Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed Expansion of Pulp Plant, VSF Plant, Sulphuric Acid Plant, Carbon-Disulphide Plant and Captive Power Plant along with new Excel Fibre Plant at Village: Kumarapatnam, Taluka: Ranebennuru, Distr
(b)Name of the Company / Organisation GRASIM INDUSTRIES LIMITED, KUMARAPATNAM
(c)Registered Address Grasim Industries Ltd., Kumarapatnam, Taluka-Ranebennur,,Haveri,Karnataka-581123
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Ajay Kumar Gupta
(b)Designation (Owner/ Partner/ CEO) SeniorPresident
(c)Address Grasim Industries Ltd., Kumarapatnam, Taluka-Ranebennur, Haveri, Karnataka,,Ranibennur,Haveri,Karnataka-581123
(d)Pin code 581123
(e)E-mail a.k.gupta@adityabirla.com
(f)STD Code. 8192(f)Telephone No. 247550
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(d) Manmade fibres manufacturing
Minor Activity5(i) Pulp & paper industry excluding manufacturing of paper from waste
(b)Category A
(c)Proposal Number IA/KA/IND2/82389/2006
(d)Master Proposal Number(Single Window) SW/81279/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. List of Khasra no. has been enclosed with PFR
(b)Pincode 581123
(c)Bounded Latitudes (North)
From
Degree 143123.63
Minutes
Second
From
Degree 143221.61
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 754627.78
Minutes
Second
From
Degree 754743.03
Minutes
Second
(e)Survey of India Topo Sheet No. 48 N/10, 48 N/11, 48 N/14 and 48 N/15
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 539
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 10
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Karnataka
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)TelanganaKhammamDummugudemDummugudem
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/346/2016-IA-II (I)
(c)Date of Issue of TOR 18 Oct 2006
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 13 Nov 2018
(c)Date of Issue of EC 13 Aug 2019
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :17 Mar 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :17 Apr 2018
Distance of Public Hearing Venue from the Proposed Project :1
Balehalli Veerassimhasana Managala Mantapa, Kodiyala Hospet
State :Karnataka
District :Haveri
Tehsil :Ranibennur
Village :Kumarapatnam
562Issues related to Employment, Environment, CSR and Others were raised during Public hearingDeputy Commissioner
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bangalore
(iii)Letter No. EP/12.1/524/KAR
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jun 12 2017 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Carbon disulphide143651436528730Tons per Annum(TPA)Road
(2.)Excel Fibre (Solvent Spun Cellulosic Fibre)03650036500Tons per Annum(TPA)Road
(3.)Sulphuric Acid7511075110150220Tons per Annum(TPA)Road
(4.)Viscose Staple Fibre8760087600175200Tons per Annum(TPA)Road
(5.)(By product) Anhydrous Soduim Suphate6920569205138410Tons per Annum(TPA)Road
(6.)Pulp7440074400148800Tons per Annum(TPA)Road
(7.)Recovery Boiler101020Mega Watt(MW)OthersCaptive Use
(8.)Captive Power Plant203050Mega Watt(MW)OthersCaptive Use
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Viscose Staple Fibre87600 TPA87600 TPA175200 TPA7300 TPA will be done by debottlenecking and 80300 TPA by new installations
(2.)By product (Anhydrous Soduim Sulphate69205 TPA69205 TPA138410 TPA
(3.)Captive Power Plant20 MW30 MW50 MW
(4.)Excel Fibre (Solvent Spun Cellulosic Fibre)036500 TPA36500 TPA
(5.)Pulp74400 TPA74400 TPA148800 TPA
(6.)Carbon disulphide14365 TPA14365 TPA28730 TPA
(7.)Recovery Boiler10 MW10 MW20 MW
(8.)Sulphuric Acid75110 TPA75110 TPA150220 TPA
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 12 Oct 2018
(iv)Valid Upto 30 Jun 2021
(v)File No. AW-308173
(vi)Application No. 23496
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 2550
(b) Funds Allocated for Environment Management (Capital) (in Crores) 600
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 63.75
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 6
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 498749
(b)Existing quantity of raw material/fuel 451050
(c)Total quantity of raw material/fuel 949799
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Caustic Soda4800Tons per AnnumKarnataka and TamilnaduRoad460 Open MarketCopy of Linkage
(2.)Sulphuric Acid3000Tons per AnnumOwn Fibre PlantPipe Conveyor0 CaptiveCopy of Linkage
(3.)Hydrochloric Acid2800Tons per AnnumAP and GujaratRoad385 Open MarketCopy of Linkage
(4.)Sea Shell900Tons per AnnumKarnataka and APRoad220 Open MarketCopy of Linkage
(5.)Hydrogen Peroxide5800Tons per AnnumMaharashtraRoad708 Open MarketCopy of Linkage
(6.)Rayon Grade Pulp176100Tons per AnnumCaptive and OverseasRoad12700 OthersFrom Group IndustriesCopy of Linkage
(7.)Sulphuric Acid124600Tons per AnnumCaptivePipe Conveyor0 CaptiveCopy of Linkage
(8.)HCl7556Tons per AnnumAP and TNRoad387 Open MarketCopy of Linkage
(9.)Wood457000Tons per AnnumLocalRoad300 Open MarketCopy of Linkage
(10.)Caustic Soda95400Tons per AnnumFrom ABG CompanyRoad556 Open MarketCopy of Linkage
(11.)Carbon disulphide25600Tons per AnnumCaptivePipe Conveyor0 CaptiveCopy of Linkage
(12.)RG Pulp36865Tons per AnnumOverseasRoadSea708 OthersGroupIndustriesCopy of Linkage
(13.)N-Methyl morpholine N-oxide / Ionic Liquid1022Tons per AnnumAmines & Plasticizer Pvt. Ltd.Road707 Open MarketCopy of Linkage
(14.)Soduim Suphate3800Tons per AnnumOwn Fibre PlantRoad0 CaptiveCopy of Linkage
(15.)Soduim Chlorate1100Tons per AnnumAP, Guajarat and KarnatakaRoad150 Open MarketCopy of Linkage
(16.)Propyl Gallate66Tons per AnnumTwinkle Chemical Ltd.Road707 Open MarketCopy of Linkage
(17.)Caustic Soda2190Tons per AnnumFrom ABG Company Karnataka and TNRoad556 Open MarketFrom Group IndustriesCopy of Linkage
(18.)Gaseous Oxygen1200Tons per AnnumOnsite GenerationPipe Conveyor0 CaptiveCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2016 To 28 Feb 2017
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube39.2317.1538.7860
(2.)OthersH2SMicro Gram per Meter Cube9.351.409.19150
(3.)PM10Micro Gram per Meter Cube67.3129.8466.56100
(4.)SO2Micro Gram per Meter Cube23.487.0623.1580
(5.)NOxMicro Gram per Meter Cube26.318.3425.9580
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSNA0000
(2.)Total Hardnessmg/l486180200600
(3.)Chloridesmg/l457.63279.932501000
(4.)Fluoridemg/l0.210.0811.5
(5.)pHNA7.907.446.58.5
(6.)TDSmg/l140510685002000
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l7.16.3E
(2.)OthersTDSmg/l210196E
(3.)pHNA7.307.20E
(4.)BODmg/l4.54.0E
(5.)CODmg/l30.125E
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))63.848.875
(2.)Leq(Night)A-weighted decibels(dB(A))52.439.670
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNA8.177.89
(2.)N(Nitrogen)Kilogram per hectare275.84165.55
(3.)P(Phosphorus)Kilogram per hectare43.125.3
(4.)K(Potassium)Kilogram per hectare153.4573.65
(5.)Electric ConductivityMillisiemens per Centimetre0.250.20
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 100 To 75
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 20 To 30
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface964800.8 Not Appliacble PipelineIntake WellKE/KNNN/BNV.5......22 May 201797765
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)VSF Plant2852040000ETPDischarge into Surface Water Body28520
(2.)Pulp Plant5200060000ETPDischarge into Surface Water Body52000
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 80520
(b)Total Discharged Water (Kilolitre per Day) 80520
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Pulp Mill BleachingIndustrial Waste800Tons950RoadOthersSold out to low quality fibre manufacturing
(2.)ETP wasteIndustrial Waste7000Tons0OthersNAOthersDried and Burnt in Coal Boiler / Used as manure
(3.)Wood YardIndustrial Waste5100Tons10RoadOthersVermi compositing / Bio fuel
(4.)CS2 and Acid Plant wasteIndustrial Waste4000Tons0OthersNAOthersBurnt in coal fired boiler
(5.)ETP wasteIndustrial Waste6000Tons25RoadOthersDewatered and sold to Cement blocks / Units
(6.)Viscose, Spinning, Recovery and Power PlantIndustrial Waste3500Tons50RoadOthersSell to user
(7.)IT & Instrument wasteE Waste1Tons25RoadAuthorized Recyclers
(8.)Bio wasteBio-Medical Waste1Tons20RoadOthersIncineration
(9.)ResinHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1.5Tons230RoadTreatment, Storage and Disposal Facility(TSDF)
(10.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)16Tons130RoadAuthorized Recyclers
(11.)Insulation WaterHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1Tons230RoadTreatment, Storage and Disposal Facility(TSDF)
(12.)Power Plant WasteIndustrial Waste90000Tons100RoadOthersDisposed to Brick / Cement blocks
(13.)Canteen WasteMunicipal Solid Waste40Tons5RoadOthersCattle feed
(14.)PPEs waste and GlovesHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1Tons230RoadTreatment, Storage and Disposal Facility(TSDF)
(15.)PVC Bags & LinersHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.25Tons230RoadTreatment, Storage and Disposal Facility(TSDF)
(16.)GasketsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.2Tons230RoadTreatment, Storage and Disposal Facility(TSDF)
(17.)Lime Kiln wasteIndustrial Waste110000Tons0OthersNACo-Processing
(18.)ETP wasteIndustrial Waste2200Tons0OthersNAOthersDewatered and Burnt in coal fired boiler
(19.)Oil Soaked Cotton WasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1Tons0OthersNAOthersBurnt in boiler
(20.)Discarded Drums & ContainerHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.5Tons230RoadAuthorized Recyclers
(21.)Wood ChipsIndustrial Waste19000Tons0OthersNAOthersDried and Burnt in Coal Boiler
(22.)CS2 and Acid Plant wasteIndustrial Waste4000Tons0OthersNAOthersBurnt in coal fired boiler
(23.)Spinning wasteIndustrial Waste61000Tons10RoadOthersWashed, Dried and sold
(24.)ETP/ RO Plant wasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.1Tons230RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube39.230039.2360
(2.)NOxMicrogram per Meter Cube26.310.90.4526.7680
(3.)Others(Specify)H2SMicrogram per Meter Cube9.350.76.9616.31150
(4.)PM10Microgram per Meter Cube67.3110.9968.30100
(5.)SO2Microgram per Meter Cube23.4812.7526.2380
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Recovery BoilerNA843OthersSPM0.98
(2.)Spinning PlantCoal (Indigenous & (Imported)1753OthersSPM1.74
(3.)Spinning PlantCoal (Indigenous & Imported)1753OthersCS2265
(4.)Spinning PlantCoal (Indigenous & Imported)1753OthersH2S83
(5.)Sulphuric Acid PlantNA510.5SO21.6
(6.)Sulphuric Acid PlantNA510.5OthersAcid Mist0.104
(7.)Power PlantCoal (Indigenous & Imported)1103OthersSPM7.67
(8.)Power PlantCoal (Indigenous & Imported)1103NOx6.9
(9.)Power PlantCoal (Indigenous & Imported)1103SO232
(10.)Lime KilnFurnance Oil301OthersSPM0.15
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 70000
(b)Source Recovery Boiler (Captive) & CPP
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) NA
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 431.36
    Total Land (ha.) 431.36
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 431.36
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Scrub Land 0
    Total (ha.) 431.36
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt96
(2.)OthersOpen area64.36
(3.)Main Plant271
Total (ha.) 431.36
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSRanebennur Black Buck Sanctuary4.5NNW direction
(2.)Critically Polluted AreaNA0No Critically Polluted Area within 10 km
(3.)NPANA0No NPA within 10 km
(4.)Wildlife CorridorsNA0No Wildlife Corridors within 10 km
(5.)ESAsNA0No ESAs within 10 km
(6.)ESZsNA0No ESZs within 10 km
(7.)CorridorsNA0No Corridors within 10 km
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA0No forest within 10 km radius
(2.)Archaeological SitesNA0No Archaeological Sites within 10 km radius
(3.)Defence InstallationsNA0No Defense Installation within 10 km radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 431.36
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Black Buck, Indian Wolf and Indian Peafowl
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 169 Lakhs
(iii)Period of Implementation 5 Years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Tungabhadra River
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 0.20
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 25
(b)Permanent Employment-During Operation 1003
(c)Temporary Employment- During Construction 250
(d)Temporary Employment- During Operation 860
(e)No. of working days 345
(f)Total Manpower 2138
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt96096
(2.)Percentage of Total Project Area36036
(3.)No. of Plants14762025000172620
(4.)Funds Allocated20050250
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalGreenery of the area will be increased
(2.)FinancialRevenue generation for State & Centre in terms of taxes etc.
(3.)SocialEmployment generation & upliftment of the nearby villagers through CER
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA 0069
(ii)Name of the EIA Consultant J.M. EnviroNet Pvt. Ltd.
(iii)Address 202-A, ABW Tower, MG Road, IFFCO Chowk, Gurugram (Haryana)
(iv)Mobile No. 9015209362
(v)Landline No. 9015209362
(vi)Email Id jmenviron@hotmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 18 May 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAReply to our earlier observations dated 11/8/2018 regarding ECs for the existing production of Pulp, H2SO4 and Carbon Di-sulphide, is still not available on the portal. In addition, please inform/clarify the following:- - Categorization of each product as per schedule to the EIA Notification, 2006. - Entry at item 6 shows details as Nil and needs to be rectified. - Applicability of CRZ Notification, 2011. 17 Oct 2018
2.NAThe correction have been made as per the instruction received 13 Nov 2018
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterNA 19 Feb 2019
2.NANA 13 Feb 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAjay Kumar Gupta
DesignationSeniorPresident
Name of Company (Applicant Name should not be given here)GRASIM INDUSTRIES LIMITED, KUMARAPATNAM
AddressGrasim Industries Ltd., Kumarapatnam, Taluka-Ranebennur
Print