Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Installation of 2 nos LPG mounded bullets
(b)Name of the Company / Organisation INDIAN OIL COPERATION LIMITED
(c)Registered Address Guwahati Refinery,IOCL,Noonmati, Guwahati,Assam.,,Kamrup,Assam-781020
(d)Legal Status of the Company Central PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Gayatri Laskar
(b)Designation (Owner/ Partner/ CEO) Deputy Manager (HSE)
(c)Address Guwahati Refinery,IOCL, Noonmati, Guwahati,Assam.,,Guwahati,Kamrup,Assam-781020
(d)Pin code 781020
(e)E-mail laskargm@indianoil.in
(f)STD Code. 361(f)Telephone No. 2597344
(g)Fax No. 03612657250
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity4(a) Petroleum refining industry
Minor Activity
(b)Category A
(c)Proposal Number IA/AS/IND2/82239/2016
(d)Master Proposal Number(Single Window) SW/82233/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Modernization
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 1,10,54,101
(b)Pincode 781020
(c)Bounded Latitudes (North)
From
Degree 26.181
Minutes
Second
From
Degree 26.188
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 91.809
Minutes
Second
From
Degree 91.815
Minutes
Second
(e)Survey of India Topo Sheet No. G46H16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 200
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 5
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Assam
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)TelanganaKhammamDummugudemDummugudem
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/365/2016-II-1A
(b)Date of Apply of TOR 13 Dec 2016
(c)Date of Issue of TOR / Standard ToR 28 Feb 2017
(d)Date of Apply of EC 11 Oct 2018
(e)Date of Issue of EC 03 Dec 2018
(f)Previous TOR Letter Copy of Previous TOR letter
(g)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason as per PARA 7(II) OF EIA 2006
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Shillong
(iii)Letter No. RO-NE/E/IA/AS/OR/6/991
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Apr 13 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)LPG9887001688OthersMTRoad
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)MOUNDED BULLETABOVE GROUNDMOUNDED TYPEMOUNDED TYPEMOUNDED TYPE LPG BULLETS
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 26 Apr 2018
(iv)Valid Upto 31 Mar 2019
(v)File No. WB/GUW/T-3038/15-16/494
(vi)Application No. PCB/F50/KM/001243/11/2017
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 24
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)No Raw Material is involved1OthersNANAOthersNA0 OthersNACopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 09 Dec 2016 To 08 Mar 2017
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube974183.72100
(2.)PM2.5Micro Gram per Meter Cube45143760
(3.)SO2Micro Gram per Meter Cube2041680
(4.)NOxMicro Gram per Meter Cube441240.8680
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l2351745002000
(2.)Total Hardnessmg/l184122200600
(3.)Fluoridemg/l0.240.1011.5
(4.)OthersArsenicmg/l0.0020.0020.010.05
(5.)TSSmg/l4320100100
(6.)pHmg/l7.36.78.58.5
(7.)Chloridesmg/l45222501000
(8.)Heavy MetalsLeadmg/l0.050.050.010.01
    14.3.     No. of Surface Water monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)OthersTotal ColiformsOthersMPN/100 ml1628512C
(2.)CODmg/l226C
(3.)pHNA8.06.8C
(4.)BODmg/l72C
(5.)DOmg/l6.75.7C
    14.4.     No. of Ambient Noise monitoring locations : 10
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))58.446.570
(2.)Leq(Day)A-weighted decibels(dB(A))68.255.875
    14.5.     No. of Soil Sample Monitored locations : 4
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Percent0.320.19
(2.)P(Phosphorus)Percent0.170.12
(3.)K(Potassium)Percent0.210.11
(4.)Electric ConductivityOthersMicromhos/cm602532
(5.)pHOthers-6.25.1
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 5 To 7
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersBrahmaputra River33 Not Appliacble PipelineOthersFilterationNA01 Nov 20180
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Brahmaputra River1.62Septic Tank followed by Soak PitOthersDischarge through Septic Tank followed by soak pit01.6
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 1.6
(b)Total Discharged Water (Kilolitre per Day) 1.6
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Dry GarbageMunicipal Solid Waste.45Tons0Others--OthersThrough municipal trucks.
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5NA00000
(2.)SO2NA00000
(3.)Others(Specify)NANA00000
(4.)PM10NA00000
(5.)NOxNA00000
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NA000OthersNA0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 250
(b)Source Assam State Eletricity Board
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) Captive Power Plant of the existing refinery
(e)Stack Height (in m) 50
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 197
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 197
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 2395.8
(b)Waste/Barren Land (ha.) 3256.65
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 2879.01
(e)Settlements (ha.) 10173.51
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Open and Dense Vegitation, Current Fallow, open sc 16683.75
    Total (ha.) 35388.72
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Built Up Area0.046
(2.)Main Plant0.365Mounded Bullet Area, TLF gantry
(3.)OthersRoad and Vacant Land0.803
Total (ha.) 1.214
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsNone within 10 km0NA
(2.)ESZsNone within 10 km0NA
(3.)Critically Polluted AreaNone within 10 km0NIL
(4.)CorridorsNone within 10 km0NA
(5.)Wildlife CorridorsAamchung Sanctuary4.3NA
(6.)WLSNone within 10 km0NA
(7.)NPANone within 10 km0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestKhanapara6.7NA
(2.)Archaeological SitesNone within 10 km0NA
(3.)Defence InstallationsNone within 10 km0NA
(4.)OthersNILNA00
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired The proposedaugmentaionwill be carried out within
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 365
(f)Total Manpower 0
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt58.74058.74
(2.)Percentage of Total Project Area33033
(3.)No. of Plants3800010038100
(4.)Funds Allocated3000000300000
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/RA 0094
(ii)Name of the EIA Consultant M/s. Ultra-Tech
(iii)Address Unit No. 206, 224, 225, Jai Commercial Complex, Eastern Express Highway, Opp. Cadbury Factory, Khopat, Thane (W) – 400601
(iv)Mobile No. 9674488198
(v)Landline No. 0222534277
(vi)Email Id deepa@ultratech.in
(vii)Category of Accreditation B
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 10 Mar 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease clarify as to why the proposal should not be covered be covered under category B of item 6(b) of the schedule to the EIA Notification, 2006. Also, please confirm whether the EIA consultant is accredited for preparation of EIA/EMP report for the said project under category A of item 4(a). If not, the consultant needs to be blacklisted. 07 Nov 2018
2.NAThe correction have been made as per the instruction received 07 Jan 2019
3.NAIn view of the clarifications provided and no increase in refining capacity, the proposal needs to be examined vis-a-vis this Ministry's Notification dated 23/11/2016 to ascertain the requirement of EC for the proposed LPG storage within the Refinery. 13 Jan 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantGayatri Laskar
DesignationDeputy Manager (HSE)
Name of Company (Applicant Name should not be given here)INDIAN OIL COPERATION LIMITED
AddressGuwahati Refinery,IOCL,Noonmati, Guwahati,Assam.
Print