Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Ankur Udyog Limited
(b)Name of the Company / Organisation ANKUR UDYOG LIMITED STEEL DIVISION
(c)Registered Address Nakaha No. 2, Near Fertilizer Factory, Gorakhpur, Uttar Pradesh,,Gorakhpur,Uttar Pradesh-273007
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Nikhil Jalan
(b)Designation (Owner/ Partner/ CEO) CEO
(c)Address Nakaha No. 2, Near Fertilizer Factory, Gorakhpur, Uttar Pradesh,,Sahjanwa,Gorakhpur,Uttar Pradesh-273007
(d)Pin code 273007
(e)E-mail ankur1in@gmail.com
(f)STD Code. 551(f)Telephone No. 2261660
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
Minor Activity
(b)Category A
(c)Proposal Number IA/UP/IND/75680/2018
(d)Master Proposal Number(Single Window) SW/82471/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. No. AL-2, Sector 23, GIDA Industrial Area
(b)Pincode 273209
(c)Bounded Latitudes (North)
From
Degree 26.753922
Minutes
Second
From
Degree 26.762708
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 83.202008
Minutes
Second
From
Degree 83.207189
Minutes
Second
(e)Survey of India Topo Sheet No. 63 N1
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 80
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 2.9
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Uttar Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Uttar PradeshGorakhpurSahjanwa
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/416/2017-IA-II(I)
(b)Date of Apply of TOR 02 Jul 2018
(c)Date of Issue of TOR / Standard ToR 20 Aug 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :08 Sep 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :09 Oct 2018
Distance of Public Hearing Venue from the Proposed Project :0
Project site
State :Uttar Pradesh
District :Gorakhpur
Tehsil :Sahjanwa
Village :Sahbazganj & Domharmafi Villages
71No compensation for land Environment Pollution Ground water depletion EmploymentDistrict Collector
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)DRI Kilns2 x 500 TPD
(2.)Induction furnace with Concast3 x 30 MT
(3.)Rolling Mills1 x 800 TPD & 1 x 280 TPD
(4.)CFBC26 MW
(5.)WHRB Power Plant24 MW
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Sponge Iron330000Tons per AnnumConveyor Belt
(2.)MS Re-Bars (TMT) & Structural Steel356400Tons per AnnumRoad
(3.)Electricity24Mega Watt(MW)OthersElectrical Cables
(4.)Electricity26Mega Watt(MW)OthersElectrical Cables
(5.)MS Billets / Hot metal for hot charging356400Tons per AnnumConveyor Belt
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 330.0
(b) Funds Allocated for Environment Management (Capital) (in Crores) 28.0
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 5.45
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.85
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 387000
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 387000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Imported Coal387000Tons per AnnumSouth Africa, Vishakapatnam portRail1500 MoUCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube48.925.248.960
(2.)PM10Micro Gram per Meter Cube82.744.582.7100
(3.)NOxMicro Gram per Meter Cube24.88.124.880
(4.)SO2Micro Gram per Meter Cube14.87.414.880
(5.)OthersCOMicro Gram per Meter Cube135039413502000
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Total Hardnessmg/l283211300600
(2.)Fluoridemg/l1.10.751.01.5
(3.)OthersAlkalinitymg/l315243200600
(4.)TDSmg/l4363255002000
(5.)pHNA8.17.26.58.5
(6.)TSSmg/l2.01.200
(7.)Heavy MetalsIronmg/l0.050.0210.31.0
(8.)Chloridesmg/l2061582501000
    14.3.     No. of Surface Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l32.4A
(2.)CODmg/l116A
(3.)DOmg/l4.23.2A
(4.)OthersTDSmg/l382228A
(5.)pHmg/l7.87.3A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))674475
(2.)Leq(Night)A-weighted decibels(dB(A))523570
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNA7.87
(2.)K(Potassium)Kilogram per hectare381189
(3.)Electric ConductivityMillisiemens per Centimetre192124
(4.)N(Nitrogen)Kilogram per hectare361168
(5.)P(Phosphorus)Kilogram per hectare7239
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 4.38 To 7.66
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.47 To 4.49
(c)Whether Ground Water Intersection will be there ? Yes
(d)Upload Copy of Central Ground Water Authority Letter Copy of Central Ground Water Authority Letter
(e)Letter No. 21-4/5813/UP/IND/2018
(f)Date of Issue 13 Oct 2018
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater18000Copy of Permission LetterPipelineTube Well21-4/5813/UP/IND/201813 Oct 20181800
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Boiler blowdown4747ETPGreen Belt Renewal Plant470
(2.)Sanitary wastewater from Domestic Consumption2020Septic Tank followed by Subsurface dispersionOthersSeptic Tank followed by Subsurface dispersion200
(3.)Cooling tower blowdown150150ETPGreen Belt Renewal Plant150
(4.)D.M. plant regeneration water from Power Plant3030ETPGreen Belt Renewal Plant30
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 247
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 247
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Ash from DRIFly Ash59400Tons500RoadOtherswill be given to cement pant and brick manf.
(2.)Kiln accretion slagIndustrial Waste2970Tons100RoadOthersWill be used in road construction
(3.)SMS slagIndustrial Waste35640Tons100RoadOthersWill be used in road construction
(4.)end cutting from Rolling millIndustrial Waste10692Tons0RoadOthersresued in SMS
(5.)GypsumIndustrial Waste9600Tons100RoadOthersgiven to cement plant or gypsum board unit
(6.)DolocharIndustrial Waste99000Tons0RoadOtherswill be reused in FCB pwer plant as fuel
(7.)Wet scrapper sludgeIndustrial Waste15180Tons100RoadOthersWill be used in road construction
(8.)Ash from Power PlantFly Ash100305Tons500RoadOtherswill be given to cement pant and brick manf.
(9.)mill scales from Rolling MillIndustrial Waste7128Tons100RoadOthersgiven to nearby Ferro alloy industries
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube14.8140014.529.380
(2.)Others(Specify)COMicrogram per Meter Cube135014002.31352.32000
(3.)PM2.5Microgram per Meter Cube48.914001.750.660
(4.)PM10Microgram per Meter Cube82.714003.185.8100
(5.)NOxMicrogram per Meter Cube24.8140014.038.880
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DRI Kiln with WHRBCoal932.9PM103.4
(2.)DRI kiln with WHRBCoal932.9SO290.3
(3.)DRI kiln with WHRBcoal932.9PM103.4
(4.)DRI kiln with WHRBcoal932.9NOx13.7
(5.)Induction Furnaceelectricity451.8NOx5.6
(6.)Induction Furnaceelectricity451.8PM101.4
(7.)Rolling Millpulverized coal451.8PM101.2
(8.)Rolling Millpulverised coal451.8NOx4.8
(9.)Rolling MillElectricity612.4PM102.2
(10.)Rolling MillElectricity612.4NOx8.9
(11.)CFBC BoilerCoal802.6PM101.6
(12.)CFBC BoilerCoal802.6SO25.3
(13.)DRI kiln with WHRBcoal932.9SO290.3
(14.)Rolling Millpulverised coal451.8SO213.0
(15.)Induction Furnaceelectricity451.8PM101.4
(16.)CFBC BoilerCoal802.6NOx5.3
(17.)DRI kiln with WHRBcoal932.9NOx13.7
(18.)Induction Furnaceelectricity451.8NOx5.6
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 50000
(b)Source Captive & backup power from Purvanchal Vidyut Vitr
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 2 x 1250 kva, 2 x 1250 kva & 1 x 800 kva
(e)Stack Height (in m) 7
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 32.0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 32.0
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 23958.2
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 1978.2
(d)Surface Water Bodies (ha.) 2920.2
(e)Settlements (ha.) 1507.2
(f)Industrial (ha.) 1036.2
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Nil 0
    Total (ha.) 31400.000000000004
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Water Reservoir0.4
(2.)Green belt10.9
(3.)Area for Solid Waste Management4.0storage area (RM, product and solid waste)
(4.)Othersopen area and others2.5
(5.)Main Plant9.6
(6.)Built Up Area4.6parking, railway siding,roads,admin building
Total (ha.) 32
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNil0None within 10 Kms. radius
(2.)NPANil0None within 10 Kms. radius
(3.)ESAsNil0None within 10 Kms. radius
(4.)ESZsNil0None within 10 Kms. radius
(5.)Wildlife CorridorsNil0None within 10 Kms. radius
(6.)CorridorsNil0None within 10 Kms. radius
(7.)Critically Polluted AreaNil0None within 10 Kms. radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNone0None within 10 Kms. radius
(2.)Archaeological SitesNone0None within 10 Kms. radius
(3.)OthersWater bodiesRapti river3.5None
(4.)Defence InstallationsNone0None within 10 Kms. radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 32.0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired total land is taken on lease from GIDA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Drain is passing adjacent to the Project Boundary in NE direction
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Rapti river
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 3.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 370
(c)Temporary Employment- During Construction 1000
(d)Temporary Employment- During Operation 130
(e)No. of working days 330
(f)Total Manpower 1500
32.
Green Belt in Ha:
(a)Total Area of Green Belt 10.9
(b)Percentage of Total Project Area 34.06
(c)No. of Plants to be Planted 16200
(d)Funds Allocated for Plantation 2500000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialWith the implementation of the proposed plant, the socio-economic status of the local people will improve substantially. The land rates in the area will improve in the nearby areas due to the proposed activity. This will help in upliftment of the social status of the people in the area. Educational institutions will also come-up and will lead to improvement of educational status of the people in the area. Primary health and medical facilities will certainly improve due to the proposed plant.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/ EIA/ 1619/ RA 026
(ii)Name of the EIA Consultant PIONEER ENVIRO LABORATORIES & CONSULTANTS PVT. LTD
(iii)Address 6-3-652, Flat # 7-3, Dhruvatara Apartments, Amrutha Estates, Erramanjil, Somajiguda, Hyderabad- 500082
(iv)Mobile No. 9440677333
(v)Landline No. 0402331427
(vi)Email Id pelcpl@yahoo.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 22 Jun 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAMay kindly refer to the Form-II. The EIA/EMP report, Annexures and Figures and maps attached are not visible. Kindly upload properly for further scrutiny. 15 Oct 2018
2.NAThe correction have been made as per the instruction received 15 Oct 2018
3.NAMay kindly refer to the Form-II again. The EIA/EMP report, Annexures and Figures and maps attached are still not visible. Kindly upload properly for further scrutiny. 16 Oct 2018
4.NAThe correction have been made as per the instruction received 16 Oct 2018
5.NAYou are requested to submit the status of orders of Hon'ble supreme court in the matter of Gorakhpur Textile park Vs State of Uttar pardesh regarding land proposed for proposed project 17 Jan 2019
6.NAThe correction have been made as per the instruction received 19 Jan 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterSir, please find the attachment for reply to ADS generated on 12th April 2019. 15 Apr 2019
2.NA

After detailed deliberations, the committee advised the PP to submit DPR to the railways as desired in the IN-PRINCIPLE approval and submit the information to the Ministry for further consideration.

Detailed action plan for ground water recharge and rainwater storage shall be furnished in the current financial year alongwith time schedule for implementation of action plan within 03 years.

12 Apr 2019
3. ADS Reply LetterNA 07 Mar 2019
4.NAADS 27 Feb 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantNikhil Jalan
DesignationCEO
Name of Company (Applicant Name should not be given here)ANKUR UDYOG LIMITED STEEL DIVISION
AddressNakaha No. 2, Near Fertilizer Factory, Gorakhpur, Uttar Pradesh
Print