Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) M/s Vitthalrao Shinde Sahakari Sakhar Karkhana Ltd.
(b)Name of the Company / Organisation VITTHALRAO SHINDE SSK LTD
(c)Registered Address Gangamai nagar, Pimpalner, Tal- Madha, Dist- Solapur,,Solapur,Maharashtra-413214
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant R S Ranaware
(b)Designation (Owner/ Partner/ CEO) Managing Director
(c)Address Gabgamai Nagar, Pimpalner, Tal- Madha Dist- Solapur,,Madha,Solapur,Maharashtra-413214
(d)Pin code 413214
(e)E-mail vs.sugar@gmail.com
(f)STD Code. 2183(f)Telephone No. 233056
(g)Fax No. 233005
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(g) Distilleries
5(j) Sugar Industry
Minor Activity1(d) Thermal Power Plants
(b)Category A
(c)Proposal Number IA/MH/IND2/82804/2009
(d)Master Proposal Number(Single Window) SW/82603/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. At Post Pimpalner
(b)Pincode 413210
(c)Bounded Latitudes (North)
From
Degree 18.02
Minutes
Second
From
Degree 19.24
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 75.15
Minutes
Second
From
Degree 75.30
Minutes
Second
(e)Survey of India Topo Sheet No. 47N4, 47N8, 47O1, 47O5
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 515
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 15
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/376/2016-IA-II (I)
(c)Date of Issue of TOR 31 Mar 2009
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 10 Jul 2019
(c)Date of Issue of EC 20 Nov 2019
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :25 May 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :26 Jun 2018
Distance of Public Hearing Venue from the Proposed Project :0
At Site M/s Vitthalrao Shinde Sahakari Sakhar Karkhana Ltd.
State :Maharashtra
District :Solapur
Tehsil :Madha
Village :Pimpalner
85Peoples ask about the effluent treatment plan, air pollution control measures, local farmers can get press mud and compost for farming, benefits of expansion of project to local peoples, rain water haOthers
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Nagpur
(iii)Letter No. F.No.5-16/2014(ENV)/2776
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Sep 4 2017 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Distillery6090150Kilo Litre per Day(KLD)Road
(2.)Co-Generation381149Mega Watt(MW)Road
(3.)Sugar8500250011000Tons Crushed per Day(TCD)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Sugar, Cogeneration & Distillery8500TCD, 38MW & 60KLPD2500TCD, 11MW & 90KLPD1100 TCD, 49 MW & 150 KLPD
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 16 Feb 2018
(iv)Valid Upto 31 Aug 2018
(v)File No. Format-1.0/BO/CAC-CELL/UAN No. 0000028767/R/CAC-18
(vi)Application No. 0000028767
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 162
(b) Funds Allocated for Environment Management (Capital) (in Crores) 33.3
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 4.05
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.10
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Sulphur880Tons per AnnumLocal MarketRoad85 Open MarketCopy of Linkage
(2.)Lime2640Tons per AnnumLocal MarketRoad85 Open MarketCopy of Linkage
(3.)Sugar cane1760000Tons Crushed per DayLocal Market & Surrounding AreaRoad0 Open MarketCopy of Linkage
(4.)Bagasse492800Tons per AnnumInhuseConveyor Belt0 OthersInhouseCopy of Linkage
(5.)Molasses149850Tons per AnnumInhousePipe Conveyor0 OthersInhouseCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2017 To 31 May 2017
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube69.7031.5068.31100
(2.)SO2Micro Gram per Meter Cube28.908.1026.5880
(3.)NOxMicro Gram per Meter Cube37.4013.4035.2680
(4.)PM2.5Micro Gram per Meter Cube39.8015.6036.860
    14.2.     No. of Ground Water monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Total Hardnessmg/l1287.04125.93200600
(2.)TSSmg/l361000
(3.)Fluoridemg/l2.721.2211.5
(4.)Heavy MetalsArsenicmg/l000.050.05
(5.)Chloridesmg/l820.5049.042501000
(6.)pHNA8.186.718.58.5
(7.)TDSmg/l22563365002000
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.277.06A
(2.)CODmg/l100A
(3.)DOmg/l6.204.80A
(4.)BODmg/l4.102.30A
    14.4.     No. of Ambient Noise monitoring locations : 9
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))44.9240.5065
(2.)Leq(Day)A-weighted decibels(dB(A))51.4243.3675
    14.5.     No. of Soil Sample Monitored locations : 9
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Milligram per Kilogram377.42148.73
(2.)K(Potassium)Milligram per Kilogram784.2251
(3.)Electric ConductivityMillisiemens per Centimetre909211
(4.)P(Phosphorus)Milligram per Kilogram919.843.2
(5.)pHOthersNA8.187.79
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 5.75 To 7.90
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 3.65 To 5.10
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface130510 Not Appliacble PipelineOthersPipelineDN./UDMD/BC/1008/Year201308 Mar 2013657
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Laboratory and Floor Washing68.51700Primary+Secondary+Tertiary TreatmentOthersFor Irrigation Purpose68.50
(2.)Quarter111700Primary+Secondary+Tertiary TreatmentOthersFor Irrigation Purpose110
(3.)Domestic1341700septic tank followed by soak pitGreen Belt Renewal Plant134
(4.)WTP Regeneration111700Primary+Secondary+Tertiary TreatmentOthersFor Irrigation Purpose110
(5.)Cooling Tower & Boiler1621700Primary+Secondary+Tertiary TreatmentOthersFor Irrigation Purpose1620
(6.)Industrial Process4001700Primary+Secondary+Tertiary Treatment+ Condensate Polishing Unit+Incinerator BoilerOthersBio-compost & Incineration4000
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 786.5
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 786.5
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)CanteenMunicipal Solid Waste7.66Tons0RoadCollectionOthersCompost
(2.)Boiler AshIndustrial Waste5475Tons0RoadOthersSale to Brick Manufacturer
(3.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)24Tons0RoadOthersUsed as Manure
(4.)Spent OilIndustrial Waste18Tons0Conveyor BeltOthersBurnt with Bagasses in Cogen Boiler
(5.)Spent SolventIndustrial Waste2.52Tons0RoadOthersUsed for Manure
(6.)Dsitillation ResidueIndustrial Waste2.52Tons0RoadOthersUsed as Manure
(7.)Garden TrashMunicipal Solid Waste40.15Tons0RoadOthersCompost
(8.)Office WasteMunicipal Solid Waste10.95Tons0RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube625000.2963100
(2.)SO2Microgram per Meter Cube245000.982580
(3.)PM2.5Microgram per Meter Cube335000.073460
(4.)NOxMicrogram per Meter Cube9.25000.31080
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Existing Boiler 3 (150TPH)Bagasses855.5PM10100
(2.)Existing Boiler 1 (40TPH)Bagasses653.5PM10100
(3.)Existing Boiler 2 (70TPH)Bagasses653.5PM10100
(4.)Proposed Boiler 1 (40TPH)Bagasses653.5PM10100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 18794
(b)Source Own Generation
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 500 KVA
(e)Stack Height (in m) 18
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 63.6502
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 63.6502
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 20898
(b)Waste/Barren Land (ha.) 8439
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 279
(e)Settlements (ha.) 1404
(f)Industrial (ha.) 395
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : 0 0
    Total (ha.) 31415
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt33.4
(2.)OthersUtility+Storage+Road20.13
(3.)Built Up Area10.12
Total (ha.) 63.65
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNA00
(2.)ESZsNA00
(3.)CorridorsNA00
(4.)Wildlife CorridorsNA00
(5.)Critically Polluted AreaNA00
(6.)NPANA00
(7.)ESAsNA00
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA00
(2.)ForestNA00
(3.)Defence InstallationsNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 63.6502
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Nimgaon Talav: 2.2 km in North East Direction Saptane Talav: 3.1 km in South West Direction
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Ujani Dam
(ii)Direction of Water Bodies in Buffer Area North West
(iii)Distance of Water Bodies in Buffer Area 8
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 2
(b)Permanent Employment-During Operation 10
(c)Temporary Employment- During Construction 3
(d)Temporary Employment- During Operation 10
(e)No. of working days 270
(f)Total Manpower 25
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt12454490000214544
(2.)Percentage of Total Project Area19.5614.1333.69
(3.)No. of Plants300200500
(4.)Funds Allocated102535
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Social1. There is an open market for sugarcane cultivator which increase in sugarcane productivity in the vicinity of plant area. 2. CER Cost 4.05 Cr. for project will be used for social welfare of farmers and shareholders of surrounding area.
(2.)Financial1. The project will contribute additional revenue to the state & central exchange in the form of different kind of taxes. 2. Maharashtra State is contributing nearly 40% if India’s total sugar production. The said project will contribute to enhance total sugar production of state.
(3.)Environmental1. By product like Molasses & Bagases will generated from Sugar Industry, it will be used in in-house Distillery % cogeneration plant. 2. Green Belt will be developed in area about 210045 sqm which helps in pollution control and increase in aesthetic value of area.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. 130
(ii)Name of the EIA Consultant sd engineering services pvt. ltd.
(iii)Address 14, Age Arcade, New Osmanpura, Near Sant Eknath Rang Mandir, Aurangabad, Maharashtra
(iv)Mobile No. 9960634559
(v)Landline No. 0240233362
(vi)Email Id deepak.sanghai@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 10 Feb 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease inform/clarify/submit the following:- - Compliance status for the ECs dated 3/7/2010 & 18/9/2012 granted by SEIAA Maharashtra. - EC for the power generation from 30.5 to 38 MW and the compliance status thereof. - Permission of the concerned regulatory authority to draw surface water of 1305 cum/day. - Accreditation of EIA Consultant expired on 10/2/2019 and thus not authorized for preparation/submission of the EIA/EMP reports. 03 Mar 2019
2.NAThe correction have been made as per the instruction received 29 Mar 2019
3.NAPlease refer your reply to our observations dated 3/3/2019 on the proposal. It is to inform that the certified compliance report dated 22/4/2015 (site visit on 22/11/2014) for the ECs dated 3/2/2004, 21/8/2009, 3/7/2010 & 18/9/2012, is more than 3 years old and not acceptable as per the Ministry's extant norms/guidelines in the regard.Further, there is no CCR available for the EC dated 17/3/2018 issued by SEIAA. Your validity of accreditation has been extended subject to submission of the required information/documents on time to NABET. Please inform the present status. 31 Mar 2019
4.NAThe correction have been made as per the instruction received 10 Apr 2019
5.NAPlease ensure submission of certified compliance reports, not older than 3 years old, for all the ECs issued by the Ministry or SEIAA to take the proposal forward. 19 Apr 2019
6.NAPlease ensure submission of certified compliance reports, not older than 3 years old, for all the ECs issued by the Ministry or SEIAA to take the proposal forward. 19 Apr 2019
7.NAThe correction have been made as per the instruction received 10 Jul 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantR S Ranaware
DesignationManaging Director
Name of Company (Applicant Name should not be given here)VITTHALRAO SHINDE SSK LTD
AddressGangamai nagar, Pimpalner, Tal- Madha, Dist- Solapur
Print