Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Kama Khuia Ochre , White Earth& Laterite Mine by Shiv Kumar Agarwal with a capacity of 250000 TPA (ROM)
(b)Name of the Company / Organisation SHIV KUMAR AGARWAL
(c)Registered Address P.O. Jaitwara, District Satna (MP) iv,,Satna,Madhya Pradesh-485221
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant shiv kumar agrawal
(b)Designation (Owner/ Partner/ CEO) owner
(c)Address P.O. Jaitwara, District Satna (MP),,Amarpatan,Satna,Madhya Pradesh-485221
(d)Pin code 485221
(e)E-mail shivkumaragrawal731@gmail.com
(f)STD Code. 120(f)Telephone No. 4261560
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity
(b)Category A
(c)Proposal Number IA/MP/MIN/82549/2017
(d)Master Proposal Number(Single Window) SW/82547/2018
(e)EAC concerned (for category A Projects only) Non-Coal Mining
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 65P
(b)Pincode 485226
(c)Bounded Latitudes (North)
From
Degree 24.8825
Minutes
Second
From
Degree 24.8877
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 81.0175
Minutes
Second
From
Degree 81.0212
Minutes
Second
(e)Survey of India Topo Sheet No. 63h/1
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 445
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1000
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Madhya Pradesh
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J-11015/278/2015-IA.II (M)
(b)Date of Apply of TOR 21 Jun 2017
(c)Date of Issue of TOR / Standard ToR 04 Dec 2017
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :31 Jul 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :01 Sep 2018
Distance of Public Hearing Venue from the Proposed Project :0
Mine Site at Village Kama Khuia,Teh Birsinghpur,Satna
State :Madhya Pradesh
District :Satna
Tehsil :Majhgawan
Village :kama Khuia
80Major Issues raised consists of worker welfare and jobs to the villagers.District Collector
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Screening/Crusher Plant of 50 TPHMobile
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)16.19 ha250000Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 1.0
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.08
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.20
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.075
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
a)Protected areas notified under the wildlife (Protection) Act, 1972 Yes
d)Inter-State boundaries and international boundaries Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)NA0Tons per Annum0Road0 OthersNACopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2015 To 31 Dec 2015
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube64.4042.0564.23100
(2.)SO2Micro Gram per Meter Cube12.956.9812.8980
(3.)NOxMicro Gram per Meter Cube20.859.7920.7380
(4.)PM2.5Micro Gram per Meter Cube38.0625.9132.3460
    14.2.     No. of Ground Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.447.256.58.5
(2.)TDSmg/l5424645002000
(3.)Fluoridemg/l0.840.691.01.5
(4.)Heavy MetalsSilvermg/l0.00.00.10.1
(5.)Total Hardnessmg/l290.11246.75300600
(6.)TSSmg/l64.964.1100200
(7.)Chloridesmg/l92742501000
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.867.72A
(2.)DOmg/l6.76.5A
(3.)BODmg/l3.63.2A
(4.)CODmg/l25.223.2A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))63.846.280
(2.)Leq(Night)A-weighted decibels(dB(A))47.137.180
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersna7.827.03
(2.)N(Nitrogen)Percent0.0890.079
(3.)P(Phosphorus)Milligram per Kilogram32.0528.33
(4.)K(Potassium)Milligram per Kilogram120.21102.86
(5.)Electric ConductivityMillisiemens per Centimetre431385
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 33 To 35
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 30 To 32
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersOLD BOREWELL51.0 Not Appliacble modeOthersWATER TANKEROthersPUMPNA06 Aug 20185
(2.)OthersMINE SUMP200 Not Appliacble PipelineTube Wellna02 Jul 201820
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)domestic2.52.5bio toiletGreen Belt Renewal Plant2.5
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 2.5
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 2.5
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)mineral rejectOthersMineral reject27000Tons0OthersOn site utilizationOthersFor protective bund and back filling
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2NA00000
(2.)NOxNA00000
(3.)PM2.5NA0000000
(4.)PM10Microgram per Meter Cube64.4000.0564.45100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)naNa00PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 0
(b)Source NA
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 250
(e)Stack Height (in m) 10
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 16.19
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 16.19
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 16.19
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : none 0
    Total (ha.) 16.19
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt1.12
(2.)Othersplantation in back filling area15.07
Total (ha.) 16.19
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted Areana0non PRESENT
(2.)WLSRanipur WLS4.90ESZ notified on 15.11.2017
(3.)NPANA0non PRESENT
(4.)ESAsNA0non PRESENT
(5.)Wildlife CorridorsNA0non PRESENT
(6.)ESZsRanipur WLS3.90ESZ notified on 15.11.2017
(7.)CorridorsNA0non PRESENT
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestS00
(2.)Archaeological Sites000
(3.)Defence Installationsna00
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 16.19
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired granted by MP government for mining
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area TAMAR TANK
(ii)Direction of Water Bodies in Buffer Area South West
(iii)Distance of Water Bodies in Buffer Area 0.75
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 50
(e)No. of working days 275
(f)Total Manpower 50
32.
Green Belt in Ha:
(a)Total Area of Green Belt 1.12
(b)Percentage of Total Project Area 6.92
(c)No. of Plants to be Planted 2240
(d)Funds Allocated for Plantation 825000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialThe project will improve the physical infrastructure, social infrastructure like improvement of road conditions water supply during dry season, drainage, educational institutions and improved environmental conditions, etc. The project also provide direct employment to 50 persons and indirect employment to another 50 persons. It increases economic activities, better living standard, educational facility, health facility and infrastructural development. The project will contribute to district mine
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 2
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)lateriteMinor
(2.)OchreMinor
2.
Mine Capacity in ROM (Run of Mine) 250000
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. MP/Satna/Iron ore/MPLN/MOD-07/2018-19/5525
(b)Date of Approval 10 Jul 2018
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department IBM
(e)Approved Mining Lease Area 16.19
(f)Approved Capacity 250000
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 2178773
(b)Mineable Reserves (Million Ton) 2052304
(c)Extractable Reserves(Million Ton) 2052304
(d)Percent(%) of Extraction 94
(e)Grade of Coal /Ore /Mineral 1
(f)Stripping Ratio 1 : 0.11
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 0
(i)Mining Method Opencast
(j)Life of Mine (Years) 10
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area Yes
(c)No. of crushers 1
     6.1.    Details of crusher:
S. No.Crusher ID Capacity (in PH)Remarks
(1.)150 Mobile crusher
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 16.19
(b)Whether obtained Letter of Intent (LOI) from the state government ? No
(i)Reason thereof the lease has been granted from 11.01.1978
(c)Whether Lease Deed Executed ? Yes
(i)Copy of Executed Lease deed valid as on Date Copy of Executed Lease deed
(ii)Provide area in Hectare as per executed lease deed (initial) document 16.19
(iii)Validity of the lease deed From : 11 Jan 1978 To : 10 Jan 2028
(iv)Date of Execution of Mining Lese 11 Jan 1978
(v)Reference Number MP348622017A1689698
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof The lease has been granted from 11.01.1978 to 10.0
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 1
(ii)Total Area (in Hectare) 0.165
(iii)Height (in meter) 3
(iv)Quantity (in Million Cubic meter) 5000
(v)No. of year back fill up 2
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 0
(b)Depth (in meter) 0
(c)Volume (in Million Cubic meter) 0
12.
Details of Quarry:
(a)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 0
13.
Details of Transportation:
(a)In Pit/Underground to Surface DUMPERS
(b)Surface to Siding/Loading TIPPER
(c)Transportation / Conveyor Details Material will be transported to various plants thr
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)WASTE LAND16.19016.19
(2.)FOREST LAND000
(3.)AGRICULTURE LAND000
(4.)SETTLEMENTS000
(5.)GRAZING LAND000
(6.)SURFACE WATER BODIES000
TOTAL16.19016.19
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)GREEN BELT1.12001.12
(2.)EXCAVATION/QUARRY15.070015.07
(3.)BUILT UP AREA (COLONY/OFFICE)0000
(4.)TOP SOIL STORAGE0000
(5.)INTERNAL OB DUMPS0000
(6.)EXTERNAL OB DUMPS0000
(7.)ROADS0000
(8.)VIRGIN AREA0000
TOTAL16.1900016.19
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 15.07
(d)Safety Zone(in hectare) 1.12
(e)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 2000
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0
(h)Total afforestation plant (in hectare) 16.19
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)20150250002500024995.640
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. 9
(ii)Name of the EIA Consultant ENVIRTA Sustainable Solutions India pvt ltd
(iii)Address 2412,Express Trade towers ,b-36,sector 132,Noida
(iv)Mobile No. 9910037943
(v)Landline No. 0120427424
(vi)Email Id manas.vyas@envirta.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 29 Jan 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Copy of District Survey Report Copy of District Survey Report
(h)Uploaded Copy of Replenishment Study Report & Baseline Survey Data Copy of Replenishment Study Report & Baseline Survey Data
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAThis is with reference to your letter no nill dated 15.10.2018 w.r.t. submission of final EIA/EMP report to appraisal in the EAC meeting. PP has not submitted the EIA/EMP report in the web portal of Parivesh. PP also submitted that TOR accorded by the Ministry vide letter no J-11015/278/2015-IA.II(M) dated 24.09.2015.However no TOR letter submitted. PP did not upload the Topo sheet In the Form-II point no 18 PP uploaded the copy of Advertisement instead of instead of Schedule-I Species conservation Plan. In the form –II in sectorial specification S.No. 8 it was mentioned that the validity of the lease deed is from 11 Jan 1978 to 15 th Oct 2018 is of you’re the PP submission the validity of the executed lease deed is not valid from 1 November, 2018. PP may submit the valid lease deed. In the Form-II point no 39 No attachment are uploaded except the cover letter kindly upload the all the attachments 02 Nov 2018
2.NAThe correction have been made as per the instruction received 31 Jan 2019
3.NA(i). TOR was granted on 24.09.2015 which is valid upto 23.09.2018 however PP has uploaded EIA/EMP report after expiry of validity of TOR (ii). It is noted that the PP/Consultant has not prepared the EIA/EMP report as per Appendix III (Generic Structure of Environmental Impact Assessment Document) of EIA Notification, 2006. The report should contain 12 chapters whereas PP has submitted only 10 Chapters in the EIA/EMP Report. In this context Consultant/ PP needs to revise the EIA EMP report as per Appendix III of EIA Notification, 2006 and resubmit the same for consideration before EAC. (iii). Copy of approved mine plan has not uploaded. (iv). The documents related to the PH is not legible. (v). Covering letter submitted by PP without signature. 01 Feb 2019
4.NAThe correction have been made as per the instruction received 11 Feb 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterSir, we will submit hard copy of EIA with uploaded reply 17 points ADS in Non coal Mining EAC meeting 25-26 March 2019 for kamakhuia Mine (16.19 ha) 08 Jan 2021
2.NA

refer MOM

12 Apr 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of Applicantshiv kumar agrawal
Designationowner
Name of Company (Applicant Name should not be given here)SHIV KUMAR AGARWAL
AddressP.O. Jaitwara, District Satna (MP)