Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) M/s Crystal Surfactants & Chemicals
(b)Name of the Company / Organisation CRYSTAL SURFACTANTS AND CHEMICALS
(c)Registered Address 113, Labh Chamber, Station road, Aurangabad,,Aurangabad,Maharashtra-431005
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Govardhan Dwarkadas Agrawal
(b)Designation (Owner/ Partner/ CEO) Partner
(c)Address Plot. No. B-31/2, MIDC area Paithan, Dist.-Auranbagad,,Aurangabad,Aurangabad,Maharashtra-431148
(d)Pin code 431148
(e)E-mail crystal.pcona@gmail.com
(f)STD Code. 240(f)Telephone No. 2362341
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/MH/IND2/82242/2018
(d)Master Proposal Number(Single Window) SW/82238/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. At Plot No. B-31/2, MIDC Paithan, Tal. Paithan, Di
(b)Pincode 431107
(c)Bounded Latitudes (North)
From
Degree 19.540561
Minutes
Second
From
Degree 19.541128
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 75.385322
Minutes
Second
From
Degree 75.386061
Minutes
Second
(e)Survey of India Topo Sheet No. 47M06/47M07
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 469
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 431
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number No.IA-J-11011/66/2018-IA-II(I)
(b)Date of Apply of TOR 20 Apr 2018
(c)Date of Issue of TOR / Standard ToR 24 May 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Project Located in Notified Industrial Area {MIDC}
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Dye & pigment intermediates1908 TPANA
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)4- Chloro 2-Nitro Aniline360Tons per AnnumRoad
(2.)4- Nitro -2-Chloro Aniline240Tons per AnnumRoad
(3.)5- Chloro-2-Nitro Aniline240Tons per AnnumRoad
(4.)4- Nitro-m-Phenylene Di-amine24Tons per AnnumRoad
(5.)Fenbendazole240Tons per AnnumRoad
(6.)Albendazole240Tons per AnnumRoad
(7.)2- Nitro Aniline300Tons per AnnumRoad
(8.)2-Amino 3-chlro 5-trifluoro methyl pyridine144Tons per AnnumRoad
(9.)8-amino Quinaldine120Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 11 Oct 2018
(iv)Valid Upto 11 Oct 2018
(v)File No. Not Applicable
(vi)Application No. Not Applicable
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 7.189
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.75
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.1437
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.075
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
a)Protected areas notified under the wildlife (Protection) Act, 1972 Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)ammonia300.672Tons per AnnumLocal MarketRoad50 Open MarketCopy of Linkage
(2.)Methanol62.88Tons per AnnumIndigenousRoad500 Open MarketCopy of Linkage
(3.)3, 4 Di Chloro Nitro Benzene267.12Tons per AnnumIndigenousRoad500 Open MarketCopy of Linkage
(4.)2, 3 DiChloro 5 (Trifluromethyl) Pyridine158.4Tons per AnnumIndigenousRoad500 Open MarketCopy of Linkage
(5.)Acetic Acid480Tons per AnnumIndigenousRoad500 Open MarketCopy of Linkage
(6.)Coal5760Tons per AnnumLocal MArketRoad50 Open MarketCopy of Linkage
(7.)HSD Fuel1.8Kilo Litre per DayLocal MarketRoad50 Open MarketCopy of Linkage
(8.)2,4 Dichloro Nitro Benzene297.24Tons per AnnumIndigenousRoad500 Open MarketCopy of Linkage
(9.)Ortho Nitro Chloro Benzene342.6Tons per AnnumIndigenousRoad500 Open MarketCopy of Linkage
(10.)8-Chloro Quinaldine135Tons per AnnumIndigenousRoad500 Open MarketCopy of Linkage
(11.)4 Phenyl Sulphanyl Benzene 1, 2 Diamine346.56Tons per AnnumIndigenousRoad500 Open MarketCopy of Linkage
(12.)Cyano Carbamate280.32Tons per AnnumIndigenousRoad500 Open MarketCopy of Linkage
(13.)2, 5 Dichloro Nitro Benzene400.68Tons per AnnumIndigenousRoad500 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube64.8730.5963.2992100
(2.)PM2.5Micro Gram per Meter Cube36.6316.0334.456160
(3.)NOxMicro Gram per Meter Cube38.5416.9034.4480
(4.)SO2Micro Gram per Meter Cube27.489.5926.612080
    14.2.     No. of Ground Water monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.526.678.50
(2.)TSSmg/l34.600.4000
(3.)Total Hardnessmg/l536.60103.00200600
(4.)Chloridesmg/l155.9541.992501000
(5.)Fluoridemg/l0.30.0111.5
(6.)Heavy MetalsArsenicmg/l000.050
(7.)TDSmg/l634.05134.195002000
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.906.89A
(2.)DOmg/l6.801.20A
(3.)CODmg/l100A
(4.)BODmg/l2.802.40A
    14.4.     No. of Ambient Noise monitoring locations : 9
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))67.664751.794175
(2.)Leq(Night)A-weighted decibels(dB(A))61.642841.4470
    14.5.     No. of Soil Sample Monitored locations : 9
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNA8.167.09
(2.)K(Potassium)Milligram per Kilogram596.3196
(3.)Electric ConductivityMillisiemens per Centimetre0.670.19
(4.)N(Nitrogen)Milligram per Kilogram221.5125.6
(5.)P(Phosphorus)Milligram per Kilogram125.3
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 12.8 To 15
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10.9 To 7.63
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersMIDC Paithan38.500 Not Appliacble PipelineOthersMIDC PaithanIn Process13 Oct 201840
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic2.50Spetik Tank with Soak PitOthersUsed for Land irrigation2.50
(2.)Boiler Steam Generation5.50Steam Condensate RecycledReuse within the Plant & Recycling5.5
(3.)General House Keepinh0.50Collected, distilled and recycledReuse within the Plant & Recycling0.5
(4.)Process90Used in process and distilled. It is redistilled and recycledReuse within the Plant & Recycling90
(5.)Industrial Cooling0.50Evaporation lossOthersEvaporation loss0.50
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 18
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 18
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Cotton Waste (33.2)Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)5Tons180RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)Discarded Container Barrels (33.1)Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)1.2Tons180RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)Spent Oil Residue containing oil (5.1)Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)20Tons180RoadTreatment, Storage and Disposal Facility(TSDF)
(4.)Off Specification Products (28.4)Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.12Tons180RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube64.870.81.866.67100
(2.)NOxMicrogram per Meter Cube00000
(3.)PM2.5Microgram per Meter Cube36.630.80.737.3360
(4.)SO2Microgram per Meter Cube27.480.80.127.5880
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Boiler (0.8 TPH)Coal300.5OthersPM10 & SO100 & 80
(2.)DG Set (125 KVA)HSD300.3OthersPM10 & SO2100 & 80
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 200
(b)Source MSEDCL
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 150 KVA (DG Set)
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0.4
    Total Land (ha.) 0.4
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 22185
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 7682
(e)Settlements (ha.) 1263
(f)Industrial (ha.) 285
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NA 0
    Total (ha.) 31415
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Built Up Area1.52Utilities, Storage & ETP
(2.)Green belt1.204
(3.)OthersRoad & Parking1.029
Total (ha.) 3.753
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNot Applicable00
(2.)WLSNot applicable00
(3.)NPAJayakwadi Bird Sanctury20
(4.)CorridorsNot Applicable00
(5.)ESAsNot Applicable00
(6.)Wildlife CorridorsNot applicable00
(7.)ESZsJayakwadi Bird Sanctury ESZ1.50
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNot Applicable00
(2.)Defence InstallationsNot Applicable0NA
(3.)Archaeological SitesNot Applicable0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.3938
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Indian peafowl, white stork
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 10 Lakhs
(iii)Period of Implementation 5 Years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Nath Sagar Dam
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Nath Sagar Dam
(ii)Direction of Water Bodies in Buffer Area South West
(iii)Distance of Water Bodies in Buffer Area 2
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 5
(b)Permanent Employment-During Operation 10
(c)Temporary Employment- During Construction 5
(d)Temporary Employment- During Operation 20
(e)No. of working days 300
(f)Total Manpower 40
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.13
(b)Percentage of Total Project Area 32.50
(c)No. of Plants to be Planted 150
(d)Funds Allocated for Plantation 4
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Social1. Total 40 persons are expected to employed. 2. The CER budget shall be Rs.14.37 Lakhs. {OM/F.No.22-65/2017-IA.III Dated on 1 May 2018} 3. Company will spend CER fund on Activity like; Water Conservation, Tree Plantation , Education & Skill Development, Other Social Welfare Activities
(2.)Financial1. Direct Revenue Earning to the National & State Exchequer in the form of GST {SGST/CGST} 2.Export Potential 3.Economic Developments
(3.)Environmental1. Green belt Development 2. Cleaner Production should be beneficial for Human health & environment. 3. Products are produced using Eco-friendly, cost effective & Safe.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. 133
(ii)Name of the EIA Consultant sd engineering services pvt ltd
(iii)Address 14, Age Arcade, New Osamnapura, Near Sant Eknath rang Manidr, Aurangbad
(iv)Mobile No. 9960634559
(v)Landline No. 0240233362
(vi)Email Id deepak.sanghai@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 10 Feb 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAIn view of the accreditation of EIA Consultant valid up to 10/2/2019 only, how the present proposal for EC is acceptable. Applicability of general conditions needs to be justified along with supporting documents for consideration of the proposal at central level. Also, please inform about notification status of the said industrial area. 30 Mar 2019
2.NAThe correction have been made as per the instruction received 30 Mar 2019
3.NAPlease refer our earlier observations dated 30/3/2019 and your reply thereto. Following are to be clarified:- - Validity of NABET accreditation is extended till 10/8/2019 or completion of assessment process whichever is earlier. Further, the said extension is subject to submission of required information or documents relating to assessment on time to NABET. Present status in this regard may be informed. - In case of applicability of general condition due to Jayakvadi Bird Sanctuary within 2 km, please inform whether any proposal has been submitted for clearance under the Wildlife (Protection) Act, 1972. 06 Apr 2019
4.NAThe correction have been made as per the instruction received 08 Apr 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantGovardhan Dwarkadas Agrawal
DesignationPartner
Name of Company (Applicant Name should not be given here)CRYSTAL SURFACTANTS AND CHEMICALS
Address113, Labh Chamber, Station road, Aurangabad
Print