Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) EIA-EMP for Proposed 2x2 MTPA Coal Washery (Wet Process) in an area of 8.195 ha at Village - Batari, Tehsil - Khatgora, District – Korba, State- Chhattisgarh
(b)Name of the Company / Organisation CG Coal & Power Ltd.
(c)Registered Address Near Railway Crossing, Mowa, PO. Shankar Nagar, Raipur (CG) - 492007,Near Railway Crossing, Mowa, PO. Shankar Nagar, Raipur (CG) - 492007,Raipur,Chhattisgarh-492007
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Virendra Goel
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address Near Railway Crossing, Mowa, PO. Shankar Nagar, Raipur (CG) - 492007,Near Railway Crossing, Mowa, PO. Shankar Nagar, Raipur (CG) - 492007,,Raipur,Chhattisgarh-492007
(d)Pin code 492007
(e)E-mail virendra@nakodagroup.com
(f)STD Code. 771(f)Telephone No. 2282230
(g)Fax No. 2282130
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity2(a) Coal washeries
Minor Activity
(b)Category A
(c)Proposal Number IA/CG/CMIN/25774/2014
(d)Master Proposal Number(Single Window) SW/77686/2018
(e)EAC concerned (for category A Projects only) Coal Mining
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Sn. No. 272/2, 272/4,273/1,273/2,274, 275, 281/2,
(b)Pincode 496001
(c)Bounded Latitudes (North)
From
Degree 22.362364
Minutes
Second
From
Degree 22.366361
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 82.51461
Minutes
Second
From
Degree 82.514806
Minutes
Second
(e)Survey of India Topo Sheet No. 64J/11- F44K11
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 332
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 9.7
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Chhattisgarh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)ChhattisgarhKorbaKatghora
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J-11015/512/2014-IA-II(M)
(b)Date of Apply of TOR 18 Nov 2014
(c)Date of Issue of TOR / Standard ToR 18 Aug 2015
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :06 Jan 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :07 Feb 2018
Distance of Public Hearing Venue from the Proposed Project :0
Project Site, Village Batari
State :Chhattisgarh
District :Korba
Tehsil :Katghora
Village :Batari
7001. Employment generation 2. Env./Dust pollution 3. CSR activities 4. Development of Batari villege 5.Green belt development 6. Indus School issue 7. Ground water level. 8 TransportatioDistrict Collector
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Coal Washery2x2 MTPA = 4 MTPANA
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Washed Coal3200000Tons per AnnumRoad,Rail
(2.)Rejects800000Tons per AnnumRoad,Rail
(3.)Raw Coal4000000Tons per AnnumRoad,Rail
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 60
(b) Funds Allocated for Environment Management (Capital) (in Crores) 4.92
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.20
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.21
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 4000000
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 4000000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Raw coal4000000Tons per AnnumSECL MinesRoad,Rail25 e-auctionCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2015 To 31 Dec 2015
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube793578100
(2.)PM2.5Micro Gram per Meter Cube29112960
(3.)NOxMicro Gram per Meter Cube22620.680
(4.)SO2Micro Gram per Meter Cube1841780
(5.)OthersCOMicro Gram per Meter Cube215932122000
    14.2.     No. of Ground Water monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.417.078.58.5
(2.)Fluoridemg/l0.710.111.01.5
(3.)OthersNitratemg/l33.11.024545
(4.)Chloridesmg/l29814.992501000
(5.)Heavy MetalsIronmg/l2.070.010.30.3
(6.)TDSmg/l11381215002000
(7.)TSSmg/l643.200
(8.)Total Hardnessmg/l31258200600
    14.3.     No. of Surface Water monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l6.63.6E
(2.)BODmg/l28.33.0E
(3.)OthersTDSmg/l244121A
(4.)CODmg/l85.45E
(5.)pHNA8.277.31A
    14.4.     No. of Ambient Noise monitoring locations : 10
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))503755
(2.)Leq(Day)A-weighted decibels(dB(A))634465
    14.5.     No. of Soil Sample Monitored locations : 10
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNA7.46.1
(2.)N(Nitrogen)Kilogram per hectare101.531.5
(3.)P(Phosphorus)Kilogram per hectare33.220.1
(4.)Electric ConductivityOthersuS/cm24691.8
(5.)K(Potassium)Kilogram per hectare83.185.97
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 3 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface13004.10Copy of Permission LetterPipelineOthersAnicut on Ganja NallahF4-294/S- 2/31/AJP/1506 Feb 20181300
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Dust Suppresion610Not RequiredOthersSprinkling061
(2.)Process Plant Operation1333316500ThickenerReuse within the Plant & Recycling13333
(3.)Domestic2330STP (MBBR)Green Belt Renewal Plant23
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 13417
(b)Total Discharged Water (Kilolitre per Day) 61
(c)Total Reused Water (Kilolitre per Day) 13356
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)DomesticMunicipal Solid Waste3.300Tons0RoadOthersComposting and Inorganic to Authorized Vendors
(2.)Spent Oil and GreaseHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.792Tons0RoadAuthorized Recyclers
(3.)Thickner SludgeIndustrial Waste1600Tons100RoadOthersMixed with Reject Coal
(4.)Reject CoalOthersRejected Coal800000Tons100Road,RailOthersWill be sold to nearby CFBC Power Plants as Fuel
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube79.01.4180.2100
(2.)PM2.5Microgram per Meter Cube29.01.40.229.260
(3.)NOxMicrogram per Meter Cube221.40.3122.3180
(4.)SO2Microgram per Meter Cube181.40.0004618.0004680
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG SetHSD70.15NOx0.016
(2.)DG SetHSD70.15SO20.0000212
(3.)DG SetHSD70.15PM100.00053
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 5500
(b)Source Chhattisgarh State Power Distribution Company Limi
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1000
(e)Stack Height (in m) 7
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 8.195
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 8.195
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 8.195
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NA 0
    Total (ha.) 8.195
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant2.630Plant Area
(2.)Green belt2.732
(3.)Water Reservoir0.607
(4.)OthersOther Components2.227Coal Storage Parking Building Etc
Total (ha.) 8.196
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANil0Nil
(2.)ESZsNil0.NA
(3.)CorridorsNil0NA
(4.)ESAsNil0NA
(5.)Wildlife CorridorsNil0NA
(6.)WLSNil0NA
(7.)Critically Polluted AreaKorba24Based on study by IIT Kharagpur during May to Dec, 2014 Korba has significantly improved and CEPI is 74.5, earlier it was 83.0 in 2009
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNil0NA
(2.)Archaeological SitesNil0NA
(3.)Defence InstallationsNil0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 8.195
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 8.195 Ha on 99 years lease by CSIDC
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Melursus ursinus (Sloth Bear)
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 15 Lakhs
(iii)Period of Implementation 5 Years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Khalari reservoir
(ii)Direction of Water Bodies in Buffer Area South West
(iii)Distance of Water Bodies in Buffer Area 8.8
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 10
(b)Permanent Employment-During Operation 40
(c)Temporary Employment- During Construction 25
(d)Temporary Employment- During Operation 10
(e)No. of working days 303
(f)Total Manpower 85
32.
Green Belt in Ha:
(a)Total Area of Green Belt 2.73
(b)Percentage of Total Project Area 33.31
(c)No. of Plants to be Planted 5460
(d)Funds Allocated for Plantation 650000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)0Minor
2.
Mine Capacity in ROM (Run of Mine) 0
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. 0
(b)Date of Approval 08 Oct 2018
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department NA
(e)Approved Mining Lease Area 0
(f)Approved Capacity 0
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 0
(b)Mineable Reserves (Million Ton) 0
(c)Extractable Reserves(Million Ton) 0
(d)Percent(%) of Extraction 0
(e)Grade of Coal /Ore /Mineral 0
(f)Stripping Ratio 0 : 0
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) 0
(h)Average Gradient(Degree) 0
(i)Mining Method Adit
(j)Life of Mine (Years) 0
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 0
(b)Whether obtained Letter of Intent (LOI) from the state government ? No
(i)Reason thereof NA
(c)Whether Lease Deed Executed ? No
(i)Reason thereof NA
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof NA
9.
OB (Over Burden) Management:
Details Not Applicable
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare)
(b)Depth (in meter)
(c)Volume (in Million Cubic meter)
12.
Details of Quarry:
(a)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 0
13.
Details of Transportation:
(a)In Pit/Underground to Surface 0
(b)Surface to Siding/Loading 0
(c)Transportation / Conveyor Details 0
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)WASTE LAND000
(2.)SETTLEMENTS000
(3.)OTHERS(Specify)NA000
(4.)SURFACE WATER BODIES000
(5.)AGRICULTURE LAND000
(6.)FOREST LAND000
(7.)GRAZING LAND000
TOTAL000
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)EXCAVATION/QUARRY0000
(2.)EXTERNAL OB DUMPS0000
(3.)ROADS0000
(4.)GREEN BELT0000
(5.)VIRGIN AREA0000
(6.)TOP SOIL STORAGE0000
(7.)INTERNAL OB DUMPS0000
(8.)BUILT UP AREA (COLONY/OFFICE)0000
TOTAL00000
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare)
(b)Internal Dump(in hectare)
(c)Quarry(in hectare)
(d)Safety Zone(in hectare)
(e)Final Void of (hectare) at a Depth of meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.)
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc)
(h)Total afforestation plant (in hectare)
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)000000
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? Yes
(b)Name of the Court Districts Courts
(c)Name of the Sub Court Bilaspur
(d)Case No. 1) RN/10/R/B-103/299/2018 & (2) RN /10/R/B-121/431
(e)Orders/Directions of the court ,if any and its relevance with the proposed project (1) On 04th Jan 2018, the Board of Revenue, Bilasp
(f)Case Details (1) On 04th Jan 2018, the Board of Revenue, Bilasp
(g)Uploaded Court Order Copy of Court Order
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0059
(ii)Name of the EIA Consultant ANACON LABORATORIES PRIVATE LIMITED
(iii)Address 60, BAJIPRABHU NAGAR, NAGPUR
(iv)Mobile No. 9373104416
(v)Landline No. 0712224207
(vi)Email Id ngp@anacon.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Coal Mining
(ix)Validity of Accreditation 01 Oct 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease confirm details of products mentioned in column 8.2 of Form-2 along with complete mass balance. Also, please provide potential consumers to utilize the washed coal and the MoUs signed in this regard. 21 Nov 2018
2.NAThe correction have been made as per the instruction received 18 Jan 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterSubmission of ADS response for proposed 2X2 MTPA Coal Washery of M/s. CG Coal & Power Limited 31 Jul 2020
2. ADS Raise LetterYou are requested to provide the clarification on the proposal. pls find the enclosed letter 29 Jun 2020
3. ADS Reply LetterSubmission of ADS response for proposed Coal Washery by M/s. CG Coal. 31 Dec 2019
4.NA

The EAC, after deliberations and especially in view of the project site in Korba, Chhattisgarh (having CEPI score 57.57) covered under the said orders of NGT, preferred not to take the proposal forward for the present, but to seek advice of the Ministry for appropriate course of action in such cases. The Committee also opined that in case, such proposals are to be considered on merits, environmental conditions and other stringent measures would have to be looked into comprehensively in complete perspective and in consulta

23 Sep 2019
5. ADS Reply LetterSubmission of ADS response for proposed 2X2 MTPA Coal Washery of M/s. CG Coal & Power Limited 29 Jun 2019
6.NANA 13 Mar 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantVirendra Goel
DesignationDirector
Name of Company (Applicant Name should not be given here)CG Coal & Power Ltd.
AddressNear Railway Crossing, Mowa, PO. Shankar Nagar, Raipur (CG) - 492007