1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Group Housing Project "DFM Residences" | (b)Name of the Company / Organisation | THE DELHI FLOUR MILLS COMPANY LIMITED | (c)Registered Address | 8381, Roshanara Road, Delhi,,North,Delhi-110007 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Vivek Kohli | (b)Designation (Owner/ Partner/ CEO) | SeniorGeneralManager | (c)Address | 8381, Roshanara Road, Delhi,,Civil Lines,North,Delhi-110007 | (d)Pin code | 110007 | (e)E-mail | vivek.kohli@dfmgroup.in | (f)STD Code. | 11(f)Telephone No. | 23826445 | (g)Fax No. | 23822409 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 8(a) Building and Construction projects
| Minor Activity | 8(a) Building and Construction projects
| (b)Category | B2 | Reason for Applying at Ministry | SEIAA | (c)Proposal Number | IA/DL/MIS/82648/2018 | (d)Master Proposal Number(Single Window) | SW/82642/2018 | (e)EAC concerned (for category A Projects only) | INFRA-2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 8381 | (b)Pincode | 110007 | (c)Bounded Latitudes (North) | | From | | Degree | 3173128.50 | Minutes | | Second | | From | | Degree | 3173259.22 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 715304.76 | Minutes | | Second | | From | | Degree | 715487.68 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 53H/01 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 219.92 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 1.86 | (j)Seismic Zone | 4 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Delhi | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR): | (a)Whether TOR is mandatory for submitting application | No | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | It is Building Construction project. Hence, It is | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Club house | 1 | | (2.) | Dwelling Units | 346 | | (3.) | EWS | 276 | | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Plot area | 1.7514997 | Hectares | | Others | NA | (2.) | Built-up Area | 13.2957 | Hectares | | Others | NA | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 501 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 16.1528 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 2.505 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.5697 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 0 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 0 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Coarse Aggregate | 77500 | Others | cum | India | Road | | 300 | Open Market | | Copy of Linkage | (2.) | Fine Aggregate | 39000 | Others | cum | India | Road | | 300 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 07 May 2018 To 10 May 2018 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 292.50 | 274.20 | 288.40 | 100 | (2.) | SO2 | | Micro Gram per Meter Cube | 10.4 | 9.5 | 10.1 | 80 | (3.) | NOx | | Micro Gram per Meter Cube | 48.20 | 38.60 | 44.10 | 80 | (4.) | PM2.5 | | Micro Gram per Meter Cube | 128.70 | 114.50 | 124.80 | 60 | |
14.2. No. of Ground Water monitoring locations : 1 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TSS | | | NA | | 0 | 0 | 0 | 0 | (2.) | Fluoride | | | mg/l | | 1.5 | 1.5 | 1.0 | 1.0 | (3.) | Total Hardness | | | mg/l | | 1020 | 1020 | 200 | 200 | (4.) | TDS | | | mg/l | | 2743 | 2743 | 500 | 500 | (5.) | pH | | | NA | | 7 | 7 | 6.5 | 8.5 | (6.) | Chlorides | | | mg/l | | 879.7 | 879.7 | 250 | 250 | |
14.3. No. of Surface Water monitoring locations : 1 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.1 | 7.1 | E | (2.) | BOD | | mg/l | | 35 | 35 | E | (3.) | DO | | mg/l | | 4.2 | 4.2 | E | (4.) | COD | | mg/l | | 114 | 114 | E | |
14.4. No. of Ambient Noise monitoring locations : 1 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 57.6 | 57.6 | 45 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 64.2 | 64.2 | 55 | |
14.5. No. of Soil Sample Monitored locations : 1 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | N(Nitrogen) | Milligram per Kilogram | | 81.3 | 81.3 | (2.) | P(Phosphorus) | Milligram per Kilogram | | 51.0 | 51.0 | (3.) | K(Potassium) | Milligram per Kilogram | | 9.1 | 9.1 | (4.) | pH | Others | NA | 8.0 | 8.0 | (5.) | Electric Conductivity | Millisiemens per Centimetre | | 814 | 814 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 24.05 To 6.44 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 25.05 To 6.11 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Municipal Supply & Borewell | 301 | 0 | Copy of Permission Letter | modeOthers | Municipal Pipeline & Borewell | Others | Municipal Supply & Borewell | DLOFCTS2535 | 30 Sep 1998 | 301 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic & Flushing | 374 | 445 | STP | Reuse within the Plant & Recycling,Others | will be sent for irrigation to nearby sites | 247 | 127 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 374 | (b)Total Discharged Water (Kilolitre per Day) | 127 | (c)Total Reused Water (Kilolitre per Day) | 247 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Used Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.408 | Kilolitre | 50 | Road | | Authorized Recyclers | | (2.) | Biodegradable | Municipal Solid Waste | | 406.8 | Tons | 0 | Others | Collection | Others | Organic waste converter | (3.) | E waste | E Waste | | 0.06 | Tons | 50 | Road | | Authorized Recyclers | | (4.) | Nom Biodegradable | Municipal Solid Waste | | 145.08 | Tons | 50 | Road | | Authorized Recyclers | | (5.) | plastic | Plastic Waste | | 29.5 | Tons | 50 | Road | | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 278.05 | 0.67 | 1.0 | 279.05 | 100 | (2.) | PM2.5 | | Microgram per Meter Cube | 116.95 | 0.67 | 0.50 | 117.45 | 60 | (3.) | SO2 | | Microgram per Meter Cube | 9.65 | 0.67 | 0.30 | 9.95 | 80 | (4.) | NOx | | Microgram per Meter Cube | 39.40 | 0.67 | 3.0 | 42.40 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | DG Set- 3x1500 | Diesel | 171 | 0.75 | PM10 | | 0.050 | (2.) | DG Set- 3x1500 | Diesel | 171 | 0.75 | SO2 | | 0.18 | (3.) | DG Set- 3x1500 | Diesel | 171 | 0.75 | NOx | | 0.288 | (4.) | DG Set- 3x1500 | Diesel | 171 | 0.75 | Others | PM2.5 | 0.020 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 3600 | (b)Source | TATA Power Delhi Distribution Limited | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 3x1500 kVA | (e)Stack Height (in m) | 6 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 1.7514997 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 1.7514997 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Residential as per Master Plan of Delhi of 2021 | 1.7514997 | Total (ha.) | 1.7514997 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Built Up Area | | 1.7514997 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | Anand Parbat Industrial Area | 2.66 | South West direction from project site | (2.) | Corridors | None | 0 | no corridors in 10 km radius to project site | (3.) | ESAs | None | 0 | no ESAs in 10 km radius to project site | (4.) | NPA | None | 0 | no NPA in 10 km radius to project site | (5.) | Wildlife Corridors | None | 0 | no wildlife corridor in 10 km radius | (6.) | ESZs | Okhla Bird Sanctuary | 14.26 | South East direction from project location | (7.) | WLS | Okhla Bird Sanctuary | 14.26 | South East direction from project location | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Northern Ridge Reserve Forest | 0.42 | North East direction from project site | (2.) | Archaeological Sites | | Delhi Fort/Lal Quila | 3.85 | North direction from project site | (3.) | Defence Installations | | Air Force Station | 8.01 | South direction from project site | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 1.7514997 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | NA | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Peacock (Pavo cristatus) | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Najafgarh Drain | (ii)Direction of Water Bodies in Buffer Area | North West | (iii)Distance of Water Bodies in Buffer Area | 1.82 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 0 | (c)Temporary Employment- During Construction | 800 | (d)Temporary Employment- During Operation | 100 | (e)No. of working days | 300 | (f)Total Manpower | 900 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 0.8323 | (b)Percentage of Total Project Area | 47.52 | (c)No. of Plants to be Planted | 164 | (d)Funds Allocated for Plantation | 23438000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Green area of 8323 sq.m (47.5%) will be developed.
Energy efficient measures to reduce the energy requirements which leads to lesser demands. | (2.) | Social | It will provide employment to the people during construction and operational phase directly & indirectly.
An eco friendly group housing project will result in infrastructure development of the area. | (3.) | Financial | Additional revenue generation to the government will happen because of development. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For INFRA-2 |
|
1. | Details of Building Construction: | (a)Maximum Height of the Building (Meters) | 165 | (b)Total No. of Flats to be Build | 622 | (c)No. of Buildings | 4 | (d)Total plot area (sqm) | 17514.997 | (e)Total built up area (sqm) | 132957 | |
|
2. | Foreshore Facilities and/or Marine Disposal: | (a)Whether Project Involves Foreshore Activities and/or marine Disposal? | No | |
|
3. | Rain Water Harvesting: | (a)No. of Storage | 0 | (b)Capacity | 0 | (c)No. of Recharge Pits | 9 | (d)Capacity | 222 | |
|
4. | Parking: | (a)Details of 4 Wheeler/ 2 Wheeler Parking | 1143 ECS | |
|
5. | Energy Saving Measures: | (a)Source/Mode | LED Lights & Solar PV panels of 8 kW | (b)Percentage | 40 | (c)Quantity | 560 | |
|
|
7. Type of Industries to be established with Industrial Estate as per their category A/B |
---|
S. No. | Type of Industry | No. of Units | Category A/B |
---|
NIL | |
8. | Length of the alignment | N/A | |
|
9. | Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass | Details Not Applicable | |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | 116 | (ii)Name of the EIA Consultant | Perfact Enviro Solutions | (iii)Address | 5th Floor, NN Mall, Sector-3, Rohini | (iv)Mobile No. | 9818362330 | (v)Landline No. | 0114928136 | (vi)Email Id | info@perfactgroup.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | INFRA-2 | (ix)Validity of Accreditation | 19 Nov 2018 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | NA | 10 Jun 2019 | 2. | NA | Kindly see the Final Minutes of 36th EAC Infra-II Meeting held on 26-28 November, 2018 | 04 Dec 2018 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Vivek Kohli | Designation | SeniorGeneralManager | Name of Company (Applicant Name should not be given here) | THE DELHI FLOUR MILLS COMPANY LIMITED | Address | 8381, Roshanara Road, Delhi |
|