Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion in paper production capacity from 45 TPD to 100 TPD at 9th Km stone, Nagina Road, Village Abdullpur Munna, Tehsil and District Bijnor (Uttar Pradesh) by M/s. Mohit Paper Mills limited
(b)Name of the Company / Organisation MOHIT PAPER MILLS LIMITED
(c)Registered Address 15A/13, Upper Ground Floor, East Patel Nagar, New Delhi,,West,Delhi-110008
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Sandeep Jain
(b)Designation (Owner/ Partner/ CEO) MD
(c)Address Mohit Paper Mills Limited, 9th KM Stone, Nagina Road, Bijnor (UP),,Bijnor,Bijnor,Uttar Pradesh-246701
(d)Pin code 246701
(e)E-mail pradeep01767@rediffmail.com
(f)STD Code. 1342(f)Telephone No. 295395
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(i) Pulp & paper industry excluding manufacturing of paper from waste
Minor Activity
(b)Category A
(c)Proposal Number IA/UP/IND/81970/2017
(d)Master Proposal Number(Single Window) SW/81034/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 15, 40, 41,42,43
(b)Pincode 246701
(c)Bounded Latitudes (North)
From
Degree 29.39583
Minutes
Second
From
Degree 29.40056
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 78.21861
Minutes
Second
From
Degree 78.22389
Minutes
Second
(e)Survey of India Topo Sheet No. 53K3 and 53K7
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 247
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 9.5
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Uttar Pradesh
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/130/2017-IA II (I)
(c)Date of Issue of TOR 18 Apr 2017
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 09 Oct 2018
(c)Date of Issue of EC 25 Feb 2019
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :27 Feb 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :05 Apr 2018
Distance of Public Hearing Venue from the Proposed Project :0
Plant site
State :Uttar Pradesh
District :Bijnor
Tehsil :Bijnor
Village :Abdullpur Munna
112Employment, resource utilization, pollution prevention, Chhoiya river pollutionOthersAdditional District Magistrate, Bijnor
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By SPCB
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on
(iii)Letter No. 1595/M-18/Bijnor
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jan 17 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Writing and Printing Paper4555100OthersTons per DayRoad
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Writing and printing paper plant4555100TPD
(2.)Co-generation power plant4.504.5MW
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 24 Mar 2017
(iv)Valid Upto 31 Dec 2018
(v)File No. F98766/C-7/114/Air pollution/Bijnor/2017
(vi)Application No. F98766/C-7/114/Air pollution/Bijnor/2017
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 6
(b) Funds Allocated for Environment Management (Capital) (in Crores) 2
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.06
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.85
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 113358.1
(b)Existing quantity of raw material/fuel 93231.95
(c)Total quantity of raw material/fuel 206590.05
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Wheat Straw60955Tons per AnnumLocal SuppliersRoad200 OthersLocal SuppliersCopy of Linkage
(2.)Soap stone powder10950Tons per AnnumLocal SuppliersRoad150 OthersLocal SuppliersCopy of Linkage
(3.)Bagasse127750Tons per AnnumNearby Sugar MillsRoad200 OthersNearby Sugar MillsCopy of Linkage
(4.)Imp. Soft Wood Pulp/Imported Waste Paper6935Tons per AnnumFrom European countries by sea via Indian PortOthersBy Sea and Road3000 OthersFrom European countries by sea via Indian PortCopy of Linkage
(5.)Rice Husk and Bagasse Pith94426Tons per AnnumLocal SuppliersRoad200 OthersLocal SuppliersCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2017 To 31 Dec 2017
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube24.211.623.3680
(2.)PM10Micro Gram per Meter Cube89.565.588.51100
(3.)PM2.5Micro Gram per Meter Cube47.426.246.1460
(4.)SO2Micro Gram per Meter Cube14.06.813.7980
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.737.106.58.5
(2.)Total Hardnessmg/l368.25196.35200600
(3.)Chloridesmg/l70.4515.872501000
(4.)Fluoridemg/l1.120.661.01.5
(5.)TSSmg/l0000
(6.)TDSmg/l4522135002000
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l86.814.64E
(2.)DOmg/l5.904.8B
(3.)pHNA7.727.36A
(4.)BODmg/l17.033.20E
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))58.352.875
(2.)Leq(Night)A-weighted decibels(dB(A))48.842.070
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare378.56235.60
(2.)P(Phosphorus)Kilogram per hectare294.0528.33
(3.)K(Potassium)Kilogram per hectare193.066.43
(4.)Electric ConductivityMillisiemens per Centimetre0.390.19
(5.)pHOthersNA7.697.06
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 18.42 To 2.53
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.95 To 18.10
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater40050Copy of Permission LetterPipelineTube WellCGWA/NOC/IND/ORIG/2017/270314 Aug 20174018.50
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Process691610000ETPDischarge into Surface Water Body,Reuse within the Plant & Recycling38603056
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 6916
(b)Total Discharged Water (Kilolitre per Day) 3056
(c)Total Reused Water (Kilolitre per Day) 3860
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)ETP sludgeIndustrial Waste9709Tons0.1Pipe ConveyorOthersused for board manufacturing
(2.)Lime sludgeIndustrial Waste9855Tons10RoadOthersland filling of low lying areas
(3.)AshFly Ash9563Tons10RoadOthersUsed by farmers for soil amelioration
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube42.30042.360
(2.)SO2Microgram per Meter Cube13.311.2314.5380
(3.)PM10Microgram per Meter Cube80.510.4580.95100
(4.)NOxMicrogram per Meter Cube19.311.8021.180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)14 TPH boilerRice husk and bagasse pith311.0PM10SPCB standards(150 mg/Nm3)
(2.)24 TPH boilerRice husk and bagasse pith351.5PM10SPCB standards (150 mg/Nm3)
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 4500
(b)Source 4.5 MW co-generation power plant
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 1250 KVA and 625 KVA
(e)Stack Height (in m) 15
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 11.45
    Total Land (ha.) 11.45
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 11.45
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Industrial land 11.45 Ha 0
    Total (ha.) 11.45
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant11.45Main plant, storage yard and utilities
Total (ha.) 11.45
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsNot Applicable0No ESAs within 10 km radius
(2.)Wildlife CorridorsNot Applicable0No Wildlife Corridors within 10 km radius
(3.)Critically Polluted AreaNot Applicable0No CPA within 10 km radius
(4.)NPANot Applicable0No NPA within 10 km radius
(5.)CorridorsNot Applicable0No Corridors within 10 km radius
(6.)WLSHastinapur wildlife sanctuary8.5As per draft notification dated 2nd February, 2018
(7.)ESZsNot Applicable0No ESZs within 10 km radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNot Applicable0No Defence installation within 10 km radius
(2.)Archaeological SitesNot Applicable0No Archaeological sites within 10 km radius
(3.)ForestNot Applicable0No Forest within 10 km radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? Yes
(i)Status of NBWL NIL
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 11.45
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Already Acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Pea fowl and Monitor lizard
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 13 lakhs for Pea fowl and 7.5 lakhs for Monitor l
(iii)Period of Implementation 10 Years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Malin River
(ii)Direction of Water Bodies in Buffer Area North West
(iii)Distance of Water Bodies in Buffer Area 9.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 300
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 365
(f)Total Manpower 300
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt3.803.8
(2.)Percentage of Total Project Area33033
(3.)No. of Plants54965005996
(4.)Funds Allocated20000050000250000
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA 0069
(ii)Name of the EIA Consultant JM EnviroNet Pvt. Ltd.
(iii)Address 202 A, ABW Tower, MG Road, Gurgaon Haryana
(iv)Mobile No. 9015209362
(v)Landline No. 9015209362
(vi)Email Id jmenviron@hotmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 18 May 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSandeep Jain
DesignationMD
Name of Company (Applicant Name should not be given here)MOHIT PAPER MILLS LIMITED
Address15A/13, Upper Ground Floor, East Patel Nagar, New Delhi
Print