Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Group Housing Project "DFM Residences"
(b)Name of the Company / Organisation THE DELHI FLOUR MILLS COMPANY LIMITED
(c)Registered Address 8381, Roshanara Road, Delhi,,North,Delhi-110007
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Vivek Kohli
(b)Designation (Owner/ Partner/ CEO) SeniorGeneralManager
(c)Address 8381, Roshanara Road, Delhi,,Civil Lines,North,Delhi-110007
(d)Pin code 110007
(e)E-mail vivek.kohli@dfmgroup.in
(f)STD Code. 11(f)Telephone No. 23826445
(g)Fax No. 23822409
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity8(a) Building and Construction projects
Minor Activity8(a) Building and Construction projects
(b)Category B2
   Reason for Applying at Ministry SEIAA
(c)Proposal Number IA/DL/MIS/82648/2018
(d)Master Proposal Number(Single Window) SW/82642/2018
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 8381
(b)Pincode 110007
(c)Bounded Latitudes (North)
From
Degree 3173128.50
Minutes
Second
From
Degree 3173259.22
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 715304.76
Minutes
Second
From
Degree 715487.68
Minutes
Second
(e)Survey of India Topo Sheet No. 53H/01
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 219.92
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1.86
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Delhi
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application No
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason It is Building Construction project. Hence, It is
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Club house1
(2.)Dwelling Units346
(3.)EWS276
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Plot area1.7514997HectaresOthersNA
(2.)Built-up Area13.2957HectaresOthersNA
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 501
(b) Funds Allocated for Environment Management (Capital) (in Crores) 16.1528
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 2.505
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.5697
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Coarse Aggregate77500OtherscumIndiaRoad300 Open MarketCopy of Linkage
(2.)Fine Aggregate39000OtherscumIndiaRoad300 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 07 May 2018 To 10 May 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube292.50274.20288.40100
(2.)SO2Micro Gram per Meter Cube10.49.510.180
(3.)NOxMicro Gram per Meter Cube48.2038.6044.1080
(4.)PM2.5Micro Gram per Meter Cube128.70114.50124.8060
    14.2.     No. of Ground Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSNA0000
(2.)Fluoridemg/l1.51.51.01.0
(3.)Total Hardnessmg/l10201020200200
(4.)TDSmg/l27432743500500
(5.)pHNA776.58.5
(6.)Chloridesmg/l879.7879.7250250
    14.3.     No. of Surface Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.17.1E
(2.)BODmg/l3535E
(3.)DOmg/l4.24.2E
(4.)CODmg/l114114E
    14.4.     No. of Ambient Noise monitoring locations : 1
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))57.657.645
(2.)Leq(Day)A-weighted decibels(dB(A))64.264.255
    14.5.     No. of Soil Sample Monitored locations : 1
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Milligram per Kilogram81.381.3
(2.)P(Phosphorus)Milligram per Kilogram51.051.0
(3.)K(Potassium)Milligram per Kilogram9.19.1
(4.)pHOthersNA8.08.0
(5.)Electric ConductivityMillisiemens per Centimetre814814
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 24.05 To 6.44
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 25.05 To 6.11
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersMunicipal Supply & Borewell3010Copy of Permission LettermodeOthersMunicipal Pipeline & BorewellOthersMunicipal Supply & BorewellDLOFCTS253530 Sep 1998301
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic & Flushing374445STPReuse within the Plant & Recycling,Otherswill be sent for irrigation to nearby sites247127
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 374
(b)Total Discharged Water (Kilolitre per Day) 127
(c)Total Reused Water (Kilolitre per Day) 247
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.408Kilolitre50RoadAuthorized Recyclers
(2.)BiodegradableMunicipal Solid Waste406.8Tons0OthersCollectionOthersOrganic waste converter
(3.)E wasteE Waste0.06Tons50RoadAuthorized Recyclers
(4.)Nom BiodegradableMunicipal Solid Waste145.08Tons50RoadAuthorized Recyclers
(5.)plasticPlastic Waste29.5Tons50RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube278.050.671.0279.05100
(2.)PM2.5Microgram per Meter Cube116.950.670.50117.4560
(3.)SO2Microgram per Meter Cube9.650.670.309.9580
(4.)NOxMicrogram per Meter Cube39.400.673.042.4080
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG Set- 3x1500Diesel1710.75PM100.050
(2.)DG Set- 3x1500Diesel1710.75SO20.18
(3.)DG Set- 3x1500Diesel1710.75NOx0.288
(4.)DG Set- 3x1500Diesel1710.75OthersPM2.50.020
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 3600
(b)Source TATA Power Delhi Distribution Limited
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 3x1500 kVA
(e)Stack Height (in m) 6
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 1.7514997
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 1.7514997
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Residential as per Master Plan of Delhi of 2021 1.7514997
    Total (ha.) 1.7514997
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Built Up Area1.7514997
Total (ha.) 1.7514997
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaAnand Parbat Industrial Area2.66South West direction from project site
(2.)CorridorsNone0no corridors in 10 km radius to project site
(3.)ESAsNone0no ESAs in 10 km radius to project site
(4.)NPANone0no NPA in 10 km radius to project site
(5.)Wildlife CorridorsNone0no wildlife corridor in 10 km radius
(6.)ESZsOkhla Bird Sanctuary14.26South East direction from project location
(7.)WLSOkhla Bird Sanctuary14.26South East direction from project location
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNorthern Ridge Reserve Forest0.42North East direction from project site
(2.)Archaeological SitesDelhi Fort/Lal Quila3.85North direction from project site
(3.)Defence InstallationsAir Force Station8.01South direction from project site
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 17
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1.7514997
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Peacock (Pavo cristatus)
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Najafgarh Drain
(ii)Direction of Water Bodies in Buffer Area North West
(iii)Distance of Water Bodies in Buffer Area 1.82
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 800
(d)Temporary Employment- During Operation 100
(e)No. of working days 300
(f)Total Manpower 900
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.8323
(b)Percentage of Total Project Area 47.52
(c)No. of Plants to be Planted 164
(d)Funds Allocated for Plantation 23438000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalGreen area of 8323 sq.m (47.5%) will be developed. Energy efficient measures to reduce the energy requirements which leads to lesser demands.
(2.)SocialIt will provide employment to the people during construction and operational phase directly & indirectly. An eco friendly group housing project will result in infrastructure development of the area.
(3.)FinancialAdditional revenue generation to the government will happen because of development.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 165
(b)Total No. of Flats to be Build 622
(c)No. of Buildings 4
(d)Total plot area (sqm) 17514.997
(e)Total built up area (sqm) 132957
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 9
(d)Capacity 222
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 1143 ECS
5.
Energy Saving Measures:
(a)Source/Mode LED Lights & Solar PV panels of 8 kW
(b)Percentage 40
(c)Quantity 560
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area Excess treated water shall be sent to nearby areas
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. 116
(ii)Name of the EIA Consultant Perfact Enviro Solutions
(iii)Address 5th Floor, NN Mall, Sector-3, Rohini
(iv)Mobile No. 9818362330
(v)Landline No. 0114928136
(vi)Email Id info@perfactgroup.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 19 Nov 2018
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterNA 10 Jun 2019
2.NAKindly see the Final Minutes of 36th EAC Infra-II Meeting held on 26-28 November, 2018 04 Dec 2018
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantVivek Kohli
DesignationSeniorGeneralManager
Name of Company (Applicant Name should not be given here)THE DELHI FLOUR MILLS COMPANY LIMITED
Address8381, Roshanara Road, Delhi
Print