Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Ratankamal Industries
(b)Name of the Company / Organisation RATANKAMAL INDUSTRIES
(c)Registered Address 14 & 15 2ND Floor, Rudraksh Complex, Opp. Annapurna Hotel, Phase-I, GIDC, Vatva, Ahmedabad,,Ahmedabad,Gujarat-382445
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Kalpanaben S Jaithaliya
(b)Designation (Owner/ Partner/ CEO) Proprietress
(c)Address 14,15, 2nd Floor, Rudraksh Complex, Opp.Annapurna Hotel, Phase-I, GIDC, Vatva, Ahmedabad,,Ahmedabad City,Ahmedabad,Gujarat-382445
(d)Pin code 382445
(e)E-mail ratankamalindustries@gmail.com
(f)STD Code. 40(f)Telephone No. 23060702
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/63130/2017
(d)Master Proposal Number(Single Window) SW/81820/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 65-F & G
(b)Pincode 382430
(c)Bounded Latitudes (North)
From
Degree 22.50.07.2
Minutes
Second
From
Degree 22.50.07.2
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72.31.27.4
Minutes
Second
From
Degree 72.31.27.4
Minutes
Second
(e)Survey of India Topo Sheet No. 46 B/5,6,9,10
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 28
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1.5
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratAhmedabadDaskroi
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/125/2017-IA-II(I)
(b)Date of Apply of TOR 14 Mar 2017
(c)Date of Issue of TOR / Standard ToR 07 Jul 2017
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :24 May 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :30 Jun 2018
Distance of Public Hearing Venue from the Proposed Project :0.01
Beside of Plot no. 65-F &G, Soham Industrial Park, Part - II, Block No. 312 & 313, vill:- Timba, Ta:- Daskroi, Bareja - Mahijada. Navapura-Dholka Road, Dist: - Ahmedabad.
State :Gujarat
District :Ahmedabad
Tehsil :Daskroi
Village :Timba
33Employment issues raised during Public Hearing and any air pollution due to proposed projectDistrict Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Fuel Briquettes fired boiler0.8 TPH
(2.)Cooling Towers150 TR
(3.)D.G. Set30 KVA
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)PVA Emulsion800OthersMT/MonthRoad
(2.)Synthetic wood Adhesive400OthersMT/MonthRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 1.25
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.175
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.625
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.08
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 1.2
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 1.2
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Vinyl acetate monomer4608Tons per AnnumDomesticRoad20 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2017 To 31 Dec 2017
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube26.620.126.360
(2.)SO2Micro Gram per Meter Cube14.910.114.980
(3.)OthersNH3Micro Gram per Meter Cube361635.5400
(4.)PM10Micro Gram per Meter Cube63.550.363.3100
(5.)NOxMicro Gram per Meter Cube22.71822.780
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Chloridesmg/l145.9101.52501000
(2.)Fluoridemg/l0.30.211.5
(3.)TDSmg/l7204305002000
(4.)TSSmg/l0000
(5.)Total Hardnessmg/l310175200600
(6.)pHNA7.917.188.50
(7.)Heavy MetalsLeadmg/l0.010.010.010
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.957.32E
(2.)BODmg/l13.45.4E
(3.)DOmg/l5.44.9E
(4.)CODmg/l6524E
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))64.242.975
(2.)Leq(Night)A-weighted decibels(dB(A))50.335.870
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNA7.567.05
(2.)N(Nitrogen)Milligram per Kilogram1.391.15
(3.)K(Potassium)Milligram per Kilogram16.8212.32
(4.)Electric ConductivityOthersยต mhos245160.3
(5.)P(Phosphorus)Milligram per Kilogram12.54.58
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 22.32 To 3.11
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.34 To 22.87
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersDM Water34.1110Copy of Permission LettermodeOthersWater TankersOthersDM WaterGPCB/ABD/DSK/CCA-116/ID-5386306 Nov 201834.11
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Washings10Waste water will be reused back in the processReuse within the Plant & RecyclingWaste water will be reused back in the process1
(2.)Cooling tower Blow Down12Forced evaporation. Condensate reused in cooling tower makeupOthersFE system10
(3.)Boiler blowdown0.202Forced evaporation. Condensate reused in cooling tower makeupOthersFE system0.20
(4.)Domestic0.800Sent to septic tank followed by soak pit.OthersSent to septic tank followed by soak pit.0.80
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 3
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 3
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Raw material bagsOthersRaw material bags - 1800 No's/year1800Tons10RoadOthersGPCB authorized vendor
(2.)Empty BarrelsOthersEmpty Barrels - 1200 No's/year1200Tons10RoadOthersGPCB authorized vendor
(3.)FE SaltsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1.08Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
(4.)Ash from boilerFly Ash108Tons10RoadOthersSent to Brick manufacturers
(5.)Process Waste (Organic)Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.1Tons10RoadOthersCHWIF
(6.)Used OilIndustrial Waste0.05Kilolitre10RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube23.60.21.0224.6280
(2.)PM2.5Microgram per Meter Cube26.30.20.51626.81660
(3.)SO2Microgram per Meter Cube14.90.20.7715.6780
(4.)PM10Microgram per Meter Cube63.30.20.77464.074100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)BoilerFuel Briquettes110.5PM100.15
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 50
(b)Source GEB
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 30 KVA
(e)Stack Height (in m) 11
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0.186
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 0.186
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 22356.8
(b)Waste/Barren Land (ha.) 3297
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 2951.6
(e)Settlements (ha.) 1444.4
(f)Industrial (ha.) 1350.2
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : 0 0
    Total (ha.) 31400
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt0.064
(2.)OthersRoads / Open Area0.080
(3.)Built Up Area0.042
Total (ha.) 0.186
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNA0NA
(2.)NPA000
(3.)ESAs000
(4.)Critically Polluted Area000
(5.)Corridors000
(6.)ESZs000
(7.)Wildlife Corridors000
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological Sites000
(2.)Forest000
(3.)Defence Installations000
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.186
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Sabarmati River
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 1.60
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 20
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 300
(f)Total Manpower 20
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.0647
(b)Percentage of Total Project Area 34.78
(c)No. of Plants to be Planted 100
(d)Funds Allocated for Plantation 150000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Social? Proposed to establish drinking water RO plant for providing potable water to Timba village in 5 years period.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1821/RA 0100
(ii)Name of the EIA Consultant Rightsource Industrial Solutions Pvt. Ltd.
(iii)Address Plot No.203, H.No.S-36/203, Prashanthi Nagar, IDA Kukatpally Hyderabad- 500072, Telangana
(iv)Mobile No. 9885560011
(v)Landline No. 0402307060
(vi)Email Id eiaemp@rightsource.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 25 Feb 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAThis is in continuation to our earlier observations vide query dated 29/9/2018. Please confirm submission of the proposal to CGWA for ground water withdrawal of 34.11 cum/day. 01 Dec 2018
2.NAThe correction have been made as per the instruction received 01 Jan 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantKalpanaben S Jaithaliya
DesignationProprietress
Name of Company (Applicant Name should not be given here)RATANKAMAL INDUSTRIES
Address14 & 15 2ND Floor, Rudraksh Complex, Opp. Annapurna Hotel, Phase-I, GIDC, Vatva, Ahmedabad
Print