1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Ankur Udyog Limited | (b)Name of the Company / Organisation | ANKUR UDYOG LIMITED STEEL DIVISION | (c)Registered Address | Nakaha No. 2, Near Fertilizer Factory, Gorakhpur, Uttar Pradesh,,Gorakhpur,Uttar Pradesh-273007 | (d)Legal Status of the Company | Others | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Nikhil Jalan | (b)Designation (Owner/ Partner/ CEO) | CEO | (c)Address | Nakaha No. 2, Near Fertilizer Factory, Gorakhpur, Uttar Pradesh,,Sahjanwa,Gorakhpur,Uttar Pradesh-273007 | (d)Pin code | 273007 | (e)E-mail | ankur1in@gmail.com | (f)STD Code. | 551(f)Telephone No. | 2261660 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 3(a) Metallurgical industries (ferrous & non ferrous)
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/UP/IND/75680/2018 | (d)Master Proposal Number(Single Window) | SW/82471/2018 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 1 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | No. AL-2, Sector 23, GIDA Industrial Area | (b)Pincode | 273209 | (c)Bounded Latitudes (North) | | From | | Degree | 26.753922 | Minutes | | Second | | From | | Degree | 26.762708 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 83.202008 | Minutes | | Second | | From | | Degree | 83.207189 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 63 N1 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 80 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 2.9 | (j)Seismic Zone | 4 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Uttar Pradesh | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Uttar Pradesh | Gorakhpur | Sahjanwa | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11011/416/2017-IA-II(I) | (b)Date of Apply of TOR | 02 Jul 2018 | (c)Date of Issue of TOR / Standard ToR | 20 Aug 2018 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 09 Oct 2018 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| Project site | State : | Uttar Pradesh | District : | Gorakhpur | Tehsil : | Sahjanwa | Village : | Sahbazganj & Domharmafi Villages |
| 71 | No compensation for land
Environment Pollution
Ground water depletion
Employment | District Collector | | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | DRI Kilns | 2 x 500 TPD | | (2.) | Induction furnace with Concast | 3 x 30 MT | | (3.) | Rolling Mills | 1 x 800 TPD & 1 x 280 TPD | | (4.) | CFBC | 26 MW | | (5.) | WHRB Power Plant | 24 MW | | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Sponge Iron | 330000 | Tons per Annum | | Conveyor Belt | | (2.) | MS Re-Bars (TMT) & Structural Steel | 356400 | Tons per Annum | | Road | | (3.) | Electricity | 24 | Mega Watt(MW) | | Others | Electrical Cables | (4.) | Electricity | 26 | Mega Watt(MW) | | Others | Electrical Cables | (5.) | MS Billets / Hot metal for hot charging | 356400 | Tons per Annum | | Conveyor Belt | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 330.0 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 28.0 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 5.45 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 1.85 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 387000 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 387000 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Imported Coal | 387000 | Tons per Annum | | South Africa, Vishakapatnam port | Rail | | 1500 | MoU | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2018 To 31 May 2018 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 48.9 | 25.2 | 48.9 | 60 | (2.) | PM10 | | Micro Gram per Meter Cube | 82.7 | 44.5 | 82.7 | 100 | (3.) | NOx | | Micro Gram per Meter Cube | 24.8 | 8.1 | 24.8 | 80 | (4.) | SO2 | | Micro Gram per Meter Cube | 14.8 | 7.4 | 14.8 | 80 | (5.) | Others | CO | Micro Gram per Meter Cube | 1350 | 394 | 1350 | 2000 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Total Hardness | | | mg/l | | 283 | 211 | 300 | 600 | (2.) | Fluoride | | | mg/l | | 1.1 | 0.75 | 1.0 | 1.5 | (3.) | Others | Alkalinity | | mg/l | | 315 | 243 | 200 | 600 | (4.) | TDS | | | mg/l | | 436 | 325 | 500 | 2000 | (5.) | pH | | | NA | | 8.1 | 7.2 | 6.5 | 8.5 | (6.) | TSS | | | mg/l | | 2.0 | 1.2 | 0 | 0 | (7.) | Heavy Metals | | Iron | mg/l | | 0.05 | 0.021 | 0.3 | 1.0 | (8.) | Chlorides | | | mg/l | | 206 | 158 | 250 | 1000 | |
14.3. No. of Surface Water monitoring locations : 4 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | BOD | | mg/l | | 3 | 2.4 | A | (2.) | COD | | mg/l | | 11 | 6 | A | (3.) | DO | | mg/l | | 4.2 | 3.2 | A | (4.) | Others | TDS | mg/l | | 382 | 228 | A | (5.) | pH | | mg/l | | 7.8 | 7.3 | A | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 67 | 44 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 52 | 35 | 70 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | Others | NA | 7.8 | 7 | (2.) | K(Potassium) | Kilogram per hectare | | 381 | 189 | (3.) | Electric Conductivity | Millisiemens per Centimetre | | 192 | 124 | (4.) | N(Nitrogen) | Kilogram per hectare | | 361 | 168 | (5.) | P(Phosphorus) | Kilogram per hectare | | 72 | 39 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 4.38 To 7.66 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.47 To 4.49 | (c)Whether Ground Water Intersection will be there ? | Yes | (d)Upload Copy of Central Ground Water Authority Letter | Copy of Central Ground Water Authority Letter | (e)Letter No. | 21-4/5813/UP/IND/2018 | (f)Date of Issue | 13 Oct 2018 | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 1800 | 0 | Copy of Permission Letter | Pipeline | | Tube Well | | 21-4/5813/UP/IND/2018 | 13 Oct 2018 | 1800 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Boiler blowdown | 47 | 47 | ETP | Green Belt Renewal Plant | | 47 | 0 | (2.) | Sanitary wastewater from Domestic Consumption | 20 | 20 | Septic Tank followed by Subsurface dispersion | Others | Septic Tank followed by Subsurface dispersion | 20 | 0 | (3.) | Cooling tower blowdown | 150 | 150 | ETP | Green Belt Renewal Plant | | 150 | | (4.) | D.M. plant regeneration water from Power Plant | 30 | 30 | ETP | Green Belt Renewal Plant | | 30 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 247 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 247 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Ash from DRI | Fly Ash | | 59400 | Tons | 500 | Road | | Others | will be given to cement pant and brick manf. | (2.) | Kiln accretion slag | Industrial Waste | | 2970 | Tons | 100 | Road | | Others | Will be used in road construction | (3.) | SMS slag | Industrial Waste | | 35640 | Tons | 100 | Road | | Others | Will be used in road construction | (4.) | end cutting from Rolling mill | Industrial Waste | | 10692 | Tons | 0 | Road | | Others | resued in SMS | (5.) | Gypsum | Industrial Waste | | 9600 | Tons | 100 | Road | | Others | given to cement plant or gypsum board unit | (6.) | Dolochar | Industrial Waste | | 99000 | Tons | 0 | Road | | Others | will be reused in FCB pwer plant as fuel | (7.) | Wet scrapper sludge | Industrial Waste | | 15180 | Tons | 100 | Road | | Others | Will be used in road construction | (8.) | Ash from Power Plant | Fly Ash | | 100305 | Tons | 500 | Road | | Others | will be given to cement pant and brick manf. | (9.) | mill scales from Rolling Mill | Industrial Waste | | 7128 | Tons | 100 | Road | | Others | given to nearby Ferro alloy industries | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | SO2 | | Microgram per Meter Cube | 14.8 | 1400 | 14.5 | 29.3 | 80 | (2.) | Others(Specify) | CO | Microgram per Meter Cube | 1350 | 1400 | 2.3 | 1352.3 | 2000 | (3.) | PM2.5 | | Microgram per Meter Cube | 48.9 | 1400 | 1.7 | 50.6 | 60 | (4.) | PM10 | | Microgram per Meter Cube | 82.7 | 1400 | 3.1 | 85.8 | 100 | (5.) | NOx | | Microgram per Meter Cube | 24.8 | 1400 | 14.0 | 38.8 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | DRI Kiln with WHRB | Coal | 93 | 2.9 | PM10 | | 3.4 | (2.) | DRI kiln with WHRB | Coal | 93 | 2.9 | SO2 | | 90.3 | (3.) | DRI kiln with WHRB | coal | 93 | 2.9 | PM10 | | 3.4 | (4.) | DRI kiln with WHRB | coal | 93 | 2.9 | NOx | | 13.7 | (5.) | Induction Furnace | electricity | 45 | 1.8 | NOx | | 5.6 | (6.) | Induction Furnace | electricity | 45 | 1.8 | PM10 | | 1.4 | (7.) | Rolling Mill | pulverized coal | 45 | 1.8 | PM10 | | 1.2 | (8.) | Rolling Mill | pulverised coal | 45 | 1.8 | NOx | | 4.8 | (9.) | Rolling Mill | Electricity | 61 | 2.4 | PM10 | | 2.2 | (10.) | Rolling Mill | Electricity | 61 | 2.4 | NOx | | 8.9 | (11.) | CFBC Boiler | Coal | 80 | 2.6 | PM10 | | 1.6 | (12.) | CFBC Boiler | Coal | 80 | 2.6 | SO2 | | 5.3 | (13.) | DRI kiln with WHRB | coal | 93 | 2.9 | SO2 | | 90.3 | (14.) | Rolling Mill | pulverised coal | 45 | 1.8 | SO2 | | 13.0 | (15.) | Induction Furnace | electricity | 45 | 1.8 | PM10 | | 1.4 | (16.) | CFBC Boiler | Coal | 80 | 2.6 | NOx | | 5.3 | (17.) | DRI kiln with WHRB | coal | 93 | 2.9 | NOx | | 13.7 | (18.) | Induction Furnace | electricity | 45 | 1.8 | NOx | | 5.6 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 50000 | (b)Source | Captive & backup power from Purvanchal Vidyut Vitr | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 2 x 1250 kva, 2 x 1250 kva & 1 x 800 kva | (e)Stack Height (in m) | 7 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 32.0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 32.0 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 23958.2 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 1978.2 | (d)Surface Water Bodies (ha.) | 2920.2 | (e)Settlements (ha.) | 1507.2 | (f)Industrial (ha.) | 1036.2 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Nil | 0 | Total (ha.) | 31400.000000000004 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Water Reservoir | | 0.4 | | (2.) | Green belt | | 10.9 | | (3.) | Area for Solid Waste Management | | 4.0 | storage area (RM, product and solid waste) | (4.) | Others | open area and others | 2.5 | | (5.) | Main Plant | | 9.6 | | (6.) | Built Up Area | | 4.6 | parking, railway siding,roads,admin building | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | Nil | 0 | None within 10 Kms. radius | (2.) | NPA | Nil | 0 | None within 10 Kms. radius | (3.) | ESAs | Nil | 0 | None within 10 Kms. radius | (4.) | ESZs | Nil | 0 | None within 10 Kms. radius | (5.) | Wildlife Corridors | Nil | 0 | None within 10 Kms. radius | (6.) | Corridors | Nil | 0 | None within 10 Kms. radius | (7.) | Critically Polluted Area | Nil | 0 | None within 10 Kms. radius | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | None | 0 | None within 10 Kms. radius | (2.) | Archaeological Sites | | None | 0 | None within 10 Kms. radius | (3.) | Others | Water bodies | Rapti river | 3.5 | None | (4.) | Defence Installations | | None | 0 | None within 10 Kms. radius | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 32.0 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | total land is taken on lease from GIDA | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Drain is passing adjacent to the Project Boundary in NE direction | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Rapti river | (ii)Direction of Water Bodies in Buffer Area | East | (iii)Distance of Water Bodies in Buffer Area | 3.5 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 370 | (c)Temporary Employment- During Construction | 1000 | (d)Temporary Employment- During Operation | 130 | (e)No. of working days | 330 | (f)Total Manpower | 1500 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 10.9 | (b)Percentage of Total Project Area | 34.06 | (c)No. of Plants to be Planted | 16200 | (d)Funds Allocated for Plantation | 2500000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | With the implementation of the proposed plant, the socio-economic status of the local people will improve substantially. The land rates in the area will improve in the nearby areas due to the proposed activity. This will help in upliftment of the social status of the people in the area. Educational institutions will also come-up and will lead to improvement of educational status of the people in the area. Primary health and medical facilities will certainly improve due to the proposed plant. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 1 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/ EIA/ 1619/ RA 026 | (ii)Name of the EIA Consultant | PIONEER ENVIRO LABORATORIES & CONSULTANTS PVT. LTD | (iii)Address | 6-3-652, Flat # 7-3, Dhruvatara Apartments, Amrutha Estates, Erramanjil, Somajiguda, Hyderabad- 500082 | (iv)Mobile No. | 9440677333 | (v)Landline No. | 0402331427 | (vi)Email Id | pelcpl@yahoo.co.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 1 | (ix)Validity of Accreditation | 22 Jun 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | May kindly refer to the Form-II. The EIA/EMP report, Annexures and Figures and maps attached are not visible. Kindly upload properly for further scrutiny. | 15 Oct 2018 | 2. | NA | The correction have been made as per the instruction received | 15 Oct 2018 | 3. | NA | May kindly refer to the Form-II again. The EIA/EMP report, Annexures and Figures and maps attached are still not visible. Kindly upload properly for further scrutiny. | 16 Oct 2018 | 4. | NA | The correction have been made as per the instruction received | 16 Oct 2018 | 5. | NA | You are requested to submit the status of orders of Hon'ble supreme court in the matter of Gorakhpur Textile park Vs State of Uttar pardesh regarding land proposed for proposed project | 17 Jan 2019 | 6. | NA | The correction have been made as per the instruction received | 19 Jan 2019 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Sir,
please find the attachment for reply to ADS generated on 12th April 2019. | 15 Apr 2019 | 2. | NA | After detailed deliberations, the committee advised the PP to submit DPR to the railways as desired in the IN-PRINCIPLE approval and submit the information to the Ministry for further consideration. Detailed action plan for ground water recharge and rainwater storage shall be furnished in the current financial year alongwith time schedule for implementation of action plan within 03 years. | 12 Apr 2019 | 3. | ADS Reply Letter | NA | 07 Mar 2019 | 4. | NA | ADS | 27 Feb 2019 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Nikhil Jalan | Designation | CEO | Name of Company (Applicant Name should not be given here) | ANKUR UDYOG LIMITED STEEL DIVISION | Address | Nakaha No. 2, Near Fertilizer Factory, Gorakhpur, Uttar Pradesh |
|