1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Proposed Expansion of Pulp Plant, VSF Plant, Sulphuric Acid Plant, Carbon-Disulphide Plant and Captive Power Plant along with new Excel Fibre Plant at Village: Kumarapatnam, Taluka: Ranebennuru, Distr | (b)Name of the Company / Organisation | GRASIM INDUSTRIES LIMITED, KUMARAPATNAM | (c)Registered Address | Grasim Industries Ltd., Kumarapatnam, Taluka-Ranebennur,,Haveri,Karnataka-581123 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Ajay Kumar Gupta | (b)Designation (Owner/ Partner/ CEO) | SeniorPresident | (c)Address | Grasim Industries Ltd., Kumarapatnam, Taluka-Ranebennur, Haveri, Karnataka,,Ranibennur,Haveri,Karnataka-581123 | (d)Pin code | 581123 | (e)E-mail | a.k.gupta@adityabirla.com | (f)STD Code. | 8192(f)Telephone No. | 247550 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(d) Manmade fibres manufacturing
| Minor Activity | 5(i) Pulp & paper industry excluding manufacturing of paper from waste
| (b)Category | A | (c)Proposal Number | IA/KA/IND2/82389/2006 | (d)Master Proposal Number(Single Window) | SW/81279/2018 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | List of Khasra no. has been enclosed with PFR | (b)Pincode | 581123 | (c)Bounded Latitudes (North) | | From | | Degree | 143123.63 | Minutes | | Second | | From | | Degree | 143221.61 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 754627.78 | Minutes | | Second | | From | | Degree | 754743.03 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 48 N/10, 48 N/11, 48 N/14 and 48 N/15 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 539 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 10 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Karnataka | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Telangana | Khammam | Dummugudem | Dummugudem | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/346/2016-IA-II (I) | (c)Date of Issue of TOR | 18 Oct 2006 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 13 Nov 2018 | (c)Date of Issue of EC | 13 Aug 2019 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 17 Apr 2018 | Distance of Public Hearing Venue from the Proposed Project : | 1 |
| Balehalli Veerassimhasana Managala Mantapa, Kodiyala Hospet | State : | Karnataka | District : | Haveri | Tehsil : | Ranibennur | Village : | Kumarapatnam |
| 562 | Issues related to Employment, Environment, CSR and Others were raised during Public hearing | Deputy Commissioner | | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bangalore | (iii)Letter No. | EP/12.1/524/KAR | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Jun 12 2017 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Carbon disulphide | 14365 | 14365 | 28730 | Tons per Annum(TPA) | | Road | | (2.) | Excel Fibre (Solvent Spun Cellulosic Fibre) | 0 | 36500 | 36500 | Tons per Annum(TPA) | | Road | | (3.) | Sulphuric Acid | 75110 | 75110 | 150220 | Tons per Annum(TPA) | | Road | | (4.) | Viscose Staple Fibre | 87600 | 87600 | 175200 | Tons per Annum(TPA) | | Road | | (5.) | (By product) Anhydrous Soduim Suphate | 69205 | 69205 | 138410 | Tons per Annum(TPA) | | Road | | (6.) | Pulp | 74400 | 74400 | 148800 | Tons per Annum(TPA) | | Road | | (7.) | Recovery Boiler | 10 | 10 | 20 | Mega Watt(MW) | | Others | Captive Use | (8.) | Captive Power Plant | 20 | 30 | 50 | Mega Watt(MW) | | Others | Captive Use | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Viscose Staple Fibre | 87600 TPA | 87600 TPA | 175200 TPA | 7300 TPA will be done by debottlenecking and 80300 TPA by new installations | (2.) | By product (Anhydrous Soduim Sulphate | 69205 TPA | 69205 TPA | 138410 TPA | | (3.) | Captive Power Plant | 20 MW | 30 MW | 50 MW | | (4.) | Excel Fibre (Solvent Spun Cellulosic Fibre) | 0 | 36500 TPA | 36500 TPA | | (5.) | Pulp | 74400 TPA | 74400 TPA | 148800 TPA | | (6.) | Carbon disulphide | 14365 TPA | 14365 TPA | 28730 TPA | | (7.) | Recovery Boiler | 10 MW | 10 MW | 20 MW | | (8.) | Sulphuric Acid | 75110 TPA | 75110 TPA | 150220 TPA | | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 12 Oct 2018 | (iv)Valid Upto | 30 Jun 2021 | (v)File No. | AW-308173 | (vi)Application No. | 23496 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 2550 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 600 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 63.75 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 6 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 498749 | (b)Existing quantity of raw material/fuel | 451050 | (c)Total quantity of raw material/fuel | 949799 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Caustic Soda | 4800 | Tons per Annum | | Karnataka and Tamilnadu | Road | | 460 | Open Market | | Copy of Linkage | (2.) | Sulphuric Acid | 3000 | Tons per Annum | | Own Fibre Plant | Pipe Conveyor | | 0 | Captive | | Copy of Linkage | (3.) | Hydrochloric Acid | 2800 | Tons per Annum | | AP and Gujarat | Road | | 385 | Open Market | | Copy of Linkage | (4.) | Sea Shell | 900 | Tons per Annum | | Karnataka and AP | Road | | 220 | Open Market | | Copy of Linkage | (5.) | Hydrogen Peroxide | 5800 | Tons per Annum | | Maharashtra | Road | | 708 | Open Market | | Copy of Linkage | (6.) | Rayon Grade Pulp | 176100 | Tons per Annum | | Captive and Overseas | Road | | 12700 | Others | From Group Industries | Copy of Linkage | (7.) | Sulphuric Acid | 124600 | Tons per Annum | | Captive | Pipe Conveyor | | 0 | Captive | | Copy of Linkage | (8.) | HCl | 7556 | Tons per Annum | | AP and TN | Road | | 387 | Open Market | | Copy of Linkage | (9.) | Wood | 457000 | Tons per Annum | | Local | Road | | 300 | Open Market | | Copy of Linkage | (10.) | Caustic Soda | 95400 | Tons per Annum | | From ABG Company | Road | | 556 | Open Market | | Copy of Linkage | (11.) | Carbon disulphide | 25600 | Tons per Annum | | Captive | Pipe Conveyor | | 0 | Captive | | Copy of Linkage | (12.) | RG Pulp | 36865 | Tons per Annum | | Overseas | Road | Sea | 708 | Others | GroupIndustries | Copy of Linkage | (13.) | N-Methyl morpholine N-oxide / Ionic Liquid | 1022 | Tons per Annum | | Amines & Plasticizer Pvt. Ltd. | Road | | 707 | Open Market | | Copy of Linkage | (14.) | Soduim Suphate | 3800 | Tons per Annum | | Own Fibre Plant | Road | | 0 | Captive | | Copy of Linkage | (15.) | Soduim Chlorate | 1100 | Tons per Annum | | AP, Guajarat and Karnataka | Road | | 150 | Open Market | | Copy of Linkage | (16.) | Propyl Gallate | 66 | Tons per Annum | | Twinkle Chemical Ltd. | Road | | 707 | Open Market | | Copy of Linkage | (17.) | Caustic Soda | 2190 | Tons per Annum | | From ABG Company Karnataka and TN | Road | | 556 | Open Market | From Group Industries | Copy of Linkage | (18.) | Gaseous Oxygen | 1200 | Tons per Annum | | Onsite Generation | Pipe Conveyor | | 0 | Captive | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Dec 2016 To 28 Feb 2017 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 39.23 | 17.15 | 38.78 | 60 | (2.) | Others | H2S | Micro Gram per Meter Cube | 9.35 | 1.40 | 9.19 | 150 | (3.) | PM10 | | Micro Gram per Meter Cube | 67.31 | 29.84 | 66.56 | 100 | (4.) | SO2 | | Micro Gram per Meter Cube | 23.48 | 7.06 | 23.15 | 80 | (5.) | NOx | | Micro Gram per Meter Cube | 26.31 | 8.34 | 25.95 | 80 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TSS | | | NA | | 0 | 0 | 0 | 0 | (2.) | Total Hardness | | | mg/l | | 486 | 180 | 200 | 600 | (3.) | Chlorides | | | mg/l | | 457.63 | 279.93 | 250 | 1000 | (4.) | Fluoride | | | mg/l | | 0.21 | 0.08 | 1 | 1.5 | (5.) | pH | | | NA | | 7.90 | 7.44 | 6.5 | 8.5 | (6.) | TDS | | | mg/l | | 1405 | 1068 | 500 | 2000 | |
14.3. No. of Surface Water monitoring locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | DO | | mg/l | | 7.1 | 6.3 | E | (2.) | Others | TDS | mg/l | | 210 | 196 | E | (3.) | pH | | NA | | 7.30 | 7.20 | E | (4.) | BOD | | mg/l | | 4.5 | 4.0 | E | (5.) | COD | | mg/l | | 30.1 | 25 | E | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 63.8 | 48.8 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 52.4 | 39.6 | 70 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | Others | NA | 8.17 | 7.89 | (2.) | N(Nitrogen) | Kilogram per hectare | | 275.84 | 165.55 | (3.) | P(Phosphorus) | Kilogram per hectare | | 43.1 | 25.3 | (4.) | K(Potassium) | Kilogram per hectare | | 153.45 | 73.65 | (5.) | Electric Conductivity | Millisiemens per Centimetre | | 0.25 | 0.20 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 100 To 75 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 20 To 30 | (c)Whether Ground Water Intersection will be there ? | NA | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 96480 | 0.8 | Not Appliacble | Pipeline | | Intake Well | | KE/KNNN/BNV.5...... | 22 May 2017 | 97765 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | VSF Plant | 28520 | 40000 | ETP | Discharge into Surface Water Body | | | 28520 | (2.) | Pulp Plant | 52000 | 60000 | ETP | Discharge into Surface Water Body | | | 52000 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 80520 | (b)Total Discharged Water (Kilolitre per Day) | 80520 | (c)Total Reused Water (Kilolitre per Day) | 0 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Pulp Mill Bleaching | Industrial Waste | | 800 | Tons | 950 | Road | | Others | Sold out to low quality fibre manufacturing | (2.) | ETP waste | Industrial Waste | | 7000 | Tons | 0 | Others | NA | Others | Dried and Burnt in Coal Boiler / Used as manure | (3.) | Wood Yard | Industrial Waste | | 5100 | Tons | 10 | Road | | Others | Vermi compositing / Bio fuel | (4.) | CS2 and Acid Plant waste | Industrial Waste | | 4000 | Tons | 0 | Others | NA | Others | Burnt in coal fired boiler | (5.) | ETP waste | Industrial Waste | | 6000 | Tons | 25 | Road | | Others | Dewatered and sold to Cement blocks / Units | (6.) | Viscose, Spinning, Recovery and Power Plant | Industrial Waste | | 3500 | Tons | 50 | Road | | Others | Sell to user | (7.) | IT & Instrument waste | E Waste | | 1 | Tons | 25 | Road | | Authorized Recyclers | | (8.) | Bio waste | Bio-Medical Waste | | 1 | Tons | 20 | Road | | Others | Incineration | (9.) | Resin | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1.5 | Tons | 230 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (10.) | Used Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 16 | Tons | 130 | Road | | Authorized Recyclers | | (11.) | Insulation Water | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1 | Tons | 230 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (12.) | Power Plant Waste | Industrial Waste | | 90000 | Tons | 100 | Road | | Others | Disposed to Brick / Cement blocks | (13.) | Canteen Waste | Municipal Solid Waste | | 40 | Tons | 5 | Road | | Others | Cattle feed | (14.) | PPEs waste and Gloves | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1 | Tons | 230 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (15.) | PVC Bags & Liners | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.25 | Tons | 230 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (16.) | Gaskets | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.2 | Tons | 230 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (17.) | Lime Kiln waste | Industrial Waste | | 110000 | Tons | 0 | Others | NA | Co-Processing | | (18.) | ETP waste | Industrial Waste | | 2200 | Tons | 0 | Others | NA | Others | Dewatered and Burnt in coal fired boiler | (19.) | Oil Soaked Cotton Waste | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1 | Tons | 0 | Others | NA | Others | Burnt in boiler | (20.) | Discarded Drums & Container | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.5 | Tons | 230 | Road | | Authorized Recyclers | | (21.) | Wood Chips | Industrial Waste | | 19000 | Tons | 0 | Others | NA | Others | Dried and Burnt in Coal Boiler | (22.) | CS2 and Acid Plant waste | Industrial Waste | | 4000 | Tons | 0 | Others | NA | Others | Burnt in coal fired boiler | (23.) | Spinning waste | Industrial Waste | | 61000 | Tons | 10 | Road | | Others | Washed, Dried and sold | (24.) | ETP/ RO Plant waste | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.1 | Tons | 230 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 39.23 | 0 | 0 | 39.23 | 60 | (2.) | NOx | | Microgram per Meter Cube | 26.31 | 0.9 | 0.45 | 26.76 | 80 | (3.) | Others(Specify) | H2S | Microgram per Meter Cube | 9.35 | 0.7 | 6.96 | 16.31 | 150 | (4.) | PM10 | | Microgram per Meter Cube | 67.31 | 1 | 0.99 | 68.30 | 100 | (5.) | SO2 | | Microgram per Meter Cube | 23.48 | 1 | 2.75 | 26.23 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Recovery Boiler | NA | 84 | 3 | Others | SPM | 0.98 | (2.) | Spinning Plant | Coal (Indigenous & (Imported) | 175 | 3 | Others | SPM | 1.74 | (3.) | Spinning Plant | Coal (Indigenous & Imported) | 175 | 3 | Others | CS2 | 265 | (4.) | Spinning Plant | Coal (Indigenous & Imported) | 175 | 3 | Others | H2S | 83 | (5.) | Sulphuric Acid Plant | NA | 51 | 0.5 | SO2 | | 1.6 | (6.) | Sulphuric Acid Plant | NA | 51 | 0.5 | Others | Acid Mist | 0.104 | (7.) | Power Plant | Coal (Indigenous & Imported) | 110 | 3 | Others | SPM | 7.67 | (8.) | Power Plant | Coal (Indigenous & Imported) | 110 | 3 | NOx | | 6.9 | (9.) | Power Plant | Coal (Indigenous & Imported) | 110 | 3 | SO2 | | 32 | (10.) | Lime Kiln | Furnance Oil | 30 | 1 | Others | SPM | 0.15 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 70000 | (b)Source | Recovery Boiler (Captive) & CPP | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | NA | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 431.36 | Total Land (ha.) | 431.36 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 431.36 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Scrub Land | 0 | Total (ha.) | 431.36 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Green belt | | 96 | | (2.) | Others | Open area | 64.36 | | (3.) | Main Plant | | 271 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | Ranebennur Black Buck Sanctuary | 4.5 | NNW direction | (2.) | Critically Polluted Area | NA | 0 | No Critically Polluted Area within 10 km | (3.) | NPA | NA | 0 | No NPA within 10 km | (4.) | Wildlife Corridors | NA | 0 | No Wildlife Corridors within 10 km | (5.) | ESAs | NA | 0 | No ESAs within 10 km | (6.) | ESZs | NA | 0 | No ESZs within 10 km | (7.) | Corridors | NA | 0 | No Corridors within 10 km | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | NA | 0 | No forest within 10 km radius | (2.) | Archaeological Sites | | NA | 0 | No Archaeological Sites within 10 km radius | (3.) | Defence Installations | | NA | 0 | No Defense Installation within 10 km radius | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 431.36 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | NA | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Black Buck, Indian Wolf and Indian Peafowl | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 169 Lakhs | (iii)Period of Implementation | 5 Years | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Tungabhadra River | (ii)Direction of Water Bodies in Buffer Area | East | (iii)Distance of Water Bodies in Buffer Area | 0.20 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 25 | (b)Permanent Employment-During Operation | 1003 | (c)Temporary Employment- During Construction | 250 | (d)Temporary Employment- During Operation | 860 | (e)No. of working days | 345 | (f)Total Manpower | 2138 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 96 | 0 | 96 | (2.) | Percentage of Total Project Area | 36 | 0 | 36 | (3.) | No. of Plants | 147620 | 25000 | 172620 | (4.) | Funds Allocated | 200 | 50 | 250 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Greenery of the area will be increased | (2.) | Financial | Revenue generation for State & Centre in terms of taxes etc. | (3.) | Social | Employment generation & upliftment of the nearby villagers through CER | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA 0069 | (ii)Name of the EIA Consultant | J.M. EnviroNet Pvt. Ltd. | (iii)Address | 202-A, ABW Tower, MG Road, IFFCO Chowk, Gurugram (Haryana) | (iv)Mobile No. | 9015209362 | (v)Landline No. | 9015209362 | (vi)Email Id | jmenviron@hotmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 18 May 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Reply to our earlier observations dated 11/8/2018 regarding ECs for the existing production of Pulp, H2SO4 and Carbon Di-sulphide, is still not available on the portal. In addition, please inform/clarify the following:-
- Categorization of each product as per schedule to the EIA Notification, 2006.
- Entry at item 6 shows details as Nil and needs to be rectified.
- Applicability of CRZ Notification, 2011. | 17 Oct 2018 | 2. | NA | The correction have been made as per the instruction received | 13 Nov 2018 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | NA | 19 Feb 2019 | 2. | NA | NA | 13 Feb 2019 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Ajay Kumar Gupta | Designation | SeniorPresident | Name of Company (Applicant Name should not be given here) | GRASIM INDUSTRIES LIMITED, KUMARAPATNAM | Address | Grasim Industries Ltd., Kumarapatnam, Taluka-Ranebennur |
|