|
1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | M/s. S. M. Industries | (b)Name of the Company / Organisation | S. M. INDUSTRIES | (c)Registered Address | Survey No. 192/4, Village Sokhada, Taluka Khambhat, Dist. Anand, Gujarat,,Anand,Gujarat-388620 | (d)Legal Status of the Company | Others | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Rakesh Shah | (b)Designation (Owner/ Partner/ CEO) | Partner | (c)Address | Survey No. 192/4, Village Sokhada, Taluka Khambhat, Dist. Anand, Gujarat,,Khambhat,Anand,Gujarat-388620 | (d)Pin code | 388620 | (e)E-mail | smindustries98@yahoo.co.in | (f)STD Code. | 2698(f)Telephone No. | 224521 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Minor Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| (b)Category | A | (c)Proposal Number | IA/GJ/IND2/82964/2017 | (d)Master Proposal Number(Single Window) | SW/82960/2018 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | SURVEY NO. 192/4, VILLAGE : SOKHADA, TALUKA : KHAM | (b)Pincode | 388620 | (c)Bounded Latitudes (North) | | From | | Degree | 22.348703 | Minutes | | Second | | From | | Degree | 22.348839 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 72.595258 | Minutes | | Second | | From | | Degree | 72.595833 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | -- | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 10 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 3 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/371/2017-IA-II (I) | (c)Date of Issue of TOR | 24 Aug 2017 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 26 Mar 2019 | (c)Date of Issue of EC | 17 Oct 2019 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 07 Aug 2018 | Distance of Public Hearing Venue from the Proposed Project : | 10 |
| Shri Dahyabhai Hargovinddas Rao Sanskrutik Bhavan, Khambhat | State : | Gujarat | District : | Anand | Tehsil : | Khambhat | Village : | Sokhada |
| 136 | Provision of employment to local people.
Also the total green belt area that would be provided by company. | Others | Additional District Magistrate & Resident Additional Collector | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bhopal | (iii)Letter No. | Not Applicable | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Aug 24 2017 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | 100 | 15 | 85 | 100 | Others | MT/Month | Road,Rail | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Spray Dryer | 1 | 0 | 1 | 1200 lit/hr | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 21 Mar 2016 | (iv)Valid Upto | 04 Feb 2021 | (v)File No. | GPCB/CCA-AND-94(2)/ID:17608/ | (vi)Application No. | 99181 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 4.0 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 1 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.15 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 5 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 175 | (b)Existing quantity of raw material/fuel | 25 | (c)Total quantity of raw material/fuel | 200 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | diesel | 30 | Others | Liter/hr | Local Supplier | Road | | 15 | Open Market | | Copy of Linkage | (2.) | HCl | 100 | Tons per Annum | | Local Supplier | Road | | 15 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 31 Oct 2017 To 31 Dec 2017 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 10 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 47.28 | 41.66 | 46.49 | 60 | (2.) | SO2 | | Micro Gram per Meter Cube | 17.09 | 11.94 | 16.50 | 80 | (3.) | NOx | | Micro Gram per Meter Cube | 12.92 | 8.57 | 12.12 | 80 | (4.) | PM10 | | Micro Gram per Meter Cube | 78.83 | 69.35 | 77.32 | 100 | (5.) | Others | O3 | Micro Gram per Meter Cube | 14.33 | 10.37 | 14.21 | 100 | |
14.2. No. of Ground Water monitoring locations : 10 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Total Hardness | | | Others | As CaCO3 | 976.98 | 58.06 | 300 | 600 | (2.) | pH | | | NA | | 9.07 | 8.10 | 6.5 | 8.5 | (3.) | TDS | | | mg/l | | 1920 | 422 | 500 | 2000 | (4.) | Chlorides | | | mg/l | | 603.50 | 159.3 | 250 | 1000 | (5.) | Heavy Metals | | Zinc | mg/l | | 0.15 | 0.022 | 5 | 15 | (6.) | TSS | | | mg/l | | 52 | 2 | 50 | 100 | (7.) | Fluoride | | | mg/l | | 0.05 | 0.05 | 1 | 1.5 | |
14.3. No. of Surface Water monitoring locations : 4 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 8.51 | 7.89 | C | (2.) | DO | | mg/l | | 6.33 | 0.41 | C | (3.) | BOD | | mg/l | | 1 | 1 | C | (4.) | Others | Turbidity | Others | NTU | 1.6 | 0.41 | C | (5.) | COD | | mg/l | | 13.89 | 11.24 | C | |
14.4. No. of Ambient Noise monitoring locations : 10 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 75 | 47 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 69 | 39 | 70 | |
14.5. No. of Soil Sample Monitored locations : 10 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | N(Nitrogen) | Milligram per Kilogram | | 26.8 | 0.2 | (2.) | P(Phosphorus) | Milligram per Kilogram | | 4.48 | 1.26 | (3.) | K(Potassium) | Milligram per Kilogram | | 25.2 | 9.01 | (4.) | Electric Conductivity | Millisiemens per Centimetre | | 47 | 41 | (5.) | pH | Others | NA | 9.25 | 7.78 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 65 To 90 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 65 To 90 | (c)Whether Ground Water Intersection will be there ? | Yes | (d)Upload Copy of Central Ground Water Authority Letter | Copy of Central Ground Water Authority Letter | (e)Letter No. | 21-4/2782/GJ/IND/2017 | (f)Date of Issue | 21 Apr 2017 | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 31 | 1.5 | Not Appliacble | Pipeline | | Intake Well | | 21-4/2782/GJ/IND/2017 | 16 Jul 2017 | 30 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Industrial | 13.3 | 13.3 | ETP/ Spray Dryer/ MEE | Reuse within the Plant & Recycling | | 13.3 | | (2.) | Domestic | 3 | 3 | Septic Tank/ Soak Pit | Others | Disposed through septic tank and soak pit | 3 | 0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 16.3 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 16.3 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Used Oil | Industrial Waste | | 0.24 | Kilolitre | 10 | Road | | Authorized Recyclers | | (2.) | Discarded Drums/ Containers | Industrial Waste | | 72 | Tons | 15 | Road | | Authorized Recyclers | | (3.) | MEE salt | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 120 | Tons | 10 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (4.) | Spray Dryer Sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 240 | Tons | 15 | Road | | Others | Sold to Tinting dyes to end user | (5.) | Fly Ash from Boiler | Fly Ash | | 120 | Tons | 15 | Road | | Others | Co-processing/ TSDF/ Landfilling | (6.) | Spent Solvent | Industrial Waste | | 12 | Tons | 15 | Road | Pipeline | Others | Sell to end user | (7.) | ETP Sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 14.4 | Tons | 10 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | NOx | | Microgram per Meter Cube | 9.66 | 1.5 | 0.122 | 9.78 | 80 | (2.) | SO2 | | Microgram per Meter Cube | 17.09 | 0 | 00 | 17.09 | 80 | (3.) | PM10 | | Microgram per Meter Cube | 76.94 | 1.5 | 0.143 | 77.083 | 100 | (4.) | PM2.5 | | Microgram per Meter Cube | 44.25 | 1.5 | 0.339 | 44.589 | 60 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Boiler | Agro Waste | 12 | 0.6 | SO2 | | 262 | (2.) | Spray Dryer | PNG | 15 | 0.5 | SO2 | | 262 | (3.) | Spray Dryer | PNG | 15 | 0.5 | NOx | | 94 | (4.) | Boiler | Agro Waste | 12 | 0.6 | NOx | | 94 | (5.) | Spray Dryer | PNG | 15 | 0.5 | PM10 | | 150 | (6.) | Boiler | Agro Waste | 12 | 0.6 | PM10 | | 150 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 80 | (b)Source | MGVCL | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 1 | (e)Stack Height (in m) | 10 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 4.452 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 4.452 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 93.68 | (b)Waste/Barren Land (ha.) | 7.75 | (c)Grazing/ Community Land (ha.) | 10.38 | (d)Surface Water Bodies (ha.) | 1.58 | (e)Settlements (ha.) | 10 | (f)Industrial (ha.) | 0.75 | (g)Forest (ha.) | 99 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 14.53 | (j)Others (ha.) : Creek, Mud Float and other area | 76.4 | Total (ha.) | 314.07 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 1775 | | (2.) | Green belt | | 2177 | | (3.) | Tailing Pond | | 500 | ETP Area | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | NPA | -- | 0 | -- | (2.) | ESAs | -- | 0 | -- | (3.) | Wildlife Corridors | -- | 0 | -- | (4.) | ESZs | -- | 0 | -- | (5.) | Critically Polluted Area | -- | 0 | -- | (6.) | WLS | -- | 0 | -- | (7.) | Corridors | -- | 0 | -- | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Defence Installations | | -- | 0 | -- | (2.) | Forest | | -- | 0 | -- | (3.) | Archaeological Sites | | -- | 0 | -- | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 4.452 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Land already acquired | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 10 | (b)Permanent Employment-During Operation | 5 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 5 | (e)No. of working days | 330 | (f)Total Manpower | 20 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 2600 | 0 | 2600 | (2.) | Percentage of Total Project Area | 58.4 | 0 | 58.4 | (3.) | No. of Plants | 190 | 0 | 190 | (4.) | Funds Allocated | 5.9 | 0 | 5.9 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | Provision of employment to local people | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | Stay Order Against QCI NABET | (ii)Name of the EIA Consultant | M/s. Aqua Air Environmental Engineers Pvt. Ltd. | (iii)Address | 403, Centre Point, Nr. Kadiwala School, Ring Road, Surat | (iv)Mobile No. | 9904433995 | (v)Landline No. | 0261246085 | (vi)Email Id | aqua_eia@yahoo.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 11 Apr 2016 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Please inform/clarify the following:-
- Manufacturing of Azo Dyes through different processes namely, crude, blending and grinding, is covered under item 5(f) 'Synthetic Organic chemicals' and thus requires prior EC.
- Status of EC for the present production of 15 TPM.
- Clearance for ground water withdrawal for the proposed expansion from 15 to 100 TPM. | 28 Oct 2018 | 2. | NA | The correction have been made as per the instruction received | 14 Nov 2018 | 3. | NA | - Please confirm requirement of EC for different category of products (other than Azo dyes) namely, Pigments, Solvent Dyes, Acid Dyes, Direct Dyes and Reaction Dyes.
- Product details/list needs to be revised to mention only those products covered under the domain of the EIA Notification, 2006. | 24 Nov 2018 | 4. | NA | The correction have been made as per the instruction received | 08 Mar 2019 | 5. | NA | As observed earlier also, no requirement of EC for the dyes production @10 TPM by blending & grinding process, needs to be confirmed with detailed justification and the supporting documents. Also inform about permission from the concerned regulatory authority for ground water withdrawal of 31 cum/day. | 24 Mar 2019 | 6. | NA | The correction have been made as per the instruction received | 26 Mar 2019 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | ADDITIONAL INFORMATION FOR ENVIRONMENT CLEARANCE FOR PROPOSED
EXPANSION OF DYES & NEW PIGMENTS IN EXISTING DYES UNIT AT PLOT NO. 192/4,
VILLAGE: SOKHADA, TALUKA: KHAMBHAT, DIST: ANAND – 388 620 GUJARAT, INDIA,
GUJARAT OF M/s. S. M. INDUSTRIES | 08 Jun 2019 | 2. | NA | Deferred | 17 May 2019 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Rakesh Shah | Designation | Partner | Name of Company (Applicant Name should not be given here) | S. M. INDUSTRIES | Address | Survey No. 192/4, Village Sokhada, Taluka Khambhat, Dist. Anand, Gujarat |
|