1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Kama Khuia Ochre , White Earth& Laterite Mine by Shiv Kumar Agarwal with a capacity of 250000 TPA (ROM) | (b)Name of the Company / Organisation | SHIV KUMAR AGARWAL | (c)Registered Address | P.O. Jaitwara, District Satna
(MP) iv,,Satna,Madhya Pradesh-485221 | (d)Legal Status of the Company | Others | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | shiv kumar agrawal | (b)Designation (Owner/ Partner/ CEO) | owner | (c)Address | P.O. Jaitwara, District Satna (MP),,Amarpatan,Satna,Madhya Pradesh-485221 | (d)Pin code | 485221 | (e)E-mail | shivkumaragrawal731@gmail.com | (f)STD Code. | 120(f)Telephone No. | 4261560 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(a) Mining of minerals
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/MP/MIN/82549/2017 | (d)Master Proposal Number(Single Window) | SW/82547/2018 | (e)EAC concerned (for category A Projects only) | Non-Coal Mining | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 65P | (b)Pincode | 485226 | (c)Bounded Latitudes (North) | | From | | Degree | 24.8825 | Minutes | | Second | | From | | Degree | 24.8877 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 81.0175 | Minutes | | Second | | From | | Degree | 81.0212 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 63h/1 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 445 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 1000 | (j)Seismic Zone | 4 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Madhya Pradesh | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | J-11015/278/2015-IA.II (M) | (b)Date of Apply of TOR | 21 Jun 2017 | (c)Date of Issue of TOR / Standard ToR | 04 Dec 2017 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 01 Sep 2018 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| Mine Site at Village Kama Khuia,Teh Birsinghpur,Satna | State : | Madhya Pradesh | District : | Satna | Tehsil : | Majhgawan | Village : | kama Khuia |
| 80 | Major Issues raised consists of worker welfare and jobs to the villagers. | District Collector | | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Screening/Crusher Plant of 50 TPH | Mobile | | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | 16.19 ha | 250000 | Tons per Annum | | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 1.0 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.08 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.20 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.075 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | Yes | a)Protected areas notified under the wildlife (Protection) Act, 1972 | Yes | d)Inter-State boundaries and international boundaries | Yes | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 0 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 0 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | NA | 0 | Tons per Annum | | 0 | Road | | 0 | Others | NA | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Oct 2015 To 31 Dec 2015 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 64.40 | 42.05 | 64.23 | 100 | (2.) | SO2 | | Micro Gram per Meter Cube | 12.95 | 6.98 | 12.89 | 80 | (3.) | NOx | | Micro Gram per Meter Cube | 20.85 | 9.79 | 20.73 | 80 | (4.) | PM2.5 | | Micro Gram per Meter Cube | 38.06 | 25.91 | 32.34 | 60 | |
14.2. No. of Ground Water monitoring locations : 6 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.44 | 7.25 | 6.5 | 8.5 | (2.) | TDS | | | mg/l | | 542 | 464 | 500 | 2000 | (3.) | Fluoride | | | mg/l | | 0.84 | 0.69 | 1.0 | 1.5 | (4.) | Heavy Metals | | Silver | mg/l | | 0.0 | 0.0 | 0.1 | 0.1 | (5.) | Total Hardness | | | mg/l | | 290.11 | 246.75 | 300 | 600 | (6.) | TSS | | | mg/l | | 64.9 | 64.1 | 100 | 200 | (7.) | Chlorides | | | mg/l | | 92 | 74 | 250 | 1000 | |
14.3. No. of Surface Water monitoring locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.86 | 7.72 | A | (2.) | DO | | mg/l | | 6.7 | 6.5 | A | (3.) | BOD | | mg/l | | 3.6 | 3.2 | A | (4.) | COD | | mg/l | | 25.2 | 23.2 | A | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 63.8 | 46.2 | 80 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 47.1 | 37.1 | 80 | |
14.5. No. of Soil Sample Monitored locations : 6 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | Others | na | 7.82 | 7.03 | (2.) | N(Nitrogen) | Percent | | 0.089 | 0.079 | (3.) | P(Phosphorus) | Milligram per Kilogram | | 32.05 | 28.33 | (4.) | K(Potassium) | Milligram per Kilogram | | 120.21 | 102.86 | (5.) | Electric Conductivity | Millisiemens per Centimetre | | 431 | 385 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 33 To 35 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 30 To 32 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | OLD BOREWELL | 5 | 1.0 | Not Appliacble | modeOthers | WATER TANKER | Others | PUMP | NA | 06 Aug 2018 | 5 | (2.) | Others | MINE SUMP | 20 | 0 | Not Appliacble | Pipeline | | Tube Well | | na | 02 Jul 2018 | 20 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | domestic | 2.5 | 2.5 | bio toilet | Green Belt Renewal Plant | | 2.5 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 2.5 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 2.5 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | mineral reject | Others | Mineral reject | 27000 | Tons | 0 | Others | On site utilization | Others | For protective bund and back filling | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | SO2 | | NA | 0 | 0 | 0 | 0 | 0 | (2.) | NOx | | NA | 0 | 0 | 0 | 0 | 0 | (3.) | PM2.5 | | NA | 0 | 0 | 000 | 0 | 0 | (4.) | PM10 | | Microgram per Meter Cube | 64.40 | 0 | 0.05 | 64.45 | 100 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | na | Na | 0 | 0 | PM10 | | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 0 | (b)Source | NA | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 250 | (e)Stack Height (in m) | 10 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 16.19 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 16.19 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 16.19 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : none | 0 | Total (ha.) | 16.19 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Green belt | | 1.12 | | (2.) | Others | plantation in back filling area | 15.07 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | na | 0 | non PRESENT | (2.) | WLS | Ranipur WLS | 4.90 | ESZ notified on 15.11.2017 | (3.) | NPA | NA | 0 | non PRESENT | (4.) | ESAs | NA | 0 | non PRESENT | (5.) | Wildlife Corridors | NA | 0 | non PRESENT | (6.) | ESZs | Ranipur WLS | 3.90 | ESZ notified on 15.11.2017 | (7.) | Corridors | NA | 0 | non PRESENT | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | S | 0 | 0 | (2.) | Archaeological Sites | | 0 | 0 | 0 | (3.) | Defence Installations | | na | 0 | 0 | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 16.19 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | granted by MP government for mining | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | TAMAR TANK | (ii)Direction of Water Bodies in Buffer Area | South West | (iii)Distance of Water Bodies in Buffer Area | 0.75 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 0 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 50 | (e)No. of working days | 275 | (f)Total Manpower | 50 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 1.12 | (b)Percentage of Total Project Area | 6.92 | (c)No. of Plants to be Planted | 2240 | (d)Funds Allocated for Plantation | 825000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | The project will improve the physical infrastructure, social infrastructure like improvement of road conditions water supply during dry season, drainage, educational institutions and improved environmental conditions, etc. The project also provide direct employment to 50 persons and indirect employment to another 50 persons. It increases economic activities, better living standard, educational facility, health facility and infrastructural development. The project will contribute to district mine | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Non-Coal Mining |
|
1. No. of Mineral(s) to be Mined : 2 |
---|
S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
---|
(1.) | laterite | Minor | (2.) | Ochre | Minor | |
|
2. | Mine Capacity in ROM (Run of Mine) | 250000 | |
|
|
4. | Mining Plan: | (a)Approval Letter No. | MP/Satna/Iron ore/MPLN/MOD-07/2018-19/5525 | (b)Date of Approval | 10 Jul 2018 | (c)Approved Letter | Copy of Approved Letter | (d)Approved By State Mining and Geology Department | IBM | (e)Approved Mining Lease Area | 16.19 | (f)Approved Capacity | 250000 | |
|
5. | Technical Details: | (a)Total Geological Reserves (Million Ton) | 2178773 | (b)Mineable Reserves (Million Ton) | 2052304 | (c)Extractable Reserves(Million Ton) | 2052304 | (d)Percent(%) of Extraction | 94 | (e)Grade of Coal /Ore /Mineral | 1 | (f)Stripping Ratio | 1 : 0.11 | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | NA | (h)Average Gradient(Degree) | 0 | (i)Mining Method | Opencast | (j)Life of Mine (Years) | 10 | |
|
6. | Details of Beneficiations: | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | No | (b)Whether it is proposed to install crusher within the mining lease area | Yes | (c)No. of crushers | 1 | |
|
6.1. Details of crusher: |
---|
S. No. | Crusher ID | Capacity (in PH) | Remarks |
---|
(1.) | 1 | 50 | Mobile crusher | |
|
7. | Details of Seams: | (a)Whether details of seam applicable | No | |
|
8. | Details of Mining Lease: | (a)Mining Lease Area (in Hectare) | 16.19 | (b)Whether obtained Letter of Intent (LOI) from the state government ? | No | (i)Reason thereof | the lease has been granted from 11.01.1978 | (c)Whether Lease Deed Executed ? | Yes | (i)Copy of Executed Lease deed valid as on Date | Copy of Executed Lease deed | (ii)Provide area in Hectare as per executed lease deed (initial) document | 16.19 | (iii)Validity of the lease deed | From : 11 Jan 1978 To : 10 Jan 2028 | (iv)Date of Execution of Mining Lese | 11 Jan 1978 | (v)Reference Number | MP348622017A1689698 | (d)Whether Lease Deed Renewed ? | No | (i)Reason thereof | The lease has been granted from 11.01.1978 to 10.0 | |
|
9. | OB (Over Burden) Management: | (a) Details of External Dumps: | (i)No. of OB Dumps | 1 | (ii)Total Area (in Hectare) | 0.165 | (iii)Height (in meter) | 3 | (iv)Quantity (in Million Cubic meter) | 5000 | (v)No. of year back fill up | 2 | (b) Details of Internal Dumps: | (i)No. of Internal Dumps | 0 | (ii)Total Area (in Hectare) | 0 | (iii)Height (in meter) | 0 | (iv)Quantity (in Million Cubic meter) | 0 | |
|
10. | Details of Topsoil Management: | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 0 | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 0 | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 0 | |
|
11. | Details of Final Mine Void: | (a)Area (in Hectare) | 0 | (b)Depth (in meter) | 0 | (c)Volume (in Million Cubic meter) | 0 | |
|
12. | Details of Quarry: | (a)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body. | (b)Total Quarry Area (ha) | 0 | |
|
13. | Details of Transportation: | (a)In Pit/Underground to Surface | DUMPERS | (b)Surface to Siding/Loading | TIPPER | (c)Transportation / Conveyor Details | Material will be transported to various plants thr | |
|
|
14. Details of Land Usage (Pre-Mining) |
---|
S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
---|
(1.) | WASTE LAND | | 16.19 | 0 | 16.19 | (2.) | FOREST LAND | | 0 | 0 | 0 | (3.) | AGRICULTURE LAND | | 0 | 0 | 0 | (4.) | SETTLEMENTS | | 0 | 0 | 0 | (5.) | GRAZING LAND | | 0 | 0 | 0 | (6.) | SURFACE WATER BODIES | | 0 | 0 | 0 | |
TOTAL | 16.19 | 0 | 16.19 | |
|
15. Details of Land Usage (Post-Mining) |
---|
S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
---|
(1.) | GREEN BELT | | 1.12 | 0 | 0 | | 1.12 | (2.) | EXCAVATION/QUARRY | | 15.07 | 0 | 0 | | 15.07 | (3.) | BUILT UP AREA (COLONY/OFFICE) | | 0 | 0 | 0 | | 0 | (4.) | TOP SOIL STORAGE | | 0 | 0 | 0 | | 0 | (5.) | INTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (6.) | EXTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (7.) | ROADS | | 0 | 0 | 0 | | 0 | (8.) | VIRGIN AREA | | 0 | 0 | 0 | | 0 | |
TOTAL | 16.19 | 0 | 0 | 0 | 16.19 | |
16. | Details of Reclamation: | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | (a)External OB Dump(in hectare) | 0 | (b)Internal Dump(in hectare) | 0 | (c)Quarry(in hectare) | 15.07 | (d)Safety Zone(in hectare) | 1.12 | (e)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body. | (f)Density of Tree Plantation per ha (in no.) | 2000 | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | 0 | (h)Total afforestation plant (in hectare) | 16.19 | |
|
17. | Status of progressive Mining Closure Plan: | Details Not Applicable | |
|
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
---|
S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
---|
(1.) | 2015 | 0 | 25000 | 25000 | 24995.64 | 0 | |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | 9 | (ii)Name of the EIA Consultant | ENVIRTA Sustainable Solutions India pvt ltd | (iii)Address | 2412,Express Trade towers ,b-36,sector 132,Noida | (iv)Mobile No. | 9910037943 | (v)Landline No. | 0120427424 | (vi)Email Id | manas.vyas@envirta.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Non-Coal Mining | (ix)Validity of Accreditation | 29 Jan 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | This is with reference to your letter no nill dated 15.10.2018 w.r.t. submission of final EIA/EMP report to appraisal in the EAC meeting.
PP has not submitted the EIA/EMP report in the web portal of Parivesh.
PP also submitted that TOR accorded by the Ministry vide letter no J-11015/278/2015-IA.II(M) dated 24.09.2015.However no TOR letter submitted.
PP did not upload the Topo sheet
In the Form-II point no 18 PP uploaded the copy of Advertisement instead of instead of Schedule-I Species conservation Plan.
In the form –II in sectorial specification S.No. 8 it was mentioned that the validity of the lease deed is from 11 Jan 1978 to 15 th Oct 2018 is of you’re the PP submission the validity of the executed lease deed is not valid from 1 November, 2018. PP may submit the valid lease deed.
In the Form-II point no 39 No attachment are uploaded except the cover letter kindly upload the all the attachments | 02 Nov 2018 | 2. | NA | The correction have been made as per the instruction received | 31 Jan 2019 | 3. | NA | (i). TOR was granted on 24.09.2015 which is valid upto 23.09.2018 however PP has uploaded EIA/EMP report after expiry of validity of TOR
(ii). It is noted that the PP/Consultant has not prepared the EIA/EMP report as per Appendix III (Generic Structure of Environmental Impact Assessment Document) of EIA Notification, 2006. The report should contain 12 chapters whereas PP has submitted only 10 Chapters in the EIA/EMP Report. In this context Consultant/ PP needs to revise the EIA EMP report as per Appendix III of EIA Notification, 2006 and resubmit the same for consideration before EAC.
(iii). Copy of approved mine plan has not uploaded.
(iv). The documents related to the PH is not legible.
(v). Covering letter submitted by PP without signature. | 01 Feb 2019 | 4. | NA | The correction have been made as per the instruction received | 11 Feb 2019 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Sir, we will submit hard copy of EIA with uploaded reply 17 points ADS in Non coal Mining EAC meeting 25-26 March 2019 for kamakhuia Mine (16.19 ha) | 08 Jan 2021 | 2. | NA | refer MOM | 12 Apr 2019 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |