | (7.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | |
14.3. No. of Surface Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | Others | Fluoride | mg/l | | 0 | 0 | E | (2.) | pH | | NA | -- | 7.08 | 7.01 | E | (3.) | DO | | mg/l | --- | 4.0 | 2.2 | E | (4.) | BOD | | mg/l | --- | 0 | 0 | E | (5.) | COD | | mg/l | | 10 | 0 | E | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 72 | 54 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 59 | 46 | 70 | |
14.5. No. of Soil Sample Monitored locations : 11 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | K(Potassium) | Others | gm/ kg | 0.854 | 0.175 | (2.) | pH | Others | --- | 7.80 | 7.15 | (3.) | N(Nitrogen) | Others | Not Available | 0 | 0 | (4.) | P(Phosphorus) | Others | Not available | 0 | 0 | (5.) | Electric Conductivity | Others | Not available | 0 | 0 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10.0 To 5.0 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2.0 To 5.0 | (c)Whether Ground Water Intersection will be there ? | Yes | (d)Upload Copy of Central Ground Water Authority Letter | Copy of Central Ground Water Authority Letter | (e)Letter No. | --- | (f)Date of Issue | 11 Aug 2018 | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 48.025 | 0 | Copy of Permission Letter | Pipeline | | Others | Ground Water | water consumption is same after proposed expansion | 11 Aug 2018 | 86.52 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Industrial Projects - I | 53.5 | 56 | Treated in ETP & then in MEE | Others | CETP of M/s. Enviro Infrastructure Co. Ltd., | 38.5 | 15 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 53.5 | (b)Total Discharged Water (Kilolitre per Day) | 15 | (c)Total Reused Water (Kilolitre per Day) | 38.5 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | residue & waste | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 60.0 | Tons | 0 | Road | | Co-Processing | | (2.) | Crude sodium Acetate | Industrial Waste | | 96.0 | Tons | 0 | Road | | Others | sale to actual end users having rule 9 permission | (3.) | MEE Salt/ETP Sludge | Industrial Waste | | 540.0 | Tons | 0 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (4.) | scrubbing solution | Industrial Waste | | 72.0 | Tons | 0 | Road | | Others | treatment in in-house ETP | (5.) | distilled solvents/Stripper Solvent | Industrial Waste | | 600.0 | Tons | 0 | Road | | Others | Sell to actual users | (6.) | spent catalyst/ Spent carbon | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 24.0 | Tons | 0 | Road | | Co-Processing | | (7.) | discarded containers | Plastic Waste | | 10.8 | Tons | 0 | Road | | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 0 | 0 | 1.836 | 0 | 0 | (2.) | SO2 | | Microgram per Meter Cube | 0 | 0 | 1.432 | 0 | 0 | (3.) | NOx | | Microgram per Meter Cube | 0 | 0 | 1.013 | 0 | 0 | (4.) | Others(Specify) | HCl | Microgram per Meter Cube | 0 | 0 | 0.004 | 0 | 0 | (5.) | PM2.5 | | NA | 0 | 0 | 0 | 0 | 0 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Boiler- 0.8 TPH | Wood- 1.5 MT/Day | 11.0 | 0.4 | PM10 | | 150 mg/NM3 | (2.) | Thermo pack - 2 lac k lac/hr | Furnace Oil - 200 Lit/Day | 30 | 0.4 | SO2 | | 100 ppm | (3.) | Boiler- 1 TPH(2 Nos.) 1 working+ 1 standby | bio coal- 4.0 MT/Day | 30.0 | 0.6 | PM10 | | 150.0 mg/NM3 | (4.) | DG set - 50 KVA (2 NOS.) | Diesel- 100 Lit/Day | 9 | 0.3 | NOx | | 50 ppm | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 672 | (b)Source | MGVCL | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | D.G Set-2 nos.(350 KVA) & 1 nos.(100 KVA) | (e)Stack Height (in m) | 11.0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0.0 | (b)Private Land (ha.) | 0.0 | (c)Government Land (ha.) | 0.0 | (d)Revenue Land (ha.) | 0.0 | (e)Other Land (ha.) | 0.9765 | Total Land (ha.) | 0.9765 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 5989.18 | (b)Waste/Barren Land (ha.) | 753.61 | (c)Grazing/ Community Land (ha.) | 0.0 | (d)Surface Water Bodies (ha.) | 839.95 | (e)Settlements (ha.) | 781.45 | (f)Industrial (ha.) | 1523.31 | (g)Forest (ha.) | 0.0 | (h)Mangroves (ha.) | 0.0 | (i)Marine Area (ha.) | 0.0 | (j)Others (ha.) : Canal, road, open plot,water body,.etc | 22003.42 | Total (ha.) | 31890.92 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Township | | 0 | --- | (2.) | Green belt | | 0.293 | --- | (3.) | Ash Pond | | 0 | --- | (4.) | Quarry Area | | 0 | --- | (5.) | OB Dump Area | | 0 | --- | (6.) | Safety Zone | | 0 | --- | (7.) | Tailing Pond | | 0 | --- | (8.) | LandFill | | 0 | --- | (9.) | Water Reservoir | | 0 | --- | (10.) | Desalination Plant | | 0 | --- | (11.) | Area for Solid Waste Management | | 0.001646 | --- | (12.) | Others | Area of road, margin & open land | 0.558589 | | (13.) | Main Plant | | 0.05523 | Plant building | (14.) | Built Up Area | | 0.068035 | --- | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | ---- | 0 | Details of Ecological Sensitivity- Not Applicable | (2.) | NPA | ---- | 0 | Details of Ecological Sensitivity- Not Applicable | (3.) | Corridors | ---- | 0 | Details of Ecological Sensitivity- Not Applicable | (4.) | Wildlife Corridors | ---- | 0 | Details of Ecological Sensitivity- Not Applicable | (5.) | Critically Polluted Area | ---- | 0 | Details of Ecological Sensitivity- Not Applicable | (6.) | ESAs | ---- | 0 | Details of Ecological Sensitivity- Not Applicable | (7.) | ESZs | ---- | 0 | Details of Ecological Sensitivity- Not Applicable | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | ---- | 0 | details of Environmental Sensitivity- Not Applicable | (2.) | Archaeological Sites | | ---- | 0 | details of Environmental Sensitivity- Not Applicable | (3.) | Defence Installations | | ---- | 0 | details of Environmental Sensitivity- Not Applicable | (4.) | Others | --- | ---- | 0 | details of Environmental Sensitivity- Not Applicable | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 00 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0.0 | (b)Land yet to be acquired(Ha) | 0.0 | (c)Status of Land acquisition if not acquired | 0.0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 00 | (b)No. of Households | 00 | (c)No. of PDFs (Project Displaced Families) | 00 | (d)No. of PAFs (Project Affected Families) | 00 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 00 | (f)Status of R&R | In-Progress | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 35 | (c)Temporary Employment- During Construction | 50 | (d)Temporary Employment- During Operation | 45 | (e)No. of working days | 26 | (f)Total Manpower | 130 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 2930 | 0 | 2930 | (2.) | Percentage of Total Project Area | 30 | 0 | 30 | (3.) | No. of Plants | 0 | 0 | 0 | (4.) | Funds Allocated | 1500000 | 0 | 1500000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | Employment generation | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | Not Applicable | (ii)Name of the EIA Consultant | Jyoti Om Chemical Research Centre Pvt. Ltd. | (iii)Address | K-1, 7705/2-4, GIDC Estate, Ankleshwar | (iv)Mobile No. | 9824150383 | (v)Landline No. | 0264622029 | (vi)Email Id | info@jyotiom.com | (vii)Category of Accreditation | B | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 04 Apr 2016 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | - No details are provided against many of the items/columns (6,20,21, 26-31,38) of Form-2.
- Details of EC for the existing production of 10.6 TPM, and the compliance status thereof.
- No increase in fresh water requirement due to the proposed expansion needs to be clarified. | 06 Nov 2018 | 2. | NA | The correction have been made as per the instruction received | 13 Nov 2018 | 3. | NA | - As requested earlier, please reply regarding no increase in fresh water requirement due to the proposed expansion from 10.6 to 235.6 TPM.
- Documentary evidence for the unit established in 2005 to be submitted.
- Whether such an expansion would be allowed by SPCB at the given project site in non-industrial area. | 23 Nov 2018 | 4. | NA | The correction have been made as per the instruction received | 14 Dec 2018 | 5. | NA | Please refer our earlier observations. Following are yet to be informed and/or clarified:-
- Application submitted to CGWA for permission to abstract ground water shows present fresh requirement/withdrawal as 48.025 cum/day, which would remain same even after the proposed expansion.
- Whether the existing products (3 nos) and the proposed ones (21 nos) are synthetic organic chemicals, and thus covered under the domain of the EIA Notification, 2006. Entries at column 9(b) of Form-2 needs to be revised accordingly. | 22 Dec 2018 | 6. | NA | The correction have been made as per the instruction received | 28 Dec 2018 | 7. | NA | Please refer our earlier observations dated 23/11/2018 & 22/12/2018. Following are yet to submitted and/or clarified:-
- Establishment of the unit prior to inception of EIA Notification, 1994/2006, along with supporting documents.
- In view of the proposed expansion, existing fresh water requirement of 48.02 cum/day is not correct. Reply provided in this regard is not convincing.
- Products list still shows the by-products, and needs to be revised. | 05 Jan 2019 | 8. | NA | The correction have been made as per the instruction received | 07 Jan 2019 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Nirmal Chaudhary | Designation | Chief Executive Officer | Name of Company (Applicant Name should not be given here) | J R CORPORATION | Address | B/1085, Lamdapara Road, Village: Manjusar, Taluka: Savli |
|