Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Capacity Expansion, Cuddalore Port
(b)Name of the Company / Organisation TAMIL NADU MARITIME BOARD
(c)Registered Address Cuddalore Port Cuddalore District Cuddalore,Cuddalore Port Cuddalore District Cuddalore,Cuddalore,Tamil Nadu-607003
(d)Legal Status of the Company State Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant NiranjanMardi IAS
(b)Designation (Owner/ Partner/ CEO) ChiefExecutiveOfficer
(c)Address 171 South Kesavaperumal puram Off Greenways Road Raja Annamalai puram Chennai,,Mylapore Triplicane,Chennai,Tamil Nadu-600028
(d)Pin code 600028
(e)E-mail portcuddalore@gmail.com
(f)STD Code. 4142(f)Telephone No. 24641232
(g)Fax No. 238026
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(e) Ports, Harbours
Minor Activity
(b)Category A
(c)Proposal Number IA/TN/MIS/64666/2017
(d)Master Proposal Number(Single Window) SW/82566/2018
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. '2670', '1944'
(b)Pincode 607003
(c)Bounded Latitudes (North)
From
Degree 11.50
Minutes
Second
From
Degree 11.75
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 79.50
Minutes
Second
From
Degree 79.80
Minutes
Second
(e)Survey of India Topo Sheet No. '1', '58M/10'
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 3
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.2
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Tamil Nadu
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Tamil NaduCuddaloreCuddalore
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number 10-35/2017-IA-III
(c)Date of Apply of TOR 13 May 2017
(d)Date of Issue of TOR / Standard ToR 17 Aug 2017
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :19 Jan 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :22 Feb 2018
Distance of Public Hearing Venue from the Proposed Project :0.2
Tamilnadu Maritime Board Office, Cuddalore
State :Tamil Nadu
District :Cuddalore
Tehsil :Cuddalore
Village :Cuddalore
21The Peoples Concern revolved on three essential things such as fisherman livelihood, fishing resource and employmentDistrict Collector
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)FacilityCargo Handling
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)56800005680000Tons per AnnumRoad,Rail,Conveyor Belt
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 24 Jul 2018
(iv)Valid Upto 31 Mar 2019
(v)File No. T1/TNPCB/F.0187CUD/RLCUD/W&A/2018
(vi)Application No. 1808114365672
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 135
(b) Funds Allocated for Environment Management (Capital) (in Crores) 2
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 10
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 2
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 5680000
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 5680000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Cargo5680000Tons per AnnumImportRoad,Rail,Conveyor Belt0.2 LOACopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2017 To 30 May 2017
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube31.317.522.460
(2.)NOxMicro Gram per Meter Cube22.810.012.680
(3.)PM10Micro Gram per Meter Cube74.850.764.2100
(4.)SO2Micro Gram per Meter Cube19.811.511.780
    14.2.     No. of Ground Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Total Hardnessmg/l274200300600
(2.)TSSmg/l65554080
(3.)Chloridesmg/l4853202501000
(4.)Fluoridemg/l0.670.4211.5
(5.)Heavy MetalsHgmg/l000.0010
(6.)TDSmg/l5154105002000
(7.)pHNA7.556.606.58.5
    14.3.     No. of Surface Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.556.5C
(2.)BODmg/l2.61.95C
(3.)CODmg/l215C
(4.)DOmg/l76C
    14.4.     No. of Ambient Noise monitoring locations : 10
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))41.5025.1055
(2.)Leq(Night)A-weighted decibels(dB(A))30.3019.5045
    14.5.     No. of Soil Sample Monitored locations : 10
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNA7.366.84
(2.)N(Nitrogen)Percent12273
(3.)P(Phosphorus)Percent6419
(4.)K(Potassium)Milligram per Kilogram17429
(5.)Electric ConductivityMillisiemens per Centimetre265123
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.5 To 17.54
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.04 To 7.46
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface1001 Not Appliacble PipelineOthersIntake from Seanil15 Feb 2016250
15.1.
(a)Whether Desalination is proposed Yes
(b)Desalination Capacity (KLD) 100
(c)Quantity of Brine (KLD) 45
(d)Mode of Disposal of Brine Pipe line
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Combine Waste Stream100100Waste Water Treatment PlantGreen Belt Renewal Plant100
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 100
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 100
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Solid WasteMunicipal Solid Waste365Tons4RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube21.313.118.280
(2.)PM10Microgram per Meter Cube69.917.662.3100
(3.)SO2Microgram per Meter Cube17.614.213.480
(4.)PM2.5Microgram per Meter Cube27.613.424.260
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)no stacknil00Othersnil0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1169.06
(b)Source TANGEDCO
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) DG Set 1500 kVA
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 56.92
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 56.92
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 33.14
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 5
(j)Others (ha.) : Green Belt 18.78
    Total (ha.) 56.92
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Built Up Area5Reclaimed
(2.)Green belt18.7833%
(3.)Main Plant33.14Port Activity
Total (ha.) 56.92
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNil0Nil
(2.)Wildlife CorridorsNil0Nil
(3.)WLSNil0Nil
(4.)NPANil0Nil
(5.)ESAsNil0Nil
(6.)ESZsNil0Nil
(7.)CorridorsNil0Nil
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNil0Nil
(2.)Defence InstallationsNil0Nil
(3.)ForestNil0Nil
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Nil
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area River Sea Confluence
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Uppanar and Paravanar River
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 10
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 500
(b)Permanent Employment-During Operation 1000
(c)Temporary Employment- During Construction 500
(d)Temporary Employment- During Operation 500
(e)No. of working days 180
(f)Total Manpower 2500
32.
Green Belt in Ha:
(a)Total Area of Green Belt 18.78
(b)Percentage of Total Project Area 32.99
(c)No. of Plants to be Planted 600
(d)Funds Allocated for Plantation 5000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialThe Peoples Concern revolved on three essential things such as fisherman livelihood, fishing resource and employment
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 7
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 4
(d)Total plot area (sqm) 392545
(e)Total built up area (sqm) 392545
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? Yes
(b)Upload Shoreline Study Copy of Shoreline stuudy
(c)Type of Cargo Coal
(d)Quantity of Cargo 5.68
(e)Control Measures of Cargo Fugitive dust and emission control
(f)Dust Control Measures Ambient Air Shed Monitoring for PM
(g)Quantum 0.56
(h)Quantity of Dredging (Cubic meter per day) 10408.2
(i)Type of Dredging Capital
(j)Disposal of Dredge Material Low lying area, North side of near breakwater, Off
(k)Details of Outfall Diffusers 400000 Cubic Meter
(l)No. of Dilution Expected 0
(m)Distance at which the Outlet will Reach Ambient Parameters 1
(n)Details of Monitoring at Outfall After Project Starts
(o)Copy of NoC from PCB in case of Marine Disposal Copy of NoC
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 0
(d)Capacity 0
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking Yes, based on the Vehicle Movements
5.
Energy Saving Measures:
(a)Source/Mode Nil
(b)Percentage 0
(c)Quantity 0
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area Described in EIA Report
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. 1 list 2 dated 11.10.2018
(ii)Name of the EIA Consultant Centre for Environment, Health and Safety
(iii)Address Department of Civil Engineering, Faculty of Engineering and Technology, Annamalai University, Annamalai nagar, Tamilnadu - 608002
(iv)Mobile No. 9489592422
(v)Landline No. 0414423873
(vi)Email Id centreforehs@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 30 Mar 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAAs per your submission, recommendations of Coastal Zone management Authority (CZMA) are under process. It has not been submitted to the Ministry yet. Kindly submit the same. 14 Nov 2018
2.NAThe correction have been made as per the instruction received 12 Dec 2018
3.NAKindly submit the following: (i) Copy of valid Consent to operate issued by State Pollution Control Board for the existing project. (ii) Submit a copy of compliance report to the conditions of consent and authorization received from the Pollution Control Board for the existing project. 23 Jan 2019
4.NAThe correction have been made as per the instruction received 31 Jan 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterAs we faced difficulty in uploading the EIA report (size ?), we attached signed pages by EC and FAEs in the EIA report. The hard copies of EIA/EMP reports that we circulated to EAC members on 20/02/2020 has the signatures of the respective experts. 06 Jul 2020
2.NA

Kindly see the minutes of 52nd meeting of the EAC (Infra-2).

26 Jun 2020
3. ADS Reply LetterForward letter with PODs for dispatching EIA reports with ToR Compliance with Annexures,SCZMA Recommendations and CER Plan 11 May 2020
4.NAThe ADS reply submitted is incomplete. Kindly submit complete reply. 08 May 2020
5. ADS Reply LetterPoint Wise ToR Complaince document, with three Annexures 05 May 2020
6.NA

Kindly see the minutes of 49th meeting of EAC (Infra-2)

05 Mar 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantNiranjanMardi IAS
DesignationChiefExecutiveOfficer
Name of Company (Applicant Name should not be given here)TAMIL NADU MARITIME BOARD
AddressCuddalore Port Cuddalore District Cuddalore
Print