Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Sita Rama Lift Irrigation Project (Phase-I)
(b)Name of the Company / Organisation CHEIF ENGINEER I AND CAD KHAMMAM
(c)Registered Address Cheif Engineer Irrigation projects, Khammam,Khammam District, Telangana.,,Khammam,Telangana-507002
(d)Legal Status of the Company State Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Vemula Sudhakar
(b)Designation (Owner/ Partner/ CEO) CE
(c)Address Cheif Engineer, Irrigation Projects, Khammam, VDOS colony Khammam,,Khammam (Urban),Khammam,Telangana-507002
(d)Pin code 507002
(e)E-mail eedivision3@gmail.com
(f)STD Code. 8742(f)Telephone No. 228803
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(c) River Valley projects
Minor Activity
(b)Category A
(c)Proposal Number IA/TG/RIV/82147/2017
(d)Master Proposal Number(Single Window) SW/82136/2018
(e)EAC concerned (for category A Projects only) River Valley and Hydroelectric Projects
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. KHAMMAM MAHBUBABAD BHADRADRI KOTHAGUDEM
(b)Pincode 507002
(c)Bounded Latitudes (North)
From
Degree 16.75
Minutes
Second
From
Degree 18.61
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 79.81
Minutes
Second
From
Degree 81.8
Minutes
Second
(e)Survey of India Topo Sheet No. E44O7 TO E44O16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 270
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.5
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Telangana
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J-12011/16/2017-IA-I(R)
(b)Date of Apply of TOR 17 May 2017
(c)Date of Issue of TOR / Standard ToR 04 Aug 2017
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :22 Jul 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :25 Aug 2018
Distance of Public Hearing Venue from the Proposed Project :8
Patwarigudem (V), Dammapeta (M),
State :Telangana
District :Khammam
Tehsil :Dammapet
Village :Patwarigudem
393He requested to issue environmental clearance by MoEF&CC as this project helps the farmers and also requested for proper compensation He requested to provide permanent employment for filter and ITI tDistrict Magistrate
(2.)
Date of Advertisement :02 Aug 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :06 Sep 2018
Distance of Public Hearing Venue from the Proposed Project :4
Premises of Agriculture Market Committee, Garla (V&M), Mahabubabad District
State :Telangana
District :Khammam
Tehsil :Garla
Village :Garla
107• He requested the officials to pay good compensation to the farmers who have given their land to this project and he requested the officials to take the compensation to the notice of the GovernmentDistrict Magistrate
(3.)
Date of Advertisement :26 Jul 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :29 Aug 2018
Distance of Public Hearing Venue from the Proposed Project :5
Manchukonda, Raghunadhapalem
State :Telangana
District :Khammam
Tehsil :Khammam (Rural)
Village :Manchukonda
296The proposed project helps in recharge of ground water He requested to provide employment to the land loosers or else provide skill development programmes to their educated childrenDistrict Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)not applicablenot applicable
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)command area272921HectaresOtherswater conveyance
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 13384.80
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1643.52
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 68.95
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1574.57
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 494813
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 494813
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Coarse aggregate, sand, fly ash and cement494813Cubic Meter per DaylocalRoad40 Open MarketCopy of Linkage
(2.)coarse aggregate494813Cubic Meter per DaylocalRoad40 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Sep 2017 To 30 Apr 2018
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube623958.24100
(2.)PM2.5Micro Gram per Meter Cube36183660
(3.)SO2Micro Gram per Meter Cube7.75.87.780
(4.)NOxMicro Gram per Meter Cube29.915.727.0880
    14.2.     No. of Ground Water monitoring locations : 55
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.425.988.59.2
(2.)Total Hardnessmg/l106068200600
(3.)Fluoridemg/l4.470.0411.5
(4.)Heavy Metalsleadmg/l000.10.1
(5.)Otherscalciummg/l190.789.6275200
(6.)TSSmg/l176210600
(7.)TDSmg/l17621065001500
(8.)Chloridesmg/l680102001000
    14.3.     No. of Surface Water monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.255.6E
(2.)BODmg/l160.4E
(3.)CODmg/l47.420.88E
(4.)DOmg/l6.95.6E
    14.4.     No. of Ambient Noise monitoring locations : 6
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))44.9143.9155
(2.)Leq(Night)A-weighted decibels(dB(A))40.2338.2555
    14.5.     No. of Soil Sample Monitored locations : 55
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Milligram per Kilogram1578.760.22
(2.)K(Potassium)Milligram per Kilogram7510.2128.35
(3.)Electric ConductivityMillisiemens per Centimetre0.970.02
(4.)pHOthersna9.75.33
(5.)N(Nitrogen)Percent46.820.02
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 28.45 To 3.87
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 22.03 To 1.87
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface54616601Copy of Permission LetterCanalBarrage6527/projects-III/A1/201725 Jul 20175461660
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)domestic16.230STPGreen Belt Renewal Plant16.2
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 16.2
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 16.2
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Municipal Solid wasteMunicipal Solid Waste2.5Tons10RoadSanitary Landfills
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube8.80.30.119.980
(2.)NOxMicrogram per Meter Cube29.90.30.3630.2680
(3.)PM10Microgram per Meter Cube640.320.2688.31100
(4.)PM2.5Microgram per Meter Cube360.311.3947.3960
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)not applicableNA00PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 715
(b)Source TSGENCO
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) not applicable
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 1531.06
(b)Private Land (ha.) 4818.15
(c)Government Land (ha.) 2127.63
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 8476.84
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 101248
(b)Waste/Barren Land (ha.) 121166
(c)Grazing/ Community Land (ha.) 10098
(d)Surface Water Bodies (ha.) 6048
(e)Settlements (ha.) 15629
(f)Industrial (ha.) 0
(g)Forest (ha.) 63094
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : 0 0
    Total (ha.) 317283
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt50
(2.)Otherscanal8476.84
Total (ha.) 8526.84
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSKinnerasani wildlife sanctuary10NBWL clearance obtained
(2.)CorridorsNil0nil
(3.)Wildlife Corridorsnil0nil
(4.)NPAnil0nil
(5.)Critically Polluted Areanil0nil
(6.)ESAsnil0nil
(7.)ESZsKinnerasani Eco Sensitive Zone10NBWL clearance obtained
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological Sitesnil0nil
(2.)Defence Installationsnil0nil
(3.)ForestReserved Forest0stage-I clearance obtained
23.3.
(a)Whether Noc / Permission from the competent authority is required? Yes
(i)Uploaded Noc / Permission from the competent authority Copy of Noc / Permission from the competent authority
(b)Whether NBWL recommendation is required? Selec
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 935
(b)Land yet to be acquired(Ha) 3883
(c)Status of Land acquisition if not acquired under process
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 157
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 9696
(e)Funds Allocated for R&R(in INR) (in Lacs) 147170
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 1100
(b)Permanent Employment-During Operation 150
(c)Temporary Employment- During Construction 1100
(d)Temporary Employment- During Operation 150
(e)No. of working days 200
(f)Total Manpower 2500
32.
Green Belt in Ha:
(a)Total Area of Green Belt 50
(b)Percentage of Total Project Area 0.59
(c)No. of Plants to be Planted 60000
(d)Funds Allocated for Plantation 5000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For River Valley and Hydroelectric Projects
S. No.Item Details
1. Project Sub Sector Multipurpose Project
2. Name of the River GODAVARI
3.
Whether Cumulative Impact Assessment and Carrying Capacity Study of River Basin is Carried Out? No
     4.      Type of Project: (Construction of Dam/ Barrage/ Run of the River/ Lift Irrigation Scheme)
S. No.Project TypeDam Height (in meters)Dam Length (in meters)Total Submergence Area (in hectare)Gross Command Area (GCA) (in hectare)Irrigable Command Area (ICA) (in hectare)Culturable Command Area (CCA) (in hectare)Total Command Area (in hectare)
(1.)Lift Irrigation Scheme000317283272921416205272921
5.
Powerhouse Installed Capacity No
(a) Type of Powerhouse Surface
(b) Capacity (in megawatts) 0
(c) No. of Tunnels 0
(d) No. of Units 0
(e) Bank of River Left
6.
Generation of Electricity Annually.
(a) Quantity of Generation of Electricity Annually (in giga watt hours) 0
(b) Water Availability at Various percentage
S. No.PercentageWater availability (in cusecs)Dependable yearRemarks
(1.)75 %000
(2.)50 %000
(3.)90 %000
(c) Machine Availability (in percent) 0
(d) Cost of Electricity Generation (in INR) 0
(e) Internal Rate of Return (in percent) 0
(f) Year of achievement of Internal Rate of Return 0
7. Catchment Area Treatment Plan Copy of Catchment Plan
8.
Muck Management Plan
(a)Muck Management Plan Copy of Muck Management Plan
(b) Total Excavation Muck (in cubic meter) 346442
(c) Utilized for Construction (in cubic meter)121255
(d) No. of Muck Disposal sites2
(e) Total Muck Disposal Area (in hectare)225187
9.
Fishery Development and Management Plan
(a)Fishery Development and Management Plan Copy of Fishery Development and Management Plan
(b) No. of Fish Species 0
(c) Name of the umbrella Fish Species (Scientific Name)0
10.
Status of Environmental Flow
S. No.SeasonAverage Inflow (in cumec)Percent of Flow
(1.)Monsoon268930
(2.)Lean6920
(3.)Non-Lean Non-Monsoon52025
11. Free Flow Stretch (in km) 120
12.
Approval of Central Water Commission No
13.
Approval of Central Electricity Authority No
14.
Details of Coffer Dam (Upstream) None
15.
Details of Coffer Dam (Downstream) None
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. 162
(ii)Name of the EIA Consultant WAPCOS LIMITED
(iii)Address 76 C, sector-18, Gurgaon, Haryana
(iv)Mobile No. 9811487830
(v)Landline No. 0124239739
(vi)Email Id environment@wapcos.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation River Valley and Hydroelectric Projects
(ix)Validity of Accreditation 07 Sep 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterSubmission of additional documents as sought in the minutes of 19th EAC meeting held on 26.10.2018. 16 Nov 2018
2.NAproject has been Deferred 12 Nov 2018
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantVemula Sudhakar
DesignationCE
Name of Company (Applicant Name should not be given here)CHEIF ENGINEER I AND CAD KHAMMAM
AddressCheif Engineer Irrigation projects, Khammam,Khammam District, Telangana.