1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Capacity Expansion, Cuddalore Port | (b)Name of the Company / Organisation | TAMIL NADU MARITIME BOARD | (c)Registered Address | Cuddalore Port
Cuddalore District
Cuddalore,Cuddalore Port
Cuddalore District
Cuddalore,Cuddalore,Tamil Nadu-607003 | (d)Legal Status of the Company | State Government | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | NiranjanMardi IAS | (b)Designation (Owner/ Partner/ CEO) | ChiefExecutiveOfficer | (c)Address | 171 South Kesavaperumal puram Off Greenways Road Raja Annamalai puram Chennai,,Mylapore Triplicane,Chennai,Tamil Nadu-600028 | (d)Pin code | 600028 | (e)E-mail | portcuddalore@gmail.com | (f)STD Code. | 4142(f)Telephone No. | 24641232 | (g)Fax No. | 238026 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 7(e) Ports, Harbours
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/TN/MIS/64666/2017 | (d)Master Proposal Number(Single Window) | SW/82566/2018 | (e)EAC concerned (for category A Projects only) | INFRA-2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | '2670', '1944' | (b)Pincode | 607003 | (c)Bounded Latitudes (North) | | From | | Degree | 11.50 | Minutes | | Second | | From | | Degree | 11.75 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 79.50 | Minutes | | Second | | From | | Degree | 79.80 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | '1', '58M/10' | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 3 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0.2 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Tamil Nadu | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Tamil Nadu | Cuddalore | Cuddalore | | |
|
6. | Details of Terms of Reference (ToR): | (a)Whether TOR is mandatory for submitting application | Yes | (b)MoEF&CC / SEIAA File Number | 10-35/2017-IA-III | (c)Date of Apply of TOR | 13 May 2017 | (d)Date of Issue of TOR / Standard ToR | 17 Aug 2017 | (e)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 22 Feb 2018 | Distance of Public Hearing Venue from the Proposed Project : | 0.2 |
| Tamilnadu Maritime Board Office, Cuddalore | State : | Tamil Nadu | District : | Cuddalore | Tehsil : | Cuddalore | Village : | Cuddalore |
| 21 | The Peoples Concern revolved on three essential things such as fisherman livelihood, fishing resource and employment | District Collector | | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Facility | Cargo Handling | | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | 5680000 | 5680000 | Tons per Annum | | Road,Rail,Conveyor Belt | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 24 Jul 2018 | (iv)Valid Upto | 31 Mar 2019 | (v)File No. | T1/TNPCB/F.0187CUD/RLCUD/W&A/2018 | (vi)Application No. | 1808114365672 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 135 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 2 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 10 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 2 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 5680000 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 5680000 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Cargo | 5680000 | Tons per Annum | | Import | Road,Rail,Conveyor Belt | | 0.2 | LOA | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2017 To 30 May 2017 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 10 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 31.3 | 17.5 | 22.4 | 60 | (2.) | NOx | | Micro Gram per Meter Cube | 22.8 | 10.0 | 12.6 | 80 | (3.) | PM10 | | Micro Gram per Meter Cube | 74.8 | 50.7 | 64.2 | 100 | (4.) | SO2 | | Micro Gram per Meter Cube | 19.8 | 11.5 | 11.7 | 80 | |
14.2. No. of Ground Water monitoring locations : 5 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Total Hardness | | | mg/l | | 274 | 200 | 300 | 600 | (2.) | TSS | | | mg/l | | 65 | 55 | 40 | 80 | (3.) | Chlorides | | | mg/l | | 485 | 320 | 250 | 1000 | (4.) | Fluoride | | | mg/l | | 0.67 | 0.42 | 1 | 1.5 | (5.) | Heavy Metals | | Hg | mg/l | | 0 | 0 | 0.001 | 0 | (6.) | TDS | | | mg/l | | 515 | 410 | 500 | 2000 | (7.) | pH | | | NA | | 7.55 | 6.60 | 6.5 | 8.5 | |
14.3. No. of Surface Water monitoring locations : 5 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 8.55 | 6.5 | C | (2.) | BOD | | mg/l | | 2.6 | 1.95 | C | (3.) | COD | | mg/l | | 21 | 5 | C | (4.) | DO | | mg/l | | 7 | 6 | C | |
14.4. No. of Ambient Noise monitoring locations : 10 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 41.50 | 25.10 | 55 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 30.30 | 19.50 | 45 | |
14.5. No. of Soil Sample Monitored locations : 10 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | Others | NA | 7.36 | 6.84 | (2.) | N(Nitrogen) | Percent | | 122 | 73 | (3.) | P(Phosphorus) | Percent | | 64 | 19 | (4.) | K(Potassium) | Milligram per Kilogram | | 174 | 29 | (5.) | Electric Conductivity | Millisiemens per Centimetre | | 265 | 123 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.5 To 17.54 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.04 To 7.46 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 100 | 1 | Not Appliacble | Pipeline | | Others | Intake from Sea | nil | 15 Feb 2016 | 250 | |
|
15.1. | (a)Whether Desalination is proposed | Yes | (b)Desalination Capacity (KLD) | 100 | (c)Quantity of Brine (KLD) | 45 | (d)Mode of Disposal of Brine | Pipe line | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Combine Waste Stream | 100 | 100 | Waste Water Treatment Plant | Green Belt Renewal Plant | | 100 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 100 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 100 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Solid Waste | Municipal Solid Waste | | 365 | Tons | 4 | Road | | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | NOx | | Microgram per Meter Cube | 21.3 | 1 | 3.1 | 18.2 | 80 | (2.) | PM10 | | Microgram per Meter Cube | 69.9 | 1 | 7.6 | 62.3 | 100 | (3.) | SO2 | | Microgram per Meter Cube | 17.6 | 1 | 4.2 | 13.4 | 80 | (4.) | PM2.5 | | Microgram per Meter Cube | 27.6 | 1 | 3.4 | 24.2 | 60 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | no stack | nil | 0 | 0 | Others | nil | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 1169.06 | (b)Source | TANGEDCO | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | DG Set 1500 kVA | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 56.92 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 56.92 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 33.14 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 5 | (j)Others (ha.) : Green Belt | 18.78 | Total (ha.) | 56.92 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Built Up Area | | 5 | Reclaimed | (2.) | Green belt | | 18.78 | 33% | (3.) | Main Plant | | 33.14 | Port Activity | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | Nil | 0 | Nil | (2.) | Wildlife Corridors | Nil | 0 | Nil | (3.) | WLS | Nil | 0 | Nil | (4.) | NPA | Nil | 0 | Nil | (5.) | ESAs | Nil | 0 | Nil | (6.) | ESZs | Nil | 0 | Nil | (7.) | Corridors | Nil | 0 | Nil | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | Nil | 0 | Nil | (2.) | Defence Installations | | Nil | 0 | Nil | (3.) | Forest | | Nil | 0 | Nil | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Nil | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | River Sea Confluence | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Uppanar and Paravanar River | (ii)Direction of Water Bodies in Buffer Area | North | (iii)Distance of Water Bodies in Buffer Area | 10 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 500 | (b)Permanent Employment-During Operation | 1000 | (c)Temporary Employment- During Construction | 500 | (d)Temporary Employment- During Operation | 500 | (e)No. of working days | 180 | (f)Total Manpower | 2500 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 18.78 | (b)Percentage of Total Project Area | 32.99 | (c)No. of Plants to be Planted | 600 | (d)Funds Allocated for Plantation | 5000000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | The Peoples Concern revolved on three essential things such as fisherman livelihood, fishing resource and employment | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For INFRA-2 |
|
1. | Details of Building Construction: | (a)Maximum Height of the Building (Meters) | 7 | (b)Total No. of Flats to be Build | 0 | (c)No. of Buildings | 4 | (d)Total plot area (sqm) | 392545 | (e)Total built up area (sqm) | 392545 | |
|
2. | Foreshore Facilities and/or Marine Disposal: | (a)Whether Project Involves Foreshore Activities and/or marine Disposal? | Yes | (b)Upload Shoreline Study | Copy of Shoreline stuudy | (c)Type of Cargo | Coal | (d)Quantity of Cargo | 5.68 | (e)Control Measures of Cargo | Fugitive dust and emission control | (f)Dust Control Measures | Ambient Air Shed Monitoring for PM | (g)Quantum | 0.56 | (h)Quantity of Dredging (Cubic meter per day) | 10408.2 | (i)Type of Dredging | Capital | (j)Disposal of Dredge Material | Low lying area, North side of near breakwater, Off | (k)Details of Outfall Diffusers | 400000 Cubic Meter | (l)No. of Dilution Expected | 0 | (m)Distance at which the Outlet will Reach Ambient Parameters | 1 | (n)Details of Monitoring at Outfall | After Project Starts | (o)Copy of NoC from PCB in case of Marine Disposal | Copy of NoC | |
|
3. | Rain Water Harvesting: | (a)No. of Storage | 0 | (b)Capacity | 0 | (c)No. of Recharge Pits | 0 | (d)Capacity | 0 | |
|
4. | Parking: | (a)Details of 4 Wheeler/ 2 Wheeler Parking | Yes, based on the Vehicle Movements | |
|
5. | Energy Saving Measures: | (a)Source/Mode | Nil | (b)Percentage | 0 | (c)Quantity | 0 | |
|
|
7. Type of Industries to be established with Industrial Estate as per their category A/B |
---|
S. No. | Type of Industry | No. of Units | Category A/B |
---|
NIL | |
8. | Length of the alignment | N/A | |
|
9. | Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass | Details Not Applicable | |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | 1 list 2 dated 11.10.2018 | (ii)Name of the EIA Consultant | Centre for Environment, Health and Safety | (iii)Address | Department of Civil Engineering, Faculty of Engineering and Technology, Annamalai University, Annamalai nagar, Tamilnadu - 608002 | (iv)Mobile No. | 9489592422 | (v)Landline No. | 0414423873 | (vi)Email Id | centreforehs@gmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | INFRA-2 | (ix)Validity of Accreditation | 30 Mar 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | As per your submission, recommendations of Coastal Zone management Authority (CZMA) are under process. It has not been submitted to the Ministry yet. Kindly submit the same. | 14 Nov 2018 | 2. | NA | The correction have been made as per the instruction received | 12 Dec 2018 | 3. | NA | Kindly submit the following:
(i) Copy of valid Consent to operate issued by State Pollution Control Board for the existing project.
(ii) Submit a copy of compliance report to the conditions of consent and authorization received from the Pollution Control Board for the existing project. | 23 Jan 2019 | 4. | NA | The correction have been made as per the instruction received | 31 Jan 2019 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | As we faced difficulty in uploading the EIA report (size ?), we attached signed pages by EC and FAEs in the EIA report.
The hard copies of EIA/EMP reports that we circulated to EAC members on 20/02/2020 has the signatures of the respective experts. | 06 Jul 2020 | 2. | NA | Kindly see the minutes of 52nd meeting of the EAC (Infra-2). | 26 Jun 2020 | 3. | ADS Reply Letter | Forward letter with PODs for dispatching EIA reports with ToR Compliance with Annexures,SCZMA Recommendations and CER Plan | 11 May 2020 | 4. | NA | The ADS reply submitted is incomplete. Kindly submit complete reply. | 08 May 2020 | 5. | ADS Reply Letter | Point Wise ToR Complaince document, with three Annexures | 05 May 2020 | 6. | NA | Kindly see the minutes of 49th meeting of EAC (Infra-2)
| 05 Mar 2020 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | NiranjanMardi IAS | Designation | ChiefExecutiveOfficer | Name of Company (Applicant Name should not be given here) | TAMIL NADU MARITIME BOARD | Address | Cuddalore Port
Cuddalore District
Cuddalore |
|